cj1a cj3 cj5 cj1 cj5a

1
HATCH LEGEND 8'-8" A.F.F. A01 A02 A03 A04 A05 A06 A07 HJ10 HJ10 J7A J7A J7A J7A J7A J7A J7A CJ1 CJ3A CJ5A CJ1A CJ3 CJ5 J7A J7A J7A J7A J7A J7A J7A CJ1 CJ3A CJ5A CJ1A CJ3 CJ5 J7 A01 A02 A03 A04 A05 A06 A07 HJ10 HJ 1 0 J7A J7A J7A J7A J7A J7A J7A CJ1 CJ3A CJ5A CJ1A CJ3 CJ5 J7A J7A J7A J7A J7A J7A J7A CJ1 CJ3A CJ5A CJ1A CJ3 CJ5 J7 A08 A08 A08 A08 A08 A08 A08 A08 A08 42' 0" 57' 8" 7' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 7' 0" 1' 0" 20' 0" 20' 0" 1' 0" 4 1' 0" 3 15/16" 6 3/16" It is understood that above conditions have been reviewed & are acceptable for the fabrication at trusses, elevations,pitches, overhangs, fascias,ceiling elevations/pitches, bearing conditions & all detail pertaining to this truss placement plan. No back charges will be accepted without previous written approval from an A-1 Roof Trusses representative. APPROVED AS NOTED * NOTE: ALL CEILING DROPS BELOW BEAM ARE BY BUILDER (UNLESS NOTED OTHERWISE) REJECTED Ph 772-409-1010 / Fax 772-409-1015 http://www.a1truss.com DATE REVISE AND RESUBMIT APPROVED REVIEWED BY NOTE: UPLIFT CONNECTIONS FOR ALL COMMON TRUSSES BEARING ON ANOTHER TRUSS TO BE LSTA12 STRAP (BY OTHERS) UNLESS NOTED OTHERWISE (EXCLUDES VALLEY AND PIGGYBACK TRUSSES) * NOTE: ALL TRUSS TO WALL AND/OR TRUSS TO LEDGER CONNECTIONS BY BUILDER (UNLESS NOTED OTHERWISE) Gravity (> 5,000#) / Uplift (> - 1,000#) Truss I.D. Horizontal (> 350#) Truss Load Alert Box * SHEETING AREA UNDER VALLEY TRUSSES AND WASTE MATERIAL NOT INCLUDED ** BLDR TO VERIFY CALCULATIONS CALC HIP LINE AREA 2767 ft2 ROOF 0 ft FASCIA FLOOR 0 ft2 207 ft VALLEY LINE 128 ft TRUSS PLACEMENT DIAGRAM NOTE: The design assumptions, loading conditions, load paths, suitability and use of structural building components (e.g. Trusses, etc.) for any Building is the responsibility of the Owner, the Owner's authorized agent or the Building Designer (hereinafter BD), in the context of the IRC, the IBC, the local building code and ANSI/TPI 1 (TPI 1). A1 Roof Trusses and Anthony Tombo, P.E. shall be permitted to rely upon the accuracy and completeness of project contract and construction documents (also referred to at times as +Structural Engineering Documents+), including any specifications that have been furnished to A1 Roof Trusses in writing by the BD for the Building. The Truss Design Drawing(s) [TDD(s)] and Truss Placement Diagram (TPD) referenced have been prepared based on the construction documents provided by the BD indicating the nature and character of the work. The design criteria therein have been transferred to Anthony Tombo, P.E. by A1 Roof Trusses. All TDDs (also referred to at times as +Structural Delegated Engineering Documents+) are specialty structural component designs and may be part of the project's deferred or phased submittals. As the Truss Design Engineer, the seal provided here and on any TDD represents an acceptance of professional engineering responsibility for the design of the single Truss depicted on the TDD only. Where required by the project contract or construction documents, including any specifications, a TPD identifying the location of each truss, as assumed by A1 Roof Trusses based on its review of the project contract documents, is provided. When the TPD (i.e. structural submittals or shop drawings) serves only as a guide for truss