CITY OF EASTVALE CITY COUNCIL STAFF REPORT Return to Agenda {00009956.DOCX V1} ITEM 8.2 DATE: SEPTEMBER 13, 2017 TO: HONORABLE MAYOR AND COUNCIL MEMBERS FROM: CRAIG BRADSHAW, SUPERVISING ENGINEER DAHI KIM, ASSOCIATE ENGINEER SUBJECT: CONTRACT AWARD FOR 2017 RESIDENTIAL SLURRY SEAL PROJECT AND APPROPRIATION OF SENATE BILL 1 FUNDS TO FY 17/18 BUDGET RECOMMENDATION: (1) APPROVE A CONTRACT WITH PAVEMENT COATINGS CO., THE LOWEST RESPONSIBLE BIDDER, IN ACCORDANCE WITH UNIT BID PRICES IN THE ESTIMATED AMOUNT OF $1,123,123, PLUS 10% CONTINGENCY OF $112,312.30 FOR THE 2017 RESIDENTIAL SLURRY SEAL PROJECT, PROJECT NUMBER 94001 (2) ADOPT RESOLUTION NO. 17-XX AFFIRMING THE FISCAL YEAR 2017-2018 BUDGET FOR THE USE OF FUNDS PROVIDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB 1) (3) APPROVE A BUDGET AMENDMENT TO APPROPRIATE $364,238 OF SENATE BILL 1 FUNDS TO 2017 SLURRY SEAL PROJECT (4) AUTHORIZE THE CITY MANAGER TO EXECUTE THE NECESSARY DOCUMENTS BACKGROUND The 2017 Residential Slurry Seal Project is an annual program to treat pavement on various residential streets throughout the City with slurry seal (See Attachment #1 for the street locations). These locations were selected as part of the City’s Pavement Management System and subsequent 2 year work plan. The scope of work includes public notification, pavement preparation, crack sealing, areas of remove/replace asphalt, traffic striping and other related work. DISCUSSION Bids were advertised on the City’s website, QuestCDN.Com, bid boards and through emails.

Upload: others

Post on 13-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CITY OF EASTVALE ITEM 8.2 CITY COUNCIL STAFF REPORT …dahi kim, associate engineer . subject: contract award for residential slurry seal 2017 project and appropriation of senate bill

CITY OF EASTVALE CITY COUNCIL STAFF REPORT

Return to Agenda {00009956.DOCX V1}

ITEM 8.2

DATE: SEPTEMBER 13, 2017 TO: HONORABLE MAYOR AND COUNCIL MEMBERS FROM: CRAIG BRADSHAW, SUPERVISING ENGINEER DAHI KIM, ASSOCIATE ENGINEER SUBJECT: CONTRACT AWARD FOR 2017 RESIDENTIAL SLURRY SEAL

PROJECT AND APPROPRIATION OF SENATE BILL 1 FUNDS TO FY 17/18 BUDGET

RECOMMENDATION:

(1) APPROVE A CONTRACT WITH PAVEMENT COATINGS CO., THE LOWEST RESPONSIBLE BIDDER, IN ACCORDANCE WITH UNIT BID PRICES IN THE ESTIMATED AMOUNT OF $1,123,123, PLUS 10% CONTINGENCY OF $112,312.30 FOR THE 2017 RESIDENTIAL SLURRY SEAL PROJECT, PROJECT NUMBER 94001

(2) ADOPT RESOLUTION NO. 17-XX AFFIRMING THE FISCAL YEAR 2017-2018 BUDGET FOR THE USE OF FUNDS PROVIDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB 1)

(3) APPROVE A BUDGET AMENDMENT TO APPROPRIATE $364,238 OF SENATE BILL 1 FUNDS TO 2017 SLURRY SEAL PROJECT

(4) AUTHORIZE THE CITY MANAGER TO EXECUTE THE NECESSARY DOCUMENTS

BACKGROUND The 2017 Residential Slurry Seal Project is an annual program to treat pavement on various residential streets throughout the City with slurry seal (See Attachment #1 for the street locations). These locations were selected as part of the City’s Pavement Management System and subsequent 2 year work plan. The scope of work includes public notification, pavement preparation, crack sealing, areas of remove/replace asphalt, traffic striping and other related work. DISCUSSION Bids were advertised on the City’s website, QuestCDN.Com, bid boards and through emails.

