Table of Contents

�2

03

04

06

08

10

Introduction

Managerial Resources

Technical Capability

Completed Projects

Business References

Eight Ave Premier Clinic

ITS Tundra

Alberta Health Services

Calgary Lab Services

University of Calgary

Mayfair Diagnostics

Servus Credit Union

Alberta Treasury Branches

One Properties

12

12

13

15

16

17

21

21

25

Page 3: Click to go to table of contents

Introduction J R Contract Management Corp. is in the business of providing the best service possible in the execution of construction projects. Our focus is in Interior renovations, additions, building upgrades and stand-alone structures. We have extensive experience in completing work under Lump Sum, Construction Management and Design Building Contracts

Our work is performed to strict standards and pride of accomplishment. We have earned and continue to strive for a reputation of excellent service, quality work and return customers.

JR Contract Management Corp:

• Established and is financially sound with sufficient and adequate equipment, facilities and manpower to meet architect and owner requirements.

• Has the technical capability and experience to safely provide the services required with minimal delay or property loss.

• Consistently meets industry specifications and standards relative to the service provided.• Corrects any deficiencies at the end of the contract and throughout the warranty period.• Portrays a good public image in the course of performing work for the client and are courteous and

co-operative.• Will provide proof of membership in the Alberta Construction Safety Association and be registered

for a Certificate of Recognition.• Will provide proof that equipment and personnel meet the client’s safety and environmental

standards.• Have adequate controls in place to minimize environmental risks.

We are a licensed and bonded construction company and will assist you in obtaining the necessary permits and drawings required, as well as full supervision and guaranteeing any sub-trade work that may be required. We are prepared to bid or contract management according to your scope of work.

We look forward to hearing from you. Should you have any questions or comments please do not hesitate to contact us.

Yours truly,JR Contract Management Corp.

�3 Click to go to table of contents

Page 4: Click to go to table of contents

Managerial Resources

MANAGEMENT RESOURCES

J R Management Corp. is a small and highly professional organization that will exceed in providing the project the best Project Management Service that is available in the Calgary market.

OUR KEY PERSONNEL COMMITTED TO THE PROJECT WILL BE:

• Project Manager, Mr. Mike Jozsa

The project Manager has over 30 years experience in the construction industry and has an adept at integrating advanced technology into the construction environments. His technical expertise and insight of construction process offer the design team high value for problem solving, he is sensitive to the goals and aspirations of the entire design team, and is an advocate for maintaining the complete construction process and design process as intended throughout the entire project.

The project manager prepares, monitors and maintains timely schedules, cost controls and budgets for the key stakeholders and the project team. Item such as project status reports, meeting minutes contact list, resource and manpower requirements, cash flow requirements, forecasting current marketing conditions and future trends will also be provided as required. The project will manager will map out an overall project schedule using Microsoft Primavera Software. This detailed schedule will be updated every week to report on progress, and assist to resolving schedule challenges. Close attention to project scheduling ensures a smooth running project, and minimum of disputes.

�4 Click to go to table of contents

Page 5: Click to go to table of contents

• Site Superintendents, They will be committed 100% of the time to the project.

The construction superintendent shall bring his expertise as construction manager and implement his in depth understanding of the construction process, this is a tremendous resource for the project team. His diplomacy, extensive background and ability enable him to minimize conflict, optimize schedules, expedite administrative issues, maximize quality control, and cultivate team spirit during construction.

• J R Contract Management Corp. also has many full time carpenter and carpenter foremen that will augment the project work requirements as the project needs.

• J R Contract Management Corp. also has the ability to source and has open accounts at labour agencies. The superintendent can control the labor force to meet the needs of the project.

J R Contract Management Corp. specializes in construction management and general contracting and has in house employees to service each project from project managers, full superintendents, carpenters and labours all employed to the specific project they are assigned.

�5 Click to go to table of contents

Page 6: Click to go to table of contents

Technical Capability Project Management 

J R Contract Management Crop. is a small and highly professional organization that will exceed in providing the project the best Project Management Service that is available in Calgary. 

J R Contract Management Crop. monitors all aspects of the project with the most current computer project management and project scheduling systems and combined with long term practical experience we have developed a proven track record for completing projects on time and in budget. 

J R Contract Management Corp. utilizes the most up to date computerized accounting systems and is continuously monitored by a register accounting company. 

Interior and Exterior Construction

J R Contract Management Corp. has been in business in Calgary for Thirty years. J R Contract Management Corp. educated staff has extensive experienced in tenant improvements, major building renovations, standalone buildings, hospital, industrial and civil projects. Please review the list of projects attached. Our staff has experience in working on large construction project in Western Europe and throughout Canada. Our work history is vast and our eye on the detail will demonstrate such. J R Contract Management works on all projects, many from conception to completion and all projects receive the same attention regardless of the size. 

