CIVILIZED SOLUTIONS, INCCIVILIZED SOLUTIONS, INC
Executive Team MembersSeth Tibbitts: Principal In ChargeBrandon Simms: Project Manager
Ben Frison: Project EngineerMichael Schector: Project Engineer
“Because everyone needs some stability in their lives”
![Page 2: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/2.jpg)
Overview Overview
Founded in 1996
An engineering design and consulting firm
3400 N. Charles St (Latrobe Hall)
Baltimore, MD 21218
410 – 516 – 1234
![Page 3: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/3.jpg)
Proposal OutlineProposal Outline
Restoration of the Historic Leigh Street Armory
Construction of the New Office Building
![Page 4: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/4.jpg)
Armory RestorationArmory Restoration Provide bracing to maintain historic façade Replace structural masonry system with a steel
moment frame load resisting system Install an open web steel joists floor system to support
the concrete floor slab Restore all masonry walls as non-structural elements Replace all doors and windows Install new steel roof truss system to maintain original
building aesthetics while improving structural integrity Comply with Current Code Requirements
![Page 5: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/5.jpg)
Armory HistoryArmory History
Built in 1895
Served as headquarters for the First Battalion Virginia Volunteers Infantry, Richmond’s first African American regiment
Used as a social center, housing facility, recreation hall, elementary school, junior and high school
![Page 6: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/6.jpg)
Temporary BracingTemporary Bracing
![Page 7: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/7.jpg)
![Page 8: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/8.jpg)
Load CasesLoad Cases
Loads• Live loads: office, residential, corridor,
storage• Roof Live Loads: Non-pedestrian roof • Wind Loads• Snow Loads• Seismic Loads
![Page 9: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/9.jpg)
Foundation Live LoadsFoundation Live Loads
![Page 10: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/10.jpg)
First Floor Live LoadsFirst Floor Live Loads
![Page 11: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/11.jpg)
Second Floor Live LoadsSecond Floor Live Loads
![Page 12: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/12.jpg)
Load CasesLoad Cases
Loads• Live loads: office, residential, corridor,
storage• Roof Live Loads: Non-pedestrian roof • Wind Loads• Snow Loads• Seismic Loads
![Page 13: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/13.jpg)
![Page 14: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/14.jpg)
Load CasesLoad Cases
Loads• Live loads: office, residential, corridor,
storage• Roof Live Loads: Non-pedestrian roof • Wind Loads• Snow Loads• Seismic Loads
![Page 15: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/15.jpg)
Wind LoadsWind Loads
![Page 16: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/16.jpg)
![Page 17: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/17.jpg)
Load CasesLoad Cases
Loads• Live loads: office, residential, corridor,
storage• Roof Live Loads: Non-pedestrian roof • Wind Loads• Snow Loads• Seismic Loads
![Page 18: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/18.jpg)
Frame DesignFrame Design
Steel Moment Frame– Does not interfere with Building
Function– Reduce member size and longer spans– Reduction in Construction Time
Member Placement
![Page 19: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/19.jpg)
Member PlacementMember Placement
![Page 20: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/20.jpg)
![Page 21: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/21.jpg)
![Page 22: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/22.jpg)
![Page 23: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/23.jpg)
Floor Joist System:Floor Joist System:Open Web Steel JoistOpen Web Steel Joist
Long SpansLight Weight SystemLack of Large Concentrated Live
LoadsThinner Concrete Floor Slab
![Page 24: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/24.jpg)
![Page 25: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/25.jpg)
Roof SystemRoof System
Retained Historic Hip and Gable roof shape
Replaced old wood Hip members with Steel
![Page 26: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/26.jpg)
Picture of Roof SystemPicture of Roof System
![Page 27: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/27.jpg)
Renovating the ArmoryRenovating the Armory
Cleaning the façade Managing Efflorescence (phosphoric
acid)Examining Joints and SealantsAttaching lintel sections at each
floor slab for additional lateral support
![Page 28: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/28.jpg)
Current Code RequirementsCurrent Code Requirements
Structural Fire Safety Accessibility
![Page 29: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/29.jpg)
![Page 30: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/30.jpg)
New Office BuildingNew Office Building
Construct a 61’x60’ 4-story office building in lot adjacent to Armory
Create exterior façade to complement the Armory
Provide Structural Steel Moment Frame Support System
Install an open web steel joists floor system to support the concrete floor slab
Comply with Code Requirements
![Page 31: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/31.jpg)
