clayton valley, nevada - amazon web services · 2019-02-04 · financial officer of cypress...
TRANSCRIPT
![Page 1: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/1.jpg)
Clayton Valley, NevadaFrom Drilling to PEA in under 2 Years
Basic SharesOutstanding:
72.5 m
FD SharesOutstanding:
98.3 m
MarketCapitalization:
C$16.7 m
CYP (TSX-V) | CYDVF (OTCQB) | C1Z1 (Frankfurt)February 2019
![Page 2: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/2.jpg)
2
Forward Looking Statements
Some of the statements in this document may be deemed to be "forward-looking statements." All statements in this document, other than statements of historical facts, that address events or developments that management of the Company expects, are forward-looking statements. Although management believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, and actual results or developments may differ materially from those in the forward-looking statements. The Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change. Factors that could cause actual results to differ materially from
those in forward-looking statements, include market prices, exploration and development successes, continued availability of capital and financing, and general economic, market or business conditions. Please see the public filings of the Company at www.sedar.com for further information.
Qualified Person as defined by National Instrument 43-101 and supervised the preparation of the technical information in this presentation is William Willoughby, PhD, PE, Director and CEO of Cypress.
CYPRESS DEVELOPMENT CORP |
![Page 3: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/3.jpg)
3
Cypress Capital Structure
CYPRESS DEVELOPMENT CORP |
TSX Venture Symbol CYP
US OTCQB Market CYDVF
Frankfurt Exchange Symbol C1Z1
Basic Shares Outstanding 72.5 Million
FD Shares Outstanding 98.3 Million
Market Capitalization C$16.7 Million
Cash Position C$1.8 Million
![Page 4: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/4.jpg)
4
Investment Highlights
CYPRESS DEVELOPMENT CORP |
Large Scale Lithium asset strategically located in United States (located in Nevada – top USA mining jurisdiction)
Management team key capabilities across mine development and capital markets
Project is fully financed through key derisking catalysts: Drilling, Metallurgical Study, and Prefeasibility Study (Q2 2019)
Project has advanced rapidly from first drill hole to PEA in 18 months
1 2
3 4
![Page 5: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/5.jpg)
5
Key Management & Directors
CYPRESS DEVELOPMENT CORP |
William Willoughby, PhD, PE DIRECTOR, CHIEF EXECUTIVE OFFICER
Dr. Willoughby is a mining engineer with 38 years of experience in all aspects of natural resources development. Since 2014, he has been principal and owner of consulting firm Willoughby & Associates, PLLC. Prior to that, he was President and COO of International Enexco Ltd., which was acquired by Denison Mines in 2014. He previously held various positions with Teck (Cominco). Dr. Willoughby has been a Professional Engineer since 1985 and received his Doctorate in Mining Engineering & Metallurgy from the University of Idaho in 1989.
Donald C. Huston CHAIRMAN, PRESIDENT
Don Huston serves as Chairman of the Board and President of Cypress Development Corp. Mr. Huston has been associated with the mineral exploration industry for over 30 years and has extensive experience as a financier and in-field manager of numerous mineral exploration projects in North America. He was born and raised in Red Lake, Ontario and spent 15 years as a geophysical contractor with C.D. Huston & Sons Ltd. as mineral exploration consultants in northern Ontario, Manitoba and Saskatchewan. Mr. Huston serves as a director of four Canadian public resource companies.
James G. Pettit DIRECTOR, CHIEF FINANCIAL OFFICER
Jim Pettit serves as a Director and acting Chief Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly traded companies and offers over 25 years of experience within the industry specializing in finance, corporate governance, executive management and compliance. Jim was previously Chairman and C.E.O. of Bayfield Ventures Corp. which was bought by New Gold Inc. in January 2015.