Project Methodology

J R Contract Management Corp. has experienced full time superintendents dedicated to each project. Every aspect of the project is monitored with the hands on care of the old-school, combined with the most current computer project management and project scheduling systems, we know and can report on any facet of the project at any time. We combine long-term practical experience with the latest education and newest management tools and have developed a proven track record completing projects on time and in budget.

J R Contract Management Corp. will carry out continuous design budgeting exercises utilizing the current market place and be in complete control of project cost related to design and schedule at any stage in the project.

Milestones

The project team identifies the needs of the project. Combined with the calendar restraints, tenant/building owners commitments and end user timelines all combine to establish the project milestones. The milestones are prioritized and the design , cost engineering, project management and owner all work to the common goals.

�6 Click to go to table of contents

Page 7: Click to go to table of contents

Method for Tendering

J R Contract Management Corp. has and will utilize all available resources, to advertise each and every tender call for the best exposure to receive competitive sub-trades. The resources available to the team are the internet tendering systems, the Alberta construction associations, and J R ’s own broad spectrum win fax computer system set up for tender each and every trade required.

Methods for Scheduling

J R Contract Management Corp. monitors all aspects of the project with the most current computer project management and project scheduling systems. At present our educated staff is utilizing the Sure Track construction scheduling program, which is an improved construction management programme written by primavera systems.

Progress Reporting

A progress report, in the format approved by the owner, will be issued at the end of each week of project. Accompanying the manager’s weekly report will be the meeting minutes from the weekly sub-trade coordination meetings and the meeting minutes from the owner consultants bi-weekly meetings.

�7 Click to go to table of contents

Page 8: Click to go to table of contents

Completed Projects

LIST OF SOME PROJECTS COMPLETED IN THE LAST FEW YEARS.

J R Contract Management Corp. would be happy to expand on all or any of the projects note below with contacts, dollar values or other particulars that might be interesting.  PROJECTS: TD Bank Crowfoot Village Mall Alberta Treasury Branch – Marda loop Branch 2140

– 34th Ave. SW

U of C, Bio-Sciences Building  U of C – Earth Science Building Gallagher Library 

Canadian Imperial Bank Commerce Building, Main Street Nanton Alberta

The University of Calgary – Risk Management MacEwan Hall 

AGT Building Design and Construction, 7th Floor AGT Tower

Chiropractic Health Care Centre, 2nd Floor, 1000 – 5th Ave SW

Alberta Vocational College  Bakie Minarak Petroleum, 13th Floor Dome Tower

EMS Geo-post, 4th Street & McKnight Boulevard  Calgary Regional Health Authority, MacLeod Place One IT Technical Dept.

Alberta Fish and Wildlife, New Branch for Licensing and Maps 

Canada Trust Branch #397, Heritage Plaza 8330 – MacLeod Trail

Manulife Real Estate, Nu-West Building Retrofit for AGT

Canada Trust Branch #171, 1029 – 17th Ave SW 

RCMP Special Investigation Unit, Stockmen’s Centre

Calgary Regional Health Authority, Centre 15 - 4th and 5th floor renovation.

Bantrel Building Health Tech – fitness club in First Canadian Place 

La Chaumiere Restaurant 139 – 17 Avenue SW MicroAge

Midas Muffler Shop Addition Chromacolour

Terra Court Condominiums, 1625 – 15 Avenue SW Chromacolour Phase II

Selef Auto Horizon Centre, 3378 –32 Street NE Calgary Petroleum Club

Ruffneck Heaters 2827 – 18th Street NE  Bow Valley College

Alberta Treasury Branch – MacLeod Village Mall 4610 MacLeod Trail

Calgary Regional Health Authority, Office fire damages.

�8 Click to go to table of contents

Page 9: Click to go to table of contents

Calgary Regional Health Authority, Office fire damages.

Sunlife Warehouse

Calgary Regional Health Authority, Haysboro clinic CRHA Holly Cross

Calgary Regional Health Authority, Material Warehouse

Telus 7th Avenue Building

ClearNet PCS CRHA Mac Place

Microage Phase two CRHA Pembina Place

Calgary Regional Health Authority, 10th Avenue Symcor 1010

J R Contract’s own office Calgary Labs

Calgary Petroleum Club – Cardium Room Manulife

Jubilee Auditorium – replace stage flooring Elbow Drive Dry Cleaners

Harper tire – Office renovation Health Plus CLS

Calgary Regional Health Authority, Office renovation

Igloo Erectors

Altius Center + 15 Conference centre and shower facility

CRHA MVB site

PLM Railcar Management Service office Remo. CRHA Family Therapy

Distress Centre CHR Rockyview Chapel

Mental Health Clinic, High River CHR MacLeod Place

Meeting Facility, Alberta Infrastructure CHR Sunridge

Fishman’s Cleaners Manulife Disabilities

e-Energy First Seventeen Place

Razors Edge barber shop Frozen Ocean

Village Chiropractic Clinic, Camrose Alberta H & H Care

Blackburn Warehouse CLS Marlborough

Pockar Park Crossfield tourist centre

Symcor Rockyview nurse stations 54 & 57

Ideaca CHR Sunridge

Clarence Samson School Climbing Wall Cumming Residence

ATB North Hill Narland Macloed trail

Manulife Financial Sandex

Wescorp Mortgage CHR 8th & 8th 

�9 Click to go to table of contents

Page 10: Click to go to table of contents

Business References

J R Contract Management Corp. has had the privilege to work with many Architects, Interior Designers, Property Managers and Owners. This exposure has given us the opportunity to show our professionalism and successes throughout the city. Our true accomplishments speak for themselves.

