Page 1: CLIENT ENGINEERS INDIA LTD. NEW DELHI PROJECT …tenders.eil.co.in/newtenders/userdata/Doc_Repository/A307/RFQ/A307... · client: engineers india ltd. new delhi project: integrated

CLIENT : ENGINEERS INDIA LTD. NEW DELHIPROJECT : INTEGRATED REFINERY EXPANSION PROJECT AT KOCHI REFINERYSUBJECT : HIGH VELOCITY   SPRAY SYSTEM ON  TRANSFORMERS.

Sl. No. EIL DOC. NO. Clause No. Page No. Spec. Requirement Clarifications EIL Reply

1 A307-000-16-47-SP61,Rev. A 4 4 of 7 (134 of 388)

MATERIAL OF CONSTRUCTION

4.1 For non saline water serviceBody - Cast iron to IS:210 Gr. FG 260/ Cast SteelSeat/Clapper/ Rubber Clamp - Bronze to IS:318 LTB-IIDiaphragm spindle and hinged pin, bolts - SS 304

Test and drain valve,Installation stop valveoutlet valve & check valve - Cast Steel

Since the data sheet for Deluge Valve & type of water for fire fighting is not furnished with the tender specification ,we are considering Cast Iron MOC for Deluge as per Job Specification for Deluge Valve

MOC for Deluge valve shall be considered as Cast Steel

2 A307-000-16-47-SP61, Rev. A 5.6 5 of 7 (135 of 388)

In addition to above, a pressure transmitter shall be provided on the detection piping to give alarm at “Low pressure”. Low pressure alarm shall be set as per the job specific requirement. When fire occurs and deluge valve opens, the alarm shall be given in local control panel, fire station and control room/ SRR.

We have considered cable between Pressure Transmitter & DV Local Control Panel only.Further cabling from DVLCP to fire station and control room/SRR shall be provided by EIL.

Acceptable. Cabling form the vendor LCP to SRR/CR is in Purchaser's scope as per MR.

3 A307-000-16-47-SP61,Rev. A 7 of 7 (137 of 388)

Annexer - ASchematic for Deluge valve Skid

In this schematic Pressure Transmitter is indicated only on detection line, not on spray line down stream of DV (for DV open indication )Kindly confirm the requirement of no of Transmitter for each DV.

DV opening indication is indicated in the Schematic for Deluge valve Skid (Annexer - A) as ZSH/PSDL/ZIH

4 A307-000-16-47-SP-60 Rev. A 3.1 4 of 5 (141 of 388)

Detection Piping : A3A (as per PMS) This specification does not indicates service for detection system.Kindly confirm the requirement.

A3A to be used as per PMS

5 A307-000-16-47-SP-60 Rev. A 2.2.4 4 of 5 (141 of 388)

The deluge valve assembly shall comprise of solenoid valve, by pass valve, pressure switch,.....

Specification calls to provide Pressure Switch for DV ,However Job Specification for Deluge Valve Doc. No. A307-000-16-47-SP61,Rev.A,cl.no.5.6,pg 5 of 7 ) indicates Pressure Transmitter shall be provided in detection line of DV.Kindly confirm the requirement.

Pressure Transmitter shall be provided in detection line of DV.

6 A307-000-16-47-SP-60 Rev. A 3.1 5 of 5 (142 of 388)

All A/G fire water spray pipes shall be painted Fire Red confirming shade no.536 as per IS:5.

Kindly confirm the requirement of painting for G I Pipes.

Fire Red paint shade no.536 as per IS:5 shall be applied on GI pipes.

CLARIFICATION LIST - TECHNICAL

Page 2: CLIENT ENGINEERS INDIA LTD. NEW DELHI PROJECT …tenders.eil.co.in/newtenders/userdata/Doc_Repository/A307/RFQ/A307... · client: engineers india ltd. new delhi project: integrated

CLIENT : ENGINEERS INDIA LTD. NEW DELHIPROJECT : INTEGRATED REFINERY EXPANSION PROJECT AT KOCHI REFINERYSUBJECT : HIGH VELOCITY   SPRAY SYSTEM ON  TRANSFORMERS.

Sl. No. EIL DOC. NO. Clause No. Page No. Spec. Requirement Clarifications EIL Reply

CLARIFICATION LIST - TECHNICAL

7 A307-0IY-16-51-SP-1019, Rev. B

3.1 63of 13 (145 of 388)

All electronic field transmitters, solenoid valves, junction boxes, process switches shall be flame proof and shall be certified suitable for Zone-1 Gr IIA/B, Temp. Class T3 hazardous area classification by statutory body.

This clause indicates flame proof Solenoid Valve,where as clause no. 3.19 (pg 7 of 13) calls for ex-proof certified Solenoid Valve.Kindly confirm the requirement.

Confirmed. SOV shall be flameproof.

8 A307-0IY-16-51-SP-1019, Rev. B

3.18 6 of 13 (148 of 388)

Power supply (110 V AC (UPS ± 10%, 50Hz ± 3%) and / 230V AC 50Hz. 50Hz ± 3% shall be given at near the local control panel in the field by purchaser as required.Further conversion to different voltage levels using dual redundant power convertors & distribution shall be by vendor.