![Page 6: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/6.jpg)
6
Lithium Deposit Types
CYPRESS DEVELOPMENT CORP |
Sedimentary Brine Hardrock
Mine Product Lithium Carbonate(Li2C03)
Lithium Carbonate(Li2C03)
Spodumene Concentrate(6% Li20)
Typical Grade 1000-3000ppm Li 500-1000ppm Li 4500-7000ppm Li
Production Steps
MiningAcid LeachingEvaporation Crystallization
Pumping of BrineEvaporationCrystallization
MiningCrushing and GrindingRoasting Acidification
Estimated Cash Costs($/tonne Li2CO3 )
~4000* *Clayton Valley PEA 2500 – 4000 +6000
![Page 7: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/7.jpg)
7
Lithium: US “Critical Mineral”
CYPRESS DEVELOPMENT CORP |
• US Government designated Lithium as a “Critical Mineral” of strategic importance in December 2017. (Executive Order 13817 – A Federal Strategy to Ensure, Secure and Reliable Supplies of Critical Minerals)
• “Critical Mineral” designation favours domestic sources of Lithium across the supply chain
• Section 3 of the policy calls for identification of new sources of the minerals, increasing exploration mining and processing and streamlining permitting
![Page 8: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/8.jpg)
8
Clayton Valley Highlights
CYPRESS DEVELOPMENT CORP |
Major lithium resources, multi-million tonneLCE
Size
Next to Albamarle’s Silver Peak brine operation
Location
First hole February 2017Rapidly advancing, PFS by Q2 2019
New
MiningFlat deposit, no overburden Soft clay, no drill & blast
Leachable clay, low acid consumptionPotential by-products, including REEs
Metallurgy
![Page 9: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/9.jpg)
9
Clayton Valley Project Preliminary Economic Assessment
CYPRESS DEVELOPMENT CORP |
32.7%
Internal Rate of Return (IRR)$1.45-billion
Net present value (NPV 8%)
2.7 years
Payback Period15,000 tpd for 40 years
Operating Rate
$482-million over 2 years
Capital Cost Estimate81.5%
Net Lithium Recovery
$13,000/tonne
Base case price for lithium carbonate
24,042 tonnes
Average production lithium carbonate
$3,983/tonne
Operating Cost for Lithium
After-Tax Cash Flow Analysis
![Page 10: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/10.jpg)
10
Sedimentary Hosted Lithium Comparable Projects
CYPRESS DEVELOPMENT CORP |
Project Clayton Valley (TSXV:CYP)
Operating Cost ~4000 / tonne LCE
Development Stage PEA –> PFS
Market Cap (C$) < 20 MM
Project Thacker Pass (TSX:LAC)
Operating Cost ~4000 / tonne LCE
Development Stage PFS
Market Cap (C$) 385 MM*Argentina + Nevada Assets
Project Rhyolite Ridge (ASX:INR)
Operating Cost 3500 - 4000/ tonne LCE
Development Stage PFS
Market Cap (C$) 262 MM
Project Sonora(AIM:BCN)
Operating Cost ~3900 / tonne LCE
Development Stage FS
Market Cap (C$) 51 MM
385
262
51
17
0
50
100
150
200
250
300
350
400
450
Lithium Americas(TSX:LAC)
Ioneer Ltd (ASX:INR) Bacanora Lithium(AIM:BCN)
Cypress Development(TSXV:CYP)
Market Capitalization (CAD)
![Page 11: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/11.jpg)
11
Key Events
CYPRESS DEVELOPMENT CORP |
Albemarle Corporation (NYSE: ALB) acquires Rockwood Holdings for $6.2B. Purchase includes Silver Peak Lithium Mine located in Clayton Valley
2014 2016 Sept 2017 Sept 2018
2015 March 2017 June 2018
Tesla Motors breaks ground on USD $5 billion, 35 GWh factory near Reno
Cypress acquires Clayton Valley claims. Reports 3,070 ppm Li in a surface sample of claystone
Drilling commences on Dean property
Begins leach testing on drill core
Maiden 43-101 Resource Estimate announced
Preliminary Economic Assessment completed
![Page 12: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/12.jpg)
12
Project Location
CYPRESS DEVELOPMENT CORP |
Option to Earn 100% Held Property
5700 Acres Placer and Lode Claims
3% NSR Buy-down to 1% NSR for $2 million
CLAYTON VALLEY LITHIUM PROJECT
Nevada
![Page 13: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/13.jpg)
13
Clay Deposit
CYPRESS DEVELOPMENT CORP |
Drill Hole ID Depth (m) Length (m) Average Li (ppm)
DCH-01 4.4 31.5 1,140
DCH-02 0.5 53.8 1,036
DCH-03 8.5 27.4 999
DCH-04 1.5 49.7 1,127
DCH-05 8.5 67.1 1,129
DCH-06 14.6 16.8 1,013
DCH-07 32.2 19.0 974
DCH-09 11.3 58.2 1,093
DCH-10 8.5 55.8 1,108
DCH-11 8.2 55.2 1,209
DCH-13 23.8 82.3 1,221
DCH-15 20.1 104.2 1,106
DCH-16 14.6 107.9 1,199
DCH-17 14.6 94.5 1,050
GCH-04 3.7 26.2 1,077
GCH-05 84.7 25.0 1,018
GCH-06 3.0 96.9 1,142
• Extensive volcanic-derived claystone east and south of brine field and Angel Island
• Lithium in illite and montmorillonite clays to depth of at least 120 m below surface
• Fault bounded to east and west and east
• Shallow redox boundary.
