    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SR

    Soil investigation

    The contractor shall implemented of exploratory drilling and Notemechanical test in all types of soil with on site testing and theissuance of the final report which contain the test results andrecommendations of the foundation work.

    01 Research and treatment for cavities

    Implementation through a perforating exploratory(cavity probing) In all 1 M3

    types of rock to determined the horizontal and vertical elongation of

    cavities, the contractor will be responsible for treatment all cavities

    By injection and treatment for all cavities and voids of rock with all

    necessary work accordance with the technical specifications and

    instructions of the Supervising engineer

    SITE DEVELOPMENT

    The bidder is advised to visit the site before quoting the rates in

    order to get himself familiarized with the present site conditions

    Site clearance and demolitions

    02 Demolish and clear away existing structures, pavings, electrical

    lighting, pavements or upstands, cut and plug or reroute existing

    service lines or utilities inside property line, clear site of rubbish or

    any impediments, loose top soil and as deemed necessary, for the

    total site cluster number 2 (CL02) area, approximately (23360m2),

    subject to engineer approval and as coordinated with public

    pension agency as shown on drawing CL02- XC-01 1 Item

    To Collection SR

    RATEITEM D E S C R I P T I O N QTY UNIT

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    1 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    2/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    SITE GRADING

    Bulk excavate over site on unclassified ground including all hard Noteand rock layers to reduced levels generally in cutting profiles the

    work shall include clear away to approved disposals.

    All additional excavation required for temporary works and spaces, Note

    shoring, dewatering, removal of surplus excavated materials,

    support, temporary spoil heaps and general compaction

    EXCAVATION AND EARTHWORK

    Necessary moving or transportation about the site excavation

    material including handling to temporary stockpile or ultimate

    disposal off site is to be included in the unit rate of excavation

    SITE PREPARATION AND GRADING

    01 Excavation oversite on unclassified ground including all hard and 50 M3

    rock layers (if any) to reduced levels generally in cutting profiles

    and forming depressions, falls and the like and clear away to

    approved disposal tip.

    02 Fill oversite with approved imported fill material according to site 2390 M3

    soil report recommendation including compaction in making up

    levels to required formations, embankments, contouring and the

    like as per drawings and spec.

    Note

    Work on proposed structural built-up areas from part of the Work

    pertaining to respective building or structure as measured

    elsewhere.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    2 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    3/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    PAVING AND SURFACING

    01 Supply and install precast concrete shotblasted pavers (beige color) 2900 M2

    size 400x400x60mm thk. with photocatalytic titanium doxide coating

    including 100mm thick cast-in-place concrete slab with A193-WWF

    mesh reinforcement, 20mm thick cement mortar setting bed,

    moisture barrier on compacted subgrade, 3mm water proofing

    membrane on R.C. slab as per detail no A1 on drawing CL02-XL301

    to suit required locations as shown on drawing CL02-XL101

    02 Supply and install precast concrete shotblasted pavers (beige, & 132 M2

    brown color) size 400x400x60mm thk with photocatalytic titanium

    doxide coating including 100mm thick cast-in-place concrete slab

    with A193-WWF mesh reinforcement, 20mm thick cement mortar

    setting bed, polyethylene moisture barrier, compacted subgrade,3mm water proofing membrane on R.C. slab as per detail no. A5 on

    drawing CL02-XL301 to suit required locations as shown on drawing

    CL02-XL101

    03 Supply and install precast concrete shotblasted pavers (beige, brown 36 M2

    & grey color) size 400x400x60mm thk with photocatalytic titanium

    doxide coating including 100mm thick cast-in-place concrete slab

    with A193-WWF mesh reinforcement, 20mm thick cement mortar

    setting bed, polyethylene moisture barrier, compacted subgrade,

    3mm water proofing membrane on R.C. slab as per detail no. A6 on

    drawing CL02-XL301 to suit required locations as shown on drawing

    CL02-XL101

    04 Supply and install precast concrete shotblasted pavers (beige & light 755 M2

    beige color) size 400x400x60mm thk with photocatalytic titanium

    doxide coating ,w./grey color granite band size 200x200x30mm thk

    including 100mm thick cast-in-place concrete slab with A193-WWF

    mesh reinforcement, 20mm thick cement mortar setting bed,

    polyethylene moisture barrier, compacted subgrade, 3mm water

    proofing membrane on R.C. slab as per detail no. B3 on drawing

    CL02-XL301 to suit required locations as shown on drawing

    CL02-XL101

    05 Supply and install polished granite paving dark &light colors,size 512 M2

    400x400x30mm thk w.\ granite band dark color, size200x200x30mm including 100mm thick cast-in-place concrete slab

    with A193-WWF mesh reinforcement, 20mm thick cement mortar

    setting bed, polyethylene moisture barrier, compacted subgrade,

    3mm water proofing membrane on R.C. slab as per detail no. C2

    on drawing CL02-XL301 to suit required locations as shown on

    drawing CL02-XL101

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    3 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    4/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    PAVING AND SURFACING

    01 Supply and install concrete screed with epoxy coat finish including 5230 M2

    100mm/50mm thick cast-in-place concrete slab with A193-WWF

    reinforcement mesh, polyethylene moisture barrier, compacted sub

    grade, 3mm water proofing membrane on R.C. slab as per detail

    no. D on drawing CL02-XL301 to suit required locations as shown

    on drawing CL02-XL101

    02 Supply and install 50mm thk rubber pavement green, blue , brown 259 M2

    & red color including adhesive mixture,100mm thick cast-in-place

    concrete slab with A193-WWF mesh reinforcement smooth finish,

    polyethylene moisture barrier, compacted subgrade, 3mm water

    proofing membrane on R.C. slab as per detail no. E4 on drawing

    CL02-XL301 to suit required locations as shown on drawingCL02-XL101

    03 Supply and install asphalt paving comprising 80mm bituminous 2130 M2

    wearing course, bituminous prime coat, including granular base

    course, 3mm water proofing membrane on R.C. slab as per detail

    no. F on drawing CL02-XL301 to suit required locations as shown

    on drawing CL02-XL101

    04 Supply and install cast in place concrete paving with A193-WWF 354 M2

    mesh reinforcement, smooth finish light grey color, 100mm thick

    w.\ brick edge band size 200x200x60mm thick including 20mm

    thick cement mortar setting bed, polyethylene moisture barrier,

    compacted subgrade, 3mm water proofing membrane on R.C. slab

    as per detail no. G7 on drawing CL02-XL301 to suit required

    locations as shown on drawing CL02-XL101

    EARTH MOUNT

    05 Supply and formation of 500-1500 mm height earth mount including

    compacted sub base layer, 100 mmm thick layer of sand and

    gravel mix, and all required to complete and finish te work as

    shown on drawing CL02- XL101, and as per detail no. 5 on drawing

    CL02- XL302 and sections details on drawing CL02- XL303 775 M2

    (Softscape and planting soil mix are measured elsewhere)(area

    measured on plan)

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    4 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    5/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    CURBS AND EDGING

    01 Supply and install precast concrete road curb, size 300X500X150 885 Mmm with exposed aggregate finish including bedding, haunching,

    cast in place concrete base and concrete grout behind curb, 20mm

    thick cement mortar setting bed, on R.C. slab as per detail no.1 on

    drawing CL02-XL302 to suit required locations as shown on

    drawing CL02-XL101

    02 Supply and install precast concrete mowing edge, size 152 M

    200X100X65 mm including concrete base, 20mm thick cement

    mortar setting bed, cast in place concrete base on R.C. slab, as

    per detail no. 2 on drawing CL02-XL302 to suit required locations

    as shown on drawing CL02-XL101

    SUNDRIES

    TENSILE STRUCTURE

    03 Supply and install tensile staructure comprising columns, tent

    fabric, foundation, earthwork, and all required to compleet and fix

    the work as shown on drawing CL02- XL101 and as per detail no. 6

    on drawing CL02- XL302, and sections details on drawing CL02-

    XL303 and as per manufacturer's recommendations and subject to

    engineer's approoval to cover an area of 125 m2

    .

