  • 8/2/2019 Civil Engg Project Est Mat Ion

    1/143

    PUNJAB

    SARGODHA

    PROVINCIAL BUILDINGS DIVISION

    SARGODHA

    PROVINCIAL BUILDINGS SUB DIVISION-I

    SARGODHA

    ESTIMATED COST

    MINOR HEAD

    MAJOR HEAD

    DETAILED ESTIMATE FOR THE WORK HUMAN

    RESOURCE DEVELOPMENT FOR IMPROVEMENT

    OF EXTENSION SYSTEM IN PUNJAB ONE AT I.A.T.I

    SARGODHA

    Rs. In Millions 29.479

    NAME OF WORK

    GOVERNMENT OF PUNJAB

    PROVINCE

    STATION

    DIVISION

    SUB DIVISION

  • 8/2/2019 Civil Engg Project Est Mat Ion

    2/143

    Excess

    (4-3)

    Saving

    (5-3)

    1 2 3 4 5 61 Main Building

    4678817 4726000 47183

    Residence G 18-19 3588475 3709000 120525

    Servant Quarter 400 Sft 522680 589000 66320

    Residence G 1-10 1293633 1419000 125367

    Garages 5 Nos 1169730 1008000 161730

    Construction of Chowkidar hut 97416 158000 60584

    Rennovation of Library 304000 304000 0 0

    Rennovation of Hostel No.1 1188352 1197476 9124

    Rennovation of Hostel No.2 1188352 1201137 12785

    Rennovation of Hostel No.6 3447899 3458424 10525

    Improvement/Rennovation of Main OfficeBuilding 704060 704060 0 0

    Reconstruction of Boundary Wall 4853160 4853160 0

    Repair of Workshop / Farm Stroes 878574 878574 0

    DETAILED ESTIMATE FOR THE WORK HUMAN RESOURCE DEVELOPMENT FOR IMPROVEMENT OF EX

    ONE AT I.A.T.I SARGODHA

    COMPARATIVE STATEMENT

    DifferenceDescription As per Approved

    Rough Cost

    Estimate.

    As Per Detailed

    Estimate

    Sr #

  • 8/2/2019 Civil Engg Project Est Mat Ion

    3/143

    Replacement of Sewerage Line 1426605 1426605 0

    Rehabilitation of Roads 2343639 2343639 0 0

    External Development 454664 159000 295664

    Total 28140056 28135075 4981

    Add WAPDA and Sui Gas Connection

    Charges. 500000 500000 0 0

    Total 28640056 28635075 4981

    Add 3% Contigency 844052 844052

    Net Total 28640056 29479127 839071

    Say 28640100 29479100 839000

    Rs. In Millions 28.640 29.479

    Sub Divisional Officer

    Provincial Buildings Sub Division-ISarogodha

    Provincial Buildings DivisionSargodha

    Executive Engineer

  • 8/2/2019 Civil Engg Project Est Mat Ion

    4/143

    Sr. No. Amount

    1 Rs.4726000/-

    2 Rs.3709000/-

    3 Rs.589000/-

    4 Rs.1419000/-

    5 Garages 5 Nos Rs.1008000/-

    6 Construction of Chowkidar Hut Rs.158000/-

    7 Rennovation of Library Rs.304000/-

    8 Rennovation of Hostel No.1 Rs.1197476/-

    9 Renovation of Hostel No.2 Rs.1201137/-

    DETAILED ESTIMATE FOR THE WORK HUMAN

    RESOURCE DEVELOPMENT FOR IMPROVEMENT OF

    EXTENSION SYSTEM IN PUNJAB ONE AT I.A.T.I

    SARGODHA

    (GENERAL ABSTRACT OF COST)Description

    Main Building

    Residence Grade 18-19

    Servant Quarter 400 Sft

    Residence G 1-10

  • 8/2/2019 Civil Engg Project Est Mat Ion

    5/143

    10 Renovation of Hostel No.6 Rs.3458424/-

    11

    Rs.704060/-

    12 Reconstruction of Boundary wall Rs.4853160/-

    13 Repair of Workshop/Farm stores Rs.878574/-

    14 Replacement of Sewerage Line Rs.1426605/-

    15 Rehabilitation of Roads Rs.2343639/-

    16 External Development Rs.159000/-

    Total: - Rs.28135075/-

    Add 3% Contigency Charges Rs.844052/-

    Rs.500000/-

    Total: - Rs.29479127/-

    Say. Rs.29479000/-

    29.479

    Improvement/Renovation of Main Office

    Building

    OR Rs. in Millions

    Add WAPDA and Sui Gas connection charges

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    6/143

    Sr. No. Amount

    1 Rs. 4420150.00

    2 Rs. 223000.00

    3 Rs. 83000.00

    Total: - Rs. 4726150.00

    Say. Rs. 4726000.00

    DETAILED ESTIMATE FOR THE WORK HUMAN RESOURCE

    DEVELOPMENT FOR IMPROVEMENT OF EXTENSION SYSTEM IN

    PUNJAB ONE AT I.A.T.I SARGODHA

    CONSTRUCTION OF MAIN BUILDING

    (ABSTRACT OF COST)Description

    Cost of Buildings Portion.

    Cost of Electric Installation.

    Cost of Gas Fittings

    Sub Divisional Officer

    Provincial Buildings Sub Division-ISargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    7/143

    1

    H wall 1 2 x54-1/8 x10 x4 = 4330 Cft1 x3 x24-1/8 x7 x4 = 2027 Cft1 x1 x19-1/8 x6 x4 = 459 Cft1 x1 x48-3/8 x8 x4 = 1548 Cft 13562Cft-Marked=A

    V walls 1 x2 x41-1/8 x6 x4 = 1974 Cft1 x2 x48-7/8 x8 x4 = 3128 Cft1 x1 x4 x6 x4 = 96 Cft

    PP F/B 1 x2 x88 x1-1/2 x1 = 264 CftF/B 1 x2 x36 x1-1/2 x1 = 108 Cft 597Cft-Marked=B

    1 x1 x70 x1-1/2 x1 = 105 Cft1 x2 x15 x4 x1 = 120 Cft

    Total = 14159 Cft @Rs.2795.75%oCft Rs. 39585/-2

    2 x1 x54-1/8 x26 = 2815 Cft3 x1 x24-1/8 x23 = 1665 Cft1 x1 x19-1/8 x22 = 421 Cft

    1 x1 x48-3/8 x24 = 1161 CftV walls 2 x1 x41-1/8 x22 = 1810 Cft2 x1 x48-7/8 x24 = 2346 Cft1 x1 x4 x22 = 88 Cft1 x1 x60 x30 = 1800 Cft2 x1 x30 x20 = 1200 Cft1 x1 x54 x15-1/2 = 837 Cft

    Total = 14143 Cft @Rs.522.40%Sft Rs. 73883/-3

    13562Cft x 1/4 x 3/4 = 2543 CftTotal 2543 Cft @Rs.5384.55%Cft Rs. 136929/-

    4

    597Cft x 2/3 = FALSE CftTotal 0 Cft @Rs.2158.20%Cft Rs. 0/-

    Take Qty 1/2 of Item No.1

    marked "B"

    Take Qty 3/16 of ItemNo.1 marked "A"

    CONSTRUCTION OF MAIN BUILDING

    Building Protion

    Excavation in foundation of building, bridges and other structures,

    including dagbelling, dressing, refilling around structure with

    excavated earth, watering and rammiing lead upto one chain (30 m)

    and lift upto 5 ft. (1.5 m) b) in ordinary soil

    Termite Proofing of Buildings by spraying anti termite liquid with chemical

    (Biflux or Dursban) consisting of one liter of chemical (Biflux or Dursban)

    and 40 liter of water for and area of 175Sft as approved directed by the

    Engineer Incharge.

    P/Laying cement concret brick or stone ballast 1-1/2" to 2"gauge in

    foundation and plinth.

    i- 1:6:12 Ratio

    P/Laying watering ramming brick or stone ballast 1-

    1/2" to 2"gauge in foundation and plinth.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    8/143

    5

    A 1 x2 x70-1/8 x9 x 1/4 = 316 Cft1 x2 x69-3/4 x8-5/8 x 1/4 = 301 Cft1 x2 x69-3/8 x8-1/4 x 1/4 = 286 Cft

    1 x2 x69 x7-7/8 x 1/4 = 272 Cft1 x2 x68-5/8 x7-1/2 x 1/4 = 257 Cft1 x2 x68-1/4 x7-1/8 x 1/4 = 243 Cft1 x2 x67-7/8 x6-3/4 x 1/4 = 229 Cft1 x2 x67-1/2 x6-3/8 x 1/4 = 215 Cft1 x2 x67-1/8 x6 x 1/4 = 201 Cft1 x2 x66-3/4 x5-5/8 x 1/4 = 188 Cft1 x2 x66-3/8 x5-1/4 x 1/4 = 174 Cft1 x2 x66 x4-7/8 x 1/4 = 161 Cft1 x2 x65-5/8 x4-1/2 x 1/4 = 148 Cft1 x2 x65-1/4 x4-1/8 x 1/4 = 135 Cft1 x2 x64-7/8 x3-3/4 x 1/4 = 122 Cft1 x2 x64-1/2 x3-3/8 x 1/4 = 109 Cft1 x2 x64-1/8 x3 x 1/4 = 96 Cft1 x2 x63-3/4 x2-5/8 x 1/4 = 84 Cft1 x2 x63-3/8 x2-1/4 x 1/4 = 71 Cft1 x2 x63 x1-7/8 x 1/4 = 59 Cft1 x2 x62-5/8 x1-1/2 x 1/4 = 47 Cft1 x2 x62-1/4 x1-1/8 x2 = 280 Cft

    B 1 x2 x49-3/8 x7-1/2 x 1/4 = 185 Cft1 x2 x49 x7-1/8 x 1/4 = 175 Cft

    1 x2 x48-5/8 x6-3/4 x 1/4 = 164 Cft1 x2 x48-1/4 x6-3/8 x 1/4 = 154 Cft1 x2 x47-7/8 x6 x 1/4 = 144 Cft1 x2 x47-1/2 x5-5/8 x 1/4 = 134 Cft1 x2 x47-1/8 x5-1/4 x 1/4 = 124 Cft1 x2 x46-3/4 x4-7/8 x 1/4 = 114 Cft1 x2 x46-3/8 x4-1/2 x 1/4 = 104 Cft1 x2 x46 x4-1/8 x 1/4 = 95 Cft1 x2 x45-5/8 x3-3/4 x 1/4 = 86 Cft1 x2 x45-1/4 x3-3/8 x 1/4 = 76 Cft1 x2 x44-7/8 x3 x 1/4 = 67 Cft

    1 x2 x44-1/2 x2-5/8 x 1/4 = 58 Cft1 x2 x44-1/8 x2-1/4 x 1/4 = 50 Cft1 x2 x43-3/4 x1-7/8 x 1/4 = 41 Cft1 x2 x43-3/8 x1-1/2 x 1/4 = 33 Cft1 x2 x43 x1-1/8 x3 = 290 Cft

    C 1 x1 x17-5/8 x4-1/2 x 1/4 = 20 Cft1 x1 x18 x4-1/8 x 1/4 = 19 Cft1 x1 x18-3/8 x3-3/4 x 1/4 = 17 Cft1 x1 x18-3/4 x3-3/8 x 1/4 = 16 Cft1 x1 x19-1/8 x3 x 1/4 = 14 Cft

    Pacca brick work with

    cement sand mortar in

    foundation and plinth.i)

    Ratio 1:6

  • 8/2/2019 Civil Engg Project Est Mat Ion

    9/143

    1 x1 x19-1/2 x2-5/8 x 1/4 = 13 Cft1 x1 x19-7/8 x2-1/4 x 1/4 = 11 Cft1 x1 x20-1/4 x1-7/8 x 1/4 = 9 Cft1 x1 x20-5/8 x1-1/2 x 1/4 = 8 Cft1 x1 x21 x1-1/8 x 1/4 = 6 Cft1 x1 x21-3/8 x 3/4 x4 = 64 Cft

    D 1 x1 x52-1/16 x6 x 1/4 = 78 Cft1 x1 x52-7/16 x5-5/8 x 1/4 = 74 Cft1 x1 x52-13/16 x5-1/4 x 1/4 = 69 Cft1 x1 x53-3/16 x4-7/8 x 1/4 = 65 Cft1 x1 x53-9/16 x4-1/2 x 1/4 = 60 Cft1 x1 x53-15/16 x4-1/8 x 1/4 = 56 Cft1 x1 x54-5/16 x3-3/4 x 1/4 = 51 Cft1 x1 x54-11/16 x3-3/8 x 1/4 = 46 Cft1 x1 x55-1/16 x3 x 1/4 = 41 Cft1 x1 x55-7/16 x2-5/8 x 1/4 = 36 Cft1 x1 x55-13/16 x2-1/4 x 1/4 = 31 Cft1 x1 x56-3/16 x1-7/8 x 1/4 = 26 Cft

    1 x1 x56-9/16 x1-1/2 x 1/4 = 21 Cft1 x1 x56-15/16 x1-1/8 x3-1/4 = 208 Cft

    V walls E 1 x2 x22-1/8 x5-1/4 x 1/4 = 58 Cft1 x2 x22-1/2 x4-7/8 x 1/4 = 55 Cft1 x2 x22-7/8 x4-1/2 x 1/4 = 51 Cft1 x2 x23-1/4 x4-1/8 x 1/4 = 48 Cft1 x2 x23-5/8 x3-3/4 x 1/4 = 44 Cft1 x2 x24 x3-3/8 x 1/4 = 41 Cft1 x2 x24-3/8 x3 x 1/4 = 37 Cft1 x2 x24-3/4 x2-5/8 x 1/4 = 32 Cft1 x2 x25-1/8 x2-1/4 x 1/4 = 28 Cft1 x2 x25-1/2 x1-7/8 x 1/4 = 24 Cft1 x2 x25-7/8 x1-1/2 x 1/4 = 19 Cft1 x2 x26-1/4 x1-1/8 x3-3/4 = 221 Cft

    F 1 x2 x23-5/8 x6 x 1/4 = 71 Cft1 x2 x24 x5-5/8 x 1/4 = 68 Cft1 x2 x24-3/8 x5-1/4 x 1/4 = 64 Cft1 x2 x24-3/4 x4-7/8 x 1/4 = 60 Cft1 x2 x25-1/8 x4-1/2 x 1/4 = 57 Cft1 x2 x25-1/2 x4-1/8 x 1/4 = 53 Cft1 x2 x25-7/8 x3-3/4 x 1/4 = 49 Cft

    1 x2 x26-1/4 x3-3/8 x 1/4 = 44 Cft1 x2 x26-5/8 x3 x 1/4 = 40 Cft1 x2 x27 x2-5/8 x 1/4 = 35 Cft1 x2 x27-3/8 x2-1/4 x 1/4 = 31 Cft1 x2 x27-3/4 x1-7/8 x 1/4 = 26 Cft1 x2 x28-1/8 x1-1/2 x 1/4 = 21 Cft1 x2 x28-1/2 x1-1/8 x3-1/4 = 208 Cft

    F1 1 x2 x23-5/8 x6 x 1/4 = 71 Cft1 x2 x24 x5-5/8 x 1/4 = 68 Cft1 x2 x24-3/8 x5-1/4 x 1/4 = 64 Cft

