CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL MIDDLE GEORGIA REGIONAL COMMISSION

Upload: sophia-washington

Post on 21-Jan-2016

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

CITY OF IVEYCRITICAL WATER INFRASTRUCTURE

IMPROVEMENTS

DCA APPLICANTS’ WORKSHOPLODGE AT CALLAWAY GARDENS

DECEMBER 3, 2015

PRESENTED BY JONATHON CONNELLMIDDLE GEORGIA REGIONAL COMMISSION

Page 2: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

BACKGROUND• CITY OF IVEY

• SMALL TOWN OF ABOUT 944 RESIDENTS LOCATED IN NORTHWESTERN WILKINSON COUNTY

• LESS THAN 3% MINORITY POPULATION.

• HISTORY OF SERIOUS INFRASTRUCTURE ISSUES.

• HOLLIDAY HILLS NEIGHBORHOOD• BUILT IN THE 1950’S AS A PRIVATE COMMUNITY. WATER

SYSTEM WAS INHERITED BY THE CITY IN 1990.

• LARGE AMOUNTS OF SUBSTANDARD AND DILAPIDATED HOUSING.

• 24 STREETS. 200 OCCUPIED HOUSEHOLDS. 534 RESIDENTS

• SERVED BY ONE 6” WATER MAIN.

Page 3: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL
Page 4: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

PROJECT TARGET AREA

• TARGET AREA AND WATER LINES WERE MAPPED BY MGRC GIS TEAM.

• DOOR-TO-DOOR SURVEYS WERE CONDUCTED (12 SEPARATE TRIPS.)

• INITIAL PROJECT AREA DID NOT MEET LMI THRESHOLD.

• FOCUSED TARGET AREA TO ENTIRE NEIGHBORHOOD

• TOTAL NUMBER OF HOUSES SURVEYED FOR VALID SAMPLE SIZE: 200 (WATER CUSTOMERS)

• MGRC STAFF, CITY OF IVEY PUBLIC WORKS AND CITY COUNCIL MEMBERS.

Page 5: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

PROJECT AREA PROBLEMS

• SUB STANDARD WATER LINES/ FREQUENT WATER MAIN BURSTS

• NO RELIEF OR CUTOFF VALVES IN THE ENTIRE NEIGHBORHOOD. ALL RESIDENTS WATER SUPPLY WOULD BE SHUT OFF FOR REPAIR PURPOSES, AT ANY TIME, FOR ANY LENGTH OF TIME.

• INADEQUATE FIRE PROTECTION

• LACK OF ACCESS TO HYDRANTS, INSUFFICIENT FLOW

• INOPERABLE WELL

• 2 WELLS, ONLY 1 IN OPERATION

• EPD VIOLATIONS

Page 6: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

PROJECT AREA PROBLEMS

• LACK OF BACKFLOW PREVENTERS

• LEAKING OF WASTES AND/OR HAZARDOUS CHEMICALS INTO WATER LINE.

• FINANCIAL NEED

• LACK OF CAPITAL IMPROVEMENT FUNDS DUE TO CONSTANT REPAIRS.

• DEBT SERVICE ON $4 MILLION GEFA LOAN FOR VACUUM SEWER SYSTEM IN 2002.

• AVERAGE WATER BILL PER CUSTOMER $53.70 (1.72% OF MHI)

FY 2015 GENERAL FUND BUDGET: $405,155 FY 2015 WATER/SEWER BUDGET: $257,900

Page 7: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

DOCUMENTING THE NEED

Page 8: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

DOCUMENTING THE NEED

Page 9: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

DOCUMENTING THE NEED – RESIDENT COMMENTS

“There are times when if your kids don’t get a bath at night (ie. Late night, fell asleep, etc,) you might would have to send the kids to school without a bath and worry about someone calling D.F.C.S if they were the “stinking” kid in class due to no water. Simply because the water is so frequently out – you have to prepare ahead of time – if you have water @ 3:00 PM, BATHE them. You might not have it @ 4pm.”- Resident at 204 North Lakeshore Drive