    Contractor shall submitt shop drawings for approval before supply 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    5 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    6/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    SITE SIGNAGE

    Manufacturer's standard outdoor sings, letters and plaquesincluding fixings, finishes, accessories complete as per

    details on drawing CL02-XC-04, CL02-XC-05 and as per

    specifications

    REGULATORY SIGNS

    01 Ref. type R5-1 ( ENTRY PROHIBTED ) 8 No.

    INFORMATIVE SIGNS

    02 Ref. type I-1 (PARKING) 7 No.

    03 Ref. type I-2 (ENTRY ) 7 No.

    04 Ref. type I-3 (EXIT ) 6 No.

    Manufacturer's standard outdoor signs, letters and plaques,

    including fixings, accessories complete as per details on

    drawing CL02-XL-602 to suit required locations as shown on

    drawing CL02-XL-601 and as per specifications

    05 Residential sign, as per detail (1) 10 No.

    06 Directional sign, as per detail (2) 3 No.

    07 Sports club building, as per detail (3) 2 No.

    08 Sports club parking as per detail (4) 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    6 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    7/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    ROAD SIGNAGE & PAVEMENTMARKING

    Thermoplastic paint for traffic marking on drive way atbasement/ground floor and ramps floor as per

    Manufacturer's standard as shown on details on drawing

    CL02-XC-05, to suit required locations as shown on drawing

    CL02-XC-04, as per specification and as per engineer's

    instructions

    pavement marking

    01 White edge line, ref. detail 2 230 M

    02 Lane marking, as per detail (3) 210 M

    03 Dotted line marking (give way line), ref. detail 7 550 M

    04 Through traffic arrow, ref. detail 9-1 46 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    7 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    8/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    RAISED CONCRETE PLANTER

    Supply and install concrete raised planter with granitecladding, including (Softscape and planting soil mix are

    measured elsewhere), drainage layer, filter , membrane,

    sealant and all required to compleet and finish the work as

    per detail no. 3 on drawing CL02-XL302

    01 Raised planter to suit required locations as shown on drawing

    CL02- XL101 205 M2

    RAISED CONCRETE PLANTER & WOODEN BENCH

    02 Supply and install concrete raised planter with granite cladding,

    and wooden bench, 50x75 mm interior wooden rails,comprisingconcrete walls, reinforced concrete slab with A 193 W.W.F

    reinforcement mesh smooth finished, (Softscape and planting soil

    mix are measured elsewhere), drainage layer, filter membrane,

    water proofing membrane, protection board, sealant and all

    required to compleet and finish the work as per detail no.4 on

    drawing CL02- XL302, and sections details on drawing CL02-

    XL303 to suit required locations as shown on drawing CL02- XL101 202 M2

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    8 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    9/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    LANDSCAPING

    Palms including pit excavation, stakes and ties, soilplanting mix, mulching, filter membrane and drainage

    layer all as details and planting schedule as per detail P1,

    on drawing CL02-XL-401

    01 P/Wf 7 No.

    Trees including pit excavation, stakes and ties, soil

    planting mix, mulching, filter membrane and drainage

    layer all as details and planting schedule as per detail

    P2 on drawing CL02-XL-401

    02 T/Aa 2 No.

    03 T/Af 12 No.

    04 T/Po 4 No.

    05 T/Tp 8 No.

    Shrubs including planting, site excavation as required, soil

    planting mix, mulching, filter membrane, screed sloped to

    drain and drainage layer all as per details and planting

    schedule as per detail P3,P5, on drawing CL02-XL-401

    06 S/Hs 230 No.

    07 S/Iha 35 No.

    08 S/lo 26 No.

    09 S/Ld 18 No.

    10 S/Ob 10 No.

    11 S/Pav 43 No.

    12 S/Mc 203 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    9 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    10/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    LANDSCAPING

    Ground cover including planting, site excavation asrequired, soil planting mix, mulching, filter membrane,

    screed sloped to drain and drainage layer all as per details

    and planting schedule as per detail P3, on drawing

    CL02-XL-401

    01 G/As 574 No.

    02 G/Lm 723 No.

    03 G/Ggp 1162 No.

    04 G/Gr (Y) 942 No.

    Lawn planting, including soil planting mix, filter membrane

    and drainage layer, screed sloped to drain all as per details

    and planting schedule as per detail P4,P6 on drawing

    CL02-XL-401

    05 L/Cd 2117 M2

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    10 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    11/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    PLUMBING INSTALLATION

    WASTE AND DRAINAGE INSTALLATION

    Supply, install and testing pipework, UPVC schedule 40, the

    work shall include but not limited to fittings, supports, cast

    iron pipes on roof for vent with caps, installation, all

    associate works and all materials and equipments required

    to complete and finish the work according to drawings,

    specification and code of practices

    01 75 mm dia. 30 M

    02 100 mm dia. 110 M

    03 150 mm dia. 67 M

    Accesssories

    04 Ground cleanout 75 mm dia, ref. FCO 1 No

    Construction work for briks inspection chamber, the work

    shall include bit not limited to earth work, plain concrete

    for foundation BED, concrete channel at chamber DED with

    standard cast iron manhole frame and double cover and all

    materials and equipments required to complete and finish

    the work according to specifications, drawings and code of

    practice

    05 Inspection chamber, ref. (WIC) 600x600mm 1 No

    WASTE AND DRAINAGE INSTALLATION

    Supply, installation and test drainage pipe work UPVC

    schedule 80 the work shall include but not limited to fittings,

    supports hangers, excavation, backfilling, cast iron pipes on

    roof for vent with caps and all materials and equipment

    required to complete and finish the work according to

    specifiactions, drawings and code of practice

    06 100 mm dia 80 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    11 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    12/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    Drainage installation to the external drainage network

    Construction work for briks inspection chamber, the work shallinclude bit not limited to earth work, plain concrete for

    foundation BED, concrete channel at chamber DED with

    standard cast iron manhole frame and double cover, UPVC

    pipework schedule 40 to nearest main sewer manhole and all

    materials and equipments required to complete and finish the

    work according to specifications, drawings and code of practice

    01 Inspection chamber, ref. (IC) 600x600mm 2 No

    02 Slow down chamber 9 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    12 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    13/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    POTABLE WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 forpotable water the work shall include but not limited to

    fittings, supports, all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    01 75 mm dia. 55 M

    02 100 mm dia. 10 M

    Supply, installation and test Packaged type constant

    pressure booster potable water pumps, set of one duty and

    one stand by pump, including piping and valving network

    within pump chamber, complete with all controllers,accessories for automatic operateion and all associate

    works as per code standard and as described on drawings

    and specification

    03 Ref. PWP CAP 3.14 KW 1 Set

    04 Ref. CP CAP 0.5 HP 1 Set

    Reinforced concrete under ground water tank and pump

    room with proprietary cast iron manhole covers and frames

    the work shall include but not limited to earthworks,

    concrete works, sump pit, and submersible pump internal

    lining and water proofing, access ladders, pipework andvalving, test main fold vent pipes, truck fill pipework with

    back flow preventer, ventilating fan and duct work within

    tank and pump room structure, and UPVC schedule 80

    drainge pipe from submersible pump to the nearest sewer

    manhole and all materials and equipments required to

    complete and finish the work according to drawings,

    specification and code of practices

    05 Potable water tank CAP 83 M3 1 No.

    06 Gray water tank CAP 25 M3 1 No.

    07 Potable water tank CAP 173 M3 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    13 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    14/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    POTABLE WATER SUPPLY SYSTEM