Page 2: CITY OF EASTVALE ITEM 8.2 CITY COUNCIL STAFF REPORT …dahi kim, associate engineer . subject: contract award for residential slurry seal 2017 project and appropriation of senate bill

CITY OF EASTVALE CITY COUNCIL STAFF REPORT

Return to Agenda {00009956.DOCX V1}

ITEM 8.2

Bids were opened on August 30, 2017 and bid results are as follows: Prime Contractors requesting bidding documents:

3

Total Bids received: 3 Total Non-Responsive Bids received: 0 Bid Results Summary:

NAME OF BIDDER CITY BID AMOUNT

Pavement Coatings Co. Mira Loma $ 1,123,123.00 American Asphalt South, Inc. Fontana $ 1,137,128.60 All American Asphalt Corona $ 1,199,639.96

The Engineer’s estimate was $1,219,202.70. A total of three responsive bids were received. The lowest bid was submitted by Pavement Coatings Co. in the amount of $1,123,123.00. Pavement Coatings Co. holds a valid Class A and C32 General Contractor’s license in the State of California with no enforcement actions listed and has good references; therefore, Pavement Coatings Co. qualifies as the lowest responsible bidder as required under state law.

Schedule:

The project allows for a total of 55 working days. The anticipated schedule is as follows:

Award Contract: September 13, 2017 Notice to Proceed: October 2, 2017 Project Completion: December 15, 2017 In accordance with the California Environmental Quality Act, the proposed project is exempt from future review. A Notice of Exemption (NOE) was filed for the project. On April 28, 2017 the Governor signed Senate Bill (SB) 1, which is known as the Road Repair and Accountability Act of 2017, to address basic road maintenance, rehabilitation and critical safety needs on both the state highway and local streets and road system. In order to receive an apportionment of the funds, cities are required to submit a list of project(s) proposed to be funded by SB1, and the project(s) must be included in a city budget that is adopted by the city council at a regular public meeting. The revenue amount for FY 17/18 for Eastvale is estimated to be $368,238. The apportionment is estimated to begin in mid-January, 2018.

Page 3: CITY OF EASTVALE ITEM 8.2 CITY COUNCIL STAFF REPORT …dahi kim, associate engineer . subject: contract award for residential slurry seal 2017 project and appropriation of senate bill

CITY OF EASTVALE CITY COUNCIL STAFF REPORT

Return to Agenda {00009956.DOCX V1}

ITEM 8.2

This fund is eligible to be used on projects that include, but are not limited to, the following:

• Road Maintenance and Rehabilitation • Safety Projects • Railroad Grade Separations • Complete Streets Components • Traffic Control Devices

Slurry seal operation is considered as road maintenance therefore is eligible to be funded by SB1. The City Council is recommended to approve budget amendment to appropriate $368,238 of SB1 funds to the 2017 Residential Slurry Seal Project. FISCAL IMPACT The 2017 Residential Slurry Seal project is part of the 2017/18 Capital Improvement Program Budget. There is currently $500,000 budgeted in FY 2017/18 budget under Measure A and $1,125,000 of Continuing Appropriations are available for the project in Measure A. If the budget amendment recommendation is approved, $368,238 of SB1 funds will be used for the project, and current available budget in amount of $1,625,000.00 in Measure A will be decreased to $1,260,762.00. There are sufficient amount of funds budgeted to complete the project, and any remaining funds within Measure A will be appropriated to future Slurry Seal projects. STRATEGIC PLAN IMPACT Objective 4.5 – Improve traffic circulation through street maintenance. ATTACHMENT(S)

1. Project Location Map 2. Contract Agreement 3. Budget Amendment Form 4. Resolution Affirming FY17/18 Budget for the use of SB 1 funds

Prepared by: Craig Bradshaw, Supervising Engineer/ Dahi Kim, Associate Engineer Reviewed by: Joe Indrawan, City Engineer Reviewed by: John Cavanaugh, City Attorney Reviewed by: Michele Nissen, City Manager

Page 4: CITY OF EASTVALE ITEM 8.2 CITY COUNCIL STAFF REPORT …dahi kim, associate engineer . subject: contract award for residential slurry seal 2017 project and appropriation of senate bill

