    Reliability

    The growth in unit sizes of equipment in most industries with the

    result that the consequence of failure has become either muchmore expensive, as in the case of low availability or potentiallycatastrophic makes the following more important:

    Prediction of the expected life of plant and its major parts.

    Prediction of the availability of plant

    Prediction of the expected maintenance load

    Prediction of the support system resources needed for effectiveoperation

    These predictions can only result from careful consideration ofreliability and maintainability factors at the design stage.

    Reliability

    System

    Reliability

    Series and

    ParallelSystemReliability

    Industrial Engineering

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    2/27

    2

    Reliability

    In reliability analysis of engineering systems it is often assumed

    that the hazard or time- dependent failure rate of items followsthe shape of a bathtub with three main phases.

    The burn-in phase (known also as infant mortality, break-in ,debugging):

    During this phase the hazard rate decrease and the failure occu

    due to causes such as:

    Reliability

    System

    Reliability

    Series and

    ParallelSystemReliability

    Industrial Engineering

    Incomplete final testPoor test specificationsIncorrect use procedures

    Wrong handling or

    packaging

    Over-stressed partsPoor quality control

    Poor technical

    representative training

    Incorrect installation or

    setup

    Inadequate materials

    Power surgesPoor manufacturing

    processes or tooling

    Marginal parts

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    3/27

    3

    Reliability

    The useful life phase:

    During this phase the hazard rate is constant and the failuresoccur randomly or unpredictably. Some of the causes of thefailure include:

    A. Insufficient design margins

    B. Incorrect use environmentsC. Undetectable defects

    D. Human error and abuse

    E. Unavoidable failures

    Reliability

    System

    Reliability

    Series and

    ParallelSystemReliability

    Industrial Engineering

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    4/27

    4

    Reliability

    The wear-out phase (begins when the item passes its useful

    life phase):

    During this phase the hazard rate increases. Some of thecauses of the failure include:

    A. Wear due to aging.

    B. Inadequate or improper preventive maintenance C. Limited-life components

    C. Wear-out due to friction, misalignments, corrosion and cree

    D. Incorrect overhaul practices.

    Reliability

    System

    Reliability

    Series andParallelSystemReliability

    Industrial Engineering

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    5/27

    5

    Reliability

    The whole-life of failure probability for the generality of

    components is obtained by drawing the three possible (t)

    However, the following will vary by orders magnitude from onesort of item to another:

    I. The absolute levels of(t)

    II. The time scale involved

    III. The relative lengths of phases I, II, and III

    Some times one or two of the phases could be effectivelyabsent.

    Reliability

    System

    Reliability

    Series andParallelSystemReliability

    Industrial Engineering

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    6/27

    6

    Reliability

    Estimates of the parameters of the whole-life failure probability

    profile of the constituent components are an essentialrequirement for the prediction of system reliability.

    Additional information, such as repair-time distribution, thenleads to estimates of availability, maintainability, and the level

    (and cost) of corrective and preventive maintenance.

    Reliability

    System

    Reliability

    Series andParallelSystemReliability

    Industrial Engineering

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    7/27

    7

    System Reliability

    Reliability Prediction for Complex Systems (plants or equipment

    To predict the reliability of complex plant the following should beperformed:

    1. Regard the large and complex system (plant) as a hierarchyof units and items (equipment) ranked according to theirfunction and replaceability.

    2. At each functional level, the way in which the units anditems (equipment) in this level is connected is determine

    (The equipment in general could be connected in series, inparallel or in some combination of either)

    Reliability

    SystemReliability

    Series andParallelSystemReliability

    Industrial Engineering

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    8/27

    8

    System Reliability

    3. The appropriate measure of reliability is calculated for each

    unit and item (in this analysis The appropriate measure ofreliability is the failure survival .

    4. The analysis starts from the component level upwards andat the end of the analysis the survival probability of the

    system is calculated.

    5. All the component mean failure rates are calculated. Theyare either being known or susceptible to estimation.

    6. At each level the survival probability calculation takes thefunctional configuration into account.

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    9/27

    9

    System Reliability

    7. The result of the system can be used in the

    selection of design or redesign alternatives, in thecalculation of plant availability, or in the prediction ofmaintenance work load.

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    10/27

    10

    System Reliability

    A few important prerequisites are given for application of the

    Boolean theory: The system must be non-repairable, that is, the first

    system failure ends the systems lifetime. Thus, forrepairable systems it is only possible to calculate thereliability up to the first system failure.

    The system elements must be either in a functional orfailed state of condition.

    The system elements are independent, that is, thefailure behaviour of a component is not influenced by thefailure behaviour of another component.

