Page 1: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

CITY OF CORNWALL

UPDATE TO VARIOUS INFRASTRUCTURE AND

STIMULUS PROJECTS

Page 2: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Projects

• Waste Water Treatment Plant• New Watermain – Brookdale Avenue• Emergency Medical Services Facility• Multi-Sports Arena• Multi-Purpose Gym• St-Theresa Splash Pad• Ballpark Lighting Reg Campbell Park

Page 3: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Waste Water Treatment Plant

Page 4: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Waste Water Treatment Plant

Page 5: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Waste Water Treatment PlantUpdates to the 2005 EA

• Increase of Average Day flows by 20% (from 54 432 m3/d to 65 318 m3/d) reconfirmed

• Peak Day and Peak Instantaneous flow capacity may be increased from 130 000 m3/d to 160 000 m3/d. This will be reviewed further during design.

• Effluent Objectives and Limits were clarified and approved by the Ministry of the Environment, as summarized below.

• The Opinion of Probable Cost for the project was updated for a total of $64 698 000 plus taxes in two phases (Phase 1 - $60 715 000 and Phase 2 - $3 983 000)

• The use of Biological Aerated Filtration (BAF) and Ultraviolet Irradiation (UV) were reconfirmed as the preferred technologies for secondary treatment and disinfection, respectively.

Page 6: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Waste Water Treatment Plant

Implementation Schedule

• Preliminary Design & Pre-selection of Major Equipment Suppliers March to December, 2010

• Detailed Design & Preparation of Contract Documents January to December,

2011

• Tendering and Contract Award January to April, 2012

• Construction May, 2012 to August 2014

• Start-up of Operations September, 2014

Page 7: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Watermain – Brookdale Avenue

Page 8: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Emergency Medical Services Headquarters Complex

Page 9: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS
Page 10: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Vehicle Area

Technical Support

Public

Administration

Operations

Page 11: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Vehicle Area

• Space for 21 vehicles• Drive through configuration• Clearance for semi-trailer delivery• Enclosed wash bay• Infloor heating• Natural Lighting

Page 12: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Technical Support Area

• Storage and workspace independent of vehicles• Specific contamination space• Delivery direct to stores• Secure zone

Page 13: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Public Area

• Training/meeting room• Audio/video capability• Communications infrastructure• Configurable to multiple use• Secure zone

Page 14: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Administrative Area

• 6 enclosed offices• 3 workstations• 6 seat meeting room• Files/Printers• Secure Zone

Page 15: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Operations Area

• Shared Captain’s Office• Pre-shift Briefing Room• Study/Resource Room• Secure Drug Storage• Lunch Room• Configurable Locker/Change Room• Secure Zone

Page 16: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Exterior

• Drive-in/Drive out• Washboard patch on in ramp• Security gate protected• Low maintenance exterior • Full function generator protection• Parking for staff and visitors

Page 17: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Multi-Sports Arena

Page 18: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Multi-Sports Arena

• Three (3) Sequential tenders awarded• Construction underway

-(Site Preparation, Foundations, Steel (March-April 2010)

• Major general contractor tender open February 10th, 2010• That will determine the total expected construction costs• Good success with local bidders• Premier facility for Eastern Ontario and will serve Cornwall

and area for fifty (50) years• This facility replaces aged existing facilities

Page 19: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Gym and Multi-Purpose Room

Page 20: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Gym and Multi-Purpose Room

• Design process proceeding• Front location preferred and practical • Rear location is problematic• Front location is operationally superior and provides for only one

construction area (Gym & Multi-Purpose Room)• Gym design is single High School dimensioned

(Basketball, Badminton, Volleyball, Floor use etc.)• Challenges with exiting from Complex in any location = cost • Budget may be a challenge

(Total Approved, Design and Construct $2.5 Million)• Consultants to develop design further to provide class “D” cost estimate

Page 21: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Gym and Multi-Purpose Room