E a s t v a l e C i t y L i m i t

E a s t va l e

C i t yL i m

i t

N o r c oC i t y

L i mi t

AG

BC

H

I

JK

L

D

E

N

M

F

LAKE NORCONIAN

SWAN LAKE

BELLEGRAVE AVE

HAMN

ER AV

E

68TH ST

65TH ST

ARCH

IBAL

D AV

E

SUMN

ER AV

E

HARR

ISON

AVE

CITRUS ST

SCHLEISMAN RD

NORCO DR

SCHO

LAR

WAY

CHANDLER ST

CORY

DON AVE

PAT S

RANC

H RDBARO

N DR

RIVER RD

SCHLEISMAN RD

15

15

AREA DSa

ntaAn

a River

Cuca

mong

a Cree

k

Map By: Interwest Consulting Group's GIS Solution Team | Path: G:\PROJECTS\EASTVALE\ROADWAY_MAINTENANCE\PAVEMENT_ASSESSMENT\Slurry_Seal_2017-2018_11x17_MH.mxd | Date: 8/8/2017

RESIDENTIAL SLURRY SEAL PROJECT 2017LOCATION OF PROJECT IMPROVEMENTS

NOTE: REFER TO CONTRACT BID DOCUMENTS FOR EXACT LOCATION AND WORK

0 0.5 10.25

Miles

STREETS TO BE SLURRY SEALED

ADDENDUM #2 - AUGUST 22, 2017 2017 Residential Slurry Seal Project

Page 7 of 19

Dkim
Typewritten Text
Attachment 1
Dkim
Typewritten Text
Dkim
Typewritten Text
Dkim
Typewritten Text
Dkim
Typewritten Text
Dkim
Typewritten Text
Page 5: CITY OF EASTVALE ITEM 8.2 CITY COUNCIL STAFF REPORT …dahi kim, associate engineer . subject: contract award for residential slurry seal 2017 project and appropriation of senate bill

Attachment 4

{00009850.DOCX V1}

RESOLUTION NO. 17-XX

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF EASTVALE, CALIFORNIA, AFFIRMING THE FISCAL YEAR 2017- 2018 BUDGET FOR THE USE OF FUNDS PROVIDED BY THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB 1)

WHEREAS, the Governor of California on April 28, 2017 signed Senate Bill 1, the Road Repair and Accountability Act of 2017, also known as the Road Maintenance and Rehabilitation Account (RMRA), to address basic road maintenance, rehabilitation and critical safety needs on highways and local streets, which is funded through a per gallon fuel tax and vehicle registration fees; and

WHEREAS, pursuant to Street and Highways Code (SHC) Section 2034, each

eligible city or county prior to receiving an apportionment of RMRA funds is required to have identifiable capital projects in a budget adopted or amended by the governing body that monies provided by RMRA will fund; and

WHEREAS, pursuant to SHC Section 2030, RMRA funds are to be prioritized for

expenditure on basic road maintenance and rehabilitation projects, and on critical safety projects, railroad grade separations, complete streets components including active transportation purposes, pedestrian and bicycle safety projects, transit facilities, and drainage and storm water recapture projects in conjunction with any other allowable project, and traffic control devices; and

WHEREAS, pursuant to SHC Section 2037, a city or county may spend its

apportionment of RMRA funds on transportation priorities other than those outlined in SHC Section 2030, if the city or county’s average Pavement Condition Index (PCI) meets or exceeds 80; and

WHEREAS, pursuant to SHC Section 2036, a city or county may spend its

apportionment of RMRA funds for general fund transportation expenses in excess of the maintenance of effort as calculated in the Street Report as the average general fund expenditures for street, road and highway purposes in Fiscal Years 2009-2010, 2010- 2011 and 2011-2012; and

WHEREAS, the City of Eastvale is projected to receive $364,238 in RMRA funds

in Fiscal Year 2017-2018.

NOW, THEREFORE, the City Council of the City of Eastvale does hereby resolve, determine, and order as follows:

SECTION 1. The City of Eastvale has identified the following RMRA capital

project to the adopted budget for Fiscal Year 2017-2018: 2017 Residential Slurry Seal Project

Page 6: CITY OF EASTVALE ITEM 8.2 CITY COUNCIL STAFF REPORT …dahi kim, associate engineer . subject: contract award for residential slurry seal 2017 project and appropriation of senate bill

SECTION 2. The City of Eastvale will submit to the California Transportation Commission for their review a list of proposed projects to be funded by RMRA by October 16, 2017, in the format prescribed.

SECTION 3. The Director of Engineering is hereby authorized to undertake such acts as necessary to carry out this Resolution.

SECTION 4. The City Clerk is directed to certify to the adoption of this Resolution.

PASSED, APPROVED, AND ADOPTED this 13th day of September, 2017.

________________________________

Joe Tessari, Mayor

APPROVED AS TO FORM: ATTEST:

____________________________ ________________________________

John E. Cavanaugh, City Attorney Steven D. Aguilar, Assistant City Clerk