The true success of J R Contract Management Corp. has been derived from 30 years of experience. These years within the industry, allow our clients to experience a project from start to finish with confidence and ease. J R Contract Management Corp. strives to deliver the best-scheduled time and budget costs for each individual project. We have worked hard to establish solid, confident and trusting relationships with each client

PLEASE REFER TO THE FOLLOWING BUSINESS REFERENCES

Dr. Karim Surani Premier Medical Clinics 403-408-7705

Manny Mangat ITS Tundra 403-255-5222

Dean Melnick Abugov Kaspar Architects 237-9227

Jim Strome Alberta Health Services 943-0928

Beverly Wilson Alberta Health Services 943-0529

Michael McKerrow Alberta Infrastructure 297-2992

Ron Rutledge Alberta Treasury Branch 1-780-408-7003

Paul Bezooyen  BCMP Architects 262-9733

Gary Milton BCMP Architects 262-9733

Charl Johnson BKDI Architects 262-9733

Brian Mills Calgary Laboratory Services 770-3324

Alex MaColm CB Commercial 263-4444

Barry Macdonald CB Commercial 263-4444

Frank Oliverio CB Commercial 263-4444

Dave Coupland Coupland Kraemer Architects 269-7109

Alan Benson Coupland Kraemer Architects 269-7109

Carl Fransen CRESA Partners 571-8220

Dennise Bathory Dennise Bathory 229-9222

Drew Olsen Design Dialog 245-5501

�10 Click to go to table of contents

Page 11: Click to go to table of contents

Glen Olmstead Design Dialog 245-5501

Sean Maclean Design Dialog 245-5501

Lyle Hallett Hallett Architects Ltd 247-2404

Dan Howell    Howell Associates Interior Design 269-8267

Keith Moe  Karo Group 266-4094

Karen Iredale Martens Group 264-1818

Sharon Marten Martens Group 264-1818

David Pidgeon O & Y Enterprise 205-7401

Bruce Mckenzie Poon McKenzie Architects Ltd 264-4000

Scott Macdonald Qualico Developments 253-3311

Mark Sevcik Radiology Consultants 301-4528

Rick Balbi Rick Balbi Architects 253-2853

Paul Beaty Riddell Kurczaba Architects 266-2100

Rick Scarff  RS & A Interior Design Inc. 264-2799

Peter Bradshaw S2 Architecture 670-7000

Holly Shearer Shearer Design 264-7756

Sean Crawford Shearer Design 264-7756

Candace Shortland Shearer Design 264-7756

Gorgi Sizeland Sizeland Evans Interior Design 266-2110

Michele Gunn Sizeland Evans Interior Design 266-2110

Ben Weggs Stantec Architecture 716-8000

Rick Legge Sunlife Financial 269-8384

Simone Sable Symcor 1-905-273-1163

Larry Magnusson Symcor 216-4906

Peter Lavaditis The LaCaille Group 262-6262

Tom Eger WAM Development Group 1-780-498-8904

�11 Click to go to table of contents

Page 12: Click to go to table of contents

Projects Details

8TH AVENUE MEDICAL CLINICS AND SETON MEDICAL CLINICS MEDICAL CLINIC DENTAL CLINIC OPTICAL CLINIC MEDIDERM SPA CLINIC PHARMACY PROJECT COMPLETION COST $2,897,423.00

This project was to construct all the clinics as noted above, at the 2 sites. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines. Also the details to ensure each clinic was uniquely displayed to show their products and Logo. This project required very stringent direction from the General Contractor to ensure all correspondences from Mechanical / Electrical Engineers was relayed to the Sub-Trades on a timely and fashionable manor so as not to impede the construction schedule.

Contact: Dr. Karim Surani Premier Medical Clinics (403) 408-7705 Chuck Smith Smith & Co.Design (403) 850-2711

ITS TUNDRA INTEGRATED THERMAL SOLUTIONS PROJECT COMPLETION COST $1,263,482.00

This project was to renovate the existing space in 2 buildings occupied by ITS Tundra. The systems furniture was very extensive with special detail to Voice / Data and Electrical requirements, the project was also very detailed with Altos glass wall systems and sound baffling above all partitions. JR Contract Management had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction scheduled as issued, the requirement for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines.