installation, it does not require the seal of any RDP. Anthony Tombo, P.E.'s seal on any TPD certifies that the individual truss designs are based on the positioning shown and that the dimensions and loads shown on the referenced drawings match that positioning. Anthony Tombo, P.E. seal designates specifically that TPD has been created in compliance with the latest version of TPI 1. The Building Designer is responsible for and shall coordinate and review the TDDs and this TPD for compatibility with their written engineering requirements. Structural submittals (i.e. shop drawings) shall be reviewed by the BD for compatibility with the design of the building or structure, including submittal documents prepared by others, deferred submittal documents and phased submittal documents. This review shall include a notation indicating that the reviewed documents have been found to be in general conformance with the design of the building (or to make specific corrections noted and to return for review). In the absence of this notation A1 Roof Trusses will provide its Buyer with the design assumptions used, per the construction documents, to design individual structural building components and provide any TPDs per TPI 1. The Truss Design Engineer is NOT responsible for the following including but not limited to: Transfer of lateral load from the roof to the shear walls, Connection of trusses to the bearing support, Design of the bearing supports, Temporary and permanent building stability bracing required in the roof and/or floor system, Transfer of vertical loads down to the foundation, +Design of the foundation and soil, Analysis of the roof and/or floor diaphragms of the building, Connection of roof and/or floor diaphragm to the truss, Specifying the loads used in the design of the trusses and so forth. Neither A1 Roof Trusses nor Anthony Tombo, P.E. is the Building Designer or Truss System Designer/Engineer for any building. If any engineering services, outside the scope of work of the truss design engineer, are required by the Owner, the Owner's authorized agent or the BD, please call 772-409-1010 for assistance. 10* DEAD LOAD 0 ASCE 7-10 30 BOT CHORD LOADING 0 0 0 ROOF 160 MPH TOP CHORD 10 DEAD LOAD LIVE LOAD FLOOR 0 WIND LOAD ENCLOSED 15 LIVE LOAD 55 CATEGORY II 1.25 TPI - 2007 DURATION FACTOR TOTAL LOAD EXP C FBC - 2014 1.00 *Non-concurrent - --/--/---- - REMARKS - - - BY --/--/---- - - --/--/---- REV - - - - - - - - - --/--/---- --/--/---- - --/--/---- - --/--/---- - - DATE - REPRESENTS THE LEFT SIDE OF EACH TRUSS DRAWING FOR BRACING & ERECTION DETAILS REFER TO BCSI-03 AND/OR ENGINEER OF RECORD * NOTE: THIS TRUSS PLACEMENT DIAGRAM IS TO SHOW TRUSS I.D. AND TRUSS LOCATION THE BUILDING DESIGNER IS REPSONSIBLE FOR THE STRUCTURAL STABILITY OF THE ENTIRE STRUCTURE. REFER TO THE INDIVIDUAL TRUSS ENGINEERING DRAWINGS FOR GRAVITY AND UPLIFT LOADS. - OPTION(S) Garage Module 1 - - MASTER JOB NAME PLAN DATE ARCH: STRUCT: 04/26/2017 - - CITY 04/26/2017 CUSTOMER DRAWN SCALE N.T.S. BLDG TYPE COMMNTY / LOT # - BLDG # DATE 07/12/2017 Kaufman Lynn Construction XKLWCAPG1 TP JOB # Addison Place COUNTY G - - - P JUS46 F - - - N THD28-2 HANGER BY BUILDER BBB Q - - - - - - - - - - - - - - - X V U T S R B MSH422 J JUS26 THD46 H BEAM BY BUILDER HBB JUS24 A - - - K E - - - M THD26-2 THD26 D L THD28 C MUS26 - - - - - -

