City of Guelph Water - Wastewater Servicing Master Plan Public Meeting #2 Presentation Tuesday April 8 th , 2008

Upload: nguyendat

Post on 09-Apr-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

City of GuelphWater - Wastewater Servicing Master Plan

Public Meeting #2Presentation

Tuesday April 8th, 2008

Page 2: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

2

Welcome/Introduction

� Opening Remarks

Page 3: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

3

Agenda

4) Next Steps

A question and answer period will follow the presentation7:45 pm

Adjourn9:00 pm

Open House – Registration

Opportunity for participants to view displays and meet informally with City staff and Consultant Project Team members

7:00 pm

3) Wastewater Conveyance SystemPreferred AlternativeProposed Implementation Plan

2) Water Distribution / Storage SystemPreferred AlternativeProposed Implementation Plan

1) Overview of Master Plan and Class EA Process

Introduction to the Water Wastewater Servicing Mast er Plan Study –Earth Tech

DESCRIPTIONTIME

Welcome and Opening Remarks – Don Kudo, City of Guel ph7:15 pm

Page 4: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

4

Municipal Act

City to Meet Servicing Requirements

Official Plan

• Population Projections

• Land Use/Community Development

Planning Act

City to Meet Available Land Requirements

Infrastructure Master Plans

• Water Distribution/ Storage & Wastewater Conveyance (2008 ) *

•Water Supply (2006)

• Wastewater Treatment (2008)

• Transportation

• Others

Ontario Places To Grow Plan

Local Growth Management

Strategy

• Implementation

• Monitoring

• Adjustment as required

City of Guelph Master Plan Studies

* Project web link:guelph.ca > living > planning&building > master plans > click on the Presentations PDF

Page 5: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

5

Purpose of Today’s Meeting

� To review the status of the City of Guelph Water Distribution/ Storage and Wastewater Conveyance Master Plan project.

�PIC 1 – identification of alternatives for water distribution and wastewater conveyance systems, evaluation and recommendation of preferred solutions.

�Public and agency feedback

�PIC 2 – development of implementation plans for preferred alternative solutions, with capital budget estimate

� To seek stakeholder feedback on preferred alternatives and proposed implementation plans.

Page 6: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

6

Master Planning Process

Page 7: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

7

Assumptions in Developing Implementation Plans to 2031

• Implementation of new water supply facilities are assumed to follow the WSMP schedule.

• Prioritization of required upgrades references asset management inventory.

• Watermain and sanitary sewer replacements to be coordinated with road reconstruction projects

• Infrastructure required within 25 years

• Infrastructure shown in new development areas will be subject to EA and planning approvals (e.g. Provincial review of adequacy of current policies/legislation to protect the Paris Galt Moraine)

• Timeline for capital works is pending completion of Local Growth Management Strategy (LGMS); for this plan, assumed growth priorities in first 10 years include:– continued growth in approved development areas of south end – development of York district area (Ontario Reformatory lands)– intensification in downtown core (drainage to York trunk sewer)

Page 8: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

8

Preferred Alternative: Water Distribution / Storage System

• Water Conservation/ Demand Management• Improvements to Existing System - New Facilities and

Watermains: Preferred Alternative – Zone 1:

� Best use of existing infrastructure� Can be phased in with improvements in tank operation� Eliminates operational issues associated with two elevated tanks in

one zone� New transmission mains and pumping stations to improve pressures

in south areas – Zone 2:

� Addresses deficiencies in existing system� Increased storage requirements met through anticipated water

supply facilities near Guelph Lake– Zone 3:

� Required to meet system pressures and fireflows for areas south of Clair Road at higher elevation