Contact: Manny Mangat ITS Tundra (403) 255-5222

�12 Click to go to table of contents

Page 13: Click to go to table of contents

HOMECARE DECENTRALIZATION PROJECTS: MVB PARKDALE SITE MACLEOD PLACE SUNRIDGE PROFESSIONAL CENTRE APPROXIMATE VALUE $2,2000,000.00

This project was to construct facilities for the three separate locations as noted above , this was a Construction Management Contract that had a nine-week dead line to relocate Home-care from three separate locations. The scope of work had very extensive electrical and data / communications as set by AHS ITS Infrastructure, The requirements for security were also very detailed as they had to be linked with Peter Lougheed Hospital and The Foothills Hospital , the emphasis for JR Contract Management was to ensure quality control and standards were not jeopardized with this fast track approach.   Contact: Jim Strome Alberta Health Services (403) 943-0928 Beverly Wilson Alberta Health Services (403) 943-0923

ADOLESCENT DAY TREATMENT FACILITY: HOLLY CROSS CENTRE APPROXIMATELY VALUE $865,000.00  This project was to construct a facility with special detail in sound proofing and audio visual equipment for observation rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all observation rooms for the therapists, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contact: Jim Strome Alberta Health Services (403) 943-0928 Alan Benson Coupland Kraemer (403) 269-7109

FAMILY THERAPY CLINIC: HOLLY CROSS CENTRE APPROXIMATELY VALUE $550,000.00

This project was very similar in design and scope of work as outlined above for the AHS Adolescent Day Treatment Program with respect to sound proofing and audio visual equipment , also attention was focused on IT requirements with future capability for fibre optics link for all data / communications as set forth by CHR IT department  Contact: Jim Strome Alberta Health Services (403) 943-0928 Alan Benson Coupland Kraemer (403) 269-7109

�13 Click to go to table of contents

Page 14: Click to go to table of contents

SURGICAL SUPPLIES WAREHOUSE: 1115-55TH AVENUE N.E. APPROXIMATE VALUE $725,000.00

This project was to facilitate the operation that warehouses all supplies for the hospital sites with special requirements to implement the IT Requirements to integrate this site with all the hospital sites on a fibre optics link with requirements to link with hub used by all vendors and suppliers on this system , the challenge was to develop a system with AHS IT Infrastructure that was compatible with systems implemented on the hospital sites in a warehouse environment, In addition to developing 20,000 square foot paint application on the floor that would stand up to the traffic of 24hour use and forklift as requested by the user group   Contact: Jim Strome AHS Planning Development (403) 943-0928

COURTYARD BUILDING DATA UPGRADE: COURTYARD BUILDING 17TH AVENUE S.W. APPROXIMATE VALUE$639.000.00

This project entailed the implementation of a complete data / communications upgrade to the entire building , as per the scope of work as outlined by AHS IT Infrastructure the building had to be equipped with data tray through out and all new wiring installed for data/communications, the project had to take into consideration the sensitive nature for this scope of work as the users occupied the building and construction could not impede their operation , the phones could not be disconnected ant any time during construction as this was the Home-care Department.  Contact: Jim Strome Alberta Health Services (403) 943-0928 Dan Howell Howell Associates (403) 269-8267

4 & 5 & Main Floor CENTRE FIFTEEN 1501 CENTRE STREET SOUTH APPROXIMATE VALUE $823,000.00 

This project was to construct 40,000 square feet of office space , complete demolition, build out tenant improvements inclusive of new acoustical ceiling tiles and grid system , the scope entailed very extensive electrical and data/communications with all floors linked to a common logistical room on the main floor and security system also linked to the main floor, JR Contract had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction schedule.   Contacts: Ed Mercier Alberta Health Services (403) 943-0924 Jim Strome Alberta Health Services (403) 943-0919 Michelle Gun Sizeland Evans Interior (403) 266-2110 

�14 Click to go to table of contents

Page 15: Click to go to table of contents

CALGARY LABORATORY SERVICES HEALTH PLUS CLS HEALTH PLUS 290 MIDPARK WAY S.E. APPROXIMATE VALUE $210,000.00  This project was to refurbish an existing clinic at the above noted location , the emphasis on this project was to construct new facility with the clinic to remain operational at all times during construction , JR Contract had to schedule all deliveries and sub-trades so as not to interfere with the operation of the clinic and patients , this was achieved by a very detailed construction and monitored daily by JR Contract Management to ensure the quality control was not jeopardized by the after hours operation of construction as required by the construction scheduled as issued  Contacts: Leslie Laurie Calgary Lab Services (403) 209-5214 Charl Johnston BKDI Architects (403) 233-2525 