  • 8/2/2019 Civil Engg Project Est Mat Ion

    10/143

    1 x2 x24-3/4 x4-7/8 x 1/4 = 60 Cft1 x2 x25-1/8 x4-1/2 x 1/4 = 57 Cft1 x2 x25-1/2 x4-1/8 x 1/4 = 53 Cft1 x2 x25-7/8 x3-3/4 x 1/4 = 49 Cft1 x2 x26-1/4 x3-3/8 x 1/4 = 44 Cft1 x2 x26-5/8 x3 x 1/4 = 40 Cft1 x2 x27 x2-5/8 x 1/4 = 35 Cft1 x2 x27-3/8 x2-1/4 x 1/4 = 31 Cft1 x2 x27-3/4 x1-7/8 x 1/4 = 26 Cft1 x2 x28-1/8 x1-1/2 x 1/4 = 21 Cft1 x2 x28-1/2 x1-1/8 x 1/4 = 16 Cft1 x2 x28-7/8 x 3/4 x3 = 130 Cft

    G 1 x2 x10-15/16 x5-1/4 x 1/4 = 29 Cft1 x2 x11-5/16 x4-7/8 x 1/4 = 28 Cft1 x2 x11-11/16 x4-1/2 x 1/4 = 26 Cft1 x2 x12-1/16 x4-1/8 x 1/4 = 25 Cft1 x2 x12-7/16 x3-3/4 x 1/4 = 23 Cft1 x2 x12-13/16 x3-3/8 x 1/4 = 22 Cft

    1 x2 x13-3/16 x3 x 1/4 = 20 Cft1 x2 x13-9/16 x2-5/8 x 1/4 = 18 Cft1 x2 x13-15/16 x2-1/4 x 1/4 = 16 Cft1 x2 x14-5/16 x1-7/8 x 1/4 = 13 Cft1 x2 x14-11/16 x1-1/2 x 1/4 = 11 Cft1 x2 x12-1/4 x1-1/8 x 1/4 = 7 Cft1 x2 x12-5/8 x 3/4 x3-1/2 = 66 Cft

    Toe wall 2 x1 x87-1/4 x 3/4 x3-1/2 = 458 Cft2 x1 x36-3/4 x 3/4 x3-1/2 = 193 Cft1 x1 x54-1/4 x 3/4 x3-1/2 = 142 Cft2 x1 x15 x4 x2 = 240 Cft2 x1 x15 x3 x 1/2 = 45 Cft2 x1 x15 x2 x 1/2 = 30 Cft

    Total = 10809 Cft @Rs.8354.70%Cft Rs. 903060/-12

    Lintels

    W1 lintel

    and design 6 x1 x10-1/2 x2-5/8 x 3/4=

    124 CftW2 lintel 2 x1 x7-1/2 x1-1/8 x2-1/2 = 42 CftPurgolas

    Vert 2 x4 x3 x 1/2 x2-1/2=

    30 CftPurgolas

    Hor 2 x2 x6-3/4 x 1/2 x2-1/2=

    34 CftW3 lintel

    and design 7 x1 x6-1/2 x1-1/2 x 3/4=

    51 Cft

    Providing and laying reinforced cement concrete (including prestressed concrete), using

    coarse sand and screened graded and washed aggregate, in required shape and

    design,including forms, moulds, shuttering, lifting, compacting,curing, rendering and

    finishing exposed surface, complete (but excluding the cost of steel reinforcement, its

    fabrication and placing in position, etc.):- (a) (i) Reinforced cement concrete in roof

    slab, beams,columns lintels, girders and other structural members laid in situ or

    precast laid in position, or prestressed members cast in situ, complete in all respects:- (3)

    (c) Type C (nominal mix 1:2:4)

  • 8/2/2019 Civil Engg Project Est Mat Ion

    11/143

    W1 design

    vert 6 x1 x15-3/8 x 3/4 x 3/4=

    52 CftDesign

    bracing 6 x1 x6-1/2 x 3/8 x 3/8=

    5 CftW3 Design

    Vert 7 x1 x5-1/2 x 3/4 x 3/8=

    11 Cft

    Front

    designs vert

    portion 2 x1 x19-1/8 x2-1/4 x 3/4

    =

    65 Cft

    2 x1 x19-1/8 x1-1/2 x 3/4 = 43 Cft

    Hor Portion 2 x1 x10-1/8 x2-1/4 x2-1/2=

    114 Cftbracing 2 x1 x6-3/4 x1-1/4 x 3/4 = 13 CftO ice

    window

    lintel 1 x1 x6-1/2 x 3/4 x 3/4

    =

    4 CftD1 linels 2 x1 x6-1/2 x1-1/8 x 3/4 = 11 CftD2 3 x1 x5-1/2 x2-1/2 x 1/4 = 10 Cft

    wo no

    combined

    linel 1 x1 x10 x1-1/8 x1

    =

    11 Cftbeams lab 3 x1 x32-1/4 x1-1/2 x2 = 290 Cft

    C rooms 2 x1 x21-7/8 x1-1/4 x1-1/2 = 82 CftRoof slab C

    rooms 1 x1 x43 x32-1/4 x 5/12=

    578 Cftlab 1 x1 x62-1/4 x32-1/4 x 5/12 = 836 CftOffice 1 x1 x17-1/2 x8-3/4 x 5/12 = 64 CftStore 1 x1 x10-3/4 x8-3/4 x 5/12 = 39 CftEnt hall 1 x1 x35-1/4 x15-1/2 x 5/12 = 228 CftPardi 1 x1 x275-3/4 x 1/3 x3 = 273 Cft

    Total = 3010 Cft @Rs.201.95/Cft Rs. 607870/-ii) -do- in slab of raft strip foundation complete.B.P 5 x2 x3 x1-1/8 x 3/4 = 25 Cft.Front design 2 x1 x5 x5 x 5/8 = 31 Cft.W1 design fo 6 x1 x2 x2 x 5/8 = 15 Cft.

    Total. = 71 Cft. @Rs.149.35/Cft Rs. 10604/-

    13

    3010 x6.75 x0.454 = 9224 Kg

    71 x6.75 x0.454 = 218 Kg

    = 9442 Kg @Rs.8973.05%Kg Rs. 847235/-

    7

    2 x2 x62-1/8 x1-1/8 = 280 Sft.2 x2 x30 x1-1/8 = 135 Sft.1 x2 x54-1/4 x1-1/8 = 122 Sft.1 x1 x30 x1-1/8 = 34 Sft.

    Fabrication of M.S reinforcement i/c

    cutting bending binding laying in

    postion making joints and fastenings

    inculding cost of binding wire and

    labour charges for binding of steel

    reinforcement (also includes removal

    - -

    Providing and laying damp proof

    course with c conc (1:2:4):- (a) with

    one coat of bitumen and one coat of

    polythene sheet 500 gauge:

    ""

  • 8/2/2019 Civil Engg Project Est Mat Ion

    12/143

    1 x1 x27 x 3/4 = 20 Sft.2 x2 x30 x1-1/8 = 135 Sft.2 x2 x43 x1-1/8 = 194 Sft.1 x1 x13 x 3/4 = 10 Sft.

    Total = 930 [email protected]%Sft Rs. 26139/-7

    1 x1 x30 x1 = 30 Sft.1 x1 x60 x1 = 60 Sft.1 x1 x30 x1 = 30 Sft.1 x1 x14 x1 = 14 Sft.1 x1 x14 x1 = 14 Sft.

    1 x1 x30 x1 = 30 Sft.1 x1 x40 x1 = 40 Sft.1 x1 x30 x1 = 30 Sft.1 x1 x12 x1 = 12 Sft.

    Total = 260 [email protected]%Sft Rs. 5331/-8

    Take 2/3 of It.No Cft x 2/3 = 14159 Cft

    Total. = 14159 [email protected]%oCft Rs. 19064/-

    8-i

    Ent hall 1 x1 x35-1/4 x15-1/2 x1-3/4 = 956 CftPlateform 1 x1 x38-1/5 x4-1/2 x1-3/4 = 301 CftLab 1 x1 x60 x30 x1-3/4 = 3150 CftOff 1 x1 x8 x16-3/4 x1-3/4 = 235 Cft

    CR 2 x1 x30 x20 x1-3/4 = 2100 Cft1 x1 x8 x16-3/4 x1-3/4 = 235 Cft1 x1 x8 x10 x1-3/4 = 140 Cft1 x 1/2 x35-1/4 x15-1/2 x1-3/4 = 478 Cft

    PP 1 x1 x260 x3-1/4 x1 = 845 Cft1 x1 x60 x27 x1 = 1620 Cft1 x1 x13-1/4 x17-1/8 x1 = 227 Cft

    Total = 10287 CftNet Qty. 10287.0 ( - ) 14159 = -3872 [email protected]%oCft Rs. 0/-

    12

    Ent hall 1 x1 x35-1/4 x15-1/2 x 1/8 = 68 CftPlateform 1 x1 x38-1/5 x4-1/2 x 1/8 = 21 Cft

    Total = 89 Cft @Rs.12806.65/%Cft Rs. 11398/-

    P/L c conc plain (1:2:4) i/c placing mixing finishing curing etc complete.

    Providing and laying vertical damp

    proof course with cement sand

    plaster and bitumen coating:- (a)

    with one coat of bitumen and onecoat of polythene sheet 500 gauge:

    ii) 1:3 a) 3/4" thick.

    Filling, watering, ramming, earth

    under floor with i) with surplus earth

    from foundation, etc.

    Filling, watering, ramming, earthunder floor with ii) New earth

    excavated from out side lead up to 3

    miles.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    13/143

    11

    2 x1 x62-1/4 x1-1/8 x14 = 1961 Cft.2 x1 x30 x1-1/8 x14 = 945 Cft.1 x1 x30 x 3/4 x14 = 315 Cft.1 x1 x27 x 3/4 x14 = 284 Cft.1 x1 x54-1/4 x1-1/8 x14 = 854 Cft.2 x1 x30 x1-1/8 x14 = 945 Cft.2 x1 x43 x1-1/8 x14 = 1355 Cft.1 x1 x13 x 3/4 x14 = 137 Cft.

    Total. = 6796 Cft.Deduction.

    D1 3 x1 x5 x1-1/8 x8-1/2 = 143 Cft.D2 2 x1 x4 x1-1/8 x7 = 63 Cft.D3 2 x1 x3-1/2 x1-1/8 x7 = 55 Cft.W1 6 x1 x8 x1-1/8 x5-1/2 = 297 Cft.W2 3 x1 x6 x1-1/8 x5-1/2 = 111 Cft.W3 7 x1 x5 x1-1/8 x5-1/2 = 217 Cft.

    W4 4 x1 x2 x1-1/8 x5-1/2 = 50 Cft.Lintels D 1 x1 x5 x1-1/8 x 3/4 = 4 Cft.D2 2 x1 x5 x1-1/8 x 1/2 = 6 Cft.D3 2 x1 x4-1/2 x1-1/8 x 1/2 = 5 Cft.W1 6 x1 x9-1/2 x1-1/8 x 3/4 = 48 Cft.W2 3 x1 x7-4/5 x1-1/8 x 3/4 = 20 Cft.W3 7 x1 x6-1/2 x1-1/8 x 3/4 = 38 Cft.W4 4 x1 x3 x1-1/8 x 1/2 = 7 Cft.

    Total Ded. = 1064 Cft.

    Net Qty. 6796 ( - ) 1064 = 5732 [email protected]%Cft Rs. 544904/-18

    D1 3 x1 x5 x8-1/2 = 128 Sft.D2 2 x1 x4 x7 = 56 Sft.D3 2 x1 x3-1/2 x7 = 49 Sft.

    Total = 233 [email protected]/Sft Rs. 113727/-18-i = 7 No @Rs.124.65/E Rs. 873/-

    Pacca brick work c/s (1:6) mortar in

    G.F

    P/F deodar wood panelled or

    panelled with glazed doors andwindows with M.S chowkat

    consisting of M.S angle iron 1 1 /2"x

    1 1/2"x1/4" welded with M.S flat 1

    1/2"x1/4" complete.

    P/F iron sliding bolts to doors 12" long

  • 8/2/2019 Civil Engg Project Est Mat Ion

    14/143

    18

    W1 6 x1 x8 x5-1/2 = 264 Sft.W2 3 x1 x6 x5-1/2 = 99 Sft.W3 7 x1 x5 x5-1/2 = 193 Sft.W4 4 x1 x2 x5-1/2 = 44 Sft.

    Total = 600 [email protected]/Sft Rs. 254100/-

    22

    C rooms 1 x1 x61-1/2 x31-1/2 = 1937 Sft

    1 x1 x31-1/2 x32-1/4 = 1016 Sft1 x 1/2 x54-1/4 x35-1/2 = 963 Sft

    Total = 3916 Sft.Deduction.

    Khurra 1 x6 x2 x2 = 24 Sft.

    Total = 24 Sft.

    Net Qty 3916 ( - ) 24 3892 [email protected]%Sft Rs. 155049/-

    23

    = 6 No @Rs.281.80/E Rs. 1691/-

    24

    1 x10 x16 = 160 Rft.Total = 160 Rft @Rs.222.20/Rft Rs. 35552/-

    25

    Providing, laying, cutting, jointing,

    testing and disinfecting pipe line in

    trenches with P.V.C. pipes of B.S.S.

    with `D' and valves is not included in

    the Class working pressure complete

    - "

    Providing and installing P.V.C.

    bends, of B.S.S. class D working

    pressure. 4"dia

    Single layer of tiles 9"x4"x1"(225x113x40 mm) laid over 4"(100

    mm) earth and 1" (25 mm) mud

    plaster without Bhoosa, grouted with

    cement sand 1:3 on top of RCC roof

    slab, provided with 34 lbs. per %Sft.

    or 1.72 Kg/Sq.m bitumen coating

    sand blinded i/c supplying and laying

    polythene sheet over DPC under

    floors and on roofs etc 500 gauge.

    Khuras on roof 2'x2'x6" (600 x 600 x

    150 mm)

    Providing and fixing steel windows with openable glazed

    panels, using beam section for frame 1"x1"x5/8"x1/8" For fixed pannels,

    the composite(40x25x16x3 mm), Z-section for leaves "x1"x"x1/8"

    (20x25x20x3 mm), T-section sashes 1"x1"x1/8" (25x25x3mm), glass

    panes, wooden screed for glazing embedded metre.over a thin layer of

    putty duly screwed with leaves, brass fittings, holdfast, duly painted,

    complete in all respects, including all cost of material and labour, etc. as

    per approved design and as directed by the Engineer Incharge.

    fixed with wire gauze, 24 SWG

    glass pane 5 mm thick.

    Providing and fixing M.S. flat "x1/8" (13mm x 3mm) grill Per Sft.

    including " x 1/8" (20 mmx3 mm) M.S. flat frame, in windows of

    approved design, including painting three coats, complete in all respects.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    15/143

    1 x10 x1 = 10 No @Rs.469.30/Each Rs. 4693/-25

    1 x10 x1 = 10 No @Rs.957.10/Each Rs. 9571/-17

    1 x2 x(60 +30 ) x13-1/2=

    2430 Sft.

    2 x2 x(30 +20 ) x13-1/2 = 2700 Sft.1 x2 x(80 +16-3/4) x13-1/2 = 2612 Sft.1 x2 x(8 +10 ) x13-1/2 = 486 Sft.1 x2 x(35-1/4 +15-1/2) x13-1/2 = 1370 Sft.

    Total = 9598 [email protected]%Sft Rs. 95097/-

    16

    1 x1 x60 x30 = 1800 Sft.

    2 x1 x30 x20 = 1200 Sft.

    1 x1 x8 x16-3/4 = 134 Sft.1 x1 x8 x10 = 80 Sft.1 x1 x35-1/4 x15-1/2 = 546 Sft.

    Total = 3760 Sft. @Rs.1267.15%Sft Rs. 47645/-34

    2 x2 x32-1/4 x14 = 1806 Sft.1 x2 x14 x14 = 392 Sft.1 x1 x62-1/4 x2 = 125 Sft.1 x1 x43 x2 = 86 Sft.1 x1 x75 x2 = 150 Sft.

