WATER TRANSMISSION PIPELINE CONDITION ASSESSMENT

ESRI USER CONFERENCE 7/16/2014

CITY OF SAN DIEGO

Page 2: CITY OF SAN DIEGO - Esri

PRESENTATION AGENDA

Goals of the Project

Overview of Risk Analysis Process

Incorporating Field Inspection Data

Data Management Planning

Tips and Lessons Learned

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 2

Page 3: CITY OF SAN DIEGO - Esri

INTRODUCTION

Page 4: CITY OF SAN DIEGO - Esri

PROJECT GOALS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014

Identify critical pipes/segments

Prioritize pipes for inspections

Prioritize pipes for rehabilitation

Establish a defendable/repeatable process

4

Page 5: CITY OF SAN DIEGO - Esri

SETTING THE FOUNDATION

Created 100’ Pipe Segments

Reconciled stationing

Created unique Pipe ID Numbering System for this project (yet maintained City’s FSN)

Kearny Mesa PotableCity’s original SPLASH GIS

After pipe segmentation

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 5

Page 6: CITY OF SAN DIEGO - Esri

SUMMARY OF RISK CRITERIA

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 6

Page 7: CITY OF SAN DIEGO - Esri

LIKELIHOOD OF FAILURERISK CRITERIA

Page 8: CITY OF SAN DIEGO - Esri

PHYSICAL CHARACTERISTICS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 8

Page 9: CITY OF SAN DIEGO - Esri

Safety Factor = Yield Strength of Steel/Hoop Stress in PipeWhere Hoop Stress = Pd/2t and P= total pressure (working + surge), d= diameter, and t=pipe wall thickness

PHYSICAL CHARACTERISTICS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 9

Page 10: CITY OF SAN DIEGO - Esri

PIPE CONDITION

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 10

Page 11: CITY OF SAN DIEGO - Esri

INSTALLATION PRACTICES & MODIFICATIONS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 11

Page 12: CITY OF SAN DIEGO - Esri

EXTERNAL LOADING & SOIL FACTORS

CA Geological Survey data

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 12

Page 13: CITY OF SAN DIEGO - Esri

CURRENT& HISTORICAL PERFORMANCE

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 13

Page 14: CITY OF SAN DIEGO - Esri

CONSEQUENCE OF FAILURERISK CRITERIA

Page 15: CITY OF SAN DIEGO - Esri

COST OF FAILURE

Indirect costs: Fines,Lawsuits, Property Damage,Non Compliance

Direct costs: Overtime, PipeRepair, water loss

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 15

Page 16: CITY OF SAN DIEGO - Esri

ENVIRONMENTAL IMPACTS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 16

Page 17: CITY OF SAN DIEGO - Esri

SOCIAL IMPACTS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 17

Page 18: CITY OF SAN DIEGO - Esri

SOCIAL IMPACTS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 18

Page 19: CITY OF SAN DIEGO - Esri

IMPACT TO CITY OPERATIONS

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 19

Page 20: CITY OF SAN DIEGO - Esri

WEIGHTING FACTORS

Page 21: CITY OF SAN DIEGO - Esri

WEIGHTING FACTORS

19

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 21

Page 22: CITY OF SAN DIEGO - Esri

ASSET PRIORITIZATION TOOL

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 22

Evaluated:• Pros/cons of each• Capabilities• Applicability to this project• Cost/Investment• Integration with SAP

PRIORITIZATION TOOL OPTIONS

1 Excel

2 GIS based model/custom(Black & Veatch’s custom script)

3 COTS Solutions

a. Innovyze CapPlan

b. SAP PPM

c. Riva Modeling

STATISTICAL MODELING OPTIONS

1 R Statistical Analysis

2 KANEW Model

3 Linear Extension Yule Model

4 Monte Carlo Simulation

Page 23: CITY OF SAN DIEGO - Esri

SAMPLE RESULTS (BRE = LOF X COF)

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 23

Page 24: CITY OF SAN DIEGO - Esri

ESRI’s iCIP TEMPLATE

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 24

Page 25: CITY OF SAN DIEGO - Esri

DELIVERING RESULTS – A PRIORITIZED CIP

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 25

SAMPLE

Page 26: CITY OF SAN DIEGO - Esri

SUMMARY

Page 27: CITY OF SAN DIEGO - Esri

DATA MANAGEMENT PLAN

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 27

Share results to engineers using ESRI’s ArcGIS Online

Page 28: CITY OF SAN DIEGO - Esri

USEFUL TIPS

Develop consensus on proposed Risk Factors

Exporting CMMS data and historical information can be difficult, but worth the effort

ArcGIS Online is a very useful tool for encouraging user engagement with the data/results

Asset Management has many “pieces” but it is important to focus on “putting the pieces together” –resulting in a prioritized CIP!

2014 ESRI UC | City of San Diego Water Transmission Pipeline Condition Assessment | July 16, 2014 28

Page 29: CITY OF SAN DIEGO - Esri

QUESTIONS?

HEATHER SCHUCHARD, GISP | Asset Management ConsultantBlack & Veatch Corporation | San Marcos, California

760 621 8567 P | [email protected]