– Lowest capital cost and lowest life cycle cost

Page 9: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

9

Water Distribution / Storage System: Preferred Alternative

Page 10: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

10

Water Distribution / Storage System: Pipes with high headloss

Page 11: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

11

Water Distribution / Storage System: 0 – 5 years

Page 12: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

12

Water Distribution / Storage System: 5 – 10 years

Page 13: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

13

Water Distribution / Storage System: 10 – 15 years

Page 14: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

14

Water Distribution / Storage System: 15 - 25 years

Page 15: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

15

Water Distribution / Storage System: List of Projects

Preferred Alternative: Water Distribution and Stor age Projects

Years Project Type Project no. Project Description Budgetary Estimate

Class EA Schedule

Studies0-1 W-S-1 Calibrate model - c factor testing; Verney/Clair Model Optimization; Transient analysis $ 300,000 A0-1 W-S-2 Distribution system water quality assessment & modelling $ 100,000 A

0 - 5 W-S-3 Asset Management $ 300,000 A 0 - 5 W-S-4 Water Conservation Audit/ Performance/ Benchmarking $ 200,000 A 0 - 5 W-S-5 Review opportunities for capturing energy/ energy pumping efficiency & optimization $ 100,000 A 0 - 5 W-S-6 Flushing & UFW Metering Studies $ 225,000 A5 - 25 W-S-7 Water Supply - Distribution Master Plan Update $ 900,000 Master Plan EA

Subtotal $ 2,125,000

Linear Infrastructure 0 - 5 W-I-1 Clair Road Zone 3 Main - Crawley to Gordon / Gordon to Victoria (400mm) $ 1,863,000 A 0 - 5 W-I-2 *Hanlon Crossing - to Paisley (supply security) $ 2,500,000 A or B5 - 10 or Silvercreek - Wellington to Paisley BS (400mm) (security) A 0 - 5 W-I-3 Kortright Zone 1B Main (400mm) to Edinburgh Road, Edinburgh to Gordon $ 540,000 A

15 - 25 W-I-4 Woodlawn Road - Watson to Imperial (400/500mm) $ 3,600,000 A+ or B (river crossing) 15 - 25 W-I-5 Imperial - Woodlawn to Paisley BS (400mm) $ 1,620,000 A

0 - 10 W-I-6 Wellington - Hanlon (north of Speed River) to Watson (600mm) $ 3,750,000 BOR Wellington - Hanlon (south of Speed River on Water St) to Edinburgh to Watson

0 - 15 W-I-7 Stevenson - Woods BS to Emma/Verney (river crossing) to Tank (600mm) $ 1,500,000 B10-15 W-I-8 Exhibition/Dublin - Tank to Wellington (600mm) $ 1,562,500 A 0 - 5 W-I-9 Parallel Hanlon - Wellington to Clair (river crossing) or Water to Clair (river crossing) (600mm) $ 7,550,000 B

0 - 5 W-I-10 *Speedvale - Watson to Westmount (300/400mm) $ 2,160,000 B 0 - 5 W-I-11 Starwood extension from Eastview to Speedvale (300mm) $ 1,080,000 A 5 - 10 W-I-12 Watson from Eastview to Woodlawn (400mm) $ 1,215,000 A 5 - 10 W-I-13 *Gazer-Mooney redundancy - off Woodlawn $ 100,000 A 0 - 5 W-I-14 *Zone boundary change - Zone 1/2 (north of Speedvale) $ 400,000 A

15 - 25 W-I-15 *connections between transmission mains and/or river crossing for criticality $ 2,000,000 A/B 5 - 10 W-I-16 *Arkell wellfield transmission main (for redundancy, assume 750mm) $ 10,125,000 B 0 - 5 W-I-17 Edinburgh - Wellington to Zone 1A/B Reservoir & BS $ 1,375,000 B 0 - 5 W-I-18 Edinburgh - Zone 1A/B Reservoir & BS to Kortright 1B Main (600mm) $ 937,500 A/B 0 - 5 OR Edinburgh - Zone 1A/B Reservoir & BS through Park to Kortright 1B Main (600mm) 5 - 10 W-I-19 Complete Zone 1A/B split piping & Valves (Hanlon crossing @ Kortright etc) $ 500,000 A 5 - 25 W-I-20 *Replace distribution piping < 100 mm diameter/ looping deadends/WQ issues $ 9,801,550 A 5 - 25 W-I-21 *Asset replacement - all pipes with headloss greater than 5m/1000m $ 6,754,050 A 5 - 25 W-I-22 Asset replacement - pipes with headloss < 5 and > 2 m/1000m (allowance) $ 8,783,775 A

