Connecting Our Communities
Why Multiple Modes Matter
1
2015 ITE District 10/FSITE 55th Annual Meeting
November 3, 2015
![Page 2: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/2.jpg)
Agenda
• Philosophy through Policy
• InVision Center City Plan
• Walk-Bike Master Plan
• Evolving Standards
• Complete Streets
• Project Implementationo Resurfacing Program
o FDOT/MPO Funded
• Enhanced Mobility o Bike-share
o Additional Modes of Transportation
• Economic Developmento Bike Benefit Districts
o Events/Programs
• Questions
2
![Page 3: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/3.jpg)
Philosophy Through Policy
• Integration of the City’s Walk/Bike plan with InVision Center City Plan, Channelside re-development as well as other developments
• Coordinate with local agencies to explore alternative modes of Transportation
• Collaboration/support of a common vision for key components of our transportation system
• Establish framework for other improvements
3
![Page 4: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/4.jpg)
Philosophy Through Policy
• Statewide Bicycle/Pedestrian Focused Initiative
• Coordination with FDOT
• Cooperative effort to enhance safety and awareness
4
![Page 5: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/5.jpg)
InVision Center City Plan
• 2011: InVision Center City Plan Launchedo Utilize planning and policy to create
transportation modes for entire City
o Develop framework for other improvements
Landscaping/beautification
Creation of new programs for economic development
o Develop hierarchy of street levels to serve traffic and land-use needs
5
![Page 6: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/6.jpg)
Walk-Bike Master Plan
• Implement Comprehensive Plan and Long Range Transportation Plan
o Business Centers
o Urban Villages
o Mixed-Use Corridor Villages
o Primary Transit Corridors/Facilities
• Develop Multimodal “Grid”
• Identify Constructible Projects
6
![Page 7: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/7.jpg)
Walk-Bike I (2011)
7
oEnhance bicycle and pedestrian mobility o 30 Roadway Corridors
oMain Business Centerso Downtown
o USF Area
o Westshore
o Joint MPO/City Study
![Page 8: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/8.jpg)
Walk-Bike II (2012)
8
oExpanded Walk-Bike Io West Tampa
o Central Tampa
o East Tampa
o Interbay Peninsula
o Joint MPO/City Study
![Page 9: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/9.jpg)
Complete Streets Resolutions
9
• City Resolution 2012-184 (Feb 16, 2012)
• Hills. MPO Resolution 2012-1 (Apr 3, 2012)City Reso 2012-184; Section 4:
o Sidewalk space for pedestrians;
o Bicycle lanes or bicycle routes;
o Appropriately sized travel laneso Transit vehicles, facilities and routes;
o On-street parking where applicable;o Median use for traffic flow, safety, and pedestrian
refuge;
o Buffer areaso Landscaping/hardscaping;o Land use context.
![Page 10: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/10.jpg)
Complete Streets Resolutions
10
City Reso 2012-184; Section 7:
o That the provisions set forth in this Resolution should be employed where appropriate and financially feasible in all transportation planning, design, review, operations, major maintenance projects (such as milling and overlay), new construction, and reconstruction projects.
o City departments including Public Works, Transportation, Growth Management and Development Services and Parks and Recreation should consider the provisions of this Resolution as they plan, design and review improvements within the City's rights-of-way.