    Total(A) = 2559 SftDeductions

    W1 6 x1 x8 x5-1/2 = 264 Sft.W2 3 x1 x6 x5-1/2 = 99 Sft.W3 7 x1 x5 x5-1/2 = 193 Sft.W4 4 x1 x2 x5-1/2 = 44 Sft.D1 2 x1 x5 x8-1/2 = 85 Sft.

    Total(B) = 685 SftNet Total (A-B) 2559 - 685 = 1874 Sft @Rs.1279.00%Sft Rs. 23968/-

    9

    1 x1 x60 x30 x 1/3 = 594 Cft

    2 x1 x30 x20 x 1/3 = 396 Cft

    1 x1 x8 x16-3/4 x 1/3 = 44 Cft1 x1 x8 x10 x 1/3 = 26 Cft1 x1 x35-1/4 x15-1/2 x 1/3 = 180 Cft2 x1 x85-3/4 x2-1/4 x 1/3 = 127 Cft2 x1 x32-1/4 x2-1/4 x 1/3 = 48 Cft2 x1 x14 x2-1/4 x 1/3 = 21 Cft1 x1 x54 x2-1/4 x 1/3 = 40 Cft

    Cement plaster 3/8" (10 mm) thick

    under soffit of R.C.C.roof slabs , 1:2

    ratio.

    Supply and filling of sand under floor

    or plugging in wells.

    Providing and installing P.V.C. Tee,

    of B.S.S. class D working pressure.

    4"dia

    1/2" thick cement plaster 1:4 upto

    20' (6.00 mm) height:-

    Cement pointing struck joint (1:2)

    mixed with red oxide pigment to

    match the colour of bricks.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    16/143

    1 x1 x12 x2-1/4 x 1/3 = 9 Cft

    Total = 1485 Cft @Rs.947.80%Cft Rs. 14075/-

    10

    Take smeQty of It.No 9 = 1485 Cft

    Total = 1485 [email protected]%Cft Rs. 34525/-29

    Lab 1 x1 x60 x30 = 1800 SftOff 1 x1 x8 x16-3/4 = 134 Sft

    CR 2 x1 x30 x20 = 1200 Sft.1 x1 x8 x16-3/4 = 134 Sft.1 x1 x8 x10 = 80 Sft.3 x1 x5 x1-1/8 = 17 Sft.2 x1 x4 x1-1/8 = 9 Sft.

    2 x1 x3-1/2 x1-1/8 = 8 Sft.

    Total = 3382 Sft. @Rs.5928.08%Sft Rs. 200487/-

    29-i

    1 x2 x(8 +7-1/8) x 1/2 = 15 Sft.Lab 1 x1 x(60 +30 ) x 1/2 = 45 Sft.Off 1 x1 x(8 +16-3/4) x 1/2 = 12 Sft.CR 2 x1 x(30 +20 ) x 1/2 = 50 Sft.

    1 x1 x(8 +16-3/4) x 1/2 = 12 Sft.1 x1 x(8 +10 ) x 1/2 = 9 Sft.

    Total = 143 Sft. @Rs.5600.80%Sft Rs. 8009/-

    12

    Ent hall 1 x1 x35-1/4 x15-1/2 = 546 SftPlateform 1 x1 x38-1/5 x4-1/2 = 172 Sft

    1 x2 x(35-1/4 +15-1/2) x 3/7 = 42 Sft1 x2 x38-1/5 +4-1/2) x 3/7 = 36 Sft

    Total = 796 Sft @Rs.140.00/Sft Rs. 111440/-

    1/2" thick mosaic dado or skirtingusing white cement i/c rubbing and

    polishing complete with finishing

    using grey cement

    Providing, laying, watering and

    ramming brick ballast 1" to 2"(40

    mm to 50 mm) gauge mixed with

    25% sand, for floor foundation,

    complete in all respects.

    2"(40 mm) thick mosaic flooring,

    consisting of " mosaic topping of

    one part of cement and marble

    powder in the ratio of 3:1 and two

    parts of marble chips,laid over

    1.5"(25 mm) thick floor of 1:2:4

    cement concrete,

    including rubbing and polishing

    complete with finishing :- (a) using

    grey cement

    P/L Porcelain Granite Tiles Colour Master 16"x16"x3/8",18"x18"x3/8" Laid over Bed of 3/4"

    Thick cement sand mortar i/c making patterns on floor and dado i/c filling of joints complete

    in all respects as Directed/Approved by the Engineer Incharage.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    17/143

    31

    2 x1 x81-1/4 x3 = 488 Sft.2 x1 x32-1/4 x3 = 194 Sft.2 x1 x14 x3 = 84 Sft.1 x1 x54-1/4 x3 = 163 Sft.1 x1 x12 x3 = 36 Sft.

    Total = 965 Sft @Rs.2988.60%Cft Rs. 28840/-

    32

    Qty of

    It.No. 29 3382 x 70% = 2367 RftTa e 70%

    Qty of

    It.No 31 965 x 70% = 676 Rft

    Total = 3043 Rft @ 5.30/Rft Rs.16128/-

    36

    Take Qty

    item No. 17 = 9598 Sft.

    Take Qtyitem No. 16 = 3760 Sft.

    Total = 13358 Sft @Rs.254.00%Sft Rs. 33929/-28

    Double of

    It.No.18 Sft 2 x233 = 466 Sft.Total = 466 [email protected]%Sft Rs. 4749/-

    Total Rs. 4420150/-

    Distempering 3 coats on new

    Painting new surface:- Preparing

    surface and painting of doors and

    windows any type (including edges):-

    3 coats.

    Providing and laying conglomerate

    flooring (two coat work) with top

    layer of "(13mm)thick wearing

    surface, for panelling, consisting of

    one part of cement and 2 parts of

    stonechips passing 3/16"(6 mm)

    sieve, over bottom layer ofcement

    concrete 1:3:6,including surface

    finishing anddividing in panels i/c

    rubbing.

    Providing and fixing marble strip of

    any shade for dividing the mosaic

    flooring into panels.

    a) Size 1" x 3/8" (40 x 10 mm)

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    18/143

    Sr. No. Amount

    1 Rs. 3185711/-

    2 Rs. 132600/-

    3 Rs. 108500/-

    4 Rs. 81700/-

    5

    275 Rft @Rs.727.67/Rft Rs. 200108/-

    Total: - Rs. 3708619/-

    Say. Rs. 3709000/-

    DETAILED ESTIMATE FOR THE WORK HUMAN RESOURCE

    DEVELOPMENT FOR IMPROVEMENT OF EXTENSION SYSTEM IN

    PUNJAB ONE AT I.A.T.I SARGODHA

    CONSTRUCTION OF RESIDENCE G 18-19

    (ABSTRACT OF COST)Description

    Cost of Buildings Portion.

    Cost of Electric Installation.

    Cost of Sanitary Installation.

    Cost of Gas Fittings

    Construction of compund wall 4 1/2"

    thick and 6' high above D.P.C

  • 8/2/2019 Civil Engg Project Est Mat Ion

    19/143

    u v s ona cerProvincial Buildings Sub Division-I

    Sargodha

    xecu ve ng neerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    20/143

    20

    1

    H walls 2 x1 x21-1/2 x3-1/4 x3 = 419 Cft1 x1 x30-1/4 x3-1/4 x3 = 295 Cft1 x1 x9 x3-1/4 x3 = 88 Cft1 x1 x35-1/2 x3-1/4 x3 = 346 Cft1 x1 x26 x3-1/4 x3 = 254 Cft1 x1 x27-7/8 x3-1/4 x3 = 272 Cft1 x1 x9-3/4 x3-1/4 x3 = 95 Cft1 x1 x16-3/4 x3-1/4 x3 = 163 Cft1 x1 x35 x3-1/4 x3 = 341 Cft1 x1 x18-1/2 x3-1/4 x3 = 180 Cft1 x1 x38-1/4 x2-1/2 x3 = 287 Cft1 x1 x21-3/4 x2-1/2 x3 = 163 Cft1 x1 x7 x2-1/2 x3 = 53 Cft1 x2 x2-3/8 x2-1/2 x3 = 36 Cft 4544Cft-Marked=A

    V walls 1 x2 x15 x2-1/2 x3 = 225 Cft1 x3 x9 x2-1/2 x3 = 203 Cft1 x1 x22-3/4 x2-1/2 x3 = 171 Cft1 x1 x37-5/8 x2-1/2 x3 = 282 Cft1 x1 x17 x2-1/2 x3 = 128 Cft1 x1 x13-3/4 x2-1/2 x3 = 103 Cft1 x1 x27-7/8 x2-1/2 x3 = 209 Cft1 x1 x15-3/4 x2-1/2 x3 = 118 Cft1 x1 x15 x2-1/2 x3 = 113 Cft

    Toe wall 1 x1 x3 x1-1/2 x 3/4 = 3 Cft1 x1 x40-1/8 x1-1/2 x 3/4 = 45 Cft1 x1 x8-1/4 x1-1/2 x 3/4

    =9 Cft

    1 x1 x23-5/8 x1-1/2 x 3/4 = 27 Cft1 x1 x48-1/4 x1-1/2 x 3/4 = 54 Cft1 x1 x3 x1-1/2 x 3/4 = 3 Cft 171Cft-Marked=B1 x1 x12-1/8 x1-1/2 x 3/4 = 14 Cft1 x1 x14-3/8 x1-1/2 x 3/4 = 16 Cft

    Total = 4715 Cft @Rs.2795.75%oCft Rs. 13182/-

    DETAILED ESTIMATE FOR CONSTRUCTION OF RESI 2750 SFT

    Excavation in foundation of

    building, bridges and otherstructures, including dagbelling,

    dressing, refilling around

    structure with excavated earth,

    watering and rammiing lead

    upto one chain (30 m) and lift

    upto 5 ft. (1.5 m) b) in ordinary

    soil

    Building Protion

  • 8/2/2019 Civil Engg Project Est Mat Ion

    21/143

    212

    1 1 x21-1/2 x9-1/4 = 199 Sft1 1 x30-1/4 x9-1/4 = 280 Sft1 x1 x9 x9-1/4 = 83 Sft1 x1 x35-1/2 x9-1/4 = 328 Sft1 x1 x26 x9-1/4 = 241 Sft1 x1 x27-7/8 x9-1/4 = 258 Sft1 x1 x9-3/4 x9-1/4 = 90 Sft1 x1 x16-3/4 x9-1/4 = 155 Sft1 x1 x35 x9-1/4 = 324 Sft1 x1 x18-1/2 x9-1/4 = 171 Sft1 x1 x38-1/4 x8-1/2 = 325 Sft

    1 x1 x21-3/4 x8-1/2 = 185 Sft1 x1 x7 x8-1/2 = 60 Sft1 x2 x2-3/8 x8-1/2 = 40 Sft1 x2 x15 x8-1/2 = 255 Sft1 x3 x9 x8-1/2 = 230 Sft1 x1 x22-3/4 x8-1/2 = 193 Sft1 x1 x37-5/8 x8-1/2 = 320 Sft1 x1 x17 x8-1/2 = 145 Sft1 x1 x13-3/4 x8-1/2 = 117 Sft1 x1 x27-7/8 x8-1/2 = 237 Sft1 x1 x15-3/4 x8-1/2 = 134 Sft1 x1 x15 x8-1/2 = 128 Sft

    Take

    as per

    Item = 79 SftTake

    as per

    Item

    No. 30

    = 2029 SftTake

    as per

    ItemNo. 29

    = 1388 SftTotal = 7994 Sft @Rs.522.40%Sft Rs. 41761/-

    3

    4544Cft x 1/3 # # = 1136 Cft.Total = 1136 [email protected]%Cft Rs. 67371/-

    P/Laying cement concret brick or

    stone ballast 1-1/2" to 2"gauge

    in foundation and plinth.

    i- 1:6:12 Ratio

    Take Qty 3/16 of Item No.1 marked "A"

    Termite Proofing of Buildings by

    spraying anti termite liquid with

    chemical (Biflux or Dursban)

    consisting of one liter of

    chemical (Biflux or Dursban) and

    40 liter of water for and area of

    175Sft as approved directed by

    the Engineer Incharge.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    22/143

    224

    171Cft x 1/2 = 86 Cft.Total = 86 [email protected]%Cft Rs. 1856/-

    5

    H walls A 1 x2 x23-3/4 x2-1/4 x 1/4 = 27 Cft.1 x2 x23-3/8 x1-7/8 x 1/4 = 22 Cft.1 x2 x23 x1-1/2 x 1/4 = 17 Cft.1 x2 x22-5/8 x1-1/8 x4-1/4 = 216 Cft.1 x1 x31-3/8 x2-1/4 x 1/4 = 18 Cft.1 x1 x31 x1-7/8 x 1/4 = 15 Cft.1 x1 x30-5/8 x1-1/8 x4-1/2 = 155 Cft.1 x1 x11-1/8 x2-1/4 x 1/4 = 6 Cft.1 x1 x10-3/4 x1-1/2 x 1/4 = 4 Cft.1 x1 x10-3/8 x1-1/2 x 1/4 = 4 Cft.1 x1 x10 x1-1/8 x4-1/4 = 48 Cft.

    1 x1 x37-3/4 x1-7/8 x 1/4 = 18 Cft.1 x1 x37-3/8 x1-1/2 x 1/4 = 14 Cft.1 x1 x37 x1-1/8 x 1/4 = 10 Cft.1 x1 x36-5/8 x1-1/8 x4-1/4 = 175 Cft.1 x1 x27-1/8 x2-1/4 x 1/4 = 15 Cft.1 x1 x26-3/4 x1-7/8 x 1/4 = 13 Cft.1 x1 x26-3/8 x1-7/8 x 1/4 = 12 Cft.1 x1 x26 x1-1/8 x5 = 146 Cft.1 x1 x49-3/4 x2-1/4 x 1/4 = 28 Cft.1 x1 x49-3/8 x1-7/8 x 1/4 = 23 Cft.1 x1 x49 x1-1/2 x 1/4 = 18 Cft.

    1 x1 x48-5/8 x1-1/8 x4-1/4 = 232 Cft.1 x1 x39-3/8 x1-7/8 x 1/4 = 18 Cft.1 x1 x39 x1-1/2 x 1/4 = 15 Cft.1 x1 x38-5/8 x1-1/2 x 1/4 = 14 Cft.1 x1 x38-1/4 x1-1/8 x4-1/4 = 183 Cft.1 x1 x12 x2-1/4 x 1/4 = 7 Cft.1 x1 x11-5/8 x1-7/8 x 1/4 = 5 Cft.1 x1 x11-1/4 x1-1/2 x 1/4 = 4 Cft.1 x1 x10-7/8 x1-1/8 x4-1/4 = 52 Cft.1 x1 x19 x2-1/4 x 1/4 = 11 Cft.1 x1 x18-7/8 x1-7/8 x 1/4 = 9 Cft.

    1 x1 x18-1/4 x1-1/2 x 1/4 = 7 Cft.1 x1 x17-7/8 x1-1/8 x4-1/4 = 85 Cft.1 x1 x37-1/4 x2-1/4 x 1/4 = 21 Cft.1 x1 x36-7/8 x1-7/8 x 1/4 = 17 Cft.1 x1 x36-1/2 x1-1/2 x 1/4 = 14 Cft.1 x1 x36-1/8 x1-1/8 x4-1/4 = 173 Cft.1 x1 x19-5/8 x1-7/8 x 1/4 = 9 Cft.1 x1 x20 x1-1/2 x 1/4 = 8 Cft.1 x1 x20-3/8 x1-1/8 x 1/4 = 6 Cft.1 x1 x20-3/4 x 3/4 x4-1/4 = 66 Cft.

    Pacca brick work with cement

    sand mortar in foundation and

    plinth.i) Ratio 1:6

    Dry rammed brick or stone

    ballast 1 1/2"-2" guage.