Upload: others

Post on 12-Apr-2022

11 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CJ1A CJ3 CJ5 CJ1 CJ5A

HATCH LEGEND

8'-8" A.F.F.

A01

A02

A03

A04

A05

A06

A07

HJ10

HJ1

0

J7A

J7A

J7A

J7A

J7A

J7A

J7A

CJ1

CJ3A

CJ5A

CJ1

A

CJ3

CJ5

J7A

J7A

J7A

J7A

J7A

J7A

J7A

CJ1

CJ3A

CJ5A

CJ1

A

CJ3

CJ5

J7

A01

A02

A03

A04

A05

A06

A07

HJ1

0

HJ10

J7A

J7A

J7A

J7A

J7A

J7A

J7A

CJ1

CJ3A

CJ5A

CJ1

A

CJ3

CJ5

J7A

J7A

J7A

J7A

J7A

J7A

J7A

CJ1

CJ3A

CJ5A

CJ1

A

CJ3

CJ5

J7

A08

A08

A08

A08

A08

A08

A08

A08

A08

42' 0

"

57' 8"

7' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 2' 0" 7' 0"

1' 0"

20' 0

" 20' 0

"

1' 0"

4

1' 0

"

3 15/16"6 3/16"

It is understood that aboveconditions have been reviewed

& are acceptable for thefabrication at trusses,

elevations,pitches, overhangs,fascias,ceiling

elevations/pitches, bearingconditions & all detail pertainingto this truss placement plan. Noback charges will be accepted

without previous writtenapproval from an A-1 RoofTrusses representative.

APPROVED AS NOTED

* NOTE: ALL CEILING DROPS BELOW BEAM AREBY BUILDER (UNLESS NOTED OTHERWISE)

REJECTED

Ph 772-409-1010 / Fax 772-409-1015http://www.a1truss.com

DATE

REVISE AND RESUBMIT

APPROVED

REVIEWED BY

NOTE: UPLIFT CONNECTIONS FOR ALL COMMONTRUSSES BEARING ON ANOTHER TRUSS TO BE LSTA12

STRAP (BY OTHERS) UNLESS NOTED OTHERWISE(EXCLUDES VALLEY AND PIGGYBACK TRUSSES)

* NOTE: ALL TRUSS TO WALL AND/OR TRUSS TOLEDGER CONNECTIONS BY BUILDER

(UNLESS NOTED OTHERWISE)Gravity (> 5,000#) / Uplift (> - 1,000#)

Truss I.D.

Horizontal (> 350#)

Truss Load Alert Box

* SHEETING AREA UNDER VALLEY TRUSSES AND

WASTE MATERIAL NOT INCLUDED

** BLDR TO VERIFY CALCULATIONS

CALC

HIP LINE

AREA

2767 ft2ROOF

0 ft

FASCIA

FLOOR 0 ft2

207 ft

VALLEY LINE

128 ft

TRUSSPLACEMENTDIAGRAMNOTE:

The

desi

gnas

sum

ptio

ns,

load

ing

cond

ition

s,lo

adpa

ths,

suita

bilit

yan

dus

eof

stru

ctur

albu

ildin

gco

mpo

nent

s(e

.g.

Trus

ses,

etc.)

for

any

Build

ing

isth

ere

spon

sibi

lity

ofth

eOw

ner,

the

Owne

r'sau

thor

ized

agen

tor

the

Build

ing

Desi

gner

(her

eina

fter

BD),

inth

eco

ntex

tof

the

IRC,

the

IBC,

the

loca

lbu

ildin

gco

dean

dAN

SI/T

PI1

(TPI

1).

A1Ro

ofTr

usse

san

dAn

thon

yTo

mbo

,P.

E.sh

all

bepe

rmitt

edto

rely

upon

the

accu

racy

and

com

plet

enes

sof

proj

ect

cont

ract

and

cons

truc

tion

docu

men

ts(a

lso

refe

rred

toat

times

as+

Stru

ctur

alEn

gine

erin

gDo

cum

ents

+),

inclu

ding

any

spec

ifica

tions

that

have

been

furn

ishe

dto

A1Ro

ofTr

usse

sin

writ

ing

byth

eBD

for

the

Build

ing.