If it is 230 V AC power supply ,We have not considered any Battery back-up.Kindly confirm your requirement.

Vendor to follow MR. 110V AC UPS power supply shall be used for all Indication and Controls. 230VAC is only for panel illumination purpose, for which battery back up is not required as per MR.

9 A307-0IY-16-51-SP-1019, Rev-B

8 10 of 13 (152 of 388)

1.5 Mandatory spares shall be quoted as per the following table and price for the same shall be included in Lump sum Base price of the equipments:

As per the price format & as per job specification received, we need to provide mandatory spares (Mechanical items) for each transformer separately. Do we need to provide instrumentation Mandatory spares like Pressure Gauge,Pressure Transmitter etc. also for each transformer separately Kindly confirm.

Mandatory Spares shall be not considered Transformer wise. Vendor shall supply Mandatory spares (as per MR philosophy) for the whole package being supplied.

10 A307-000-16-47-SOW-50 Rev. A

1.2,b 4 of 7 (292 of 388)

Vendor shall supply deluge valve skid assembly, self contained, weatherproof enclosure,

This clause indicates deluge valve skid assembly,self contained, weatherproof enclosure, where as clause no.5.4 (pg 6 of 7) calls for Deluge valve housed with brick masonry walls (3 sides) and with RCC roof.Kindly confirm the requirement.

Deluge valve shall be Deluge valve skid assembly, self contained, weatherproof enclosure as per cl.1.2,b, doc. no. A307-000-16-47-SOW-50.

11 A307-000-16-47-SOW-50 Rev. A

7 4 of 7 (292 of 388)

LIST OF STANDARDS, SPECIFICATIONS & DRAWINGS

7.3 List of Job Specifications4.Job Specification for Cement Lined piping A307-6-44-0074

This clause calls to refer Job Specification for Cement Lined piping,where as Scope of work does not indicates any requirement of Cement Lining for fire water pipes.Kindly confirm the requirement.

Cement Lined piping is required for pipe class A33Y as per PMS as indicated in schematic for Deluge valve Skid

Page 3: CLIENT ENGINEERS INDIA LTD. NEW DELHI PROJECT …tenders.eil.co.in/newtenders/userdata/Doc_Repository/A307/RFQ/A307... · client: engineers india ltd. new delhi project: integrated

Bidder’s Query & EIL Clarification for HV/MV Transformer System MR-8060 1.  Drawing Nos 1 456 00 50 846, Rev 03  , drawing title 50 MVA, 34.5/11 Kv Onan cooled generator transformer is applicable which transformers. There are no transformer tag numbers on this drawing.  EIL Reply : Transformer tags for which this drawing is applicable are TR‐GT1‐561, TR‐GT2‐561 & TR‐GT3‐561.  2. For drawing no  3GA‐22270 , General arrangement of transformer, sheet 2 of 2 is missing.  EIL Reply : Sheet 2 is not required as it shows only the legend and does not show any GA.  3. For drawing no  3GA‐22271 , General arrangement of transformer, sheet 2 of 2 is missing.   EIL Reply : Sheet 2 is not required as it shows only the legend and does not show any GA.  4.  For transformer TR‐EG3‐561 which drawing is applicable?  EIL Reply : Typical drawing is attached. Final drawing shall be furnished to the successful bidder.  5.  The location of tapping points for transformers is not indicated in drawings. How much distance is to be assumed.  EIL Reply : Tapping points for Transformer is near the respective substation main Firewater header only. For location of Firewater main header refer drg.no. A307‐0IY‐16‐47‐0302 & 0303 attached with bids. Final location of tapping shall be furnished to the successful bidder. 

Page 4: CLIENT ENGINEERS INDIA LTD. NEW DELHI PROJECT …tenders.eil.co.in/newtenders/userdata/Doc_Repository/A307/RFQ/A307... · client: engineers india ltd. new delhi project: integrated

Bidder’s Query & EIL Clarification for HV/MV Transformer System MR-8060

1) G.A. Drawings of Transformers showing elevation & plan view, whether Generator

Transformer / Station Transformer / Unit Transformers. Please also indicate the

capacity of the transformers.

EIL REPLY: All transformer GADs already provided in the MR. The transformer rating

has been specified in the title of the drawing.

2) The size/dimension of transformers i.e. height, length & width.

EIL REPLY: Transformer dimensions have been clearly indicated in the GAD.

 

Page 5: CLIENT ENGINEERS INDIA LTD. NEW DELHI PROJECT …tenders.eil.co.in/newtenders/userdata/Doc_Repository/A307/RFQ/A307... · client: engineers india ltd. new delhi project: integrated
Page 6: CLIENT ENGINEERS INDIA LTD. NEW DELHI PROJECT …tenders.eil.co.in/newtenders/userdata/Doc_Repository/A307/RFQ/A307... · client: engineers india ltd. new delhi project: integrated
girisha
Text Box
FOR REFERENCE ONLY