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    11/27

    11

    System ReliabilityIndustrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    12/27

    12

    Series and Parallel System Reliability

    Series-Connected Components

    For a system of series-connected components (independentand non identical), survival probability of the system is:

    And the system reliability is:

    Since survival probabilities must always be less than 100%, itfollows that for the system must be less than that of anyindividual component.

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    13/27

    13

    Series and Parallel System Reliability

    If the times-to-failure of the components behave according to th

    exponential p.d.f, then the overall p.d.f of times-to-failure is alsoexponential:

    In addition, for exponentially distributed times to failure of unit ,the unit reliability is:

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    14/27

    14

    Series and Parallel System Reliability

    And the series system reliability at time t is:

    The mean time to failure in this case is:

    The hazard rate of the series system is :

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    15/27

    15

    Series and Parallel System Reliability

    Parallel-Connected Components

    A system with components connected in parallel, fails if all thecomponents in this system fail. (at least one of the units mustwork normally for system success)

    If the failure behaviour of any component in the system is quiteuninfluenced by that of the others (failure probabilities arestatistically independent), the failure probability that allcomponents will fail before time has elapsed is given by theproduct of the separate failure probabilities,

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallelSystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    16/27

    16

    Series and Parallel System Reliability

    For a system with n parallel-connected components, the failure

    probability of the system:

    And the system survival probability is:

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    17/27

    17

    Series and Parallel System Reliability

    This means that system reliability, in this case is:

    Since survival probabilities cannot be grater than 100%, itfollows that the survival probability for the system mustbe grater than that of either of its components.

    If the times-to-failure of the components behave according to thexponential p.d.f, then the overall p.d.f of times-to-failure is not asimple exponential. For example, if the system compose of twocomponent, then the system times-to-failure p.d.f :

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    18/27

    18

    Series and Parallel System Reliability

    For exponentially distribution times to failure of unit , the paralle

    system reliability is:

    And for identical units ( ) the reliability of the parallel

    system simplifies to:

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    19/27

    19

    Series and Parallel System Reliability

    And the mean time to failure for the identical unit parallel system

    is:

    The mean time to failure in this case:

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    20/27

    20

    Series and Parallel System Reliability

    The advantages of connecting equipment in parallel are:

    1. To improve reliability of the system by making some of theequipment redundant to the other.

    2. Extensive preventive maintenance can be pursued with noloss in plant availability since the separate parallel units canbe isolated.

    3. In the event of failure corrective maintenance can bearranged under less pressure from production or fromcompeting maintenance tasks.

    In the case of very high reliability units, there are only very

    marginal increments in reliability to be gained by installingredundant capacity unless the safety factors become evident.

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    21/27

    21

    Series and Parallel System Reliability

    Combination of serial and parallel structures:

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

    Convert to equivalent series system

    A B

    C

    C

    D

    RA RB RCRD

    RC

    A B C D

    RA RB RD

    RC = 1 (1-RC)(1-RC)

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    22/27

    22

    Series and Parallel System Reliability

    Example

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    23/27

    23

    Series and Parallel System Reliability

    Example

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

    S i d P ll l S t R li bilit

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    24/27

    24

    Series and Parallel System Reliability

    Example

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

    S i d P ll l S t R li bilit

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    25/27

    25

    Series and Parallel System Reliability

    Example

    A system composes of three components. These components have

    constant failure rates of 0.0004, 0.0005, 0.0003 failures per hour. Thesystem will stop working, if any one of its components fails. Calculatethe following:

    1. The reliability of the system at 2500 hour running time?

    2. The system hazard rate?

    3. Mean time to failure of the system?

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

    S i d P ll l S t R li bilit

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    26/27

    26

    Series and Parallel System Reliability

    Example

    Another system composes of four items and each one of these items

    has constant failure rate of 0.0008 failures per hour. These items whenthey work the system will work. However, when any one of the system'sitems fails, the whole system will come to a complete halt. Calculate thfollowing:

    1. The reliability of the system at 2000 hour running time?

    2. The system hazard rate?

    3. Mean time to failure of the system?

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability

    Series and Parallel System Reliability

  • 7/30/2019 Class 07- Techniques to Evaluate Systems Reliability

    27/27

    27

    Series and Parallel System Reliability

    Example

    A machine has two independent cutting parts. Any one of these cutting

    parts is sufficient to operate the machine. The hazard rates for the twoparts of this machine are constant and they are 0.001 and 0.0015failures per hour. Calculate:

    1.The survival probability of the machine at 300 hour of running time?

    2.The mean time to failure for this machine?

    Industrial Engineering

    Reliability

    SystemReliability

    Series andParallel

    SystemReliability