![Page 11: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/11.jpg)
Walk-Bike III: Parts I & II (2013)
11
oPart 1: Connectivity to New Tampa
oPart 2: Green ARTery
o Hillsborough County MPO/City Study
o Engaged with local neighborhoods
![Page 12: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/12.jpg)
Multimodal Transportation Impact Fees
• Study Conducted (Jan – Oct 2014)
• Planning Comm. Hearing (June 8, 2015)
• City Council Adoption (July 16 & 30, 2015)
• Implementation (August 1, 2015)
12
Roadway
Bicycle
Roadways
Pedestrian
Transit
Impact Fee
Multi-Modal Fee
![Page 13: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/13.jpg)
Walk-Bike IV (2014)
13
o Downtown Tampa Multimodal Project Development Study
![Page 14: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/14.jpg)
Walk-Bike V (2015-16)
14
o Feasibility and Prioritization for Green ARTery
oConcept Development and Cost Estimates
![Page 15: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/15.jpg)
Citywide Pedestrian Safety Plan (2015-16)
15
• Current citywide study with emphasis in:o East Tampa
o West Tampa
o North Tampa
o To provide clear guidance for the locations and types of pedestrian improvements
![Page 16: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/16.jpg)
Evolving Standards & Guidelines
16
![Page 17: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/17.jpg)
MUTCD Interim Approvals
• City of Tampa received approvals from FHWA for use of following items (Dec 2014):oGreen Colored Pavement (1A-14)
oRectangular Rapid Flashing Beacons (1A-11)
oBicycle Signal Faces (1A-16)
17
![Page 18: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/18.jpg)
Bicycle Safety & Awareness
• Proposed Bicycle Facilities Improvements
18
Conventional Bike Lane
Multi-Use Path
![Page 19: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/19.jpg)
Bicycle Safety & Awareness
• Proposed Bicycle Facilities Improvements
19
Buffered Bike Lane Shared Lane Markings
![Page 20: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/20.jpg)
Bicycle Safety & Awareness
• Buffered Bike Laneso Door zone area accidents
can be deadly collisions
o Typically, the bike’s handle-bar hits the door, turning the front wheel to the right and sending the cyclist tumbling to the left – where the cyclist is then run over by a vehicle in the adjacent travel lane.
• Safer to locate bike lanes outside the door zone areao Increasing the space
between the parked motor vehicles and the cyclist
20
VS. SAFETY
Platt Street
![Page 21: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/21.jpg)
Bicycle Safety & Awareness
• Pavement Enhancementso The green colored pavement
enhances the visibility of a bicycle lane in places where there is potential for conflict with motor vehicles.
o The FHWA considers green pavement markings to be effective in increasing awareness of bike lane conflict areas.
o Benefits include bicyclists positioning themselves more accurately as they travel across intersections.
Many bicyclists report feeling safer on green colored pavement because motorists are more aware of potential conflicts.
21
SAFETY
![Page 22: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/22.jpg)
Complete Street Corridor Projects
• Lane Reallocation – Repurposing Roadway
22
![Page 23: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/23.jpg)
Complete Street Corridor Projects
23
![Page 24: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/24.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
24
![Page 25: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/25.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
25
![Page 26: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/26.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
26
![Page 27: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/27.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
27
![Page 28: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/28.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
28
![Page 29: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/29.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
29
![Page 30: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/30.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
30
![Page 31: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/31.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
31
![Page 32: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/32.jpg)
Complete Street Corridor Projects
• Complete Streets – In the Making