    Packaged type variable speed discharge pressure systemGray water lift pumps (one duty & one stand-by), including

    piping and valves network within pump chamber, complete

    with all controllers, accessories for automatic operation as

    scheduled on drawing as per spec. section 15453

    01 Gray water lift pumps CAP. 5.23 KW 1 Set

    Allow for the design, supply and installation of packaged

    type waste water treatment plant complete including filter,

    chemical feeders, air blowers controls, wirings, piping and

    all as associated works as per specifications section 02736

    and scheduled on drawing

    02 Packaged water treatment unit 1 Item

    NON-POTABLE WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 for

    non-potable water the work shall include but not limited to

    fittings, supports, all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    03 75 mm dia. 22 M

    Accessories

    04 Isolating & check valve assembly 75 mm dia. 2 No

    05 Water metre assembly 50mm dia., ref. (WMA) 3 No

    06 Back flow preventer assembly, ref. BFPA 3 No

    Supply, install and testing pipework, UPVC Schedule 80 for

    fire water the work shall include but not limited to

    fittings, supports, all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    07 100 mm dia. 15 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    14 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    15/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    FIRE WATER UTILITIES

    Supply, installation and test Electrically driven horizontalsplit case centrifugal fire pump, including piping network

    and valving within pump chamber,complete with all

    controllers, accessories for automatic operateion and all

    associate workks as per code standard and as scheduled on

    drawings and specification

    01 Ref. FP1 CAP 75 KW electrically driven 1 No

    02 Ref. FP2 CAP 75 KW fuel diesel driven 1 No

    Supply, installation and test Electrically driven peripheral

    turbine Jockey pump, including piping network and valving

    within pump chamber, complete with all controllers,

    accessories for automatic operateion and all associate

    workks as per code standard and as scheduled on drawings

    and specification

    03 Ref. JP CAP 5 KW 1 No

    IRRIGATION WATER INSTALLATION

    Supply, install and testing pipework, UPVC Schedule 80 for

    Irrigataion water the work shall include but not limited to

    fittings, supports, all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    04 20 mm dia. 115 M

    05 25 mm dia. 140 M

    06 32 mm dia. 170 M

    07 40 mm dia. 160 M

    08 50 mm dia. 370 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    15 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    16/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    IRRIGATION WATER INSTALLATION

    Accessories

    01 Supply and installation irrigation controller as detailed on drwings 1 No.

    and as per specifications

    02 Supply and installation bubbler for trees 10 No.

    03 Supply and install bubbler for shrubs, ground cover and 869 No.

    succulents

    04 Supply and installation spray lawn sprinkler 60 No.

    05 Gate valve W/valve box 20 mm dia., 1 No.

    06 Gate valve W/valve box 25 mm dia., 1 No.

    07 Gate valve W/valve box 32 mm dia., 1 No.

    08 Gate valve W/valve box 40 mm dia., 2 No.

    09 Gate valve W/valve box 50 mm dia., 6 No.

    Supply and installation remote control valve assembly

    including piping complete with valve box, Y-strainer,

    accessories and all associated works as detail on drawing

    and as per specifications section 02810

    10 Ref. RCV 20mm dia. 1 No.

    11 Ref. RCV 25mm dia. 1 No.

    12 Ref. RCV 32mm dia. 2 No.

    13 Ref. RCV 40mm dia. 3 No.

    14 Ref. RCV 50mm dia. 9 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    16 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    17/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIESEL FUEL STORAGE TANK INSTALLATION

    Allow for underground fiberglass diesel fuel storage tankwith required capacity including concrete anti-flotation

    pad, heavy duty traffic type manhole ring and cover,

    pipework, valves duplex diesel fuel transfer pumps, steel

    ladder, pea gravel bed, earthworks, fixings and accessories

    all as detailed on drawings

    01 Proprietary tank units CAP. 5675 Lit. 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    17 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    18/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    SITE DEVELOPMENT

    Collection

    Sheet -1

    Sheet -2

    Sheet -3

    Sheet -4

    Sheet -5

    Sheet -6

    Sheet -7

    Sheet -8

    Sheet -9

    Sheet -10

    Sheet -11

    Sheet -12

    Sheet -13

    Sheet -14

    Sheet -15

    Sheet -16

    Sheet -17

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    18 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    19/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 2 - SITE WORK

    SITE GRADING

    All additional excavation required for temporary works and spaces,

    shoring, dewatering, removal of surplus excavated materials,

    support, temporary spoil heaps and general compaction Note

    EXCAVATION AND EARTHWORK

    Necessary moving or transportation about the site excavation Note

    material including handling to temporary stockpile or ultimate

    disposal off site is to be included in the unit rate of excavation

    Excavation in natural land consisting of solid rock formation,cracked rocks, bolders and natural contoured soil, temporary

    earthwork supports, dewatering ( if any ) as per

    specifications sections 02200

    01 Excavation for foundations commencing from existing grade level 82460 M

    Backfilling

    02 Approved selected imported fill material including compaction in 1100 M

    making up levels around and over foundations, beds and the like as

    per spec. sections 02200

    03 Approved fill material selected from excavated material including M price only

    compaction as per specification section 02200

    Drainage layer

    04 100 mm thick compacted coarse gravel to underside of slabs on 18 M

    grade as per specification section 02200

    Soil treatment application for termite control

    05 To subgrades of slabs and along periphery of building The work 21170 M

    shall include all materials and equipments required to completeand finish the work according to specifications and code of

    practice

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    19 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    20/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 2 - SITE WORK

    TRAFFIC MARKING DIMENSION

    Thermoplastic paint for traffic marking on parking pavement

    as detail 11 shown on drawing CL-GA-901 and specification

    01 Straight arrows 93 No.

    02 Straight & curved arrows 1 No.

    03 Parking lane marking 3817 M

    04 Parking lane marking at site 175 M

    05Handicapped marking on floor

    16 No.

    06 ENTRY (text) 5 No.

    07 NO ENTRY (text) 8 No.

    08 EXIT (text) 3 No.

    09 Lane numbers 493 No

    To Collection SR

    To Collection

    Sheet 19

    sheet 20

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    20 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    21/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    CONCRETE TYPES

    Include in Unit Rates for concrete of the following types and

    locations:

    20 Mpa

    a) Blinding concrete

    b) Catch basins and side walks Note

    40 Mpa

    a) Footings

    b) Columns and R.C. walls

    c) Floor and roof slabs, beams, girders, stairs

    d) Concrete topping or structural screed

    e) Slab on grade

    f) water tanks

    Water stops including junction accessories are not measured

    separately The cost of water stop items are to be included in the

    unit rates of the related concrete items

    To Collection

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    21 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    22/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    Plain insitu concrete, 20 Mpa, cement type V as per drawingsand specifications section 03300

    01 Screed, 50mm thick 1085 M

    02 Blinding beds, 100mm thick 2170 M

    Supply and placing Insitu reinforced concrete, 40 Mpa

    cement type V including formwork and steel reinforcements

    conforming to ASTMA615and A185 and all requiments to

    finish the work according to drawings as per specifications

    sections 03100, 03200 & 03300 , and code of practice in:

    03 Raft foundation various thickening including depression areas, 13605 M

    sump pits and elevators pits and electrical cables trench

    04 Retaining walls 775 M

    05 Reinforced concrete for tanks 351 M3

    06 Slab on grade 125 mm thick with A193WWF mesh reinforcement 3 M

    including thickening

    To Collection

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    22 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    23/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    Supply and placing of Insitu reinforced concrete, 40 Mpa

    type I cement including formwork and steel reinforcements

    conforming to ASTM A615 and A185 and all requirements to

    finish the work according to the drawings,as per

    specifications sections 03100, 03200 & 03300,and code of

    practice

    01 Columns 436 M

    02 Shear wall 270 M

    03 Beams 35 M

    04 Suspended flat slabs, 300mm thickening including drop panel 2790 M

    05 Suspended flat slabs, 320mm thickening including drop panel 1539 M

    06 Suspended flat slabs, 380mm thickening including drop panel 1002 M

    07 Ramps 120 M

    08 Stairs including landings 66 M

    PRECAST CONCRETE

    Precast concrete wheel stopper including dowels, grouting

    and accessories for complete installation as per detail 21 on

    drawing CL-GA-901 and specification

    09 Precast concrete wheel stopper including fixings 493 No.

    10 Ditto,but at site 60 No.

    To Collection

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    23 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    24/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    CONCRETE WORK

    Sundries

    01 Allow for reinforced concrete equipment pads including upstand 8 M

    surrounds and anti-vibration accessories as required

    02 Allow for expansion joint, fillers, back rods and sealants at 955 M

    expansion joints of concrete as required.

    03 150mm thick raised slabs, Handicapped`s ramps and curbs to suit 4569 M

    required areas as per detail 10,14, 20 on drawing CL-GA-901

    To Collection

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    24 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    25/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 3 - CONCRETE

    Collection

    Sheet - 21

    Sheet - 22

    Sheet - 23

    Sheet - 24

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    25 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    26/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 4 - MASONRY

    UNIT MASONRY

    Supply and fix concrete masonry blocks in courses with

    cement lime mortar including concrete lintels over

    openings , horizontal and vertical reinforcement, fixings,

    fillers, sealants and grout to complete the work according

    to specifications and drawings

    01 200 mm thick wall 655 M

    02 200 mm thick wall one hour fire rated 181 M

    03 Ditto, but two hour fire rated 428 M

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    26 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    27/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 5 - METALS

    EXPANSION JOINT

    Supply and install expansion joint including extruded

    aluminum assemblies, fillets, accessories, fixing and

    sealants as per detail1 on drawing CL-GA-902. Price includes

    all required to thoroughly completet the work according to

    code of practice and as per specification

    01 Per linear meter, expansion joint for floor and ceiling as per detail 955 M

    1CL-GA-902

    Steel cover as per details on drawings

    02 To suit electrical cable trench 60 M2

    03 Per number, supply and install steel bollard comprising 150

    mm dia. painted finish steel pipe filled with concrete,

    including fixings, finishing, and all associated and required to

    thoroughly complete the work as per detail no.19 on drawing

    CL- GA-901 and as per specifications and supervisor

    engineer's instructions

    04 Per number, Bollards, exposed height 750 24 No

    mm high

    05 Supply and install 30mm depth panted galvanized cast iron

    gratings including 40x40mm steel angle, medium gauge

    galvanized gutter slope to drain and all required for fixing

    and finisheng as per detail no.13 on drawing CL-GA-901 and 20 M

    specificatons

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    27 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    28/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 7 - THERMAL AND MOISTURE PROTECTION

    Water proofing and moisture protection as per specificationsection 07100

    01 Membrane waterproofing to suit "wet room" areas including upturn 43 M

    to abutting walls or upstands concrete screed and all required

    material and equipments to complete the work as per details

    shown on drawing, according to specifications and code of practice

    02 Membrane waterproofing to suit concrete wall and foundation 24855 M2

    03 Protection board to suit concrete walls 3500 M2

    Vapour barrier

    04 Vapour barrier to underside of slabs, beds, and the like, 18 M

    specifications section 07100

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    28 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    29/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 8 - DOORS AND WINDOWS

    DOOR SETS

    Supply and install all doors to suit masonry openings and approved Note

    samples including fixings, decorations, frames, architrave,

    hardwares and saddles and all required materials and equipments

    to complete and finish the work as detailed on drawing VL-GA-02

    and according to specifications and code of practice

    TYPE A : 44mm thick painted wood door door including

    frames and decortion as per drawings and specification

    01 TypeA1, single leaf door, size 800x2150mm 11 No.

    TYPE B : 44mm thick painted hollow metal insulated

    door including door grill (where required)

    02 Type B1, single leaf door, size 900x2150mm and 45 minute 4 No.

    fire rated

    03 Type B3, single leaf door, size 800x2150mm and 45 minute 1 No.

    fire rated

    04 Type B5, single leaf door, size700x2150mm 5 No.

    05 Type B6, double leaves door, leaf size 950x2400mm and 45 minute 1 No.fire rated

    TYPE C : 44mm thick fully louvered paneled hollow metal.

    door motorized adjustable louvers panel working upon signal

    from fire alarm system for generator including frames

    including frames and decoration as per drawings and

    specifications

    06 Type C1, double leaves door, leaf size 950x2400mm and 45 minute 9 No.

    fire rated

    07Type C2, double leaves door, leaf size1050x2400mm and 45 minute 1 No.fire rated

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    29 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    30/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 8 - DOORS AND WINDOWS

    DOOR SETS

    TYPE D : 44mm thick paneled hollow metal door with 6 mm

    thick wired glass fixed vision panel including frames and

    decoration as per drawings and specifications

    01 Type D2, single leaf door, size900x2150mm 3 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    30 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    31/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 8 - DOORS AND WINDOWS

    Collection

    Sheet - 29

    Sheet - 30

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    31 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    32/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 9 - FINISHES

    INTERNAL FINISHES

    Flooring including respective types of bounding materials,

    concrete screed sub-floor of required thickness, (if any)

    accessories for complete installations as per ID drawing

    and specification

    01 Epoxy paint on cement screed , ref.EC 325 M

    02 Anti carbonation Porcelain epoxy coating for pavement , ref.AEC 4569 M

    03 Multi component epoxy coating on concrete screed for drive way & 12988 M

    turns , ref.MEC

    04 Ceramic floor tiles size 600x600mm , ref.CR1 198 M

    05 Ceramic floor tiles size 300x300mm , ref.CR2 18 M

    Finishings : bases including sand-cement backing mortar

    and grout

    06 100 mm high Ceramic tiles base , ref. B03 215 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    32 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    33/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 9 - FINISHES

    INTERNAL FINISHES

    Finishings : walls including metal angle beads and lathing at

    junctions of differing backgrounds

    01 Cement plaster to suit walls 8420 M

    02 Paint on cement plaster ,ref. W01 8420 M

    03 Non toxic epoxy paint on structure ,ref. W07 2139 M

    04 Ceramic wall tiles ,ref. W03 105 M

    Finishings : ceilings

    05 Cement plaster to suit ceiling 18058 M

    06 Paint on cement plaster, ref.C01 18058 M

    07 Metal tiles 600x600mm Ref. C05 40 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    33 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    34/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 9 - FINISHES

    Collection

    Sheet - 32

    Sheet - 33

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    34 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    35/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 10 -SPECIALTIES