CALGARY LABORATORY SERVICES MARLBOROUGH: CALGARY LABS MARLBOROUGH PROFESSIONAL CENTRE APPROXIMATE VALUE $380,000.00

This project was to facilitate a new laboratory in the existing location of CLS , the complexity of this project was the Asbestos abatement removal and coordination with the landlord and other tenants in the building , Special safety program was enforced to the requirements of CLS Occupational Health for the renovation to Laboratory processing areas as requested , this project had very extensive millwork detailing and construction details as set forth by the Architect , quality control was maintained throughout all aspects of the construction process.  Contacts: Leslie Laurie Calgary Lab Services (403) 209-5214 Charl Johnson BKDI Architects (403) 233-2525

�15 Click to go to table of contents

Page 16: Click to go to table of contents

UNIVERSITY OF CALGARY BIO SCIENCE LABORATORY: THIRD FLOOR BIO-SCIENCES BUILDING APPROXIMATE VALUE $725,000.00

 This project was to construct seven Class C Laboratories complete with 14 versa-lab stations in each class room, the project was very complex in mechanical / electrical as the existing site condition was built out to accommodate only office space, the existing mechanical system had to be totally revamped to accommodate the labs and fume hoods in each class room , This project required very stringent direction from the general contractor to ensure all correspondences from the Mechanical / Electrical Engineers was relayed to the sub-trades on a timely and fashionable manor so as not to impede the construction schedule   Contacts: Brent Johnson University Of Calgary (403) 220-4124 Otto Macko Hutchinson Architects (403) 228-9307

UNIVERSITY OF CALGARY RISK MANAGEMENT / SECURITY: LOWER LEVEL MACEWAN HALL APPROXIMATE VALUE $450,000.00  This project was to construct new offices for the campus security; the project entailed a dispatch monitoring room with a computer console networked with eighteen cameras on campus. The electrical / data communications and mechanical were very extensive with great detail and co-ordination of mechanical / electrical in ceiling space. As the ceiling grid allowed 2” clearance to all equipment.  Contacts: John McDermot University Of Calgary (404) 221-4126 Hank Brezinski Hutchinson Architects (403) 228-9307 UNIVERSITY OF CALGARY GALLAGHER LIBRARY: EARTH SCIENCES BUILDING APPROXIMATE VALUE $329,000.00  This project was to construct a new inter connecting stair well to the basement and build out 10.000 square feet in the basement to library space. This entailed removing a section of the existing pan slab and support with structural steel as required for metal stairs, the cast-in-place concrete was extensive in that the structural grade beams were cast in place concrete and tied into existing pan slab construction.  Contacts: John Mcdermot University Of Calgary (403) 221-4126 David Iisey Hutchinson Architects (403) 228-9307 

�16 Click to go to table of contents

Page 17: Click to go to table of contents

RILEY PARK PLACE COMPLETION FOR FEBRUARY 2ND 2012 1414-8TH AVENUE N.W.  PROJECT COMPLETION COST $1,189,000.00  This project was to construct a new 4,800 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the X-Ray room , the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik   Mayfair Diagnostics (403) 301-4528 Keith Moe KARo Group (403) 266-4094

ASPEN LANDING NEW CLINIC 105 339 ASPEN GLEN LANDING S.W.  PROJECT COMPLETION COST $1,164,000.00  This project was to construct a new 5,183 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the X-Ray room , the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Sharon Marten Martens Group (403) 264-1818

CASTLERIDGE PLAZA NEW CLINIC 55 CASTLERIDGE BLVD N.W. PROJECT COMPLETION COST $1,378.000.00  This project was to construct a new 9,348 square foot X-ray facility with special detail in soundproofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Nuclear Med and X-Ray room , the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines

Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Holly Shearer Shearer Interior Design (403) 264-7756

�17 Click to go to table of contents

Page 18: Click to go to table of contents

CROWFOOT VILLAGE NEW CLINIC 401 CROWFOOT BUSINESS CENTRE PROJECT COMPLETION COST $798,000.00  This project was to construct a new 4,739 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Bone Density Equipment , the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik   Radiology Consultants Associated (403) 301-4528 Rick Balbi Rick Balbi Architect Ltd. (403) 253-2853

SUNPARK PLAZA NEW CLINIC #40 SUNPARK PLAZA S.E. PROJECT COMPLETION COST $842,000.0  This project was to construct a new 4,531 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Mamo Gram Machines and the X-Ray Room, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik   Mayfair Diagnostics (403) 301-4528                          SOUTH CENTRE MALL COMPLETE RENOVATION 177 SOUTH CENTRE MALL S.E. PROJECT COMPLETION COST $1,245,000.00  This project was to construct a new 4,739 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Mammogram Equipment and the X-Ray Room , the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545 WESTBROOK COMPLETE RENOVATION 200 WESTBROOK PROFESSIONAL BLDG PROJECT COMPLETION COST $687,000.00   This project was to construct a new 4,739 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Mammogram Equipment and the X-Ray Room , the