The

Trus

sDe

sign

Draw

ing(

s)[T

DD(s

)]an

dTr

uss

Plac

emen

tDi

agra

m(T

PD)

refe

renc

edha

vebe

enpr

epar

edba

sed

onth

eco

nstr

uctio

ndo

cum

ents

prov

ided

byth

eBD

indi

catin

gth

ena

ture

and

char

acte

rof

the

wor

k.Th

ede

sign

crite

riath

erei

nha

vebe

entr

ansf

erre

dto

Anth

ony

Tom

bo,

P.E.

byA1

Roof

Trus

ses.

All

TDDs

(als

ore

ferr

edto

attim

esas

+St

ruct

ural

Dele

gate

dEn

gine

erin

gDo

cum

ents

+)

are

spec

ialty

stru

ctur

alco

mpo

nent

desi

gns

and

may

bepa

rtof

the

proj

ect's

defe

rred

orph

ased

subm

ittal

s.As

the

Trus

sDe

sign

Engi

neer

,th

ese

alpr

ovid

edhe

rean

don

any

TDD

repr

esen

tsan

acce

ptan

ceof

prof

essi

onal

engi

neer

ing

resp

onsi

bilit

yfo

rth

ede

sign

ofth

esi

ngle

Trus

sde

pict

edon

the

TDD

only

.W

here

requ

ired

byth

epr

ojec

tco

ntra

ctor

cons

truc

tion

docu

men

ts,

inclu

ding

any

spec

ifica

tions

,a

TPD

iden

tifyi

ngth

elo

catio

nof

each

trus

s,as

assu

med

byA1

Roof

Trus

ses

base

don

itsre

view

ofth

epr

ojec

tco

ntra

ctdo

cum

ents

,is

prov

ided

.W

hen

the

TPD

(i.e.

stru

ctur

alsu

bmitt

als

orsh

opdr

awin

gs)

serv

eson

lyas

agu

ide

for

trus

sin

stal

latio

n,it

does

not

requ

ireth

ese

alof

any

RDP.

Anth

ony

Tom

bo,

P.E.

'sse

alon

any

TPD

cert

ifies

that

the

indi

vidu

altr

uss

desi

gns

are

base

don

the

posi

tioni

ngsh

own

and

that

the

dim

ensi

ons

and

load

ssh

own

onth

ere

fere

nced

draw

ings

mat

chth

atpo

sitio

ning

.An

thon

yTo

mbo

,P.

E.se

alde

sign

ates

spec

ifica

llyth

atTP

Dha

sbe

encr

eate

din

com

plia

nce

with

the

late

stve

rsio

nof

TPI

1.Th

eBu

ildin

gDe

sign

eris

resp

onsi

ble

for

and

shal

lco

ordi

nate

and

revi

ewth

eTD

Dsan

dth

isTP

Dfo

rco

mpa

tibili

tyw

ithth

eir

writ

ten

engi

neer

ing

requ

irem

ents

.St

ruct

ural

subm

ittal

s(i.

e.sh

opdr

awin

gs)

shal

lbe

revi

ewed

byth

eBD

for

com

patib

ility

with

the

desi

gnof

the

build

ing

orst

ruct

ure,

inclu

ding

subm

ittal

docu

men

tspr

epar

edby

othe

rs,

defe

rred

subm

ittal

docu

men

tsan

dph

ased

subm

ittal

docu

men

ts.

This

revi

ewsh

all

inclu

dea

nota

tion

indi

catin

gth

atth

ere

view

eddo

cum

ents

have

been

foun

dto

bein

gene

ral

conf

orm

ance

with

the

desi

gnof

the

build

ing

(or

tom

ake

spec

ific

corr

ectio

nsno

ted

and

tore

turn

for

revi

ew).

Inth

eab

senc

eof

this

nota

tion

A1Ro

ofTr

usse

sw

illpr

ovid

eits

Buye

rw

ithth

ede

sign

assu

mpt

ions

used

,pe

rth

eco

nstr

uctio

ndo

cum

ents

,to

desi

gnin

divi

dual

stru

ctur

albu

ildin

gco

mpo

nent

san

dpr

ovid

ean

yTP

Dspe

rTP

I1.