    CORNER & COLUMN GUARD

    Corner guards install at 600 high from finish floor heavy duty

    rubber guard bumper, including all associated works, as per

    detail 18 shown on drawing CL-GA-901 and as specification

    01 To suit column location as required 442 No

    ALUMINUM SAND TRAP LOUVERS

    Supply and installation fixed anodized aluminum sand trap

    louvers panels on anodized aluminum frames including

    fixings and including frames and decoration as per drawing

    CL - GA- 802 and specifications

    02 Ref.L02, size1800x3200mm . 1 No.

    03 Ref.L03, size2500x3200mm . 2 No.

    04 Ref.L04, size2500x3400mm . 3 No.

    05 Ref.L05, size2500x1500mm . 6 No.

    06 Ref.L06, size2500x2300mm . 2 No.

    07 Ref.L07, size700x450mm . 2 No.

    08 Ref.L08, size400x700mm . 6 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    35 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    36/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 10 -SPECIALTIES

    SIGNAGE

    Manufacturer's standard indoor signs, letters and plaques

    including fixings, finishes, accessories complete as per

    interior design drawings CL02-i901 to CL02-i910 and all

    required materials and equipments to complete and finish

    the works according to specifications, drawings and code of

    practice

    01 Ref. type S01 23 No

    02 Ref. type S02 9 No

    03 Ref. type S09 3 No

    04 Ref. type S10 102 No

    05 Ref. type S11 14 No

    06 Ref. type S12 22 No

    07 Ref. type S13 1 No

    TOILET AND BATH ACCESSORIES

    Supply and installation of following

    toilet and bath accessories as per

    schedule including fixings andtrims as shown on drawings and

    specification

    08 Ref. FM2, Clear glass mirror with stainless steel frame, size 400 x 5 No

    600 mm

    09 Ref. RH, Single robe hook 10 No

    10 Ref. SDH, Wall mounted soap dish and holder . 5 No

    11 Ref.SH1 wall mounted shower head . 5 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    36 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    37/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 10 -SPECIALTIES

    Collection

    Sheet - 35

    Sheet - 36

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    37 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    38/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 14 - CONVEYING SYSTEMS

    AUTOMATED WASTE COLLECTION SYSTEM

    Supply and provide all required to construct, test and operate

    automated waste collection system, consisting of the following

    items:-

    01 Discharge valve room with basement floor including all required works 10 No.

    as detailed on drawing no. STM - ITCCP2 - TD - 008. Contractor shall

    perform all required coordination with other trade to ensure proper

    installation and operation of the complete system to transport waste

    from tower chute to pipe networks as shown on drawings STM -

    ITCCP2 - TD - 001 to 007 and 015, 016 and according to

    manufacturer's standards and specifications

    02 Full Vacuum Load station including required earthworks, concrete 1 No.

    works, masonry and electromechanical works for the vacuum room

    and PAI service box located at the end of pipe work including all

    required works as detailed on drawing no. STM - ITCCP2 - TD - 010

    and 011. Contractor shall perform all required coordination with other

    trade to ensure proper installation and operation of the complete

    system to transport waste kitchen areas to pipenetworks as shown

    on drawings STM - ITCCP2 - TD - 001 to 007 and according to

    manufacturer's standards and specifications

    PIPE WORK

    Supply and installation of Automated waste collection systempiping. Item shall include the earth works, insulation,

    ,concentric reducer, puddle flanges ,inspection covers and all

    required materials and equipments to complete the transport

    pipe line from DV rooms , outdoor load stations and full

    vacuum load stations to waste plant

    03 508mm under/above ground transport pipe 975 M

    RC MANHOLE

    Supply and install cast insitu or precast reinforced concrete

    manhole ,the item shall include excavation, backfill insulation

    ,inspection cover and all required to complete the work.

    04 RC manhole to suit required location in sitesas shown on drawings 20 No.

    STM - ITCCP2 - TD 001 to 016

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    38 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    39/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    SANITARY FIXTURES

    Supply and install sanitary fixtures, water mixers and

    accessories, as selection schedule, the work shall include

    but not limited to necessary fittings, trims, valves, traps,

    spouts and all materials and equipment required to

    complete and finish the work according to specifiactions,

    drawings and code of practice

    01 Floor mounted water closet with f lush tank, ref. (WC) 5 No

    02 Lavatory without pedistal, ref. LAV 5 No

    03 Counter top one bowel sink, ref. 03 3 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    39 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    40/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    WASTE AND DRAINAGE INSTALLATION

    Supply, installation and test drainage pipe work UPVC

    schedule 40 the work shall include but not limited to fittings,

    supports hangers, excavation, backfilling, cast iron pipes on

    roof for vent with caps and all materials and equipment

    required to complete and finish the work according to

    specifiactions, drawings and code of practice

    01 32 mm dia 310 M

    02 40 mm dia 85 M

    03 50 mm dia 380 M

    04 75 mm dia 820 M

    05 100 mm dia 1700 M

    06 150 mm dia 1415 M

    Supply, installation and test drainage pipe work UPVC

    schedule 80 the work shall include but not limited to fittings,

    supports hangers, excavation, backfilling, cast iron pipes on

    roof for vent with caps and all materials and equipment

    required to complete and finish the work according tospecifiactions, drawings and code of practice

    07 100 mm dia 175 M

    Accessories

    08 Floor drain, 50 mm dia., ref. (FD) 32 No.

    09 Parking drain, 150mm dia., ref. PD 50 No.

    10 Cleanout, 50 mm dia., ref. (CO) 3 No.

    11 Cleanout, 75 mm dia., ref. (CO) 61 No.

    12 Cleanout, 100 mm dia., ref. (CO) 126 No.

    13 Cleanout, 150 mm dia., ref. (CO) 14 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    40 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    41/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    WASTE AND DRAINAGE INSTALLATION

    Accessories

    01 Floor cleanout 50mm dia., ref. (FCO) 18 No.

    02 Floor cleanout 100mm dia., ref. (FCO) 1 No.

    03 Floor cleanout 150mm dia., ref. (FCO) 1 No.

    04 Gully trap, ref. GT 2 No.

    05 Trench drain outlet, 100mm dia., ref. TDO 4 No.

    06 Running trap 32mm dai., 10 No.

    Reinforced concrete sump pit including internal lining,

    proprietary galvanized steel manhole cover and frame,

    guide bar, lifting chain and all associated works, valves

    pipework within sump pit chamber as detailed on drawings

    (concrete work & earthwork, waterproofing measured

    elsewhere)

    07 Sump pit 8 No.

    Submersible pumps (one duty and one stand-by) includingassociated valves, pipework, valves controllers and

    accessories within sump pit chamber as described on

    drawings (sump pit measured separately)

    08 Ref. SP1 capacity 1.5 HP 8 Set

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    41 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    42/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    POTABLE WATER INSTALLATION

    Supply, installation and test pipework, plypropylene

    for potable water the work shall include but not limited

    to installation, fittings, insulation for hot pipework,

    valves, supports and all materials and equipment

    required to complete and finish the work according to

    specifications, drawings and code of practice

    01 15 mm dia. 58 M

    02 20 mm dia. 758 M

    03 25 mm dia. 195 M

    04 50 mm dia. 740 M

    05 63 mm dia. 220 M

    06 75 mm dia. 60 M

    07 100 mm dia. 245 M

    NON-POTABLE WATER INSTALLATION

    Supply, installation and test pipework, plypropylenefor non-potable water the work shall include but not limited

    to installation, fittings, insulation for hot pipework,

    valves, supports and all materials and equipment

    required to complete and finish the work according to

    specifications, drawings and code of practice

    08 20 mm dia. 25 M

    09 50 mm dia. 1550 M

    10 63 mm dia. 215 M

    11 75 mm dia. 500 M

    12 100 mm dia. 330 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    42 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    43/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    HOT WATER INSTALLATION