    Take Qty 1/2 of Item No.1 marked "B"

  • 8/2/2019 Civil Engg Project Est Mat Ion

    23/143

    231 x1 x4-7/8 x1-7/8 x 1/4 = 2 Cft.1 x1 x5-1/4 x1-1/2 x 1/4 = 2 Cft.1 x1 x5-5/8 x1-1/8 x 1/4 = 2 Cft.1 x1 x6 x 3/4 x4-1/4 = 19 Cft.1 x1 x13-1/4 x1-7/8 x 1/4 = 6 Cft.1 x1 x13-5/8 x1-1/2 x 1/4 = 5 Cft.1 x1 x14 x1-1/8 x 1/4 = 4 Cft.1 x1 x14-3/8 x 3/4 x4-1/4 = 46 Cft.

    1 x2 x12-7/8 x1-7/8 x 1/4 = 12 Cft.1 x2 x13-1/4 x1-1/2 x 1/4 = 10 Cft.1 x2 x13-5/8 x1-1/8 x 1/4 = 8 Cft.1 x2 x14 x 3/4 x4-1/4 = 89 Cft.1 x1 x20-7/8 x1-7/8 x 1/4 = 10 Cft.1 x1 x21-1/4 x1-1/2 x 1/4 = 8 Cft.1 x1 x21-5/8 x1-1/8 x 1/4 = 6 Cft.1 x1 x22 x 3/4 x4-1/4 = 70 Cft.1 x3 x6-7/8 x1-7/8 x 1/4 = 10 Cft.1 x3 x7-1/4 x1-1/2 x 1/4 = 8 Cft.1 x3 x7-5/8 x1-1/8 x 1/4 = 6 Cft.1 x3 x8 x 3/4 x4-1/4 = 77 Cft.1 x1 x37-7/8 x1-7/8 x 1/4 = 18 Cft.1 x1 x35-1/4 x1-1/2 x 1/4 = 13 Cft.1 x1 x35-5/8 x1-1/8 x 1/4 = 10 Cft.1 x1 x36 x 3/4 x4-1/4 = 115 Cft.1 x1 x11-7/8 x1-7/8 x 1/4 = 6 Cft.1 x1 x12-1/4 x1-1/2 x 1/4 = 5 Cft.1 x1 x12-5/8 x1-1/8 x 1/4 = 4 Cft.1 x1 x13 x 3/4 x4-1/4 = 41 Cft.1 x1 x25-5/8 x1-7/8 x 1/4 = 12 Cft.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    24/143

    241 x1 x26 x1-1/2 x 1/4 = 10 Cft.1 x1 x26-3/8 x1-1/8 x 1/4 = 7 Cft.1 x1 x26-3/4 x 3/4 x4-1/4 = 85 Cft.1 x1 x13-5/8 x1-7/8 x 1/4 = 6 Cft.1 x1 x14 x1-1/2 x 1/4 = 5 Cft.1 x1 x14-3/8 x1-1/8 x 1/4 = 4 Cft.1 x1 x14-3/4 x 3/4 x4-1/4 = 47 Cft.1 x1 x12-7/8 x1-7/8 x 1/4 = 6 Cft.1 x1 x13-1/4 x1-1/2 x 1/4 = 5 Cft.1 x1 x13-5/8 x1-1/8 x 1/4 = 4 Cft.1 x1 x14 x 3/4 x4-1/4 = 45 Cft.

    PP 1 x1 x275 x 3/4 x2-1/4 = 464 Cft.1 x1 x21-1/8 x 3/4 x2-1/4 = 36 Cft.1 x1 x14-3/8 x 3/4 x2-1/4 = 24 Cft.

    Steps 1 x1 x38 x4 x2-1/4 = 342 Cft.

    Total. = 3674 [email protected]%Cft Rs. 326372/-6

    D.P.C 1 x1 x14 x1-1/8 = 16 Sft.1 x1 x36 x1-1/8 = 41 Sft.1 x1 x5-1/4 x 3/4 = 4 Sft.1 x1 x31-3/8 x1-1/8 = 35 Sft.1 x1 x8-3/4 x 3/4 = 7 Sft.1 x1 x15-1/8 x1-1/8 = 17 Sft.1 x1 x8 x1-1/8 = 9 Sft.1 x1 x46-1/8 x1-1/8 = 52 Sft.1 x1 x14-3/4 x1-1/8 = 17 Sft.1 x1 x17-1/8 x1-1/8 = 19 Sft.1 x1 x21-3/4 x1-1/8 = 24 Sft.1 x1 x5-1/8 x1-1/8 = 6 Sft.1 x1 x15-1/8 x 3/4 = 11 Sft.1 x1 x22 x1-1/8 = 25 Sft.1 x18 x 3/4 x 3/4 = 10 Sft.

    2nd

    D.P.C 1 x2 x14 x1-1/8 = 32 Sft.

    1 x1 x14 x 3/4 = 11 Sft.1 x1 x6 x 3/4 = 5 Sft.1 x1 x35-7/8 x1-1/8 = 40 Sft.1 x1 x5-1/4 x1-1/8 = 6 Sft.1 x1 x6 x 3/4 = 5 Sft.1 x1 x31-3/8 x 3/4 = 24 Sft.1 x1 x14 x 3/4 = 11 Sft.1 x1 x14-3/8 x 3/4 = 11 Sft.1 x2 x22-3/4 x 3/4 = 34 Sft.1 x2 x8 x 3/4 = 12 Sft.

    Providing and laying damp proof

    course of cement concrete 1:2:

    4(using cement, sand and

    shingle), including bitumencoating :-(a) with one coat of

    bitumen and one coat of

    polythene sheet 500 gauge: i) 1-

    1/2" thick.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    25/143

    251 x1 x15-1/8 x1-1/8 = 17 Sft.1 x1 x8 x1-1/8 = 9 Sft. 454Sft-Marked=A1 x1 x46-1/8 x1-1/8 = 52 Sft.1 x1 x14 x 3/4 = 11 Sft.1 x1 x14-3/4 x1-1/8 = 17 Sft.1 x1 x19-1/4 x 3/4 = 14 Sft.1 x1 x36-1/8 x 3/4 = 27 Sft.1 x1 x17-1/8 x1-1/8 = 19 Sft.

    1 x1 x14 x 3/4 = 11 Sft.1 x1 x21-3/4 x1-1/8 = 24 Sft.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    26/143

    261 x1 x16-3/4 x 3/4 = 13 Sft.1 x1 x5-1/8 x1-1/8 = 6 Sft.1 x1 x15-1/8 x 3/4 = 11 Sft.1 x18 x 3/4 x 3/4 = 10 Sft.1 x13 x 3/4 x2-1/4 = 22 Sft.

    Total.(A) = 747 Sft.D/D openings

    1 x1 x14 x1-1/8 = 16 Sft.

    1 x1 x25-1/4 x1-1/8 = 28 Sft.1 x2 x4 x 3/4 = 6 Sft.1 x4 x3-1/4 x 3/4 = 10 Sft.1 x4 x2-1/2 x 3/4 = 8 Sft.

    D1 1 x1 x3-1/2 x1-1/8 = 4 Sft.D2 1 x1 x3 x1-1/8 = 3 Sft.D3 1 x1 x3-1/2 x1-1/8 = 4 Sft.

    1 x1 x4 x1-1/8 = 5 Sft.1 x1 x3 x 3/4 = 2 Sft.1 x1 x4 x 3/4 = 3 Sft.1 x1 x3 x 3/4 = 2 Sft.

    1 x1 x9 x 3/4 = 7 Sft.1 x1 x9 x 3/4 = 7 Sft.

    Total.(B) = 105 Sft.

    Net Total (A-B) = 642 [email protected]%Sft Rs. 18044/-7

    1 x1 x14 x2 = 28 Sft.

    1 x1 x17 x2 = 34 Sft.1 x1 x12 x2 = 24 Sft.1 x1 x2 x2 = 4 Sft.1 x1 x6-5/8 x2 = 13 Sft.1 x1 x6 x2 = 12 Sft.1 x1 x14 x2 = 28 Sft.1 x1 x14-3/8 x2 = 29 Sft.1 x1 x14 x2 = 28 Sft.1 x1 x16 x2 = 32 Sft.1 x1 x4-1/2 x2 = 9 Sft.1 x1 x7 x2 = 14 Sft.

    1 x1 x5-1/4 x2 = 11 Sft.1 x1 x5-5/8 x2 = 11 Sft.1 x1 x5-3/4 x2 = 12 Sft.1 x1 x14 x2 = 28 Sft.1 x1 x8-3/4 x2 = 18 Sft.1 x1 x9 x2 = 18 Sft.1 x1 x12 x2 = 24 Sft.1 x1 x14 x2 = 28 Sft.1 x1 x14-3/8 x2 = 29 Sft.1 x1 x5-1/4 x2 = 11 Sft.1 x1 x1-1/2 x2 = 3 Sft.

    Providing and laying vertical

    damp proof course with cement

    sand plaster and bitumen

    coating:- (a) with one coat of

    bitumen and one coat of

    polythene sheet 500 gauge:

  • 8/2/2019 Civil Engg Project Est Mat Ion

    27/143

    271 x1 x10-3/8 x2 = 21 Sft.1 x2 x30 x2 = 120 Sft.

    Total = 589 [email protected]%Sft Rs. 12077/-8

    Take 2/3 of It4715 x 2/3 = 3145 Cft

    Total. = 3145 [email protected]%oCft

    Rs. 4234/-

    Filling, watering, ramming, earth

    under floor with i) with surplus

    earth from foundation, etc.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    28/143

    288-i

    79 x1-1/2

    = 119 Cft2029 x1-1/2

    = 3044 Cft174 x1-1/2 = 261 Cft

    PP 1 x1 x260 x3-1/4 x1 = 845 Cft1 x1 x60 x27 x1 = 1620 Cft1 x1 x13-1/4 x17-1/8 x1 = 227 Cft.

    Total = 6116 CftNet Qty. 6116.0 ( - ) 3145 = 2971 [email protected]%oCft Rs. 15877/-

    9

    79 x 1/3

    = 26 Cft42 x 1/3

    = 14 Cft200 x 1/3 = 66 Cft

    Back Ter 1 x1 x13-1/8 x17-1/8 x 1/3 = 75 CftPorch 1 x1 x20 x23 x 1/3 = 153 CftPP 1 x1 x260 x3-1/2 x 1/3 = 300 Cft

    Total = 634 Cft @Rs.947.80%Cft Rs. 6009/-

    10

    sme Qty

    ofIt.No.9 634 = 634 Cft

    Total = 634 [email protected]%Cft Rs. 14740/-11

    H walls 1 x2 x14 x1-1/8 x11 = 347 Cft.1 x1 x14 x 3/4 x11 = 116 Cft.1 x1 x5 x 3/4 x11 = 41 Cft.1 x1 x35-7/8 x1-1/8 x11 = 444 Cft.1 x2 x6 x 3/4 x11 = 99 Cft.1 x1 x31-3/8 x1-1/8 x11 = 388 Cft.

    Qty item No.

    33(Floor )

    Qty item No.

    29(Floor )

    Qty item No.

    30(Floor )

    Qty item No.

    33(Floor )

    Qty item No.

    29(Floor )

    Qty item No.

    30(Floor )

    Filling, watering, ramming, earth

    under floor with ii) New earth

    excavated from out side lead up

    to 3 miles.

    Supply and filling of sand under

    floor or plugging in wells.

    Providing, laying, watering and

    ramming brick ballast 1" to

    2"(40 mm to 50 mm) gauge

    mixed with 25% sand, for floor

    foundation, complete in all

    respects.

    Pacca brick work c/s (1:6)

    mortar in G.F

  • 8/2/2019 Civil Engg Project Est Mat Ion

    29/143

    291 x1 x14 x 3/4 x11 = 116 Cft.1 x1 x38-1/2 x 3/4 x11 = 318 Cft.1 x1 x8 x 3/4 x11 = 66 Cft.1 x1 x8 x 3/4 x11 = 66 Cft.1 x1 x15-1/8 x1-1/8 x11 = 187 Cft.

    V walls 1 x1 x46-1/8 x1-1/8 x11 = 571 Cft.1 x1 x14 x 3/4 x11 = 116 Cft.1 x1 x19-1/8 x1-1/8 x11 = 237 Cft.

    1 x1 x14-3/4 x 3/4 x11 = 122 Cft.1 x1 x36-1/3 x 3/4 x11 = 300 Cft.1 x1 x36-1/8 x 3/4 x11 = 298 Cft.1 x1 x14 x 3/4 x11 = 116 Cft.1 x1 x17-1/8 x1-1/8 x11 = 212 Cft.1 x1 x21-3/4 x1-1/8 x11 = 269 Cft.1 x1 x16 x 3/4 x11 = 132 Cft.1 x1 x5-1/8 x1-1/8 x11 = 63 Cft.1 x1 x15-1/8 x 3/4 x11 = 125 Cft.1 x1 x22 x1-1/8 x11 = 272 Cft.1 x18 x 3/4 x 3/4 x11 = 111 Cft.

    At side 1 x3 x2 x 3/8 x11 = 25 Cft.Total. = 5157 Cft.

    Deduction.

    D1 1 x1 x4 x1-1/8 x7 = 32 Cft.D2 1 x6 x4 x 3/4 x7 = 126 Cft.D3 1 x2 x3 x 3/4 x7 = 32 Cft.D3A 1 x1 x3 x1-1/8 x7 = 24 Cft.D4 1 x4 x3 x 3/4 x7 = 63 Cft.W1 1 x7 x8 x1-1/8 x6-1/2 = 410 Cft.W2 1 x1 x12 x1-1/8 x6-1/2 = 88 Cft.W3 1 x1 x3 x1-1/8 x3-1/2 = 12 Cft.V1 1 x5 x3 x1-1/8 x2 = 34 Cft.

    Opening 1 x1 x5-1/2 x 3/4 x7 = 29 Cft.1 x1 x3 x 3/4 x7 = 16 Cft.

    Lintels D 1 x1 x5 x1-1/8 x 3/4 = 4 Cft.1 x6 x4-1/2 x 3/4 x 3/4 = 15 Cft.1 x2 x4 x 3/4 x 3/4 = 5 Cft.1 x1 x4 x1-1/8 x 3/4 = 3 Cft.1 x3 x3-1/2 x 3/4 x 3/4 = 6 Cft.1 x1 x4-1/2 x 3/4 x 3/4 = 3 Cft.1 x1 x4 x 3/4 x 3/4 = 2 Cft. 155Cft-Marked=A

    W 1 x7 x9-1/2 x1-1/8 x1 = 75 Cft.1 x1 x14 x1-1/8 x1 = 16 Cft.1 x1 x4 x1-1/8 x 3/4 = 3 Cft.1 x5 x4 x1-1/8 x 3/4 = 17 Cft.1 x1 x7 x 3/4 x 3/4 = 4 Cft.1 x1 x4 x 3/4 x 3/4 = 2 Cft.

    Total Ded. = 1021 Cft.

    Net Qty. 5157 ( - ) 1021 = 4136 [email protected]%Cft Rs. 393183/-11-i Pacca brick work with cement

    sand mortar in Ground floor.i)

    Ratio 1:4

  • 8/2/2019 Civil Engg Project Est Mat Ion

    30/143

    30Din 1 x1 x1-1/2 x 3/8 x11 = 6 Cft

    1 x1 x2-1/2 x 3/8 x11 = 10 Cft

    1 x3 x8 x 3/8 x11 = 99 Cft

    Total(A) = 115 Cft

    D/D

    1 x2 x2-1/2 x 3/8 x7 = 13 Cft

    1 x2 x3-1/2 x 3/8 x7 = 18 CftTotal(B) = 31 Cft

    = 84 Cft @Rs.10038.05%Cft Rs. 8432/-12

    Lintels

    Take

    Qty item

    No. 11 = 155 Cft.Roof

    slab 1 x1 x45-1/4 x15-7/8 x 5/12 = 299 Cft.1 x1 x20-3/4 x37-3/8 x 5/12 = 323 Cft.