![Page 14: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/14.jpg)
14
Resources
CYPRESS DEVELOPMENT CORP |
Indicated Inferred
Cut-offGrade Li ppm Tonnes (million) Li ppm Tonnes LCE (million) Tonnes (million) Li ppm Tonnes LCE (million)
300 365.3 942 1.832 160.5 992 0.847
600 361.3 946 1.820 158.5 997 0.841
900 198.0 1,105 1,164 106.8 1,119 0.626
Initial Pit Shell
Indicated Inferred
Cut-offGrade Li ppm Tonnes (Million) Li ppm Tonnes LCE (million) Tonnes (million) Li ppm Tonnes LCE (million)
300 831.0 867 3.834 1,120.3 860 5.125
Property Wide (pit constrained)
![Page 15: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/15.jpg)
15
Mining
CYPRESS DEVELOPMENT CORP |
• Soft material, no drilling and blasting
• Pit to 120m depth, 30⁰ pit slope
• 15,000 tpd
• <0.1 waste to feed
• Production with loader, feeder breaker
• Slurry pipeline to mill
![Page 16: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/16.jpg)
16
Lithium Extraction
CYPRESS DEVELOPMENT CORP |
• Acid leachable clays, not hectorite
• 4 to 8 hours agitated leach
• 50-80C solution of 5% H2SO4
• 81.5% extraction
• Acid consumption 125 kg/t
![Page 17: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/17.jpg)
17
Lithium Recovery
CYPRESS DEVELOPMENT CORP |
Brine PH Li Mg K Ca Na Mn Fe
1 173 4225 1087 593 1997 98 183
6 157 3172 984 473 1807 5 0
10 172 16 1063 756 1978 ND ND
12 193 2 1223 2 7097 ND ND
VALUES IN PPM
• Standard treatment by evaporation, purification and crystallization
• Low reagent consumptions
• Recovery to battery grade product on-site
INCREASING PH
![Page 18: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/18.jpg)
18
Process Flow Sheet
CYPRESS DEVELOPMENT CORP |
• Leach circuit
• Agitated tank leach
• pH and temp control
• Heat with steam from acid plant
![Page 19: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/19.jpg)
19
Capital Cost Estimate
CYPRESS DEVELOPMENT CORP |
USD (Millions)
Mine Development and Equipment 35
Plant feed prep, leaching, purification and lithium recovery 163
Acid plant 105
Tailings 25
Site utilities 17
Infrastructure and G&A capital 38
Direct Capital Costs 383
Working capital 24
Contingency (20% of Direct Costs) 76
Indirect Capital Costs 99
TOTAL CAPEX 482
![Page 20: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/20.jpg)
20
Operating Cost Estimate
CYPRESS DEVELOPMENT CORP |
Operating Cost $ Per Tonne Of Mill Feed $ Per Tonne of LCE
Mining 1.73 395
Plant Labor 1.45 330
Reagents & supplies 12.70 2,893
Power 0.94 210
G&A 0.68 155
TOTAL OPEX 17.50 3,983
![Page 21: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/21.jpg)
21
Upcoming Catalysts & News Flow
CYPRESS DEVELOPMENT CORP |
Drill core to provide material for further metallurgical study
Q1 2019 Infill Drill Program
Q2 2019Prefeasibility Study
Q1 2019 Metallurgical Study
2019Additional Potential Catalysts
Ongoing bench tests to refine production and cost parameters
Incorporating results of Metallurgical Study and Infill drill program
Updates related to water sources, permitting milestones
![Page 22: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/22.jpg)
22
Timeline
CYPRESS DEVELOPMENT CORP |
2019 Milestones 2018 January February March April May June
Preliminary Economic Assessment
Drilling & Metallurgical Sample
Bench Tests & Engineering
Preliminary Feasibility Study
![Page 23: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/23.jpg)
