city of surrey surrey nature centre plaza and parking lot design … · 2019-06-06 · cb x2 cb cb...
TRANSCRIPT
CB x2
CBCB
BURIED AND PAVED
OVER MH
LB
STANDPIPE
MH
MH
MH
SAN. LID
SAN. CLEANOUT
SAN. CLEANOUT
SAN. CLEANOUT
H
H
WATERV
ALVE
WATERV
ALVE
FH
WATERV
ALVE
IRRIGATION
VALVE
WATER VALVE
IRRIGATION
BOX/HOSE BIB
STEEL LID WATER
VALVES
FIRE
STANDPIPE
FHWATER VALVE
UTILITY POLE
UTILITY POLE
UTILITY POLE
UTILITY POLE
UTILITY POLES
UTILITY POLE
ELEC. BOX
ELEC. BOX
UTILITY POLE
LAMP BASE
KIOSK
KIOSK
UTILITY POLE
ELEC. BOX
ELEC. BOX
LS WITH CONC.
BASE
ELEC. BOX
ELEC. BOX
ELEC. BOX
MECH. UNITS
MECH. UNITS
G
G
G
GAS VALVE AND
METER
GAS VALVE AND METER
BC GAS
MARKER
GAS VALVE AND METER
CONC. BASE WITH 1
ELECTRICAL CONDUITLAMP
LAMP BASE
BURIED AND PAVED
OVER MH
PMTLS
LS
CB
LS
CB
LB
HB
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33
1 2 3 4 5 6 12 13 14 15 167 8 9 10 11
18 1920
2122
23
12
34
56
7 8 9 10 11 12 13 14 15 16 17
24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
CONC. HEADWALL
REMOVE BIRCH
EXISTINGPATIO
PHASE ONE PARKING AREA (33 STALLS)
TRADITIONAL /MEDICINAL
GARDEN
FLEXIBLE COURTYARD
SENSORYGARDEN
LEARNINGGARDEN
EXISTING PULL OUT(FUTURE GARDEN)
Existing split rail fence asshown (to be extended to
entry sidewalk)
Existing park signage
Existing transit bus stop to become an alternate bus parking if drop off zone is closed to vehicles.
Potential future sidewalk
Existing dry swale(approximate location)
Existing flagstonepaving
Existing
UPGRADED PARKING (38 STALLS)
Potential future sidewalk1L4.0
1L4.0
4L4.1
4L4.1
3L4.0
3L4.0
5L4.1
5L4.1
6L4.1
6L4.1
2L4.0
2L4.0
PROPERTY LINE
L0.0
Drawing Title:
17-063
MP
JS
Surrey Nature Centreon Green Timbers Way
Project Title:
COPYRIGHT RESERVEDThis drawing is and shall remain the property of R. Kim Perry & Associates Inc., and R. Kim Perry & Associates Inc. shall retain the copyright therein. This document shall not be reproduced or used for additions or alterations to the project or for the purpose of any other project without the prior written consent of R. Kim Perry & Associates Inc.
Date
2018/09/201
Client:
1:350
Sheet No.:
Scale:
Project North: Drawn By:
Checked By:
Job No.:
Revision No.
Issued for 50% ReviewIssued for Review2 2018/10/05Issued for 75% Review3 2019/04/12