develop-ment driven

W-I-23 New Development Allowance $ 15,000,000 A/B

Subtotal $ 84,717,000

Facilities (P.S. / Reservoirs / Tanks) 0 - 5 W-F-1 *Robertson Booster PS Upgrades/Expansion $ 6,075,000 B 0 - 5 W-F-2 Zone 3 Booster $ 6,075,000 A/B 0 - 5 W-F-3 *Control Package Verney/Clair, Valves, VFDs, Pumps @ Woods $ 1,350,000 B 0 - 10 W-F-4 *Distribution System Water Quality capital works (allowance) $ 4,000,000 A 10 - 15 W-F-5 East Side (Arkell/Victoria) Zone 1A/B BPS & Reservoir $ 13,500,000 B/C 5 - 10 W-F-6 Southwest Quadrant - Zone 1A/B BPS & Reservoir $ 13,500,000 B/C 5 - 10 W-F-7 Zone 3 Elevated Tank $ 2,700,000 B/C 0 - 5 W-F-8 *Upgrade/Expansion to Clythe Booster & Reservoir (Zone 1A/2) $ 4,050,000 B

15 - 25 W-F-9 Guelph Lake Storage & BS $ 13,500,000 B/CSubtotal $ 64,750,000

Total $ 151,592,000 Note: 2007 dollar values; includes 35% eng & conting

* - indicates works required due to existing system constraints

Page 16: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

16

Water Distribution / Storage System: Project Timeline & Budget

Budget and Timeline for Proposed Water Distribution and Storage Projects

Projects 0 - 5 5 - 10 10 - 15 15 - 25 Total

Studies 1,225,000$ 450,000$ 450,000$ 2,125,000$

Linear Infrastructure 24,531,000$ 26,511,000$ 14,259,000$ 19,416,000$ 84,717,000$

Facilities 19,550,000$ 18,200,000$ 13,500,000$ 13,500,000$ 64,750,000$

Total 45,306,000$ 45,161,000$ 27,759,000$ 33,366,000$ 151,592,000$

* subject to City budgeting and approvals

Timeline (years)

Page 17: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

17

Preferred Alternative: Wastewater Conveyance System

• I/I Reduction and Re-use Opportunities

• Improvements to Existing System - New Trunk Sewers: Preferred Alternative – Optimization:

� Addresses deficiencies in existing system and poor structural condition of older trunk sewers

� Can be phased in with road improvements and watermain installation

� Increase in diameter of main trunk sewers reduces upgrades upstream in system

� Further storage could be implemented to minimize peak to ADF ratio

– Intensification:� Results in major upgrades through core of City and east-

west trunk sewers– New growth:

� New sewers to accommodate growth can be implemented within existing gravity system

– Lowest capital cost

Page 18: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

18

Wastewater Conveyance System: Preferred Alternative

Page 19: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

19

Wastewater Conveyance System: Areas with Capacity Constraints

Page 20: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

20

Wastewater Conveyance System: 0 – 5 years

Page 21: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

21

Wastewater Conveyance System: 5 – 10 years

Page 22: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

22

Wastewater Conveyance System: 10 – 25 years

Page 23: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

23

Wastewater Conveyance System: List of Projects

Preferred Alternative: Wastewater Collection and P umping Projects

Years Project Type

Project no. Project Description Budgetary Estimate

Class EA Schedule

Studiesongoing WW-S-1 Camera and structural assessment of all major trunks: York; Speed;