The

Trus

sDe

sign

Engi

neer

isNO

Tre

spon

sibl

efo

rth

efo

llow

ing

inclu

ding

but

not

limite

dto

:Tr

ansf

erof

late

ral

load

from

the

roof

toth

esh

ear

wal

ls,

Conn

ectio

nof

trus

ses

toth

ebe

arin

gsu

ppor

t,De

sign

ofth

ebe

arin

gsu

ppor

ts,

Tem

pora

ryan

dpe

rman

ent

build

ing

stab

ility

brac

ing

requ

ired

inth

ero

ofan

d/or

floor

syst

em,

Tran

sfer

ofve

rtica

llo

ads

dow

nto

the

foun

datio

n,+

Desi

gnof

the

foun

datio

nan

dso

il,An

alys

isof

the

roof

and/

orflo

ordi

aphr

agm

sof

the

build

ing,

Conn

ectio

nof

roof

and/

orflo

ordi

aphr

agm

toth

etr

uss,

Spec

ifyin

gth

elo

ads

used

inth

ede

sign

ofth

etr

usse

san

dso

fort

h.Ne

ither

A1Ro

ofTr

usse

sno

rAn

thon

yTo

mbo

,P.

E.is

the

Build

ing

Desi

gner

orTr

uss

Syst

emDe

sign

er/E

ngin

eer

for

any

build

ing.

Ifan

yen

gine

erin

gse

rvice

s,ou

tsid

eth

esc

ope

ofw

ork

ofth

etr

uss

desi

gnen

gine

er,

are

requ

ired

byth

eOw

ner,

the

Owne

r's

auth

oriz

edag

ent

orth

eBD

,pl

ease

call

772-

409-

1010

for

assi

stan

ce.

10*

DEAD LOAD 0

ASCE 7-1030

BO

TC

HO

RD

LOADING

0

0

0

ROOF

160 MPH

TO

PC

HO

RD

10

DEAD LOAD

LIVE LOAD

FLOOR

0

WIND LOAD

ENCLOSED

15

LIVE LOAD

55

CATEGORY II

1.25 TPI - 2007DURATION FACTOR

TOTAL LOAD

EXP C

FBC - 2014

1.00

*Non-c

oncurr

ent

---/--/----

-

REMARKS

-

-

-

BY

--/--/----

-

-

--/--/----

REV

-

-

-

-

--

-

-

-

--/--/----

--/--/-----

--/--/----

-

--/--/---- -

-

DATE

-

REPRESENTS THE LEFT SIDE OFEACH TRUSS DRAWING

FOR BRACING & ERECTION DETAILS REFERTO BCSI-03 AND/OR ENGINEER OF RECORD

* NOTE: THIS TRUSS PLACEMENT DIAGRAM IS TO SHOWTRUSS I.D. AND TRUSS LOCATION

THE BUILDING DESIGNER IS REPSONSIBLE FOR THESTRUCTURAL STABILITY OF THE ENTIRE STRUCTURE.

REFER TO THE INDIVIDUAL TRUSS ENGINEERING DRAWINGSFOR GRAVITY AND UPLIFT LOADS.

-

OPTION(S)

Garage Module 1

--

MASTER

JOB NAME

PLAN DATE ARCH: STRUCT: 04/26/2017

-

-

CITY

04/26/2017

CUSTOMER

DRAWN SCALE

N.T.S.

BLDGTYPE

COMMNTY/ LOT #

-

BLDG#

DATE 07/12/2017

Kaufman Lynn Construction

XKLWCAPG1

TP

JOB #

Addison Place

COUNTY

G - - -PJUS46

F - - -NTHD28-2

HANGER BY BUILDER BBB

Q

- - -

- - -

- - -

- - -

- - -

X

V

U

T

S

RB MSH422JJUS26

THD46H

BEAM BY BUILDERHBB

JUS24A

- - -

K

E - - -MTHD26-2

THD26

D LTHD28

C MUS26

- - -

- - -

atombo
Stamp
ThomasThompson
Rectangle
ThomasThompson
Text Box
Reviewed for Code Compliance PRBD20170416058
ThomasThompson
Image