city of houston’s intelligent transportation system and ...jul 16, 2015  · tiger project 72...

16
Presented by: Jeffrey S. Weatherford, P.E., PTOE Deputy Director Department of Public Works and Engineering Traffic and Transportation Division City of Houston, TX City of Houston’s Intelligent Transportation System and TIGER 2014 Project DRAFT

Upload: others

Post on 22-Aug-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

Presented by:Jeffrey S. Weatherford, P.E., PTOEDeputy DirectorDepartment of Public Works and EngineeringTraffic and Transportation DivisionCity of Houston, TX

City of Houston’sIntelligent Transportation Systemand TIGER 2014 Project

DRAFT

Page 2: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

History

• What are Intelligent Transportation Systems (ITS)?

• Federal transition to a focus on operations

• Tradition of design, build, maintain and operate

• New focus on transportation safety, management and operationsD

RAFT

Page 3: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

The Problem

• At the same time, this is what drivers see in front of them

What are their options?

• Significant number of devices deployed throughout the country• Primarily on freeways and the occasional arterial• Prime examples are freeway dynamic message signs with

messages such as this:

DRAFT

Page 4: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

TIGER ProjectConcept

• Give commuter options • Provide integrated traffic management system• Operators and Engineers will:

• Monitor traffic• Detect incidents• Make system changes based on real-time observations• Disseminate traffic information to Media and Public DRAFT

Page 5: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

How It Will Work (see alternate graphic on next slide)

AccidentWest 34 min to BW8Rich 24 min to BW8

?

CCTV

Bluetooth

WiMaxBase Station WiMax Backbone

Bluetooth

Engineer atConsole

DRAFT

Page 6: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

What Has PWE DoneSo Far?Communications Network• Added 150+ miles of fiber optic cable across 450

traffic signals• Added WiMax radios to 1,450 traffic signals• Added Ethernet Over Copper to 300+ traffic signals

• Primarily within the Central Business District• Upgrades are still underway

Extended Communications Network• Fiber optic communications• Licensed microwave network

DRAFT

Page 7: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

WiMax Communications

DRAFT

Page 8: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

Accomplishments to date

• Upgrade to 2070 advanced traffic signal controllers at nearly 2,000 intersections

• Completing upgrade of signal detection systems at 175 intersections

• Installed 15 midblock count/speed data stations as a pilot project

• Installed 25 pan/tilt/zoom closed-circuit TV (CCTV) cameras as a pilot projectDRAFT

Page 9: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

Arterial Travel Times

Data collected using Bluetooth readers– How system works– Pilot project started 2009 with 50 readers in

West Houston

Full deployment currently underway for city-wide coverage– 602 additional locations– 80% of funding provided through CMAQ Grant

DRAFT

Page 10: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

Arterial Travel Times

DRAFT

Page 11: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

What’s Next?

Replace arterial traffic signal management software

System and controller software almost 20 years old– 8 MS Windows upgrades in same period

City is currently in process of procuring new software– 80% of funding is through CMAQ Grants– Contract expected to go to Council in August or

SeptemberDRAFT

Page 12: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

TIGER Project

72 projects awarded in 2014 TIGER call for projects– 1 of 2 projects awarded in Texas

Other was planning project, not implementation

Project provides for implementation of field devices throughout City– 113 additional pan/tilt/zoom CCTV cameras– 144 additional mid-block count/speed data stations– 91 arterial dynamic message signs– 489 additional intersection detection upgrades

DRAFT

Page 13: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

ITS Project Investment

Completed Investment $20 Million(Intersection Upgrades, Communications, Pilots)

Projects Underway $6 Million(Software and Arterial Travel Time Deployment)

TIGER Project $24 Million– Federal Investment - $10 Million– Local Investment - $14 Million

Total Investment (since 2009) $50 MillionDRAFT

Page 14: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

TIGER Project Schedule

Federal dollars must be obligated by September 2016– RCA for agreement with FHWA in

August/September 2015

TIGER funds must be expended by September 2021– Expect RFP to be released in early Fall 2015– Design/build RFP process– Construction slated for FY16, 17 & 18DRAFT

Page 15: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

TIGER Deployment Plan

DRAFT

Page 16: City of Houston’s Intelligent Transportation System and ...Jul 16, 2015  · TIGER Project 72 projects awarded in 2014 TIGER call for projects – 1 of 2 projects awarded in Texas

Questions?

DRAFT