    1 x1 x15-1/2 x23-1/4 x 5/12 = 150 Cft.1 x1 x24-1/4 x21-1/2 x 5/12 = 217 Cft.1 x1 x9-1/2 x4 x 5/12 = 16 Cft.

    Box

    shelf 1 x3 x8-3/4 x1 x 1/4 = 7 Cft.1 x1 x10-1/8 x1-3/4 x 1/4 = 4 Cft.

    Kit 1 x1 x9 x2-3/8 x 1/4 = 5 Cft.1 x1 x11 x2-3/8 x 1/4 = 7 Cft.

    WR bed 1 x1 x7-7/8 x2-1/4 x 1/4 = 4 Cft.1 x1 x8-1/4 x2-1/2 x 1/4 = 5 Cft.1 x1 x7-1/4 x2-1/2 x 1/4 = 5 Cft.

    1 x1 x8-3/4 x2-1/2 x 1/4 = 5 Cft.Carporch 1 x1 x20 x1-1/8 x1-1/2 = 34 Cft.

    1 x1 x20-1/2 x1-1/8 x1-1/2 = 35 Cft.Col 1 x3-1/7 x 5/8 x17-1/2 = 34 Cft.Din 1 x1 x12 x 3/4 x1 = 9 Cft.Parapet 1 x1 x275 x 1/2 x3-3/4 = 138 Cft.

    Kit Deck 1 x1 x60 x 1/2 x1 = 30 Cft.1 x1 x18-1/2 x1 x 1/2 = 19 Cft.1 x1 x6-7/8 x1 x 1/2 = 7 Cft.

    Providing and laying reinforced cement concrete (including prestressed

    concrete), using coarse sand and screened graded and washed aggregate,

    in required shape and design,including forms, moulds, shuttering, lifting,

    compacting,curing, rendering and finishing exposed surface, complete (but

    excluding the cost of steel reinforcement, its fabrication and placing in

    position, etc.):- (a) (i) Reinforced cement concrete in roof slab,

    beams,columns lintels, girders and other structural members laid insitu or precast laid in position, or prestressed members cast in situ,

    complete in all respects:- (3) (c) Type C (nominal mix 1:2:4)

    Net Qty(A-B)

  • 8/2/2019 Civil Engg Project Est Mat Ion

    31/143

    31LobbyEnt 1 x1 x13-2/3 x1 x 1/2 = 7 Cft.Deck 1 x1 x8-1/6 x1 x 1/2 = 4 Cft.

    1 x1 x9-2/3 x1 x 1/2 = 5 Cft.1 x1 x201 x1 x 1/2 = 101 Cft.1 x1 x26-2/3 x1 x1-1/2 = 40 Cft.1 x1 x2 x9-3/4 x 1/2 = 10 Cft.1 x1 x14-1/8 x6 x 1/2 = 42 Cft.

    Left sidepurgola = 31 Cftg

    side

    purgola = 36 Cft

    Over W1

    Purgola = 73 CftTotal = 1857 Cft. @Rs.201.95/Cft Rs. 375021/-

    13

    1857 x6.75 x0.454 = 5691 Kg @Rs.8973.05%Kg Rs. 510656/-

    14

    W1 1 x7 x8 x8-1/2 = 476 Sft.W2 1 x1 x12 x6-1/2 = 78 Sft.

    W3 1 x1 x3 x3-1/2 = 11 Sft.V1 1 x5 x3 x2 = 30 Sft.

    Total = 595 [email protected]/Sft Rs. 202836/-15

    79

    = 79 Sft.

    Qty item No.

    27(Floor )

    1 1/3x2 3/4x3/3((11^2+2/5x2 3/4^2)^1/2)

    Cement plaster 3/8" (10 mm)

    thick under soffit of R.C.C.roof

    slabs , 1:2 ratio.

    1 1/3x2 3/4x3/3((13^2+2/5x2 3/4^2)^1/2)

    5x 4/3x2 3/4x3/4((5^2+2/5x2 3/4^2)^1/2)

    Providing and fixing windows consisting of M.S. box

    section frame 2"x1", (50x40mm) leaves frame 1"x1"

    (40x25mm) box section frame for glazing 3/8"x3/8"

    (10x10mm) using 16 SWG sheet 'U' shaped rubber

    supported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"

    (5 mm) thick glass panes M.S. box section "x"

    (13x13mm) of 16 SWG for fixing 24 SWG wire gauze on

    outer side by means of "x1/8" (20x3mm) M.S. flat andscrews including grill of M.S. flat "x1/8" (13x3mm) or

    "x" (6x6mm) square bar with independent frame of

    "x" (13x13mm) box section of 16 SWG i/c all C.P.

    fitting and painting 3 coats complete in all respect

    Fabrication of M.S reinforcement

    i/c cutting bending binding

    laying in postion making joints

    and fastenings inculding cost of

    binding wire and labour charges

    for binding of steel

    reinforcement (also includes

    removal of rust from bars):- b-

    deformad bars

  • 8/2/2019 Civil Engg Project Est Mat Ion

    32/143

    322029

    = 2029 Sft.174 = 174

    Sft.

    W1 Pur 1 x5 x10 x2 = 100 Sft.1 x5 x10 x2 = 100 Sft.

    V1 Purg 1 x2 x20 x2 = 80 Sft.1 x2 x20 x2 = 80 Sft.

    Total = 2642 [email protected]%Sft Rs. 33478/-16

    Din/beds 3 x2 x(14 +12 ) x10-1/2 = 1638 Sft.Kit 1 x2 x(14 +10 ) x10-1/2 = 504 Sft.Box 1 x2 x(8 +7-1/8) x10-1/2 = 318 Sft.Bed 1 x2 x(14 +13 ) x10-1/2 = 567 Sft.

    1 x2 x(14 +16 ) x10-1/2 = 630 Sft.Bath 2 x2 x(8 +5-3/4) x6 = 330 Sft.Dress 1 x2 x(8 +5-7/8) x10-1/2 = 291 Sft.Draw 1 x2 x(14-3/8 +17 ) x10-1/2 = 659 Sft. 7374Cft-Marked=ALoung 1 x2 x(14-3/8 +18-3/4) x10-1/2 = 696 Sft.Lobby 1 x2 x(6 +14 ) x10-1/2 = 420 Sft.Bath 1 x2 x(6 +7 ) x6 = 156 Sft.

    1 x2 x(6 +6-1/4) x6 = 147 Sft.Extra NR1 x6 x2 x10-1/2 = 126 Sft.Porch 1 x2 x(17-1/2 +18-1/2) x10-1/2 = 756 Sft.Lobby 1 x1 x15-1/2 x8-3/4 = 136 Sft.Front 1 x1 x31-3/8 x12 = 377 Sft.

    1 x1 x21-1/2 x12 = 258 Sft.1 x1 x9-3/4 x12 = 117 Sft.1 x1 x21-1/2 x12 = 258 Sft.1 x1 x8-3/4 x12 = 105 Sft. 2825Cft-Marked=B

    Back 1 x1 x36-5/8 x12 = 440 Sft.1 x1 x15-5/8 x12 = 188 Sft.1 x1 x25 x12 = 300 Sft.

    Left side 1 x1 x29 x12 = 348 Sft.Right sid 1 x1 x36-1/8 x12 = 434 Sft.

    Total = 10199 [email protected]%Sft Rs. 101052/-

    17

    D1 1 x1 x4 x7 = 28 Sft.D2 1 x7 x3-1/2 x7 = 172 Sft.D3 1 x2 x3 x7 = 42 Sft.D4 1 x4 x2-1/2 x7 = 70 Sft.DW1 1 x1 x3 x7 = 21 Sft.CY door 1 x1 x4 x7 = 28 Sft.

    Qty item No.

    28(Floor )

    Qty item No.

    31(Floor )

    1/2" thick cement plaster 1:4

    upto 20' (6.00 mm) height:-

    P/F deodar wood panelled or

    panelled with glazed doors and

    windows with M.S chowkatconsisting of M.S angle iron 1 1

    /2"x 1 1/2"x1/4" welded with

    M.S flat 1 1/2"x1/4" complete.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    33/143

    33Total = 361 [email protected]/Sft Rs. 176204/-17-i x1 x8 = 15 No @Rs.124.65/E Rs. 1870/-18

    D1 1 x1 x4 x7 = 28 Sft.DW3 1 x1 x3 x7 = 21 Sft.

    Total = 49 [email protected]/Sft Rs. 22462/-19

    Beds 1 x4 x8 x10-1/2 = 336 Sft.

    Total = 336 [email protected]/Sft Rs. 154510/-20

    1 x1 x24 x4-3/4 = 114 Sft.

    Total = 114 [email protected]/Sft Rs. 50189/-

    P/F iron sliding bolts to doors

    P/F First class deodar wood

    wrought joinery work in wire

    gauzed doors and windows with

    24 SWG wire gauze with M.S

    chowkat consisting of M.S angle

    iron 1 1 /2"x 1 1/2"x1/4" welded

    with M.S flat 1 1/2"x1/4"

    complete.

    deodar wood framing 1" (40

    mm) thick, with wire

    gauze fixed in position:-

    with s rin s or s rin hin es

    Providing and fixing wardrobe 22" (550 mm) deep

    consisting of RCC shelves 1" (40 mm) thick including "

    thick vinboard boxing and back (one side ply) vinboard

    shutter " (20 mm) thick including deodar wood lipping "

    (6 mm) on all edges, fixes including deodar wood frame

    3"x1" (75mm x 25mm) with hanger rod in centre position

    drawers at bottom and openable shutter on upper portion

    including full hinges C.P. fitting and painting 3 coats

    complete.

    Providing and fixing Vin board cabinet 3/4" thick with

    drawers 3"deep in 'Kitchen including termite proofing and

    polishing with synthetic enamel as specified, with handles

    hinges,screws etc., complete in all respects.2' deep with out back.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    34/143

    3421

    W1 1 x1 x6 = 6 RftW2 1 x6 x4-1/2 = 27 RftDW1 1 x3 x4 = 12 Rft

    DW2 1 x7 x9 = 63 RftD1 1 x1 x14 = 14 RftD2 1 x1 x4 = 4 RftD3A 1 x1 x6 = 6 RftD4 1 x1 x4 = 4 Rft

    1 x1 x11 = 11 Rft1 x1 x9 = 9 Rft1 x1 x4 = 4 Rft

    Total = 160 Rft @Rs.100.90/Rft Rs. 16144/-22

    Roof 1 x1 x14-3/4 x44-1/2 = 656 Sft.1 x1 x36-7/8 x38-5/8 = 1424 Sft.

    1 x1 x8-3/4 x15-1/4 = 133 Sft.1 x1 x23-1/2 x16-3/8 = 385 Sft.1 x1 x4 x8-7/8 = 36 Sft.

    Total = 2634 Sft.Deduction.

    Khurra 1 x6 x2 x2 = 24 Sft.

    Total = 24 Sft.

    Net Qty 2634 ( - ) 24 2610 [email protected]%Sft Rs. 103977/-

    23

    = 6 No.

    Total. = 6 [email protected]/Each Rs. 1691/-24

    1 x4 x15 = 60 Rft.Total = 60 Rft @Rs.222.20/Rft Rs. 13332/-

    Single layer of tiles 9"x4"x1"

    (225x113x40 mm) laid over

    4"(100 mm) earth and 1" (25mm) mud plaster without

    Bhoosa, grouted with cement

    sand 1:3 on top of RCC roof

    slab, provided with 34 lbs. per

    %Sft. or 1.72 Kg/Sq.m bitumen

    coating sand blinded i/c

    supplying and laying polythene

    sheet over DPC under floors and

    on roofs etc 500 gauge.

    Khuras on roof 2'x2'x6" (600 x

    600 x 150 mm)

    Providing, laying, cutting,

    jointing, testing and disinfecting

    pipe line in trenches with P.V.C.

    pipes of B.S.S. with `D' and

    valves is not included in the

    Class working pressure complete

    in all respects:-

    Providing and fitting curtain railing to doors and windows,

    comprising of TOSO-elite Japan made superior type of

    railing or equivalent, fixed over 4"x" (100mmx20mm)

    deodar wood strip, including painting.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    35/143

    3525

    = 12 No @Rs.469.30/Each Rs. 5632/-

    26

    361 x2 = 722 Sft.

    Total = 722 [email protected]%Sft Rs. 7359/-

    Take

    Double of

    It.No.17

    Providing and installing P.V.C.

    bends, of B.S.S. class D working

    pressure.

    Painting new surface:- Preparing

    surface and painting of doors

    and windows any type (including

    edges):- 3 coats.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    36/143

    3626-i

    49 x2 = 98 Sft.Total = 98 [email protected]%Sft Rs. 618/-

    27

    Box 1 x1 x8 x7-1/8 = 57 Sft.Decks

    proch 1 x2 x5 x 1/2 = 5 Sft.Decks

    Kit 1 x2 x9 x 1/2 = 9 Sft.ec s

    lawn 1 x16 x 1/2 = 8 Sft.

    Total = 79 Sft. @Rs.5336.25%Sft Rs. 4216/-

    27-i

    1 x2 x(8 +7-1/8) x 3/7 = 13 Sft.Kit Khurr 1 x2 x(4 +4 ) x 1/2 = 8 Sft.

    Total = 21 Sft. @Rs.5600.80%Sft Rs. 1176/-

    28

    Lounge 1 x1 x14-3/8 x18-3/4 = 270 Sft.Lobby 1 x1 x6 x14 = 84 Sft.

    1 x1 x5-1/2 x8-3/4 = 48 Sft.D1 1 x1 x4 x1-1/8 = 5 Sft.D2 1 x7 x3-1/2 x 3/4 = 18 Sft.D3 1 x2 x3 x 3/4 = 5 Sft.

    1 x1 x3 x1-1/8 = 3 Sft.Opening 1 x1 x5-1/2 x 3/4 = 4 Sft.

    1 x1 x10-3/8 x 3/4 = 8 Sft.Beds 1 x2 x14 x12 = 336 Sft.

    Take

    Double of

    It.No.18

    Painting new surface:- Preparing

    surface and painting sashes

    fanlights glazed or gauzed doors

    and windows (including edges):-

    1"(40 mm) thick mosaic

    flooring, consisting of "mosaic topping of one part of

    cement and marble powder inthe ratio of 3:1 and two parts of

    marble chips,laid over 1"(25

    mm) thick floor of 1:2:4 cement

    concrete,

    including rubbing and polishing

    complete with finishing :- (a)

    using grey cement

    P/L Porcelain Granite Tiles

    Colour Master

    16"x16"x3/8",18"x18"x3/8" Laid

    over Bed of 3/4" Thick cement

    sand mortar i/c making patterns

    on floor and dado i/c filling of

    joints complete in all respects as

    Directed/Approved by the

    En ineer Inchara e.

    1/2" thick mosaic dado or

    skirting using white cement i/c

    rubbing and polishing complete

    with finishing using grey cement

  • 8/2/2019 Civil Engg Project Est Mat Ion

    37/143

    371 x1 x14 x16 = 224 Sft.1 x1 x14 x13 = 182 Sft.

    Dress 1 x1 x8 x5-7/8 = 47 Sft.1 x1 x4 x4 = 16 Sft.

    Din 1 x1 x14 x12 = 168 Sft.Draw 1 x1 x14-3/8 x17 = 244 Sft.Kit 1 x1 x14 x10 = 140 Sft.Lounge 1 x2 x(14-3/8 +18-3/4) x 1/2 = 33 Sft.

    Lobby 1 x2 x(6 +4 ) x 1/2 = 10 Sft.1 x2 x(5-1/2 +8-3/4) x 1/2 = 14 Sft.

    Beds 1 x2 x(14 +12 ) x 1/2 = 26 Sft.1 x2 x(14 +16 ) x 1/2 = 30 Sft.1 x2 x(14 +13 ) x 1/2 = 27 Sft.