32
![Page 33: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/33.jpg)
Project Implementation
• Prior to 2011…
• Bayshore Boulevard (NB Lanes)
• West Shore Blvd (2001)
• Manhattan Ave (2006)
• Nebraska Ave (2007)
• Tampa St/Highland Ave (2008)
• Cargo Rd (2010)
• Euclid Ave (2010) – First “Sharrows” in Florida
33Nebraska Ave
Cargo Road
Euclid Ave
Bayshore Blvd NB Lane
![Page 34: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/34.jpg)
Project Implementation
34
Downtown Streetscape StandardsWest River Redevelopment Plan (Ongoing)
Tampa St/Highland Ave/Florida Ave Corridor (FDOT/MPO/City) (Ongoing)
Green Spine Cycle Track – Downtown Segment (under Construction)
Scott Street Improvements (Design)
![Page 35: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/35.jpg)
Project Implementation
oResurfacing, Sidewalk & Complete Streets Programs
oOther Capitol Improvements Projects
o Transportation Alternatives Program (TAP) Surface Transportation Program (STP)
City submits projects through Hillsborough MPO
MPO Prioritizes via Trans. Improvement Program (TIP)
Highway Safety Improvement Program (HSIP)
oPrograms administered by FDOT via Local Agency Program (LAP)
35
![Page 36: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/36.jpg)
Platt Street – Resurfacing Program
36
Cyclist on Platt StreetBuffered Bike Lane and Door
Zone Area
Buffered Bike Lanes, Door Zone Areas, and Green
Pavement Marking
![Page 37: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/37.jpg)
Cleveland Street – Resurfacing Program
37
Green Conflict Zone
Green Pavement Marking
Green Conflict Zone
![Page 38: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/38.jpg)
Lake Ave – Resurfacing Program
38
![Page 39: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/39.jpg)
N Boulevard – Resurfacing Program
39
![Page 40: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/40.jpg)
BEFORE
AFTER
Convert from 4-lane
undivided to 2-lane
divided cross-section
Install High-Emphasis
Crosswalk Markings
N Boulevard – Resurfacing Program
40
Provide Center
Turn Lane
Provide
Marked Bike
Lanes
![Page 41: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/41.jpg)
Swann Ave Bike Lanes – Resurfacing Program
41
BEFORE
AFTER
Designated On-Street
ParkingMarked Bike Lanes
![Page 42: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/42.jpg)
Azeele Street – Resurfacing Program
42
![Page 43: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/43.jpg)
Lois Ave – Complete Streets
43
![Page 44: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/44.jpg)
Completed LAP Projects
44
22nd Street (Completed 2013)
Bayshore Blvd Ph 2 (Completed 2015)
40th Street (Completed 2012)
Cross Creek Blvd (Completed 2015)
![Page 45: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/45.jpg)
Current Walk-Bike LAP Projects
45
Bougainvillea Ave (Construction 2016)
Cypress St. (Construction 2016)
Palm Ave (Construction 2016)
Willow Ave (Construction 2017)
![Page 46: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/46.jpg)
Highway Safety Improvement Program (HSIP) Projects (Design)
46
Himes Ave (in Design) Hyde Park Ave & Plant Ave (Constr. 2016)
34th St (in Design)
![Page 47: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/47.jpg)
Future Walk-Bike LAP Projects
• 46th St. Multi-Use Path and Sharrows
• Columbus Dr Complete Street
• Floribraska Ave Complete Street
• Rome Ave Complete Street
• Green Spine Cycle Track Phases 2 & 3
• Projects prioritized in MPO Transportation Improvement Program (TIP)
• Projects currently under Work Program consideration by FDOT
47
![Page 48: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/48.jpg)
BIKE
LANESNARROWED
TRAVEL LANES
MAINTAIN ON-
STREET PARKING
WITH NEIGHBORHOOD CONNECTOR
IMPROVEMENTS
NEW TREES IN
BULB-OUTS
EXISTING | 55’ROW/45’ CURB TO CURB
INTERSECTION CROSSING
TREATMENTS
Columbus Dr Complete Street
![Page 49: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/49.jpg)
BIKE
LANES
LANE REALLOCATION
4-LANES TO 3-LANES
MEDIAN ISLANDS
WITH TREES
WITH NEIGHBORHOOD CONNECTOR IMPROVEMENTS
EXISTING | 55’ROW/45’ CURB TO CURB
INTERSECTION
CROSSING TREATMENTS
Floribraska Ave Complete Street
![Page 50: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/50.jpg)
East-West Green Spine Phases 2 & 3
o Concept Development (ongoing)
o City funded design for 2016-17
o Coordinating with FDOT/MPO for construction funding
50
Phase 2(W. Cass St)
Phase 3(Nuccio Pkwy & 15th St)
![Page 51: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/51.jpg)