Waterloo; capacity review on Hanlon crossing to the WWTP $ 250,000 A

0 - 10 WW-S-2 Asset Management $ 300,000 A 0 - 5 WW-S-3 Area I&I Studies $ 300,000 A 0 - 5 WW-S-4 Review opportunities for capturing energy (Via heat exchange) in new

trunks $ 50,000 A

0 - 5 WW-S-6 Flow monitors at Arthur; York; Speed; Downey; South of Clair $ 1,687,500 A 5 - 25 WW-S-7 Wastewater Master Plan Update $ 600,000 Master Plan EA

Subtotal $ 3,188,000

Linear Infrastructure0 - 5 WW-I-1 *Replace existing York Trunk from: $ 9,136,800 A

east of Hanlon to Victoria Rd0 - 5 WW-I-2 *Replace Stevenson Trunk from York Trunk to Eramosa Rd $ 3,414,150 A

5 - 10 WW-I-3 Replace Speed Trunk from East of Hanlon to Eramosa R. $ 4,244,400 A 10 - 25 WW-I-4 Replace Waterloo Trunk from East of Hanlon to Yorkshire $ 1,779,300 A 10 - 25 WW-I-5 Replace Yorkshire Trunk $ 2,756,681 A

0 - 5 WW-I-6 *Replace Arthur Trunk (Marlborough) from Emma to Kitchener $ 2,277,450 A0 - 5 WW-I-7 Speedvale Collector from Arthur Trunk to Metcalf $ 915,300 A

5 - 10 WW-I-9 *Replace Water St Collector $ 861,300 A 5 - 10 WW-I-10 Downey Trunk from: $ 1,620,000 A+ or B

Downey to Hazelwood to Teal0 - 10 WW-I-11 river & Hanlon crossings (allowance); including relocation catchment

area south of river discharging @river slightly west of Edinburgh $ 3,375,000 A+ or B

5 - 25 WW-I-12 *Area Asset Replacement (allowance) $ 9,247,500 AWW-I-13 new gravity sewers - allowance $ 23,350,656 A or BWW-I-14 new forcemains - allowance $ 1,350,000 A or B

Subtotal $ 64,329,000

Facilities (Storage / P.S. etc)0 - 5 WW-F-1 *Decommission SPS on Gordon (after installation of sewer) $ 2,700,000 A

0 - 15 WW-F-2 Storage/Equalization (within trunks - York/Speed; at WWTP) $ 8,000,000 A / B 0 - 5 WW-F-3 New SPS in South (ICI) - development south of Clair $ 2,025,000 B

WW-F-4 Possible new SPS in South (ICI) - future development south of Clair $ 2,025,000 B

WW-F-5 Northwest SPS (allowance) $ 2,025,000 B

Subtotal $ 16,775,000 Total $ 84,292,000

Note: 2007 dollar values; includes 35% eng & conting* - indicates works required due to existing system constraints

develop-ment

develop-ment driven

Page 24: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

24

Wastewater Conveyance System: Project Timeline & Budget

Budget and Timeline for Proposed Wastewater Collect ion and Pumping Projects

Projects 0 - 5 5 - 10 10 - 25 Total

Studies 2,313,000$ 575,000$ 300,000$ 3,188,000$

Linear Infrastructure 21,581,000$ 18,588,000$ 24,159,000$ 64,328,000$

Facilities 4,725,000$ 5,013,000$ 7,038,000$ 16,776,000$

Total 28,619,000$ 24,176,000$ 31,497,000$ 84,292,000$

* subject to City budgeting and approvals

Timeline (years)

Page 25: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

25

Next Steps

�Public Information Centre #2 (April 8/08)

�Receive and consider agency/ stakeholder comments

�Prepare draft Master Plan Study Report

�Present to City Committee/ Council (Spring ’08)

�30 day Public review period

�Finalize Master Plan Study Report (Spring/Summer ’08)

�Proceed to implement preferred alternative solutions (Summer ’08)

Page 26: City of Guelph Water - Wastewater Servicing Master … of Guelph Water - Wastewater Servicing Master ... Introduction to the Water Wastewater Servicing Master Plan ... system water

Water –

Wastewater

Servicing

Master Plan

Public Meeting

#2

April 8 th, 2008

26

Questions & Discussion