4. Connect the Cisco Routers and EA servers to the two TELCO(w/c is PLDT and Globe) according to the network diagram VISA
provided.
5. Called Sir Melvin Mancilla(VISA) to access and ping both Cisco Routers.
6. Trouble accessing Cisco Router B because there was an unstable connection occured in the other TELCO(Globe).
7. Called Globe for the immediate
Matt is now accesing the Cisco ASA and Perform Several Testing and Troubleshooting together with
MasterCard OCC and AT&T.
8. Testing ok !.9. Jeffrey, Matt Carl and Kanan told me to leave the site. activity is finished.
11.Nisha told us that we can now leave the site, activity is over.
Regards,