East-West Green Spine
51
Currently Underutilized and Oversized Roadway Corridor
Future Nuccio Parkway Cycle Track and Linear Park
Proposed
Existing
Bikeway and Pedestrian
Complete Street Corridor
![Page 52: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/52.jpg)
East-West Green Spine
52
oNeighborhood Streets – Alternatives W Cass St and Ybor City
![Page 53: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/53.jpg)
Bicycle Facilities within City
53
Existing:115 Miles
Walk-Bike Plan: 413 Miles
In Progress:41 Miles
![Page 54: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/54.jpg)
Enhanced Mobility
• Bike Share Programs
54
![Page 55: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/55.jpg)
Enhanced Mobility
• Connecting multiple modes of transportation
55
![Page 56: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/56.jpg)
Enhanced Mobility
• Connecting multiple modes of transportation
56
![Page 57: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/57.jpg)
Enhanced Mobility
• Connecting multiple modes of transportation
57
![Page 58: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/58.jpg)
Economic Development
• Bike Benefit DistrictsoOpportunities for
businesses and private companies to benefit from improved mobility
• Events & ProgramsoWalk & Bike Events
oBike Share
58
![Page 59: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/59.jpg)
Economic Development
• RiverwalkoOver 300 events along
Riverwalk annually
59
![Page 60: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/60.jpg)
Initiatives & Recognitions
• First in the State to install Shared Lane Markings (2010)
• Appointed City’s First Bicycle and Pedestrian Engineer (2013)
• Coast Bike Share Program – Deployed Bike Share program with 300 bicycles. (Cycle Hop and Social Bike) (2014)
• Bicycle Friendly Community Award – Honorable Mention (2014)
• Walk Friendly Community Award – Recognition (2014)
• Cyclovia (w/FDOT, Tampa Downtown Partnership, MPO & others) (2014)
• Bicycle Friendly Business District – 14 Downtown Businesses (2015)o Tampa Downtown Partnership, FDOT, Pedal Power Promoters and City
Planning and Development, Economic and Urban Development Depts.
• State Surgeon General Healthy Weight Community Champion (2015) o Recognized Tampa’s Bike Share Program, Bicycle and Pedestrian
Improvements
• Planning Commission Chairman’s Award – Platt St & Cleveland St (2015)
60
![Page 61: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/61.jpg)
Thank You! Questions?
61
![Page 62: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/62.jpg)
EXTRA SLIDES – Delete/Discuss
• Extra slides for use or discussion
62
![Page 63: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/63.jpg)
Potential Road Diets/Complete Streets
• Palm Ave LAP (N Boulevard to Nebraska Ave)
• Willow Ave LAP (Swann Ave to Main St)
• Doyle Carlton Drive (7th Ave to Palm Ave)
• 7th Avenue (22nd St to 50th St)
• Armenia Avenue (Sligh Ave to Linebaugh Ave)
• Green Street (N Boulevard to W Laurel St)
• Bird Street (Florida Ave to Nebraska Ave)
• Waters Avenue (Florida Ave to Nebraska Ave)
• 34th Street (Lake Ave to MLK Boulevard)
• 40th Street (Adamo Drive to Hillsborough Ave)
63
![Page 64: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/64.jpg)
7th Ave “Road Diet” Concept
64
EXISTING
PROPOSED
Convert from 4-lane
undivided to 2-lane
divided cross-section
Provide Center Turn-
Lane w/ Median Refuge
(where feasible)
Install High-Emphasis
Crosswalk MarkingsProvide Marked
Bike Lanes
![Page 65: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/65.jpg)
Armenia Ave Complete Street
Concept
65
EXISTING PROPOSED
Provide Bike Lanes
Tighten Curb
Radii
High-Emphasis
Markings
Better Delineate Business
Access, Improve Existing
Sidewalks
Provide Center Turn-Lane
w/ Median Refuge
(where feasible)
![Page 66: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/66.jpg)
Other Modes of Transportation
66
•Street Car
•Bus
![Page 67: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/67.jpg)
Walk-Bike III: Green Artery
•Green Artery Trail:oCentral Tampa Loop
oRecreational Users
oConnect Neighborhood Assets
oMethods include: Bike Boulevards
Linear Parks
Multi-Use Paths
67
![Page 68: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/68.jpg)
The Green Artery
![Page 69: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/69.jpg)
Walk-Bike III: Green ARTery
Linear Park Concept: N. River Blvd, South of Hillsborough Avenue
69
![Page 70: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/70.jpg)
