cleveland ave s villard ave - saint paul, minnesota · villard ave colette pl ford site 1 scale...
TRANSCRIPT
84
4613
4
Existing walk/bike access
Existing walk/bike access144’ ROW
100’ ROW
123’ ROW
space for future uses such as green infrastructure, transportation, park, or other options
140’ ROW
10’12’2’ 2’bikeway walkway
min clear zone
1
Segment One: Ford Site to Prior AveFord Spur Corridor Alignment ConceptsTrail OnlyAugust 29, 2017 Open House
46
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed Trail
CLEV
ELA
ND
AVE
SSAINT PAUL AVE
RETU
RN C
T
RAMLOW PL
WORCESTER AVEWORCESTER AVE
VILLARD AVE
COLE
TTE
PL
Ford Site
1
SCALE FEET
0 100 200
84
4613
4
Existing walk/bike access
Existing walk/bike access144’ ROW
100’ ROW
123’ ROW
1
potential transit guideway2’2’28’2’ 10’12’ 2’
bikeway walkway
140’ ROW
FENCE OR VERTICAL BARRIER
min clear zone
Segment One: Ford Site to Prior AveFord Spur Corridor Alignment ConceptsTransit and TrailAugust 29, 2017 Open House
46
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed TrailPotential Transit
CLEV
ELA
ND
AVE
SSAINT PAUL AVE
RETU
RN C
T
RAMLOW PL
WORCESTER AVEWORCESTER AVE
VILLARD AVE
COLE
TTE
PL
Ford Site
1
SCALE FEET
0 100 200
84
46
54
436
134
134
134
46
46
84
84 8446
54436
Signalized crossing activated by people walking and biking.
Signalized crossing activated by people walking and biking.
Signalized crossing activated by people walking and biking.
98’ ROW150’ ROW
130’ ROW
Segment Two: Edgcumbe Rd to Alton StFord Spur Corridor Alignment ConceptsTrail OnlyAugust 29, 2017 Open House
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed Trail 46
2B
130’ ROW
space for future uses such as green infrastructure, transportation, park, or other
options
10’12’2’ 2’bikeway walkway
min clear zone
2A
10’12’2’ 2’space for future uses such as green
infrastructure, transportation, park, or other options
98’ ROW
bikeway walkway
min clear zone
SAINT PAUL AVE
W 7TH ST
ALTON ST
DAV
ERN
ST
EDG
CUM
BE R
D
Fire Station
Homecroft Early Learning Center
Homecroft Park
St. Paul Jewish Community Center
St Luke Lutheran Church
Sibley Plaza
Kruger’s
2A
2B0 200100
SCALE FEET
Tell Us: Would you prefer an at-grade or grade-separated trail crossing of W 7th St?
84
46
54
436
134
134
134
46
46
84
84 8446
54436
Segment Two: Edgcumbe Rd to Alton StFord Spur Corridor Alignment ConceptsTransit and Trail August 29, 2017 Open House
46
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed TrailPotential Transit
Consider pros and cons of closing Alton St to thru tra�c to reduce con�icts with trail and transit
W 7th St crossing will be signalized and activated by people walking and biking.
Signalized crossing activated by people walking and biking.
Signalized crossing activated by people walking and biking.
98’ ROW150’ ROW
130’ ROW
FENCE OR VERTICAL BARRIER
2B
10’12’ 2’28’2’
130’ ROW
potential transit guideway2’ 2’
bikeway walkway
min clear zone
2A
10’12’ 2’28’2’
98’ ROW
potential transit guideway2’ 2’
FENCE OR VERTICAL BARRIER
bikeway walkway
min clear zone
SAINT PAUL AVE
W 7TH ST
ALTON ST
DAV
ERN
ST
EDG
CUM
BE R
D
Fire Station
Homecroft Early Learning Center
Homecroft Park
St. Paul Jewish Community Center
St Luke Lutheran Church
Sibley Plaza
Kruger’s
2A
2B0 200100
SCALE FEET
Tell Us: Would you prefer an at-grade or grade-separated trail crossing of W 7th St?
83
54
83
5483
83
83
Walkway can be widened in areas to accommodate viewing platforms
Maintain existing curb and trees on Montreal Ave
Adapt current rail bed for bikeway.
Adapt existing rail bridge for trail use. Existing bridge deck approximately 18’ wide.