    Supply, installation and test pipework, plypropylene

    for hot water the work shall include but not limited to

    installation, fittings, insulation for pipework, valves,

    supports and all materials and equipment required to

    complete and finish the work according to specifications,

    drawings and code of practice

    01 15 mm dia. 55 M

    02 20 mm dia. 10 M

    Accessories

    03 Water meter assembly 63mm dia., 10 No.

    04 Isolating valve 20 mm dia., ref. (IV) 7 No.

    05 Isolating valve, 25 mm dia, ref. (IV) 9 No.

    06 Isolating valve, 50 mm dia, ref. (IV) 24 No.

    07 Isolating valve, 75 mm dia, ref. (IV) 20 No.

    08 Isolating valve, 100 mm dia, ref. (IV) 1 No.

    09 IV & CV assembly 50 mm dia., 2 No.

    10 IV & CV assembly 100 mm dia., 5 No.

    11 Hand spray with flexible hose and wall hook, ref. (HS) 5 No.

    12 Wall mounted shower head with mixer, ref SH 4 No.

    13 Hose bib, 20mm dia., ref. )HB) 48 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    43 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    44/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    Supply, install, testing and commissioning electrical water

    heaters the work shall include but not limited to short

    length pipework, valves, supports, controls, fixings,

    accessories and all associate works and all materials and

    equipments required to complete and finish the work

    according to drawings, specification and code of practices

    01 Ref. EWH- 1 3 No

    Drainage installation

    Reinforced concrete gray water tank with proprietary

    medium duty cast iron manhole cover and frame, includingsump pit, submersible pumps, internal lining, access ladder

    vent pipework within tank as detailed on drawing (Concrete

    work, earthwork & water proofing measured elsewhere)

    02 Gray water tank CAP. 41 m3 1 No

    03 Gray water tank CAP. 44 m4 1 No

    04 Gray water tank CAP. 70 m5 1 No

    Packaged type variable speed discharge pressure system

    Gray water lift pumps, including piping and valves network

    within pump chamber, complete with all controllers,accessories for automatic operation as scheduled on

    drawing as per spec. section 15453

    05 Gray water lift pumps CAP. 5 KW 2 Set

    06 Gray water lift pumps CAP. 6 KW 1 Set

    Allow for the design, supply and installation of packaged

    type waste water treatment plant complete including filter,

    chemical feeders, air blowers controls, wirings, piping and

    all as associated works as per specifications section 02736

    and scheduled on drawing

    07 Packaged water treatment unit. Cap. 41 m3/day 1 No.

    08 Packaged water treatment unit. Cap. 44 m3/day 1 No.

    09 Packaged water treatment unit. Cap. 70 m3/day 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    44 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    45/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATIONS

    Packaged type duplex unit discharge pressure system

    potable water lift pumps, (one duty & one stand by)

    including piping and valves network within pump chamber,

    complete with all controllers, accessories for automatic

    operation as scheduled on drawing and specification

    section 15453

    01 Circulating potable water pump CAP. 7.17 KW 2 Set

    02 Circulating potable water pump CAP. 0.5 HP 2 Set

    Reinforced concrete under ground water tank and pump

    room with proprietary cast iron manhole covers andframes, including internal lining access ladders, pipework

    submersible pump, ventilating fans with exhaust and fresh

    air pipework, valves, vent pipes and truck fill pipework as

    detailed on drawings (concrete work & earthwork, water

    proofing measured elsewhere)

    02 Potable Water tank CAP. 263 M3 1 No.

    03 Potable Water tank CAP. 265 M3 1 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    45 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    46/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    FIRE WATER UTILITIES

    Supply, installation and test Pipework, UPVC class 5

    including fittings, trenching, back fill supports system and

    all associate works as per code standard

    01 25 mm dia. 2705 M

    02 32 mm dia. 675 M

    03 40 mm dia. 875 M

    04 50 mm dia. 265 M

    05 100 mm dia. 1505 M

    06 150 mm dia. 430 M

    Accessories

    07 Pendent sprinkler head 70 No

    08 Upright sprinkler head 1260 No

    09 Side wall sprinkler head 15 No

    10 100mm Fire departement valve , ref. FDV 26 No

    11 Floor control valve assembly 150mm dia., ref. FCVA 4 No

    12 Fire department connection, 2 way fire department inlet

    connection type with gate and check valve 100mm dia. 4 No

    13 Back folw preventer assembly, 150mm dia., ref. BFPA 1 No

    14 Supervisory switch 150mm dia., 1 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    46 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    47/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    FIRE WATER UTILITIES

    Supply, install, testing and commissioning proprietary

    integrated fire hose reel and fire extinguisher cabinet the

    work shall include but not limited to fire extinguisher, hose

    reel nozzle, fixings, isolating valve 40 mm dia., trims and

    all associate works and all materials and equipments

    required to complete and finish the work according to

    drawings, specification and code of practices

    01 Ref. FHC 12 No

    Supply, install, testing and commissioning portable

    multipurpose fire extinguisher the work shall include butnot limited to fixing to wall, all associate works and all

    materials and equipments required to complete and finish

    the work according to drawings, specification and code of

    practices

    02 Ref. PFE 3 No

    03 Ref. CO2 10 No

    CO2 system

    Supply, install and test CO2 cylinders including pipe work,

    black steel seamless for CO2 fittings, supports valves,

    regulators, sleeves, as shown on drawings and as per

    specification

    04 CO2 cylinders CAP 45 KG 52 No.

    05 Control panel 22 No.

    06 Remote manual release 22 No.

    07 Abort switch 22 No.

    08 Alarm bell 22 No.

    09 4-port nozzle 22 No.

    10 Ioization detector 22 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    47 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    48/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15 - MECHANICAL

    PLUMBING INSTALLATION

    DIESEL FUEL STORAGE TANK INSTALLATION

    Allow for underground fiberglass diesel fuel storage tank

    with required capacity including concrete anti-flotation

    pad, heavy duty traffic type manhole ring and cover,

    pipework, valves duplex diesel fuel transfer pumps, steel

    ladder, pea gravel bed, earthworks, fixings and accessories

    all as detailed on drawings

    01 Proprietary tank units CAP. 1890 Lit. 1 No.

    02 Proprietary tank units CAP. 2800 Lit. 2 No.

    To Collection SR

    Collection

    Sheet -39

    Sheet -40

    Sheet -41

    Sheet -42

    Sheet -43

    Sheet -44

    Sheet -45

    Sheet -46

    Sheet -46

    Sheet -47

    Sheet -48

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    48 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    49/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    CHILLED WATER SYSTEM

    Supply, install and test black steel pipework including

    fittings thermal insulation, valves, gagues, strainers,

    flexible connections and accessories as per required

    drawings and spec. sections15050 to 15140 ,15510

    01 15 mm dia. 175 M

    02 20 mm dia. 40 M

    03 25 mm dia. 70 M

    04 32 mm dia. 65 M

    05 40 mm dia. 30 M

    06 100 mm dia. 280 M

    07 150 mm dia. 185 M

    08 200 mm dia. 450 M

    09 300 mm dia. 260 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    49 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    50/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Isolating valves

    01 300 mm dia. 2 No.

    02 200 mm dia. 4 No.

    03 40 mm dia. 10 No.

    04 32 mm dia. 10 No.

    Check valve

    05 40 mm dia. 5 No.

    06 32 mm dia. 5 No.

    BTU meter

    07 40 mm dia. 5 No.

    08 32 mm dia. 5 No.