Layout and Load Cases Layout and Load Cases
Layout of New Building
Loads• Live loads: office and corridor• Roof Live Loads: Non-pedestrian roof • Wind Loads• Snow Loads• Seismic Loads
![Page 32: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/32.jpg)
First FloorFirst Floor
![Page 33: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/33.jpg)
Second - Fourth FloorSecond - Fourth Floor
![Page 34: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/34.jpg)
Roof LoadsRoof Loads
![Page 35: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/35.jpg)
Layout and Load Cases Layout and Load Cases
Layout of New Building
Loads• Live loads: office and corridor• Roof Live Loads: Non-pedestrian roof • Wind Loads• Snow Loads• Seismic Loads
![Page 36: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/36.jpg)
Wind LoadsWind Loads
![Page 37: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/37.jpg)
![Page 38: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/38.jpg)
Layout and Load Cases Layout and Load Cases
Layout of New Building
Loads• Live loads: office and corridor• Roof Live Loads: Non-pedestrian roof • Wind Loads• Snow Loads• Seismic Loads
![Page 39: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/39.jpg)
Frame DesignFrame Design
Steel Moment Frame– Does not interfere with Building
Function– Reduce member size and longer spans– Reduction in Construction Time
Member Placement
![Page 40: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/40.jpg)
![Page 41: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/41.jpg)
![Page 42: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/42.jpg)
Floor Joist System:Floor Joist System:Open Web Steel JoistOpen Web Steel Joist
Long SpansLight Weight SystemLack of Large Concentrated Live
LoadsThinner Concrete Floor Slab
![Page 43: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/43.jpg)
![Page 44: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/44.jpg)
Primary Envelope DesignPrimary Envelope Design
![Page 45: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/45.jpg)
Envelope: Prelim DataEnvelope: Prelim Data
Richmond, Virginia: 43 inch rainfall, 70 percent humidity
Architectural Issues– Parapets– Ornate Brickwork bands– Wooden Windows– Efflorescence issues
![Page 46: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/46.jpg)
Exterior Cavity Wall System with CMUExterior Cavity Wall System with CMU
Image modified and extracted from www.masonrysystems.org
![Page 47: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/47.jpg)
Why CMU over Steel Stud System?Why CMU over Steel Stud System?
![Page 48: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/48.jpg)
System at each FloorSystem at each Floor
![Page 49: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/49.jpg)
Engineering the Barriers: All in OneEngineering the Barriers: All in One
Thermal: Steel Lintel IssueWater: Warm-In-Winter side, Perm-A-
Barrier
Air: Warm In Winter sideVapor: None.
• Temperate Climate• 8,000 degree-days
![Page 50: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/50.jpg)
![Page 51: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/51.jpg)
Code RequirementsCode Requirements
Structural Fire Safety Accessibility
![Page 52: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/52.jpg)
![Page 53: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/53.jpg)
Project TimelineProject Timeline
Investigation ~ 1 weekSchematic Design ~ 1 weekDesign Development ~ 1 weekConstruction Document ~ 3 weeksConstruction Administration ~ 23 months
![Page 54: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/54.jpg)
Project BudgetProject Budget
Estimated Total Project Cost : $ 5 million
• Armory Restoration ~ $ 2 million
• New Building ~ $ 3 million
• CS, Inc Schematic Design ~ $12,205
![Page 55: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/55.jpg)
ConclusionConclusion
Efficiency– Our structure uses an intelligent moment frame
design coupled with a smart open webbed joist floor system.
Economical– This will minimize material cost, saving money.
The quick erection time shall reduce capital cost. Elegance
– Our Armory will maintain the authenticity of its historic fortress like appearance, and the New Building shall complement the aesthetic mastery of the Armory.
![Page 56: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/56.jpg)
Thank You For Your TimeThank You For Your Time
Civilized Solutions, Inc
“Because everyone needs some stability in their lives”
![Page 57: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/57.jpg)
SpecificationsSpecifications
Mortar: Low Alkali Cement (3/8”) Bed & Head Joint
Expansion Joints: ¾ inch, rubber, located every 20 ft
Veneer Support: Pintel TieRows 16” vertically, 24” spacingzinc coated
Bond Beams: < #8 (US) Steel Lintels: TBD Water Barrier: > 5 perms Perm-a-Barrier
![Page 58: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/58.jpg)
Plan View of Concrete DetailingPlan View of Concrete Detailing
![Page 59: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/59.jpg)
Roofing DetailingRoofing Detailing
![Page 60: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/60.jpg)
Foundation for Cavity WallFoundation for Cavity Wall
![Page 61: Civilized Solutions, Inc](https://reader034.vdocuments.site/reader034/viewer/2022052315/54682e14b4af9fcc668b4957/html5/thumbnails/61.jpg)
WindowsWindows