3
wetland
98’ ROW
10’
12’2’ 2’bikeway
elevated walkway
Segment Three: I-35E to Victoria ParkFord Spur Corridor Alignment ConceptsTrail OnlyAugust 29, 2017 Open House
83
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed Trail
SHEPARD RD
MONTREAL AVE
MONTREAL WAY
W 7TH ST
35E
Summit Brewing Company
Victoria Park
Crosby Farm Regional Park
0 200100
SCALE FEET
3
83
54
83
5483
83
83
Bridge would need to be widened to carry trail and transit. Existing bridge approximately 14’ wide
Walkway can be widened in areas to accommodate viewing platforms
Per Riverview Corridor study, conceptual transit station would be a cap over I-35E
28’2’
FENCE OR VERTICAL BARRIER
potential transit guideway
elevated walkway
bikeway2’
wetland
12’2’ 2’
10’
98’ ROW
min clear zone
3
Segment Three: I-35E to Victoria ParkFord Spur Alignment ConceptsTransit and Trail August 29, 2017 Open House
83
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed TrailPotential Transit
SHEPARD RD
MONTREAL AVE
MONTREAL WAY
W 7TH ST
35E
Summit Brewing Company
Victoria Park
Crosby Farm Regional Park
0 200100
SCALE FEET
3
74
74
54
54
50’ ROW
54’ ROW
41’ ROW
Maintain stop control at Armstrong Ave W
Signalized crossing activated by people walking and biking
Further study needed to determine connection to Downtown Saint Paul. Options include:-Connect to the Samuel Morgan Regional Trail via Randolph Ave.-Connect to the Samuel Morgan Regional Trail via the Ford Spur and widened sidewalk connection at James Ave and Duke St.-Follow the Ford Spur to its endpoint at Grace St and use the Western Ave bikeway to connect to the I-35E trail.
Segment Four: Bay St to Toronto StFord Spur Alignment ConceptsTrail OnlyAugust 29, 2017 Open House
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed Trail 54
4
10’12’2’ 2’
50’ ROW
bikeway walkway
min clear zone
RANDOLPH AVE
TORO
NTO
ST
S D
RAKE
ST
W 7TH ST
ARMSTRONG AVE W
OSC
EOLA
AVE
S
TUSCARORA AVE W
STEWART AVE
BAY
ST
SHEPARD RD
JUNO AVE
W FORSTER ST
BAYARD AVE
WATSON AVE
WEB
STER
ST
ADM
Bay Triangle
Park
Fire Station
Hazelden
SCALE FEET
0 100 200
4
74
74
54
54
ROW pinch points restrict overall width along segment
Widen trail at rail crossing for maneuvering room. Maintain stop control at Armstrong Ave W
Signalized crossing activated by people walking and biking
Further study needed to determine connection to Downtown Saint Paul. Options include:-Connect to the Samuel Morgan Regional Trail via Randolph Ave.-Connect to the Samuel Morgan Regional Trail via the Ford Spur and widened sidewalk connection at James Ave and Duke St.-Follow the Ford Spur to its endpoint at Grace St and use the Western Ave bikeway to connect to the I-35E trail.
The Riverview Corridor Study includes a conceptual station at the SW corner of
Randolph and Drake. The existing ROW is not wide enough for a station and trail in this
location. Additional discussion is needed for this pinch point.
50’ ROW
54’ ROW
41’ ROW
10’bikeway
6’walkway
28’2’ 2’ 2’min clear zone
min clear zone
min clear zone
potential transit guideway
50’ ROW
FENCE OR VERTICAL BARRIER
4
Segment Four: Bay St to Toronto StFord Spur Alignment ConceptsTransit and Trail August 29, 2017 Open House
54
No Public Access Existing bikewaysFuture bikewaysExisting transit line
Rail ROWProposed TrailPotential Transit
10’bikeway
6’
walkway
28’2’ 2’2’potential transit guideway
50’ ROW
FENCE OR VERTICAL BARRIER
4
min clear zone
RANDOLPH AVE
TORO
NTO
ST
S D
RAKE
ST
W 7TH ST
ARMSTRONG AVE W
OSC
EOLA
AVE
S
TUSCARORA AVE W
STEWART AVE
BAY
ST
SHEPARD RD
JUNO AVE
W FORSTER ST
BAYARD AVE
WATSON AVE
WEB
STER
ST
ADM
Bay Triangle
Park
Fire Station
Hazelden
SCALE FEET
0 100 200
4