    Dress 1 x2 x(8 +5-5/8) x 1/2 = 14 Sft.1 x2 x3 x 3/4 = 5 Sft.1 x2 x(14 +12 ) x 3/7 = 22 Sft1 x2 x(14-3/8 +17 ) x 3/7 = 26 Sft1 x2 x(14 +10 ) x 3/7 = 20 Sft

    Total = 2029 [email protected]/Sft Rs. 284060/-29

    Decks 1 x 1/4 x3-1/7 x12-3/8 x12-3/8 x 1/4 = 30 Sft.Decks Kit 1 x 1/4 x3-1/7 x17-1/2 x17-1/2 x 1/4 = 60 Sft.Decks la 1 x 1/4 x3-1/7 x36-1/4 x36-1/4 x 1/4 = 258 Sft.PP 1 x1 x260 x4 = 1040 Sft

    Total = 1388 Sft @Rs.2988.60%Cft Rs. 41482/-

    30

    79 x 70% = 55 Rft

    1388 x 70% = 972 Rft

    Total = 1027 Rft @ 5.30/Rft Rs.5443/-

    31

    bath 1 x1 x6 x7 = 42 Sft1 x1 x6 x6-5/8 = 40 Sft

    P/L floor of approved quality

    coloured glazed tiles over 3/4"

    thick c/s (1:3) plaster complete.

    Take 70% Qty ofIt.No.27

    Take 70% Qty of

    It.No.29

    Providing and fixing marble strip

    of any shade for dividing the

    mosaic flooring into panels.

    a) Size 1" x 3/8" (40 x 10

    mm)

    Providing and laying

    conglomerate flooring (two coat

    work) with top layer of

    "(13mm)thick wearing

    surface, for panelling, consisting

    of one part of cement and 2

    parts of stonechips passing

    3/16"(6 mm) sieve, over bottom

    layer ofcement concrete

    1:3:6,including surface finishing

    anddividing in panels i/c rubbing.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    38/143

    381 x2 x8 x5-3/4 = 92 SftTotal = 174 Sft @Rs.7397.00%Sft Rs. 12871/-

    32

    bath 1 x2 x(6 +7 ) x5 = 130 Sft1 x2 x(6 +6-5/8) x5 = 126 Sft1 x2 x(8 +5-3/4) x5 = 138 Sft

    Total = 394 [email protected]%Sft Rs. 31519/-33

    Porch 1 x1 x21 x20 = 420 Sft.Gate to P 1 x1 x10 x20 = 200 Sft.

    Total = 620 [email protected]/Sft Rs. 46500/-

    34

    = 7374 Sft.Total = 7374 Sft @Rs.254.00%Sft Rs. 18730/-

    35

    Take

    Qtyiten

    No.176

    B

    Plaster = 2825 Sft.Total = 2825 [email protected]%Sft Rs. 30992/-

    36

    = 454 Sft

    Total = 454 Sft @Rs.1257.60%Sft Rs. 5710/-37

    Front 1 x2 x31-3/8 = 63 Rft1 x2 x21-1/2 = 43 Rft1 x2 x9-3/4 = 20 Rft1 x2 x21-1/2 = 43 Rft1 x2 x8-3/4 = 18 Rft

    Back 1 x2 x36-5/8 = 73 Rft1 x2 x12-5/8 = 25 Rft

    Left side 1 x2 x29 = 58 Rft

    Take Qty

    item No.16

    A (Plaster)

    Take Qty

    iten No.6 A

    DPC

    Making groove 1/4" deep

    P/L Tuff paver 60mm thick

    complete as approved directed

    by the Engineer Incharge.

    P/L dado of approved coloured

    glazed tiles 1/4" thick over 3/4"

    thick c/s (1:3) plaster complete.

    Weatther Shield paint 2 coats on

    new surface

    1/2" thick c/s (1:3) plaster and

    polythene sheet 500 gauge

    under bearing of RCC slab.

    Distempering 3 coats on new

    surface.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    39/143

    391 x2 x36-1/8 = 72 Rft

    Total = 415 Rft @Rs.6.85/Rft Rs. 2843/-

    Total Rs. 3185711/-

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    40/143

    40

    1

    250.0 m @ 77.25/m Rs.19313/-

    ii-1" dia.

    70.0 m @ 93.70/m Rs.6559/-

    2

    i- 3/0.029"

    780 m @ 27.00/m Rs.21060/-

    ii- 7/0.029"

    350 m @ 39.35/m Rs.13773/-

    iii- 7/0.036"

    100 m @ 58.85/m Rs.5885/-

    4

    15 NoTotal 15 No @ 93.10/Each Rs.1397/-

    6 No

    Total 6 No @ 129.70/Each Rs.778/-

    7 NoTotal 7 No @ 243.80/Each Rs.1707/-

    2 No

    Total 2 No @ 329.25/Each Rs.659/-

    5

    = 17 No @ 479.80/Each Rs.8157/-

    DETAILED ESTIMATE FOR CONSTRUCTION OF RESI 2750 SFT

    Electric Installation Portion

    Supply and Erection of PVC pipe for wiring on

    resessed i/c inspection boxes pull boxes hook

    bends reducer and prepairing surface etc complete.

    3/4" dia

    Supply and erection of tube light, including rod,

    choke, starter with frame, flexible wire, including

    connection from ceiling rose, etc., complete.ii)

    single rod (40 watts) with one choke and one

    starter.

    ii) 17.5 x 10 cm (7"x4")

    iv) 20 x 25 cm (8"x10")

    i) 10 x 10 cm (4"x4")

    v) (10"x12")

    Supply and erection of single core PVC insulated

    copper conductor cables, in prelaid PVC pipe/M.S.conduit/G.I pipe/wooden strip batten/wooden

    casing and capping/G.I.wire/trenches (rate for

    cables only):-

    Supply and erection of M.S. sheet box of 16 SWG,10 cm (4") deep, with 4.75 mm thick (3/16")

    bakelite sheet top, for recessed wiring, including

    making holes for regulators, switches, plugs, etc.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    41/143

    416

    = 15 No @ 21.30/Each Rs.320/-

    7

    = 5 No @ 1600/Each Rs.8000/-

    9

    = 20 No @ 20.00/Each Rs.400/-10

    = 10 No @ 1600.00/Each Rs.16000/-

    11

    = 10 No @ 61.90/Each Rs.619/-

    11-i

    = 6 No @ 76.30/Each Rs.458/-12

    = 1 No @ 189.30/Each Rs.189/-

    13

    = 1 No @ 177.30/Each Rs.177/-

    14

    = 10 No @ 136.10/Each Rs.1361/-

    15

    = 10 No @ 26.10/Each Rs.261/-

    16

    1 x ( 1 ) = 1 No @ 20000/Each Rs.20000/-

    17

    = 12 Rft

    Total 12 Rft @ 212.95/Rft Rs.2555/-

    P/Fixing of Exhaust fan 12"sweep double action

    plastic body made (GFC) etc complete in all respect

    as approved by the Engineer Incharge.

    Supply and Erection of button holder backlite large

    size.

    Supply and erection of 3/8" (10 mm) dia M.S. bar

    fan hook,placed at the time of casting of slab.

    Supply and erection of house service pipe Henley(G.I. pipe water quality) or pole type, 50 mm (2")

    dia, erected to instal insulated overhead

    line,include shackle insulator for holding insulated

    wire and straining devices for bearer wire and

    other accessories etc., complete.

    Supply and erection of bell push open/recessed

    type

    Erection of ceiling fan alongwith regulator (all

    sizes), including carriage from local Railway

    Station/Store to site of work,electric wire/cable for

    suspension rod and board connection,and cutting,

    threading on the rod, where necessary.

    Supply and Errection of electric panel board size

    18 x 24x6" consisting of input circuit braker 60 amp

    1 No. and out going circuit braker 6/10 AMP SP 8

    Nos, 16/20 Amp SP 8 Nos. Neno light and voltage

    meter Amper meter etc complete in all respect as

    a roved b the En ineer Inchar e.

    Supply and erection of call bell 220/250 volts, fixed

    on teak wood board 17.5x10 cm (7"x4").

    Supply and erection of 3 pin 10/15 Amp. wall

    socket

    recessed type.

    Supply and Erection of 3 pin wall socket 5AMP

    Supply and erection of ceiling rose, bakelite.

    Cost of ceiling fans 56" sweep of approved firm

    like,GFC,Pak,Royal,Younis,fan with regulator i/c

    carriage from local market to site of work etc.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    42/143

    4218

    = 1 job

    Total 1 Job @ 2932.35/Rft Rs.2932/-

    Total. Rs. 132560/-

    Say Rs. 132600/-

    Earthing of iron clad/aluminum switches, etc. with

    G.I. wire No.8 SWG in G.I. pipe 15 mm (") dia,

    recess ed or on surface ofwall and floor, complete

    with 1.5 metre long G.I. pipe, 50 mm (2") dia with

    reducing socket 4 to 5 metre below ground level,

    and 2 metre away from building plinth.

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    43/143

    43

    1

    = 1 No @ 2290.55/Each Rs.2291/-

    2

    = 3 No @ 1302.10/Each Rs.3906/-

    3

    = 3 No @ 1302.10/Each Rs.3906/-

    4

    = 1 No @ 1190.40/Each Rs.1190/-

    5

    = 4 No @ 314.00/Each Rs.1256/-

    6

    = 6 No @ 174.80/Each Rs.1049/-

    7

    = 8 No @ 300.80/Each Rs.2406/-

    8

    = 5 No @ 500.60/Each Rs.2503/-

    9

    = 5 No @ 2319.90/Each Rs.11600/-

    10

    = 2 No @ 604.75/Each Rs.1210/-

    11

    = 14 No @ 428.00/Each Rs.5992/-

    13

    = 4 No @ 345.25/Each Rs.1381/-

    14

    = 4 No @ 322.15/Each Rs.1289/-

    DETAILED ESTIMATE FOR CONSTRUCTION OF RESI 2750 SFT

    Sanitary Installation Portion

    Providing and fitting glazed earthen ware wash hand

    basin 56x40 cm (22"x16") including bracket set,

    waste pipe and waste coupling, etc. i) Coloured, withpedestal

    Providing and fitting, chromium plated or brass

    oxidised, swan neck cock 15 mm (" dia. i) two way

    Providing and fixing chromium plated tee stop cock15mm (").

    Providing and fixing looking glass 55x40 cm

    (22"x16") size, and 5 mm thick, first quality.

    Providing and fixing glass shelf 60x13 cm (24"x5"),

    with5mm thick glass:- i) with chromium plated brackets

    Providing and fitting glazed earthen ware water

    closet

    European type, excluding seat and cover:- coloured

    i/c double seat and cover only bakelite.

    Providing and fitting glazed earthen ware water

    closet

    P/F plastic made low level flushing cistern 3 Gal

    capacity complete.

    P/F glazed eartheware low level flushing cistern

    complete.

    P/F shower rose 1/2"x4"

    P/F C.P stop cock 1/2" dia

    P/F C.P bib cock 1/2" dia

    P/F gully trap i/c C conc cost of PVC grating 6"x6"

    and masonary chamber complete.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    44/143

    4415

    = 4 No @ 324.80/Each Rs.1299/-

    11

    = 4 No @ 334.30/Each Rs.1337/-

    12

    iii- 4" dia. 4 x ( 20 ) = 80 Rft @ 222.20/Rft Rs.17776/-13

    = 10 No @ 315.70/E Rs.3157/-13-i

    = 10 No @ 957.10/E Rs.9571/-

    14

    i- 1/2" dia. = 250 Rft @ 57.90/Rft Rs.14475/-

    ii- 3/4" dia. = 120 Rft @ 73.65/Rft Rs.8838/-15

    = 50 Rft @ 242.00/Rft Rs.12100/-Total. Rs. 108532/-

    Say Rs. 108500/-

    Providing and fixing, floor trap of cast iron, includingconcrete chamber all round, and C.I. grating:-

    i) 10x5 cm (4"x3")

    Providing and fitting:-i) chromium plated towel rail60

    cm (24") long, and 2 cm (") dia.

    Providing and laying R.C.C. pipe, moulded with

    cement Chapter - 8 concrete 1:1:3, with spigot

    socket or collar joint, etc. including cost of

    reinforcement, conforming to B.S. 5911:Part I: 1981,

    Class "L" including carriage of pipe fromfactory to

    site of work, lowering in trenches tocorrectalignment and grade, jointing, cutting pipeswhere necessary, finishing and testing, etc.,

    complete. 9" dia

    Providing, laying, cutting, jointing, testing and

    disinfecting G.I. pipeline in trenches, with socket

    joints, using G.I.pipes of B.S.S. 1387-1967 complete

    in all respects, with specials and valves. ii) Medium

    Providing, laying, cutting, jointing, testing anddisinfecting ditto Providing and installing specials

    pipe line in trenches with P.V.C. pipes of B.S.S. with`D'

    Class working pressure complete in all respects:-

    Providing and installing P.V.C. bends, of B.S.S. class

    "D" working pressure.

    Providing and installing P.V.C. tees, of B.S.S. class

    "D" working pressure.

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    45/143

    45

  • 8/2/2019 Civil Engg Project Est Mat Ion

    46/143

    1

    i- 1/2" dia. = 70 Rft @ 57.90/Rft Rs.4053/-

    ii- 3/4" dia. = 98 Rft @ 73.65/Rft Rs.7218/-

    iii- 1"" dia. = 196 Rft @ 109.20/Rft Rs.21403/-

    1= 9 No @ 850.00/Each Rs.7650/-

    3

    = 3 No @ 6500.00/Each Rs.19500/-3

    = 1 No @ 2100.00/Each Rs.2100/-

    4i) 1" dia = 1 No @ 300.00/Each Rs.300/-

    3/4" dia = 10 No @ 250.00/Each Rs.2500/-

    = 1 No @ 17000.00/Rft Rs.17000/-

    Total. Rs. 81724/-

    Say Rs. 81700/-

    DETAILED ESTIMATE FOR CONSTRUCTION OF RESI 2750 SFT

    Sui Gas Portion

    P/F Sui Gas Gyser 30/35 Gal capacity floor type

    (Ambassador/Nas Gas) i/c imported thermostate

    and imported gauge meter with connection up

    to nearest point of Gas water supply i/c carriage

    from market to site of work complete in allres ects as a roved directed b the En ineer

    P/F handle valve best quality

    P/F sui gas lamp best quality

    P/F sui gas heater double burner Corona/Fire

    Sun made

    Providing, laying, cutting, jointing, testing and

    disinfecting G.I. pipeline in trenches, with socket

    joints, using G.I.pipes of B.S.S. 1387-1967

    complete in all respects, with specials and

    valves. ii) Medium Quality

    P/F sui gas Chullah double burner best quality

    as approved directed by the Engineer Incharge.

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    47/143

  • 8/2/2019 Civil Engg Project Est Mat Ion

    48/143

    Sr. No. Amount

    1 Rs. 506835.00

    2 Rs. 20600.00

    3 Rs. 10700.00

    4 Rs. 21500.00

    5

    40 Rft @Rs.727.67/Rft Rs. 29107.00

    Total: - Rs. 588742.00

    Say. Rs. 589000.00

    DETAILED ESTIMATE FOR THE WORK HUMAN RESOURCE

    DEVELOPMENT FOR IMPROVEMENT OF EXTENSION SYSTEM IN

    PUNJAB ONE AT I.A.T.I SARGODHA

    CONSTRUCTION OF SERVANT QUARTER 400 SFT

    (ABSTRACT OF COST)Description

    Cost of Buildings Portion.

    Cost of Electric Installation.

    Cost of Sanitary Installation.