    Supply, install, test and commission, Fan coil units ducted

    type including control valves, pressure & temperature,

    gauge, Y-strainer mounting and fixing as per drawings and

    specifications section 15781

    09 Ref. FCU-02, 4 KW cooling capacity 5 No.

    10 Ref. FCU-03, 2.4 KW cooling capacity 5 No.

    11 Ref. FCU-04, 5.1 KW cooling capacity 5 No.

    12 Ref. FCU-05, 4.4 KW cooling capacity 5 No.

    13 Ref. FCU-06, 1.5 KW cooling capacity 3 No.

    14 Ref. FCU-07, 2.7 KW cooling capacity 6 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    50 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    51/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply and install of A/C unit room air conditioning type

    with wooden frame as detailed on drawing and

    specifications

    01 Ref. RAC-01, 3.5 KW nominal coolling capacity 21 No.

    Supply, install, test and commission DX- ducted split unit

    including control, pipes and fixing as per drawings and

    specifications

    02Ref. FCU-01/ACC-01, 4KW capacity 3 No.

    Supply, install, test and commission, Ventilating fans as

    details on drawings and specifications, section 15860

    03 Ref. PEF- 01, 13500/22500 LPS capacity with exh. Duct and 6 No.

    CAP. On roof

    04 Ref. EF- 02, 50 LPS capacity 3 No.

    05 Ref. EF- 03, 1335 LPS capacity 3 No.

    06 Ref. EF- 04, 135 LPS capacity 3 No.

    07 Ref. EF- 05, 105 LPS capacity 3 No.

    08 Ref. EF- 06, 80 LPS capacity 11 No.

    09 Ref. EF- 07, 160 LPS capacity 4 No.

    10 Ref. EF- 08, 55 LPS capacity 10 No.

    11 Ref. EF- 09, 30 LPS capacity 1 No.

    12 Ref. EF- 10, 40 LPS capacity 1 No.

    13 Ref. EF- 11, 30 LPS capacity 4 No.

    14 Ref. EF- 12, 40 LPS capacity 2 No.

    15 Ref. BIF- 12, 3480 LPS capacity 23 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    51 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    52/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install, test and commission, Supply air round

    ceiling diffusers with opposed blade volume damper

    including frame trims & insulated plenum box as detailed

    on drawing and specification, section 15860

    01 Ref. SD1 5 No.

    02 Ref. SD2 20 No.

    Supply, install, test and commission, Supply air tegister

    as detaild on drawings and specification

    03 Ref. SR1/RR1 6 No.

    Supply, install, test and commission, door grille

    as detailed on drawings and specification

    04 Ref. DG1 2 No.

    05 Ref. DG2 10 No.

    06 Ref. DG3 18 No.

    Supply and install exhaust register as detailed on

    drawing and specification, section 15891

    07 Ref. ER1 12 No.

    Supply and install Galvanized steel sheet rectangular

    ductwork, including supports and volume damper ,

    and bill mouth opening as per drawings and

    specification, section 15891

    08 Various gauges 950 Kg

    Supply and install Duct insulation

    09 Thermal semi-rigid insulation to rectangular ductwork 245 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    52 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    53/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Supply, install and operations supply motorized damber

    door louver as detailed on drawing and specifications

    01 Size 2200 x 950 mm 3 No.

    Supply, install, test and commission, Supply air square

    ceiling diffusers as detailed on drawing and specification,

    section 15860

    02 Ref. SD 1/A,B,C 15 No.

    Supply, install, test and commission, return air round

    ceiling diffusers as detailed on drawing and specification,

    section 15860

    03 Ref. RD 1 5 No.

    04 Ref. RD 2 20 No.

    Supply, install, test and commission, return air square

    ceiling diffusers as detailed on drawing and specification,

    section 15860

    05 Ref. RD 1/A,B,C 15 No.

    Supply, install and test generator exhaust ductwork with

    canvass connection

    06 To suit generator room 3 No.

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    53 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    54/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 15B - MECHANICAL

    HVAC INSTALLATIONS

    Collection

    Sheet - 49

    Sheet - 50

    Sheet - 51

    Sheet - 52

    Sheet - 53

    To Bill Summary SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    54 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    55/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MEDIUM VOLTAGE INSTALLATION

    MVSWGR (medium voltage switchgear)

    Supply , install , testing and commissioning 13.8 KV, 3 phase,

    60 Hz,SF6 MVSWGR with 2 cells including all associated works

    to complete installation as per drawings and specifications.

    The contractor shall prepare sketches and details for approval

    from SEC and shall make arrangement and required

    coordination with supervising engineer to complete the work

    01 Ref (MVSWGR/CL-2) 1 No

    RING MAIN UNIT

    Only installation, testing and commissioning for 13.8 KV, 3

    phase, 60 Hz SF6 ring main unit including all associated works

    for complete installation as per drawings and specifications and

    required coordination (supply will be by client)

    02 Ring Main Units , ref (RMU1-CL2 ,RMU2-CL2& RMU3-CL2) 3 No

    Supply , install, testing and commissioning of the following

    equipment including grounding, all accessories and necessary

    works required for installation as per SEC regulation and as

    shown on the drawings and as described in specifications andrequired coordination

    03 Dry type transformer 1600 KVA, 13.8KV -400/230V, 3PH, 60HZ , ref 3 No

    (TR1-CL2 , TR2-CL2 &TR3-CL2)

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    55 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    56/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MEDIUM VOLTAGE INSTALLATION

    Supply , install and test medium voltage copper Cables 15KV/

    XLPE/STA/PVC, between medium voltage equipments as

    shown on drawings and coordination with other disciplines

    shall be conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best possible

    and specifications

    01 Medium voltage cable comprising 3 core 70 mm CU / XLPE /STA/ 15 M

    PVC, cables route from RMU up to transformers

    02 Medium voltage cable comprising 3 core 300 mm CU / XLPE /STA/ 510 M

    PVC, cables

    Smart Metering System

    Supply, installation , testing and commissioning of Smart

    Metering System comprising of M-bus master controller ,M-bus

    IP router, complete with soft ware, including electronic

    KWH meter, interface with water meter& digital BTU meter,

    M-bus & 1 pair twisted cable # 22 AWG for each meter,

    and the necessary connection to TCP/IP net work and

    all associated works required as shown on drawing and as

    described in specifications

    To suit Building Smart Metering System as required to form a Note

    complete and fully operative system to link all project buildings

    with the existing data center at phase (1)

    03 Electronic KWH meters 12 No

    04 M-bus master controller complete with software 12 No

    05 M-bus IP router 12 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    56 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    57/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Sub-Main Circuit: supply , install , testing and commissioning

    600/1000V XLPE multicore copper cable in conduit or cable

    tray (measured elsewhere ) , including earth cable, junction

    boxes, connection for feeders and various power loads as

    shown on drawings and coordination & integration with other

    systems shall be conducted during work execution as per

    technical specifications, drawings and by making arrangement

    with supervising engineer to achieve the work to the best

    possible and specifications

    01 4C-10mm2-CU/XLPE/PVC+10mm2G/ cable trench 236 M

    02 4C-10mm2-CU/XLPE/PVC+10mm2G/ cable trench 5 M

    03 4C-50mm2-CU/XLPE/PVC+25mm2G/ cable tray 682 M

    04 4C-95mm2-CU/XLPE/PVC+50 mm2G / cable tray 10 M

    05 4C-95 mm2-CU/XLPE/PVC+ 50 mm2G / cable trench 5 M

    06 4C-95mm2-CU/XLPE/PVC+50mm2G/ 1 x110mm UPVC conduit 21 M

    07 2(4C-120mm2-CU/XLPE/PVC)+120mm2G / cable tray 121 M

    08 2(4C-150mm2-CU/XLPE/PVC)+150mm2G / cable tray 198 M

    09 2(4C-150mm2-CU/XLPE/PVC)+150mm2G / cable trench 10 M

    10 4C-185mm2-CU/XLPE/PVC+95mm2G / cable trench 10 M

    11 2(4C-185mm2-CU/XLPE/PVC) / cable tray 12 M

    12 4C-185mm2-CU/XLPE/PVC / 1 x110mm UPVC conduit 18 M

    13 2(4C-185mm2-CU/XLPE/PVC) / 2 x110mm UPVC conduit 15 M

    14 2(4C-185mm2-CU/XLPE/PVC)+185mm2G / cable tray 364 M

    15 2(4C-185mm2-CU/XLPE/PVC)+185mm2G / cable trench 5 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    57 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    58/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Sub-Main Circuit: supply , install , testing and commissioning