Walk-Bike III: Green ARTery
Multi-Use PathN 30th Street from Rodgers Park to
Hillsborough Avenue
70
![Page 71: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/71.jpg)
Walk-Bike III: Green ARTery
“Baby Bayshore”: Bermuda Boulevard, Palmetto Beach
71
![Page 72: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/72.jpg)
Walk-Bike III: New Tampa
New Tampa:• Review Network
• Identify Opportunities
• Consider Trail Connections
72
![Page 73: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/73.jpg)
Walk-Bike III: New Tampa
73
![Page 74: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/74.jpg)
Implementation
• “Simple” projects implemented through:oCity/County resurfacing
oSidewalk Program
oComplete Streets Program
o FDOT Safety Program
• More complex projects:oDesign Traffic and Preliminary Engineering
oPublic Engagement
oCIP/TIP Programming
74
![Page 75: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/75.jpg)
Candidate Project Types
• Complete Sidewalk Connections
• Enhance Major Roadway Crossings
• Off-Road Trails
• Marked Bike Lanes
• Shared Lane Arrows
• Side paths
• Road Diets
• Roadway Enhancements
75
![Page 76: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/76.jpg)
SharedLaneArrowMarkings
ADA Curb Ramp Improvements
Before
After
Euclid Ave “Sharrows”
76
![Page 77: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/77.jpg)
Collector Street Focus
• Many have “surplus” auto capacity
4+ Lanes…Only 7,000 Daily Auto Trips
77
![Page 78: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/78.jpg)
Collector Street Focus
• Signals provide for safer crossings of “arterial streets”
78
![Page 79: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/79.jpg)
Collector Street Focus
• Typically Provide railroad, river, and freeway crossings
79
![Page 80: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/80.jpg)
Road Diet Benefits
• Reduce crossing distance
• Eliminate or reduce “multiple threat” crash types
• Install mid-block islands to cross in 2 simple steps
• Reduce top end travel speeds
• Reduce rear-end, sideswipe, and left-turn crashes
• Buffer sidewalk from travel lanes
• Reclaim street space for “higher and better use” than moving peak hour traffic
• Includes on-street bicycle facilities
80
![Page 81: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/81.jpg)
Collector Street Focus
• Speeds and traffic volumes necessitate good facilities for cyclists & pedestrians
81
![Page 82: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/82.jpg)
Technical Challenges
• Poor river crossings
82
![Page 83: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/83.jpg)
Technical Challenges
• Positive exception:
New 40th Street Bridge
Bike Lane/Paved Shoulder
Buffered Sidewalk
83
![Page 84: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/84.jpg)
Technical Challenges
• Poor River Crossings
Dr. Martin Luther King Jr. Boulevard Bridge
84
![Page 85: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/85.jpg)
Technical Challenges
• Poor river crossings
Sligh Avenue Bridge
85
![Page 86: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/86.jpg)
Technical Challenges
• Poor river crossings
Florida Avenue Bridge
86
![Page 87: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/87.jpg)
Technical Challenges
• Poor river crossings
Rowlett Park Bridge
87
![Page 88: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/88.jpg)
Technical Challenges
• Narrow existing cross sections
N Rome Avenue: ~ 22ft
88
![Page 89: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/89.jpg)
Technical Challenges
• Narrow existing cross sections
E. Hanna Avenue: ~20ft
89
![Page 90: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/90.jpg)
Technical Challenges
• Drainage swales, landscaping, parking
North Boulevard(south of Sligh Avenue)
90
![Page 91: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/91.jpg)
Technical Challenges
• Drainage swales, landscaping, parking
North Howard Avenue
91
![Page 92: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/92.jpg)
92
![Page 93: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/93.jpg)
On-Street Bicycle Modes
93
BEFORE
AFTER
![Page 94: City of Tampa Walk Bike Plan](https://reader035.vdocuments.site/reader035/viewer/2022062504/586add521a28ab123a8b9f61/html5/thumbnails/94.jpg)
East-West Green Spine
• The Center City will have an attractive and safe cross-city multi-purpose trail that links the eastern and western Center City neighborhoods to the Riverwalk and to each other.