civil integrated management
DESCRIPTION
Civil Integrated Management. 3, 4, 5, xD Modeling in Highway Design & Construction. Founded in 1885 by General William Barclay Parsons Approx. 14,000 Staff in 150 Offices Worldwide Active in All Major Infrastructure Markets Transportation is Key Area of Expertise - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/1.jpg)
Civil Integrated Management
3, 4, 5, xD Modeling in Highway Design & Construction
![Page 2: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/2.jpg)
About Parsons Brinckerhoff
Founded in 1885 by General William Barclay Parsons
Approx. 14,000 Staff in 150 Offices Worldwide
Active in All Major Infrastructure Markets
Transportation is Key Area of Expertise
Services Across the Life Cycle of a Project
Key Company under Balfour Beatty
![Page 3: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/3.jpg)
About Rachel Arulraj
Dr. Rachel K. Arulraj, Asst. Vice President at Parsons Brinckerhoff (PB)
Active in Geographic Information Systems (GIS) and Building Information Modeling (BIM) Industries
Manages a multi-million dollar BIM project for a $16B Construction Oversees IT & BIM for design projects Doctorate in Geographic Information Systems with focus on AEC
industry. Participates in AEC Industry Advisory Boards, Professional
Association Boards, Transportation Research Board committees, etc. Won industry awards for the projects she manages Is an award-winning speaker at international conferences. Also a Certified Project Manager and Principal Professional
Associate for Information Technology at PB.
![Page 4: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/4.jpg)
Objectives of Presentation
Show how CIM is the collection, organization
and managed accessibility to accurate data and
information related to a highway facility
Introduce basic principles of CIM
Briefly touch upon tools and technologies
Provide project examples where 3D, 4D, 5D has
worked in design and construction projects
![Page 5: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/5.jpg)
CIM For Transportation
Civil Integrated Modeling = CIM
CIM benefits with 3D Data (Instead of 2D)
The transportation industry requires more 4D &
5D than most other industries using CIM
CIM needs computing investments
3D is for representing graphic civil objects in an
infrastructure, 4D for time and 5D for cost
![Page 6: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/6.jpg)
Technology Adoption Life-cycle
Adapted From: Geoffery Moore (1991)
Innovators (Techies)
Early Adopters (Visionaries)
Early Majority (Pragmatists)
Late Majority (Conservatives)
Laggards (Skeptics)
The Chasm
GPS in 2012
CIM in 2012
![Page 7: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/7.jpg)
CIM
Dat
aM
anag
emen
tSy
stem
s
MappingPresentation
Portals
Information Technology, Web, Database Management Systems, Project Controls, SchedulersEstimators
Geospatial Technologies (CAD, GIS, GPS Laser Scanning)
Visual Graphics,Presentation
Material,CAVE
Integration of Technologies
![Page 8: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/8.jpg)
Laser Scanning Technology for CIM
![Page 9: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/9.jpg)
4D Technologies for CIM
C2A Alternative Steel Gas Main
C1 Water and Sewer in East Side Walk
C1 Steel Conduit
C1 North Cut-Off Wall
7’-0”
10’-0”
![Page 10: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/10.jpg)
CAVE Technology for CIM
Computer Analysis and Visualization Environment
![Page 11: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/11.jpg)
De s
ign,
Con
stru
ctio
n an
d B
e yon
d
Traditional Tools
2D drawings
Design - Weekly Meetings
Issue 2D Drawings for Construction
Design Reviews at 30%, 60%, 90%
Integrate into Facility Management
3D drawings
Develop 3D modelDesign Drawings Extracted
Multi-discipline coordination
Use Model for O&M
xD
Future Tools
Tie Construction Schedules
Review Construction SequencingQC As-builts
CIM in 3D, 4D, 5D, xD
Cost Planning & Estimating
![Page 12: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/12.jpg)
Benefits of CIM in 3D, 4D & 5D
Minimize RiskMinimize CostEnhance Value and Quality of DesignAutomate Data ManagementAvoid rework and delaysBetter design & construction procurementImprove project scheduling and planningEnhance project coordinationCommunicateSee before investing
![Page 13: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/13.jpg)
CIM for Infrastructure Life Cycle
Conceptual Design – 3D Preliminary Engineering – 3D Detailed Design – 3D, 4D, 5D Construction Phase – 3D, 4D, 5D Program Cost Management – 5D Operations & Maintenance – xD Supply Chain Management – xD
![Page 14: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/14.jpg)
CIM @ Conceptual Phase
![Page 15: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/15.jpg)
CIM @ Conceptual Phase
![Page 16: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/16.jpg)
CIM @ Design Phase
Support a Referendum
![Page 17: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/17.jpg)
CIM @ Design Phase
Communicate Design to Stakeholders
![Page 18: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/18.jpg)
Cost Management – Final Design
![Page 19: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/19.jpg)
5D Cost Estimates from BIM
![Page 20: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/20.jpg)
CIM @ Construction
![Page 21: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/21.jpg)
Operations & Maintenance
![Page 22: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/22.jpg)
Operations & Maintenance
![Page 23: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/23.jpg)
Operations & Maintenance
![Page 24: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/24.jpg)
Supply Chain Management
![Page 25: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/25.jpg)
Risk Management
![Page 26: Civil Integrated Management](https://reader038.vdocuments.site/reader038/viewer/2022110210/56812b26550346895d8f2a0e/html5/thumbnails/26.jpg)
Enhancing Stakeholder Experience
Better CommunicationFaster ApprovalsEnhanced Experience For the future of the built environment