23
Appendix: Lithium Market Fundamentals
CYPRESS DEVELOPMENT CORP |
![Page 24: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/24.jpg)
Current Lithium Supply and Breakdown by End-Use24
8,58
3
122,
068
126,
515
BatteryDemand
OtherDemand
24
CYPRESS DEVELOPMENT CORP |
LithiumCarbonate(54%)
LithiumHydroxide(46%)
NCA(14%)
NCM (29%)
LCO(30%)
OtherLTO (1%)
LFP (22%)LMNO LMO (3%)
Stationary grid storage (3%)
ElectricVehicles (61%)
Other (36%)
Metallurgy (9%) Lubricant &Grease (17%)
Class &Ceramics (37%)
Medical (5%)
Air Treatment (7%)
Other (25%)
Tota
l Lith
ium
Dem
and
in 2
018
(LC
E to
nnes
)
SOURCE: BENCHMARK MINERAL INTELLIGENCE – CYPRESS DEVELOPMENT CORP – AUGUST 2018
![Page 25: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/25.jpg)
Lithium-ion Battery Demand by End Use Sector
25
CYPRESS DEVELOPMENT CORP |
The chart below outlines the key drivers of demand for lithium-ion batteries over the forecast period. As can be seen the major growth area is for EVs, followed by stationary (grid) applications. In our base case scenario we expect that demand will be approximately 135,000 MWH in 2018, reaching 760,000 MWH by 2025, and 4M MWH by 2035.
SOURCE: BENCHMARK MINERAL INTELLIGENCE – CYPRESS DEVELOPMENT CORP – AUGUST 2018
0.0
1.0
2.0
3.0
4.0
5.0
2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
Stationary
Other
Electric Vehicles
EV Downside
EV Upside
![Page 26: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/26.jpg)
85,000125,000 125,000 125,000
30,000
31,500 31,500 31,50028,000
28,000 28,000 28,000
184,500
2030
184,500
2018
184,500
20352023
143,000
Talison
Galaxy Resource
Neometals
26
Brownfield Lithium Capacity Forecast to 2035
CYPRESS DEVELOPMENT CORP |
Albemarle SQM
2018 2023
94,000
2030
155,000155,000
2035
125,000
55,000 70,000 85,000 85,000
39,00055,000
70,000 70,000
FMC Orocabre
14,00030,000 35,000 35,000
18,000
27,00030,000 30,000
65,00065,000
203520232018 2030
57,000
32,000
3,000 3,000 3,000 3,000
Albemarle
20352018 2023 2030
2,000 2,000 2,000 2,000
1,000 1,000 1,000 1,000
203520232018
3,000
2030
3,0003,000 3,000
Arqueana de Minérios e Metals Ltda.
Companhia Brasileira de Litio
5,000 5,000 5,000 5,000
2,000 2,000 2,000 2,000
20302018
7,000
2023 2035
7,0007,000 7,000
Sociedade Mineira de Pegmatites
Bikita Minerals
6,00010,000 10,000 10,000
4,000
6,000 6,000 6,0003,000
3,000 3,000 3,0003,000
3,000 3,000 3,000
23,000
2018
17,000
23,000
20352023 2030
23,000
Jiangxi Special ElectricYichun Tani
Fozhao Lanke
Tibet Mineral Development
Qinghai Lithium
Brine
Hardrock
Brine and Hardrock
SOURCE: BENCHMARK MINERAL INTELLIGENCE – CYPRESS DEVELOPMENT CORP – AUGUST 2018
‘000 LCE tonnes
![Page 27: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/27.jpg)
Greenfield Lithium Capacity Forecast to 2035
CYPRESS DEVELOPMENT CORP |
Tawana Resources (Pos)
Core Exploration Ltd (Pos)Kidman Resources SQM (Pos)
Altura Mining (HP)
Pilbara Minerals (HP)
20,000
75,000 80,000 80,000
30,00040,000 40,000
30,00030,000 30,000
12,000
30,00030,000 30,000
20,00020,000 20,000185,000
203520302018
200,000
2023
200,000
32,000
China Minmetals (Pos)Chinese Producers (Pos)Chinese Producers (Prob)
15,00025,000 25,000
20,000
20,000 20,00010,000
10,000 10,000
5,000
2018 2023
55,000
2030 2035
45,000
55,000
2,000 25,000 25,00020,000
20,000 20,00012,000
18,000
9,000
9,000
9,000
9,000
84,000
2018 2023 2030 2035
48,00058,000
Rio Tinto - Serbia (Pos)