Page 10: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

DOCUMENTING THE NEED – RESIDENT COMMENTS

“…..First, we did not ask for this system to be put in we did not have a choice. Second, the water is out almost on a weekly basis with no warning whatsoever. Not only does it mess with our lines in our home it messes up hot water heaters. I'm also not convinced that the water is safe to drink.We can be getting ready for work at 6:00 in the morning and the water will be out. And yes we still go to work. Do you know how embarrassing this is for us?.....”- Lorea Sheffield, Holiday Hills Resident

Page 11: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

DOCUMENTING THE NEED – SUPPORT LETTERS

Good Sources• Fire Chiefs• Elected Officials• Water Superintendents• Public Works Directors

Page 12: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

MAKING IMPROVEMENTS

PROPOSED IMPROVEMENTS

REPLACE APPROXIMATELY 5,100 FEET OF EXISTING 6”MAIN WITH A NEW 8” PVC MAIN;

REPLACE ALL IMMEDIATE SERVICE CONNECTIONS AND CONNECTING LINES WITH NEW ONES THAT INCLUDES ISOLATION VALVES, BACKFLOW PREVENTERS, AND AIR RELEASE VALVES;

INSTALL BLOW-OFF HYDRANTS AT DEAD-END LINES AND A SUFFICIENT NUMBER OF APPROPRIATELY SPACED HYDRANTS;

RAISE WELL CASING, PUMP AND DISCHARGE PIPING APPROXIMATELY 15’ TO MAINTAIN A MINIMUM CLEARANCE WITH EXISTING CONCRETE SLAB.

Page 13: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

BUDGET

Activity Description CDBG Cost Match and Leverage

Total Cost Source

P-03J-01 Water

Facilities Construction

$289,025.00 $20,000.00* $309,025.00 City of

Ivey; CDBG

T-020-00 Engineering Services $32,082.00 $5,000.00* $37,082.00 City of

Ivey; CDBG C-022-00 Contingencies $30,903.00 $0.00 $30,903.00 CDBG A-21A-00 Administration $22,468.00 $0.00 $22,468.00 CDBG

Total Cost $374,478.00 $25,000.00 $399,478.00

*City of Ivey match and leverage of $25,000.00

Page 14: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

WHY WAS THIS PROJECT COMPETITIVE?

• BENEFITS TO AN ESTIMATED 534 RESIDENTS, WITH 386 OF THOSE BEING OF LOW-TO-MODERATE INCOME. (56% OF IVEY RESIDENTS!)

• LOW PER PERSON COST ($701/RESIDENT)

• MATCH AND LEVERAGE OF $25,000.00, MORE THAN SIX TIMES THE REQUIRED AMOUNT. (PROJECT SOUGHT $374,478 IN CDBG FUNDING)

• RESIDENT LETTERS AND DOCUMENTATION (NEWSPAPER ARTICLES, PICTURES, RESIDENT LETTERS)

• BONUS POINTS

Page 15: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

BONUS POINTS

• PROCUREMENT

• GRANT ADMINISTRATOR – MIDDLE GEORGIA REGIONAL COMMISSION

• PROFESSIONAL SERVICES – RICHARDSON, GARRETSON & ASSOCIATES

• PRELIMINARY ENGINEERING REPORT

• ENVIRONMENTAL REVIEW

• CONCURRENT NOTICE

• NO ACQUISITION ON PROJECT

Page 16: CITY OF IVEY CRITICAL WATER INFRASTRUCTURE IMPROVEMENTS DCA APPLICANTS’ WORKSHOP LODGE AT CALLAWAY GARDENS DECEMBER 3, 2015 PRESENTED BY JONATHON CONNELL

LESSONS LEARNED• SURVEYING

• HELP FROM LOCAL GOVERNMENT WAS CRUCIAL

• PEOPLE ARE SOMETIMES APPREHENSIVE, PUT THEM AT EASE.

• USE DIALOG TO GET A CITIZEN COMMENT.

• DOCUMENTATION• EXHAUST EVERY SOURCE OF INFORMATION

• WRITING THE APPLICATION• BE DIRECT. BE DETAILED. BE SIMPLE

• CHECK, CHECK, RE-CHECK YOUR NUMBERS, WRITING, ETC.

• PLANNING• TIMING OF ACTIONS. DEADLINES.

• COMMUNICATION

• REPORT FROM ALL STAKEHOLDERS (LOCAL OFFICIALS, RESIDENTS, ENGINEER, ETC.)

• USE DCA AS A RESOURCE!