    Cost of Gas Fittings

    Construction of compund wall 4 1/2"

    thick and 6' high above D.P.C

  • 8/2/2019 Civil Engg Project Est Mat Ion

    49/143

    1

    H walls 1 2 x22-1/8 x3-1/4 x3 = 431 Cft1 2 x3-1/4 x2-1/2 x3 = 49 Cft1 x1 x10-1/4 x2-1/2 x3 = 77 Cft1 x2 x15-5/8 x3-1/4 x3 = 305 Cft 996Cft-Marked=A1 x1 x16 x2-1/2 x3 = 120 Cft1 x1 x3-1/2 x2 x 1/2 = 4 Cft1 x1 x9-1/2 x2 x 1/2 = 10 Cft

    PP 1 x2 x50-5/8 x1-1/2 x 3/4 = 114 Cft 114Cft-Marked=BTotal = 1110 Cft @Rs.2795.75%oCft Rs. 3103/-

    2

    1 2 x22-1/8 x9-1/4 = 409 Sft1 2 x15-5/8 x9-1/4 = 289 Sft1 x2 x3-1/4 x8-1/2 = 55 Sft1 x1 x10-1/4 x8-1/2 = 87 Sft1 x1 x16 x8-1/2 = 136 Sft

    Total = 976 Sft @Rs.522.40%Sft Rs. 5099/-3

    996Cft x 1/3 x 3/4 = 249 Cft.

    Total = 249 Cft @Rs.5930.55%Cft Rs. 14767/-4

    114Cft x 1/2 = 57 Cft.

    Total = 57 Cft @Rs.2158.20%Cft Rs. 1230/-

    DETAILED ESTIMATE FOR CONSTRUCTION OF SERVANT QUARTER 400 SFT

    Building Protion

    Excavation in foundation of

    building, bridges and other

    structures, including

    dagbelling, dressing, refilling

    around structure with

    excavated earth, watering

    and rammiing lead upto one

    chain (30 m) and lift upto 5

    ft. (1.5 m) b) in ordinary soil

    Termite Proofing of Buildings

    by spraying anti termite liquid

    with chemical (Biflux or

    Dursban) consisting of one

    liter of chemical (Biflux or

    Dursban) and 40 liter of

    water for and area of 175Sft

    as approved directed by the

    Engineer Incharge.

    P/Laying cement concret

    brick or stone ballast 1-1/2"

    to 2"gauge in foundation and

    plinth.

    i- 1:6:12 Ratio

    ake Qty 3/16 of Item No.1 marked "A

    Dry rammed brick or stone

    ballast 1 1/2"-2" guage.

    Take Qty 1/2 of Item No.1 marked "B"

  • 8/2/2019 Civil Engg Project Est Mat Ion

    50/143

    5

    H walls A 1 x2 x21-1/8 x2-1/4 x 1/4 = 24 Cft.1 x2 x20-3/4 x1-7/8 x 1/4 = 19 Cft.1 x2 x20-3/8 x1-1/2 x 1/4 = 15 Cft.

    1 x2 x20 x1-1/8 x 3/4 = 34 Cft.1 x1 x10-7/8 x1-7/8 x 1/4 = 5 Cft.1 x1 x11-1/4 x1-1/2 x 1/4 = 4 Cft.1 x1 x11-5/8 x1-1/8 x 1/4 = 3 Cft.1 x1 x12 x 3/4 x 3/4 = 7 Cft.1 x2 x3-7/8 x1-7/8 x 1/4 = 4 Cft.1 x2 x4-1/4 x1-1/2 x 1/4 = 3 Cft.1 x2 x4-5/8 x1-1/8 x 1/4 = 3 Cft.1 x2 x5 x 3/4 x 3/4 = 6 Cft.

    V walls 1 x2 x16-5/8 x2-1/4 x 1/4 = 19 Cft.1 x2 x17 x1-7/8 x 1/4 = 16 Cft.

    1 x2 x17-3/8 x1-1/2 x 1/4 = 13 Cft.1 x2 x17-3/4 x1-1/8 x 3/4 = 30 Cft.1 x1 x16-5/8 x1-7/8 x 1/4 = 8 Cft.1 x1 x17 x1-1/2 x 1/4 = 6 Cft.1 x1 x17-3/8 x1-1/8 x 1/4 = 5 Cft.1 x1 x17-3/4 x 3/4 x 3/4 = 10 Cft.

    PP 1 x2 x50-5/8 x 3/4 x1-1/2 = 114 Cft.

    Total. = 234 Cft @Rs.8883.30%Cft Rs. 20787/-6

    H walls 2 x2 x20 x1-1/8 = 90 Sft.1 x1 x12 x 3/4 = 9 Sft.1 x2 x5 x 3/4 = 8 Sft.

    V walls 2 x2 x17-3/4 x1-1/8 = 80 Sft.1 x1 x17-3/4 x 3/4 = 13 Sft.

    Total.(A) = 200 Sft.D/D openings

    Ver 1 x1 x12 x1-1/8 = 14 Sft.D1 1 x1 x3-1/2 x 3/4 = 3 Sft.D2 1 x1 x3 x 3/4 = 2 Sft.D3 1 x2 x2-1/2 x1-1/8 = 6 Sft.

    Total.(B) = 25 Sft.

    Net Total (A-B) = 175 [email protected]%Sft Rs. 4919/-

    Pacca brick work with cement

    sand mortar in foundation

    and plinth.i) Ratio 1:6

    Providing and laying damp

    proof course of cement

    concrete 1:2: 4(usingcement, sand and shingle),

    including bitumen coating :-

    (a) with one coat of bitumen

    and one coat of polythene

    sheet 500 gauge: i) 1-1/2"

    thick.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    51/143

    7

    1 x1 x5 x1-1/8 = 6 Sft.1 x1 x12 x1-1/8 = 14 Sft.1 x1 x6 x1-1/8 = 7 Sft.1 x1 x11 x1-1/8 = 12 Sft.1 x1 x12 x1-1/8 = 14 Sft.1 x1 x5 x1-1/8 = 6 Sft.1 x1 x14 x1-1/8 = 16 Sft.1 x1 x4 x1-1/8 = 5 Sft.1 x1 x8-5/8 x1-1/8 = 10 Sft.

    Total = 90 [email protected]%Sft Rs. 1845/-8

    Take 2/3 of It 1110 x 2/3 = 740 Cft

    Total. = 740 Cft @Rs.1346.40%oCft Rs. 996/-8-i

    1 x1 x12 x11 x-35/2 = 2310 Sft.

    1 x1 x12 x6 x-35/2 = 1260 Sft.1 x1 x5 x8-5/8 x-35/2 = 755 Sft.1 x2 x5 x4 x-35/2 = 700 Sft.

    PP 1 x2 x44-1/8 x2-1/4 x1-1/8 = 223 Sft.1 x2 x46 x2-1/4 x1-1/8 = 233 Sft.

    Total = 0 Sft.Net Qty. 0.0 ( - ) 740 = -740 [email protected]%oCft Rs. 0/-

    9

    1 x1 x12 x11 x-1/3 = 132 Sft.1 x1 x12 x6 x-1/3 = 72 Sft.1 x1 x5 x8-5/8 x-1/3 = 43 Sft.1 x2 x5 x4 x-1/3 = 40 Sft.

    PP 1 x2 x44-1/8 x2-1/4 x 1/3 = 66 Cft1 x2 x46 x2-1/4 x 1/3 = 68 Cft

    Total = 421 Cft @Rs.947.80%Cft Rs. 3990/-

    Filling, watering, ramming,

    earth under floor with i) withsurplus earth from

    foundation, etc.

    Providing and laying vertical

    damp proof course with

    cement sand plaster and

    bitumen coating:- (a) with

    one coat of bitumen and one

    coat of polythene sheet 500

    gauge:

    ii) 1:3 a) 3/4" thick.

    Filling, watering, ramming,

    earth under floor with ii) New

    earth excavated from out

    side lead up to 3 miles.

    Supply and filling of sand

    under floor or plugging in

    wells.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    52/143

    10

    sme Qty

    of

    It.No.9 421 = 421 Cft

    Total = 421 Cft @Rs.2324.90%Cft Rs. 9788/-11

    1 x2 x20 x1-1/8 x11 = 495 Cft.1 x1 x5 x 3/4 x11 = 41 Cft.1 x1 x12 x 3/4 x11 = 99 Cft.1 x2 x17-3/4 x1-1/8 x11 = 439 Cft.1 x1 x17-3/4 x 3/4 x11 = 146 Cft.

    Kit cill 1 x2 x5 x1-1/2 x 1/2 = 8 Cft.Total. = 1228 Cft.

    Deduction.

    D1 1 x1 x3-1/2 x 3/4 x7 = 18 Cft.D2 1 x1 x3 x 3/4 x7 = 16 Cft.D3 1 x2 x2-1/2 x1-1/8 x7 = 39 Cft.W1 1 x1 x4 x 3/4 x4-1/2 = 14 Cft.W2 1 x1 x4 x1-1/8 x6-1/2 = 29 Cft.

    Ver Ope 1 x1 x12 x1-1/8 x7-3/4 = 105 Cft.RCC linte 1 x1 x4-1/2 x 3/4 x 3/4 = 3 Cft.D2 1 x1 x4 x 3/4 x 3/4 = 2 Cft.D3 1 x2 x3-1/2 x1-1/8 x 1/2 = 4 Cft.W1 1 x1 x5 x 3/4 x 3/4 = 3 Cft.W2 1 x1 x5 x1-1/8 x 3/4 = 4 Cft.

    1 x1 x13-1/2 x1-1/8 x1 = 15 Cft.Total Ded. = 252 Cft.

    Net Qty. 1228 ( - ) 252 = 976 Cft @Rs.9506.35%Cft Rs. 92782/-11-i

    Parapet 1 x2 x38-1/8 x 3/8 x 1/2 = 14 Cft1 x2 x39-1/8 x 3/4 x3-1/2 = 205 Cft1 x1 x5 x 3/8 x7 = 13 Cft

    Total = 232 Cft @Rs.10038.05%Cft Rs. 23288/-12

    Providing, laying, watering

    and ramming brick ballast

    1" to 2"(40 mm to 50 mm)

    gauge mixed with 25% sand,

    for floor foundation, complete

    in all respects.

    Pacca brick work c/s (1:6)

    mortar in G.F

    Pacca brick work with cement

    sand mortar in Ground

    floor.i) Ratio 1:4

    Providing and laying reinforced cement concrete (including prestressed

    concrete), using coarse sand and screened graded and washed aggregate,

    in required shape and design,including forms, moulds, shuttering, lifting,

    compacting,curing, rendering and finishing exposed surface, complete (but

    excluding the cost of steel reinforcement, its fabrication and placing in

    position, etc.):- (a) (i) Reinforced cement concrete in roof slab,

    beams,columns lintels, girders and other structural members laid

    in situ or precast laid in position, or prestressed members cast in situ,

    complete in all respects:- (3) (c) Type C (nominal mix 1:2:4)

  • 8/2/2019 Civil Engg Project Est Mat Ion

    53/143

    RCC linte 1 x1 x4-1/2 x 3/4 x 3/4 = 3 Cft.D2 1 x1 x4 x 3/4 x 3/4 = 2 Cft.D3 1 x2 x3-1/2 x1-1/8 x 1/2 = 4 Cft.W1 1 x1 x5 x 3/4 x 3/4 = 3 Cft.W2 1 x1 x5 x1-1/8 x 3/4 = 4 Cft.

    1 x1 x13-1/2 x1-1/8 x1 = 15 Cft.Roof

    slab 1 x1 x20 x20 x 5/12 = 167 Cft.2 x2 x20 x 1/4 x3-1/2 = 70 Cft.

    Total = 268 Cft. @Rs.201.95/Cft Rs. 54123/-13

    268 x6.75 x0.454 = 821 Kg

    = 821 Kg @Rs.8973.05%Kg Rs. 73669/-14

    W1 1 x1 x4 x4-1/2 = 18 Sft.W2 1 x1 x4 x6-1/2 = 26 Sft.

    Total = 44 [email protected]/Sft Rs. 15000/-15

    1 x1 x12 x11 = 132 Sft.1 x1 x12 x6 = 72 Sft.1 x1 x5 x8-5/8 = 43 Sft.1 x2 x5 x4 = 40 Sft.

    Total = 287 [email protected]%Sft Rs. 3637/-16

    Room 1 x2 x(12 +11 ) x10-1/2 = 483 Sft.Ver 1 x2 x(12 +6-1/8) x10-1/2 = 381 Sft.Kit 1 x2 x(5 +8-5/8) x10-1/2 = 286 Sft.

    1 x2 x(5 +4 ) x6 = 108 Sft.1 x2 x(5 +4 ) x10-1/2 = 189 Sft.

    Parapet 1 x2 x(18-1/2 +18-1/8) x3-1/2 = 256 Sft.Total = 1703 [email protected]%Sft Rs. 16873/-

    Take Qty 6.75Lbs/cft of Item No.12

    Providing and fixing windows consisting of M.S. box

    section frame 2"x1", (50x40mm) leaves frame 1"x1"

    (40x25mm) box section frame for glazing 3/8"x3/8"(10x10mm) using 16 SWG sheet 'U' shaped rubber

    supported with 1"x1/8" (25x3mm) M.S. flat for fixing 3/16"

    (5 mm) thick glass panes M.S. box section "x"

    (13x13mm) of 16 SWG for fixing 24 SWG wire gauze on

    outer side by means of "x1/8" (20x3mm) M.S. flat and

    screws including grill of M.S. flat "x1/8" (13x3mm) or

    "x" (6x6mm) square bar with independent frame of

    "x" (13x13mm) box section of 16 SWG i/c all C.P.

    fitting and painting 3 coats complete in all respect.

    Cement plaster 3/8" (10 mm)

    thick under soffit of

    R.C.C.roof slabs , 1:2 ratio.

    1/2" thick cement plaster 1:4

    upto 20' (6.00 mm) height:-

    Fabrication of M.S reinforcement i/c cutting bending

    binding laying in postion making joints and fastenings

    inculding cost of binding wire and labour charges for

    binding of steel reinforcement (also includes removal of

    rust from bars):- b- deformad bars

  • 8/2/2019 Civil Engg Project Est Mat Ion

    54/143

    17

    Room 1 x2 x(20 +20 ) x16-1/2 = 1320 Sft.Total (A) = 1320 Sft.

    D/D

    D3 1 x2 x2-1/2 x7 = 35 SftW2 1 x1 x4 x6-1/2 = 26 Sft

    Ver 1 x1 x12 x7-3/4 = 93 SftTotal (B) = 154 Sft

    = 1166 [email protected]%Sft Rs. 14913/-

    18

    D1 1 x1 x3-1/2 x7 = 25 Sft.D2 1 x1 x3 x7 = 21 Sft.D3 1 x2 x2-1/2 x7 = 35 Sft.CY 1 x1 x4 x7 = 28 Sft.

    Total = 109 [email protected]/Sft Rs. 53203/-18-i

    x1 x8 = 4 No @Rs.124.65/E Rs. 499/-19

    Roof 1 x1 x18-1/2 x18-7/8 = 349 Sft.Total = 349 Sft.

    Deduction.

    Khurra 1 x1 x2 x2 = 4 Sft.

    Total = 4 Sft.Net Qty 349 ( - ) 4 345 [email protected]%Sft Rs. 13744/-

    20

    = 1 No.

    Total. = 1 [email protected]/Each Rs. 282/-21

    iii- 4" di 1 x ( 13 ) = 13 Rft @Rs.222.20/Each Rs. 2889/-

    Khuras on roof 2'x2'x6" (600

    x 600 x 150 mm)

    P/F deodar wood panelled or

    panelled with glazed doors

    and windows with M.S

    chowkat consisting of M.S

    angle iron 1 1 /2"x 1

    1/2"x1/4" welded with M.S

    flat 1 1/2"x1/4" complete.