Savannah - Portugal (Pos)Grupo Mota - Portugal (Pos)Keliber - Finland (Pos)
Birimian Limited - Mali (Pos)
Desert Lion Energy - Namibia (Prob)
25,000 25,00025,000
25,000 25,000
20,000 20,000
15,000
20,000 20,000
8,000
10,000 10,000
2023 2030 2035
100,000
56,000
100,000
Argosy (Pos)Galaxy Resource (HP)
LSC (Pos)
Millennial Lithium (Pos)Lithium Americas (Pos)
45,00060,000
27,00027,000
10,000
17,00017,000
20,000
30,000119,000
144,000
20352030
21,000
2023
Galaxy Resource (Pos)
Pure Energy Minerals (Pos)
Nemaska Lithium (HP)Piedmont Lithium (Pos)
Global Geoscience (Pos)Lithium Americas (Pos)
Brine
Hardrock
Brine and Hardrock
2018 2035203020235,000
25,000 25,000 25,000
20,00035,000 35,000
Bacanora Minerals Ltd (Pos)AMG (HP)
SOURCE: BENCHMARK MINERAL INTELLIGENCE – CYPRESS DEVELOPMENT CORP – AUGUST 2018
‘000 LCE tonnes
HP – Highly probableProb – ProbablePos – Possible
27
![Page 28: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/28.jpg)
Lithium Capacity Forecast to 2035
28
CYPRESS DEVELOPMENT CORP |
SOURCE: BENCHMARK MINERAL INTELLIGENCE – CYPRESS DEVELOPMENT CORP – AUGUST 2018
0.20
0.70
0.10
0.80
0.00
0.30
0.40
0.50
0.90
0.60
1.00
2030 2035202920192015
Million LCE tonnes
2016 2017 2018 2020 2021 2022 2023 20342024 2025 2026 2027 2028 2031 2032 2033
Operational supply
Highly Probable additonal tonnes
Possible additonal tonnes
Probable additonal tonnes
![Page 29: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/29.jpg)
Lithium Demand-Supply Balance, 2015-2035
29
CYPRESS DEVELOPMENT CORP |
SOURCE: BENCHMARK MINERAL INTELLIGENCE – CYPRESS DEVELOPMENT CORP – AUGUST 2018
0.0
4.0
5.0
2030 2035202920192015
Million LCE tonnes
2016 2017 2018 2020 2021 2022 2023 20342024 2025 2026 2027 2028 2031 2032 2033
For the supply forecast we have divided the forecast into three main phases, which reflect the development of the market over time, these are:
Phase 1, 2015-2018:In this phase the supply-demand balance is very tight, with demand growing faster than new capacity expansions. New supply is largely from development of brownfield sites at operating producers
Demand - UpsideDemand - Base
Possible additonal tonnes
Demand - DownsideUnplanned necessary capacity - Base Case
Probable additonal tonnes
Operational supplyHighly Probable additonal tonnes
Phase 2, 2019-2025:Phase two sees new supply start to come online from greenfield projects, as well as expansions at existing producers. The market moves into a period of relative oversupply by the end of the period
Phase 3, 2026-2035:Towards the latter part of the forecast period there is a marked requirement for further as yet announced lithium capacity to come on-stream to meet rising demand. We expect that prices will remain in a range needed to stimulate this new investment, given that geological constraints are not an issue.
3.0
2.0
1.0
![Page 30: Clayton Valley, Nevada - Amazon Web Services · 2019-02-04 · Financial Officer of Cypress Development Corp. Mr. Pettit is currently serving on the board of directors of five publicly](https://reader034.vdocuments.site/reader034/viewer/2022042315/5f042de07e708231d40cb40f/html5/thumbnails/30.jpg)
Contact
William Willoughby, PhD, PE DIRECTOR, CHIEF EXECUTIVE OFFICER
Donald C. HustonCHAIRMAIN, PRESIDENT
Don MyersCORPORATE COMMUNICATION
Suite 1610, 777 Dunsmuir StreetVancouver, BC, V7Y 1K4, CANADATel: (604) 687-3376Fax: (604) 687-3119