�18 Click to go to table of contents

Page 19: Click to go to table of contents

requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545 EATON CENTRE COMPLETE RENOVATION 4178 CALGARY EATON CENTRE PROJECT COMPLETION COST $645,000.00  This project was to completely renovate the existing clinic approximately 3,911 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Bone Density Equipment and Mammogram Machines, the requirements for specialty construction were detailed in every aspect of construction as set forth by the RCA and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545

MARKET MALL PROFESSIONAL CENTRE COMPLETE RENOVATION 333 4935-40TH AVENUE N.W. PROJECT COMPLETION COST $732,000.00  This project was to completely renovate the existing clinic approximately 6,398 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the X-ray Room , the requirements for specialty construction were detailed in every aspect of construction as set forth by the RCA and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545

EATON CENTRE COMPLETE RENOVATION 4178 CALGARY EATON CENTRE PROJECT COMPLETION COST $645,000.00   This project was to completely renovate the existing clinic approximately 3,911 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Bone Density Equipment , the requirements for specialty construction were detailed in every aspect of construction as set forth by the RCA and details issued by JR Contract Management in order to maintain quality control and time lines   Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545

�19 Click to go to table of contents

Page 20: Click to go to table of contents

 MAYFAIR PLAZA X-RAY CLINIC COMPLETE RENOVATION 110 MAYFAIR PLACE PROJECT COMPLETION COST $532,000.00  This project was to completely renovate the existing clinic approximately 6,959 square foot X-ray facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the different types of X-ray equipment with special detail for the Bone Density Equipment and X-Ray Room, the requirements for specialty construction were detailed in every aspect of construction as set forth by the RCA and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545

MAYFAIR PLAZA NUCLEAR MEDICINE CLINIC  NEW CONSTRUCTION 110 MAYFAIR PLACE PROJECT COMPLETION COST $618,000.00  This project was to completely renovate the existing clinic approximately 2,363 square foot Nuclear Medicine facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the Nuclear Medicine X-Ray Machines, the requirements for specialty construction were detailed in every aspect of construction as set forth by the RCA and details issued by JR Contract Management in order to maintain quality control and time lines   Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545  MAYFAIR PLAZA VASCULAR LABORATORY NEW CONSTRUCTION 110 MAYFAIR PLACE PROJECT COMPLETION COST $280,000.00

This project was to completely renovate the existing clinic approximately 1,229 square foot Vascular Laboratory facility with special detail in sound proofing for all exam rooms, the requirements were very detailed in order to maintain control of speciality lighting , and sound emission controls for all rooms for the Technicians and Radiologist, the Mechanical and Electrical was very extensive and detailed to accommodate the Laboratory Equipment, the requirements for specialty construction were detailed in every aspect of construction as set forth by the RCA and details issued by JR Contract Management in order to maintain quality control and time lines   Contacts: Mark Sevcik    Mayfair Diagnostics (403) 301-4528 Debra Coppens Mayfair Diagnostics (403) 301-4545

�20 Click to go to table of contents

Page 21: Click to go to table of contents

SERVUS CREDIT UNION 1328-9TH AVENUE S.W. EXTENSIVE RENOVATION PROJECT COMPLETION COST $1,228,000.00  This project was to Renovate the existing 12,000 square Branch , complete demolition of the entire building. The scope included very extensive detailed drywall ceilings and partitions not standard in constructing office space , also the attention and detail to millwork was the bulk of the project to ensure the Designers vision was completely transferred from the construction drawings to the millwork shop and then installed on site. Staging of the construction and schedule was very important to ensure all dates were completed on time as per the schedule submitted by JR Contract Management, as the client was temporarily commissioned to operate the bank form the basement.  Contacts: Melanie Anderson    Servus Credit Union (403) 265-5396 Charles Smith Smith & Co (403) 263-8114

STAMPEDE STATION BRANCH NEW BRANCH 5,150 SQUARE FEET PROJECT COMPLETION COST $598,000.00  This project was for the construction of a new branch in an existing building, Stampede Station. The millwork for this branch was very detailed and Extensive as the ceiling was an open concept with floating wood rafters through out the branch. The detail for the Glass Altos wall system was also very detailed to blend in with the over all design. A Concrete bank Vault was also constructed with in the branch along with a new vault for the 24-hour bank machines. The detail for the IT room was specific for security and all equipment as supplied by Alberta Treasury Branches. The detail for the bank teller was very extensive with granite tops and Electrical detail for alarms and data. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003 Keith Moe KARo Group (403) 266-4094

SAIT CAMPUS BRANCH NEW BRANCH 2,734 SQUARE FEET PROJECT COMPLETION COST $289,000.00  This project was for the construction of a new branch in an existing building on the Sait Campus. This branch was very unique as the Design was intended for Collage Students. The design was very specific with interactive TV monitors through out the branch tied into the IT Vault. This branch was unique as the rubber flooring was carried up the back wall and onto a floating bulkhead aligning over top of the Teller Counter. The detail for the Glass Altos wall system was also very detailed to blend in with the over all design. The detail for the IT room was specific for security and all equipment as supplied by Alberta Treasury Branches. The requirements for specialty construction were detailed in