    P/F iron sliding bolts to doors 12"

    Providing, laying, cutting, jointing,

    testing and disinfecting ditto Providing

    and installing specials

    pipe line in trenches with P.V.C. pipes of

    B.S.S. with `D'

    Class working pressure complete in all

    respects:-

    Rain water down pipes

    Cement pointing (1:2) struck

    joints on walls mixed with red

    oxide pigment to match the

    colour of bricks.

    Net Total (A-B)

    Single layer of tiles 9"x4"x1" (225x113x40 mm) laid

    over 4"(100 mm) earth and 1" (25 mm) mud plaster

    without Bhoosa, grouted with cement sand 1:3 on top of

    RCC roof slab, provided with 34 lbs. per %Sft. or 1.72

    Kg/Sq.m bitumen coating sand blinded i/c supplying and

    laying polythene sheet over DPC under floors and onroofs etc 500 gauge.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    55/143

    22

    = 2 No @Rs.315.70/Each Rs. 631/-

    23

    Take

    Double

    of

    It.No.1

    8

    Doors 109 x2 = 218 Sft.

    Total = 218 [email protected]%Sft Rs. 2222/-24

    1 x2 x(26 +19-5/8) x3 = 274 Sft.Total = 274 Cft @Rs.2143.05%Sft Rs. 5872/-

    25

    1 x1 x20 x15 = 300 Sft.Total = 300 Cft @Rs.1952.60%Sft Rs. 5858/-

    26

    1 x1 x12 x11 x-1/3 = 132 Sft.1 x1 x12 x6 x-1/3 = 72 Sft.1 x1 x5 x8-5/8 x-1/3 = 43 Sft.1 x2 x5 x4 x-1/3 = 40 Sft.

    PP 1 x1 x260 x4 = 1040 SftTotal = 1040 Sft @Rs.2988.60%Cft Rs. 31081/-

    Providing and installing P.V.C. bends, of

    B.S.S. class "D" working pressure.

    Dry brick paving laid flat, sand grouted, including

    preparation of bed by watering, ramming and bringing the

    same to proper camber, by "(13 mm) thick mud plaster

    Painting new surface:-

    Preparing surface and

    painting of doors and

    windows any type (including

    edges):- 3 coats.

    P/L 1 1/2" thick topping C

    conc (1:2:4) i/c placing

    mixing finishing curing etc

    complete.1 1/2" thick

    Providing and laying

    conglomerate flooring (two

    coat work) with top layer of

    "(13mm)thick wearing

    surface, for panelling,consisting of one part of

    cement and 2 parts of

    stonechips passing 3/16"(6

    mm) sieve, over bottom layer

    ofcement concrete

    1:3:6,including surface

    finishing anddividing in

    panels i/c rubbing.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    56/143

    26-i

    1 x2 x(12 +11 ) x 1/2 = 23 Sft.1 x2 x(12 +6 ) x 1/2 = 18 Sft.1 x2 x(5 +5-5/8) x 1/2 = 11 Sft.2 x2 x(5 +4 ) x 1/2 = 18 Sft.

    D1 1 x1 x3-1/2 x 3/4 = 3 Sft.D2 1 x1 x3 x 3/4 = 2 Sft.D3 1 x2 x2-1/2 x1-1/8 = 6 Sft.Step 1 x1 x13 x2 = 26 Sft.

    1 x1 x12 x 3/4 = 9 Sft.Total = 116 Cft @Rs.1929.65%Sft Rs. 2238/-

    27

    1040 x 60% = 624 Rft

    Total = 624 Rft @ 5.30/Rft Rs.3307/-

    28

    bath 1 x2 x5 x4 = 40 Sft

    Total = 40 Sft @Rs.7397.00%Sft Rs. 2959/-29

    bath 2 x2 x(5 +4 ) x5 = 180 SftTotal = 180 Cft @Rs.7999.80%Sft Rs. 14400/-

    30

    Take

    Qty

    item

    No.16(Plaster

    ) = 1703 Sft.

    Total = 1703 Sft @Rs.254.00%Sft Rs. 4326/-31

    Providing and fixing marble

    strip of any shade for dividingthe mosaic flooring into

    panels.

    a) Size 1" x 3/8" (40 x 10

    mm)

    Take 70% Qty of

    1/2" thick c/s (1:3) plaster

    and polythene sheet 500

    gauge under bearing of RCC

    slab.

    P/L floor of approved quality

    coloured glazed tiles over

    3/4" thick c/s (1:3) plaster

    com lete.

    P/L dado of approved

    coloured glazed tiles 1/4"

    thick over 3/4" thick c/s (1:3)

    plaster complete.

    Distempering 3 coats on new

    surface.

    Providing grey cement

    skirting or dado 3/8"(10 mm)

    thick

    including rounding of corner

    and straight ening of top

    edge

    and finishing to smooth

    surface afterplastering :-

    (1:3) cement sand mortar.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    57/143

    Take

    Qty

    iten

    No.6 A

    DPC = 200 Sft

    Total = 200 Sft @Rs.1257.60%Sft Rs. 2515/-

    Total Rs. 506835/-

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    58/143

    1

    45.0 m @ 77.25/m Rs.3476/-

    2

    i- 3/0.029"

    100 m @ 27.00/m Rs.2700/-

    3

    = 30 Rft

    Total 30 Rft @ 28.10/Rft Rs.843/-

    4

    8 NoTotal 8 No @ 93.10/Each Rs.745/-

    2 No

    Total 2 No @ 129.70/Each Rs.259/-

    5

    = 3 No @ 479.80/Each Rs.1439/-

    6

    = 3 No @ 21.30/Each Rs.64/-

    8

    = 2 No @ 361.05/Each Rs.722/-

    9

    = 3 No @ 20.00/Each Rs.60/-

    10

    = 2 No @ 1600.00/Each Rs.3200/-

    11

    = 3 No @ 61.90/Each Rs.186/-

    DETAILED ESTIMATE FOR CONSTRUCTION OF SERVANT QUARTER 400 SFT

    Supply and Erection of 3 pin wall socket 5AMP

    (Electric Installation Portion)

    Supply and Erection of PVC pipe for wiring on resessed

    i/c inspection boxes pull boxes hook bends reducer

    and prepairing surface etc complete. 3/4" dia

    Supply and erection of single core PVC insulated copper

    conductor cables, in prelaid PVC pipe/M.S. conduit/G.I

    pipe/wooden strip batten/wooden casing and

    capping/G.I.wire/trenches (rate for cables only):-

    a) 250/440 volts, PVC insulated:

    Supply and erection of copper conductor cables forservice connection, in prelaid pipe/G.I. wire/trenches,

    etc. (rate for cable only):- c) PVC insulated, PVC

    sheathed 2 core, 250/440 volt:- vi) (7/0.029")

    Cost of ceiling fans 56" sweep of approved firm

    like,GFC,Pak,Royal,Younis,fan with regulator i/c

    carriage from local market to site of work etc.

    Supply and erection of tube light, including rod, choke,

    starter with frame, flexible wire, including connection

    from ceiling rose, etc., complete.ii) single rod (40

    watts) with one choke and one starter.

    Supply and Erection of button holder backlite large size.

    S/E of wall type pole type bracket with double coverwater tight flexible wire and brass holder complete

    Supply and erection of M.S. sheet box of 16 SWG, 10

    cm (4") deep, with 4.75 mm thick (3/16") bakelite

    sheet top, for recessed wiring, including making holes

    for regulators, switches, plugs, etc.

    i) 10 x 10 cm (4"x4")

    ii) 17.5 x 10 cm (7"x4")

    Supply and erection of ceiling rose, bakelite.

  • 8/2/2019 Civil Engg Project Est Mat Ion

    59/143

    11-i

    = 1 No @ 76.30/Each Rs.76/-

    12

    = 1 No @ 189.30/Each Rs.189/-

    13

    = 2 No @ 136.10/Each Rs.272/-

    14

    = 2 No @ 26.10/Each Rs.52/-

    15

    30/35 Amp 500 V1 x ( 1 ) = 1 No @ 1345/Each Rs.1345/-

    17

    = 1 No

    Total 1 No @ 2039.20/Rft Rs.2039/-

    18

    = 1 job

    Total 1 Job @ 2932.35/Rft Rs.2932/-

    Total. Rs. 20599/-

    Say Rs. 20600/-

    S/E of iron/aluminum clad 500 Volts main switch with

    kit kat fuses double pole 30/35 Amp

    Earthing of iron clad/aluminum switches, etc. with G.I.

    wire No.8 SWG in G.I. pipe 15 mm (") dia, recess ed

    or on surface ofwall and floor, complete with 1.5 metre

    long G.I. pipe, 50 mm (2") dia with reducing socket 4

    to 5 metre below ground level,

    and 2 metre away from building plinth.

    Providing and fixing M.S. iron box for housing main

    switches, made of 1.5 mm (1/16") thick M.S. sheet,with locking arrangement, including painting:-

    (24"x14"x6")

    Supply and erection of 3 pin 10/15 Amp. wall

    socket

    recessed type.

    Supply and erection of call bell 220/250 volts, fixed on

    teak wood board 17.5x10 cm (7"x4").

    Erection of ceiling fan alongwith regulator (all sizes),

    including carriage from local Railway Station/Store to

    site of work,electric wire/cable for suspension rod andboard connection,and cutting, threading on the rod,

    where necessary.

    Supply and erection of 3/8" (10 mm) dia M.S. bar fan

    hook,placed at the time of casting of slab.

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    60/143

  • 8/2/2019 Civil Engg Project Est Mat Ion

    61/143

    2

    = 1 No @ 1302.10/Each Rs.1302/-

    3

    = 1 No @ 1302.10/Each Rs.1302/-

    5

    = 1 No @ 314.00/Each Rs.314/-

    6

    = 1 No @ 174.80/Each Rs.175/-7

    = 4 No @ 300.80/Each Rs.1203/-

    8

    = 2 No @ 500.60/Each Rs.1001/-

    9

    = 1 No @ 2319.90/Each Rs.2320/-

    10

    = 1 No @ 604.75/Each Rs.605/-

    11

    = 2 No @ 428.00/Each Rs.856/-

    12

    = 2 No @ 334.30/Each Rs.669/-

    13

    = 1 No @ 345.25/Each Rs.345/-

    14

    DETAILED ESTIMATE FOR CONSTRUCTION OF SERVANT QUARTER 400 SFT

    ( Sanitary Installation Portion)

    P/F gully trap i/c C conc cost of PVC grating 6"x6"and masonary chamber complete.

    P/F shower rose 1/2"x4"

    Providing and fitting glazed earthen ware water

    closet

    orrisa pattern complete i/c cost of P trap glazed.

    P/F plastic made low level flushing cistern 3 Gal

    capacity complete.

    P/F C.P stop cock 1/2" dia

    P/F C.P bib cock 1/2" dia

    Providing and fitting glazed earthen ware wash

    hand basin 56x40 cm (22"x16") including bracketset, waste pipe and waste coupling, etc. i)

    Coloured, with pedestal

    Providing and fitting, chromium plated or brass

    oxidised, swan neck cock 15 mm (" dia. i) twoway

    Providing and fixing chromium plated tee stop cock15mm (").

    Providing and fixing, floor trap of cast iron,

    including concrete chamber all round, and C.I.grating:-i) 10x5 cm (4"x3")

    Providing and fixing looking glass 55x40 cm(22"x16") size, and 5 mm thick, first quality.

    Providing and fixing glass shelf 60x13 cm (24"x5"),

    with5mm thick glass:- i) with chromium plated brackets

  • 8/2/2019 Civil Engg Project Est Mat Ion

    62/143

    = 1 No @ 322.15/Each Rs.322/-

    15

    = 1 No @ 324.80/Each Rs.325/-

    12

    iii- 4" dia. 4 x ( 15 ) = 60 Rft @ 222.20/Rft Rs.13332/-

    Providing and fitting:-i) chromium plated towel

    rail60 cm (24") long, and 2 cm (") dia.

    Providing, laying, cutting, jointing, testing and

    disinfecting ditto Providing and installing specialspipe line in trenches with P.V.C. pipes of B.S.S.

    with `D'Class working pressure complete in all respects:-

  • 8/2/2019 Civil Engg Project Est Mat Ion

    63/143

    13

    = 8 No @ 315.70/E Rs.2526/-13-i

    = 8 No @ 957.10/E Rs.7657/-

    19

    i- 1/2" dia. = 40 Rft @ 57.90/Rft Rs.2316/-

    ii- 3/4" dia. = 20 Rft @ 73.65/Rft Rs.1473/-20

    = 20 Rft @ 100.15/Rft Rs.2003/-Total. Rs. 10739/-

    Say Rs. 10700/-

    Providing, laying, cutting, jointing, testing anddisinfecting G.I. pipeline in trenches, with socket

    joints, using G.I.pipes of B.S.S. 1387-1967complete in all respects, with specials and valves.ii) Medium Quality

    Providing and laying R.C.C. pipe, moulded withcement Chapter - 8 concrete 1:1:3, with spigot

    socket or collar joint, etc. including cost of

    reinforcement, conforming to B.S. 5911:Part I:1981, Class "L" including carriage of pipe

    fromfactory to site of work, lowering in trenches tocorrectalignment and grade, jointing, cutting pipeswhere necessary, finishing and testing, etc.,

    com lete. 6" dia

    Providing and installing P.V.C. bends, of B.S.S.

    class "D" working pressure.

    Providing and installing P.V.C. tees, of B.S.S. class"D" working pressure.

    Sub Divisional OfficerProvincial Buildings Sub Division-I

    Sargodha

    Executive EngineerProvincial Buildings Division

    Sargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    64/143

    1

    i- 1/2" dia. = 50 Rft @ 57.90/Rft Rs.2895/-

    ii- 3/4" dia. = 20 Rft @ 73.65/Rft Rs.1473/-

    iii- 1"" dia. = 40 Rft @ 109.20/Rft Rs.4368/-

    1

    = 3 No @ 850.00/Each Rs.2550/-

    3

    = 1 No @ 6500.00/Each Rs.6500/-

    3

    = 1 No @ 2100.00/Each Rs.2100/-

    4i) 1" dia = 2 No @ 300.00/Each Rs.600/-

    3/4" dia = 4 No @ 250.00/Each Rs.1000/-

    Total. Rs. 21486/-

    Say Rs. 21500/-

    DETAILED ESTIMATE FOR CONSTRUCTION OF STAFF QUARTER 400 SFT

    ( Sui Gas Portion)

    P/F sui gas Chullah double burner best quality

    as approved directed by the Engineer Incharge.

    P/F handle valve best quality

    Providing, laying, cutting, jointing, testing and

    disinfecting G.I. pipeline in trenches, with socket

    joints, using G.I.pipes of B.S.S. 1387-1967

    complete in all respects, with specials and

    valves. ii) Medium Quality

    P/F sui gas lamp best quality

    P/F sui gas heater double burner Corona/Fire

    Sun made

    Sub Divisional Officer

    Provincial Buildings Sub Division-ISargodha

    Executive Engineer

    Provincial Buildings DivisionSargodha

  • 8/2/2019 Civil Engg Project Est Mat Ion

    65/143

  • 8/2/2019 Civil Engg Project Est Mat Ion

    66/143

    Sr. No.

    1 Rs.

    2 Rs.

    3 Rs.

    4 Rs.

    5

    99 Rft @Rs.727.67/Rft Rs.

    Total: - Rs.

    Say. Rs.

    DETAILED ESTIMATE FOR THE WORK HUMAN RESO

    DEVELOPMENT FOR IMPROVEMENT OF EXTENSION S

    PUNJAB ONE AT I.A.T.I SARGODHA

    CONSTRUCTION OF STAFF QUARTER G 1-10 (990

    (ABSTRACT OF COST)Description

    Cost of Buildings Portion.

    Cost of Electric Installation.

    Cost of Sanitary Installation.

    Cos