    600/1000V XLPE multicore copper cable in conduit or cable

    tray (measured elsewhere ) , including earth cable, junction

    boxes, connection for feeders and various power loads as

    shown on drawings and coordination & integration with other

    systems shall be conducted during work execution as per

    technical specifications, drawings and by making arrangement

    with supervising engineer to achieve the work to the best

    possible and specifications

    01 4C-240mm2-CU/XLPE/PVC+120mm2G / cable tray 121 M

    02 4C-240mm2-CU/XLPE/PVC+120mm2G / cable trench 5 M

    03 2(4C-240mm2-CU/XLPE/PVC)+240mm2G / cable tray 125 M

    04 2(4C-240mm2-CU/XLPE/PVC)+240mm2G / cable trench 29 M

    05 4C-300mm2-CU/XLPE/PVC+150mm2G / cable tray 198 M

    06 3(4X1C-630mm2)-CU/XLPE/PVC / cable trench 30 M

    The following items listed below shown in drawing AP05 - E701 ,

    AP07 - E701 &SF03 - E701(inside each apartment building

    AP05, AP07 &SF03.)

    07 4C-10mm2-CU/XLPE/PVC+10 mm2G/ cable tray 100 M

    08 4C-10mm2-CU/XLPE/PVC+10mm2G/ 50mm UPVC conduit 100 M

    09 4C-50mm+1C-25mmG-CU/XLPE/PVC/ cable tray 50 M

    10 4C-70mm+1C-35mmG-CU/XLPE/PVC / cable tray 50 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    58 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    59/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply and install an Emergency Power Generating Sets

    including associated Generator Control Panel . In addition to

    circuit breakers, pads, supports, controls, daily and diesel fuel

    with necessary connections to earth as per the manufacture

    including all necessary equipment, accessories and associated

    works, as shown on drawings and as described in

    specifications. sections

    01. - , , , , , , .

    1 No

    02

    . - , , , , , , .

    1 No

    03. - , , , , , , .

    1 No

    MAN / HAND HOLE

    Supply, install, testing and commissioning reinforced concrete

    manholes and hand holes connected via UPVC conduit,

    complete with hand hole bolted type metal cover, drain pipe

    outlet, including trenching and backfilling for UPVC conduits

    for power and communication cables in UPVC conduit, tapes, ,

    grounding, all as required to suit locations as shown on

    drawings and coordination & integration with other systems

    shall be conducted during work execution as per technicalspecifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best possible

    and specifications

    04 Power manhole (1800x1800x1800mm) ( Ref.PMH). 14 No

    05 Power hand hole (900x900x900mm) ( Ref.PHH). 3 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    59 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    60/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply , install , testing and commissioning of panel boards

    including grounding, circuit breakers, grounding, fixings,

    markers units and all associated works as required and shown

    on drawings and coordination & integration with other systems

    shall be conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best possible

    and specifications

    01 Ref. MDP-P1 1 No

    02 Ref. DP51 5 No

    03 Ref. DP52 5 No

    04 Ref. DPS5 5 No

    05 Ref. PPSD 5 No

    06 Ref. DPSB1 1 No

    07 Ref. PPSB1 1 No

    08 Ref. SLP2B ( listed in bill of site lighting package ) 1 No NIC

    09 Ref. EDPSB1 with ATS (built-in ) 1 No

    10 Ref. EPSB1 1 No

    11 Ref. EPMSB1 1 No

    12 Ref. EPMSB1A 1 No

    13 Ref. EMDP1 1 No

    14 Ref. EDPS5 with ATS (built-in ) 5 No

    15 Ref. EPSD 5 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    60 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    61/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply , install , testing and commissioning of panel boards

    including grounding, circuit breakers, grounding, fixings,

    markers units and all associated works as required and shown

    on drawings and coordination & integration with other systems

    shall be conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best possible

    and specifications

    01 Ref. MDP-P2 1 No

    02 Ref. DP71 5 No

    03 Ref. DPS7 5 No

    04 Ref. EPSF 5 No

    05 Ref. DP72 5 No

    06 Ref. DPSB2 1 No

    07 Ref. PPSB2 1 No

    08 Ref. SLP2A ( listed in bill of site lighting package ) 1 No NIC

    09 Ref. PPT 3 No

    10 Ref. EDPSB2 with ATS (built-in ) 1 No

    11 Ref. EPSB2 1 No

    12 Ref. EPMSB2 1 No

    13 Ref. EPMSB2A 1 No

    14 Ref. EMDP2 1 No

    15 Ref. EDPS7 with ATS (built-in ) 5 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    61 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    62/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Supply , install , testing and commissioning of panel boards

    including grounding, circuit breakers, grounding, fixings,

    markers units and all associated works as required and shown

    on drawings and coordination & integration with other systems

    shall be conducted during work execution as per technical

    specifications, drawings and by making arrangement with

    supervising engineer to achieve the work to the best possible

    and specifications

    01 Ref. EPSF 5 No

    02 Ref. MDP-P3 1 No

    03 Ref. EMDP3 1 No

    04 Ref. MCC ( supplied and installed by others ) 1 No NIC

    05 Ref. EPP1 1 No

    06 Ref. EPP2 1 No

    Supply , install , testing and commissioning of circuit breaker

    including cables, conduits, fittings, supports, fixings, tapes,connections enclosures and all necessary works required to

    suit the locations shown on drawings and coordination &

    integration with other systems shall be conducted during work

    execution as per technical specifications, drawings and by

    making arrangement with supervising engineer to achieve the

    work to the best possible and specifications

    07 200AT /250AF Rating. 1 No

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    62 / 79

    REVISED PAGE

    Date: MAY 2012

  • 7/28/2019 CL02 (MAY 2012)

    63/79

    PROJECT: Infrastructure buildings of the residential complex (phase 2)

    of ITCC complex - RIYADH

    REVISED BOQ FOR PARKING CLUSTERS (CL02)

    AMOUNT

    SRRATEITEM D E S C R I P T I O N QTY UNIT

    DIVISION 16 - ELECTRICAL

    MAIN AND SUB-MAIN POWER

    Sub-Main circuit :Supply , install, Power & Communication

    distribution galvanized steel cable trays, including fittings,

    supports and all accessories as described on drawing

    Coordination with other disciplines shall be conducted during

    work execution as per technical specifications, drawings and

    by making arrangement with supervising engineer to achieve

    the work to the best possible and specifications

    01 200 mm wide 600 M

    02 300 mm wide 1600 M

    03 400 mm wide 150 M

    04 400 mm wide double layer 200 M

    05 600 mm wide 25 M

    06 800 mm wide 50 M

    07 800 mm wide double layer 140 M

    08 900 mm wide 30 M

    09 1000 mm wide 25 M

    To Collection SR

    Project No. J10-13300

    ZUHAIR FAYEZ PARTNERSHIP

    63 / 79

    REVISED PAGE

    Date: MAY 2012