�21 Click to go to table of contents

Page 22: Click to go to table of contents

every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003 Keith Moe KARo Group (403) 266-4094

MARDA LOOP BRANCH NEW BRANCH 6,400 SQUARE FEET PROJECT COMPLETION COST $598,000.00   This project was for the construction of a new branch in an existing building in Marda Loop. A Concrete bank Vault was also constructed with in the branch along with a new vault for the bank 24 hour bank machines. The detail for the IT room was specific for security and all equipment as supplied by Alberta Treasury Branches. The detail for the bank teller was very extensive with granite tops and Electrical detail for alarms and data. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

MAIN BRANCH STEPHEN AVENUE MALL THREE PROJECTS IN 2 YEARS PROJECT COMPLETION COST $687,000.00   This project consisted of three separate projects for renovations to Main Branch Stephen Avenue Mall. The first phase was for the 2nd floor renovations to the Executive offices .The second phase was for the complete rebuild of the 3rd floor mortgage department. The third phase was for the reconstruction of the main teller and Cash cage. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003 Ben Weggs Stantec (403) 716-8000

16TH AVENUE N.E. BRANCH COMPLETE BRANCH RENOVATION 8,389 SQUARE FEET PROJECT COMPLETION COST $897,000.00   This project was for a complete renovation to the existing branch at 16th Avenue N.E. Branch.These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003 Dennis Bathory Bathory Associates (403) 229-9222

WESTHILLS BRANCH COMPLETE BRANCH RENOVATION 5,389 SQUARE FEET PROJECT COMPLETION COST $423,000.00   

�22 Click to go to table of contents

Page 23: Click to go to table of contents

This project was for a complete renovation to the existing branch at Westhills Branch.These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003 Dennis Bathory Bathory Associates ( 403) 229

WESTHILLS BRANCH PHASE TWO PARTIAL BRANCH RENOVATION 5,389 SQUARE FEET PROJECT COMPLETION COST $67,376.00  This project was for a Partial renovation to the existing branch at Westhills Phase Two. These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

BLACK DIAMOND BRANCH COMPLETE BRANCH RENOVATION 4,389 SQUARE FEET PROJECT COMPLETION COST $389,000.00   This project was for a complete renovation to the existing branch in Black Diamond. These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

SUNRIDGE MALL BRANCH COMPLETE BRANCH RENOVATION 2,389 SQUARE FEET PROJECT COMPLETION COST $289,000.00  This project was for a complete renovation to the existing branch at Sunridge Mall. These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

�23 Click to go to table of contents

Page 24: Click to go to table of contents

FIFTH AVENUE PLACE BRANCH PARTIAL BRANCH RENOVATION 4,209 SQUARE FEET PROJECT COMPLETION COST $110,000.00  This project was for a Partial renovation to the existing branch at Fifth Avenue Place.These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines 

Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

DOUGLAS DALE BRANCH PARTIAL BRANCH RENOVATION 3,278 SQUARE FEET PROJECT COMPLETION COST $86,500.00   This project was for a Partial renovation to the existing branch at Douglas Dale.These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

WESTPOINT BRANCH PARTIAL BRANCH RENOVATION 2,312 SQUARE FEET PROJECT COMPLETION COST $45,200.00  This project was for a Partial renovation to the existing branch at Westpoint. These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003 BRENTWOOD MALL BRANCH PARTIAL BRANCH RENOVATION 3,156 SQUARE FEET PROJECT COMPLETION COST $92,234.00  This project was for a Partial renovation to the existing branch at Brentwood Mall. These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines   Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

�24 Click to go to table of contents

Page 25: Click to go to table of contents

FOREST LAWN BRANCH PARTIAL BRANCH RENOVATION 4,190 SQUARE FEET PROJECT COMPLETION COST $116,000.00   This project was for a Partial renovation to the existing branch at Forest Lawn. These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

NORTH POINT BRANCH PARTIAL BRANCH RENOVATION 2,987.00 SQUARE FEET PROJECT COMPLETION COST $71,876.00   This project was for a Partial renovation to the existing branch at North Piont. These renovations were very extensive and every detail was implemented to ensure the branch is fully operational at all time during construction. JR Contract Management employed the services of a professional cleaning company to clean the branch each evening after the construction crews have completed their shift to ensure the branch was clean and fully operational each morning. The requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Ron Rutledge    Alberta Treasury Branches (780) 408-7003

STONEY INDUSTRIAL PARK BUILDING 4, WAL-MART COMPLETED AUGUST 2012 PROJECT COMPLETION COST $580,000.00   This project was to construct a new 5,800 square foot office facility with in one corner of the 490,000square foot complex. Complete build out tenant improvements inclusive of new acoustical ceiling tiles and grid system , Complete with a one hour rated demising wall to separate the warehouse from the office space , the systems furniture was very extensive with special detail to Voice / Data and Electrical requirements, the project was also very detailed with the Altos glass wall systems and sound baffling above all partitions, JR Contract had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction schedule, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines 

�25 Click to go to table of contents

Page 26: Click to go to table of contents

Contacts: Tom Eager     One Properties (780) 498-8904 Michael Guise Mode Interior Design (403) 263-7871

STONEY INDUSTRIAL PARK BUILDING 3, PREMIER PERFORMANCE COMPLETED JUNE 2012 PROJECT COMPLETION COST $240,000.00  This project was to construct a 2,800 square foot office space . Complete build out tenant improvements inclusive of new acoustical ceiling tiles and grid system Washrooms complete with lockers and a large meeting room with extensive audio visual equipment operated from the board room table, Complete with one hour rated demising wall to separate the Warehouse from the office space, JR Contract had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction schedule, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Tom Eager     One Properties (780) 498-8904 Michael Guise Mode Interior Design (403) 263-7871

STONEY INDUSTRIAL PARK BUILDING 3, CLEAR ONE SPORTS COMPLETED AUGUST 2011 PROJECT COMPLETION COST $598,000.00  This project was to construct a new 4,500 square foot office and retail facility along with Ten Tennis courts complete with hardwood flooring for the remainder of the warehouse space. Complete build out tenant improvements inclusive of new acoustical ceiling tiles and grid system Washrooms complete with change room and lockers, Complete with one hour rated demising wall to separate the Tennis Courts from the office space, JR Contract had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction schedule, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Tom Eager     One Properties (780) 498-8904 Krista Bruce Studio K Design Group (403) 861-0387

STONEY INDUSTRIAL PARK BUILDING 3, AMJ CAMPBELL EXPANSION COMPLETED JULY 2011 PROJECT COMPLETION COST $180,000.00  This project was to construct a 1,400 square foot office space . Complete build out tenant improvements inclusive of new acoustical ceiling tiles and grid system Washrooms facilities for one Men’s and One Women’s , Complete with one hour rated demising wall to separate the Warehouse from the office space, JR Contract had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction schedule, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Tom Eager     One Properties (780) 498-8904 Krista Bruce Studio K Design Group (403) 861-0387

�26 Click to go to table of contents

Page 27: Click to go to table of contents

STONEY INDUSTRIAL PARK BUILDING 2, WHIRLPOOL CANADA   COMPLETED JULY 2008 PROJECT COMPLETION COST $687,000.00   This project was to construct a new 5,200 square foot office facility with in one corner of the 490,000 square foot complex, Also to construct a 800 square foot shipping office in the middle of the warehouse complete with exit stairs for the Truck Drivers to enter the shipping office , Complete build out tenant improvements inclusive of new acoustical ceiling tiles and grid system , Washrooms complete with lockers and a large meeting room with extensive audio visual equipment operated from the board room table, Complete with a one hour rated demising wall to separate the warehouse from the office space , the systems furniture was very extensive with special detail to Voice / Data and Electrical requirements, the project was also very detailed with the Altos glass wall systems and sound baffling above all partitions, JR Contract had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction schedule, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Tom Eager     One Properties (780) 498-8904 Drew Campbell DIALOG Design (403) 541-5500

STONEY INDUSTRIAL PARK BUILDING 2, HARMONY LOGISTICS COMPLETED NOVEMBER 2008 PROJECT COMPLETION COST $1,205,000.00  This project was to construct a new 9,200 square foot office facility with in one corner of the 490,000 square foot complex, Also to construct a 1200 square foot shipping office in the middle of the warehouse complete with exit stairs for the Truck Drivers to enter the shipping office , The Main server room was built with a complete back up generator as this was the server room for all of the Canadian operations Complete build out tenant improvements inclusive of new acoustical ceiling tiles and grid system , Washrooms complete with lockers and a large meeting room with extensive audio visual equipment operated from the board room table, Complete with a one hour rated demising wall to separate the warehouse from the office space , the systems furniture was very extensive with special detail to Voice / Data and Electrical requirements, the project was also very detailed with the Altos glass wall systems and sound baffling above all partitions, JR Contract had to maintain and coordinate security / IT Infrastructure requirements at all times and ensure all information was delivered in timely and suitable fashion to all parties concerned so as to meet the construction schedule, the requirements for specialty construction were detailed in every aspect of construction as set forth by the Architect and details issued by JR Contract Management in order to maintain quality control and time lines  Contacts: Tom Eager     One Properties (780) 498-8904 Drew Campbell DIALOG Design (403) 541-5500

Brochure Developed by: Korvo Vr Solutions [email protected] Tel: 403-775-0579