• Design process proceeding• Front location preferred and practical • Rear location is problematic• Front location is operationally superior and provides for only one

construction area (Gym & Multi-Purpose Room)• Gym design is single High School dimensioned

(Basketball, Badminton, Volleyball, Floor use etc.)• Challenges with exiting from Complex in any location = cost • Budget may be a challenge

(Total Approved, Design and Construct $2.1 Million)• Consultants to develop design further to provide class “D” cost estimate

Page 22: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Gym and Multi-Purpose Room

Page 23: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Gym and Multi-Purpose Room

Page 24: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Gym and Multi-Purpose Room

Page 25: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

St.-Theresa Splash Pad

• Design proceeding• Equipment / Spray features chosen (Pirate Theme)• Tender late winter / Early spring 2010• Spring construction, Demolition,

Pool building modifications, Splash Pad• Open by summer holiday / Pool season 2010• Budget appears to be on target

Page 26: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

St.-Theresa Splash Pad

THIRTEENTH ST W

THIRTEENTH ST W

THIRTEENTH ST W

THIRTEENTH ST W

THIRTEENTH ST W

ANNE ST

ANNE ST

ANNE ST

ANNE ST

ANNE ST

BE

DF

OR

D S

T

BE

DF

OR

D S

T

BE

DF

OR

D S

T

BE

DF

OR

D S

T

BE

DF

OR

D S

T

CH

UR

CH

ILL S

T

CH

UR

CH

ILL S

T

CH

UR

CH

ILL S

T

CH

UR

CH

ILL S

T

CH

UR

CH

ILL S

T

NE

WA

RK

AV

NE

WA

RK

AV

NE

WA

RK

AV

NE

WA

RK

AV

NE

WA

RK

AV

Page 27: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

St.-Theresa Splash Pad

Page 28: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

St.-Theresa Splash Pad

Page 29: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Reg Campbell Park Lighting

• Tender awarded• Some primary cable layout before frost• Balance of construction spring 2010• On budget

HA

MILTO

N C

R

HA

MILTO

N C

R

HA

MILTO

N C

R

HA

MILTO

N C

R

HA

MILTO

N C

R

FRA

SE

R A

V

FRA

SE

R A

V

FRA

SE

R A

V

FRA

SE

R A

V

FRA

SE

R A

V

JAS

E S

T

JAS

E S

T

JAS

E S

T

JAS

E S

T

JAS

E S

T

LEITCH DRLEITCH DRLEITCH DRLEITCH DRLEITCH DR

LYNN ST

LYNN ST

LYNN ST

LYNN ST

LYNN ST

Mc

DO

NE

LL

CR

Mc

DO

NE

LL

CR

Mc

DO

NE

LL

CR

Mc

DO

NE

LL

CR

Mc

DO

NE

LL

CR

Page 30: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Financial Overview

Page 31: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Infrastructure Ontario - Financing

The City has submitted the application for short term and long term borrowing per the report presented to Council on November 23, 2009.

The City has received a verbal confirmation that the loan application should be approved. The City is anticipating the lines of credit will be available in March. Short term financing will operate similar to a line of credit, borrow as the funds are required.

Long term debentures will require Council’s approval (via Bylaw) for the term and interest rate further into project completion.

Interim financing has been arranged with the TD Bank until the financing is available with Infrastructure Ontario.

Page 32: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Interest RatesInterest rates continue to remain stable over the past few

months:

Oct. 16/09 Nov. 17/09 Feb. 5/10

1 month 0.75% 0.75% 0.75%5 Year 3.03% 2.82% 2.66%10 Year 4.02% 3.89% 3.76%15 Year 4.52% 4.43% 4.33%20 Year 4.84% 4.77% 4.69%25 Year 5.04% 4.98% 4.92%30 Year 5.14% 5.09% 5.05%

Source: Infrastructure Ontario www.infrastructureontario.ca

Page 33: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Project Summary

Infrastructure & Stimulus Municipal Funding Total CostFunding

Waste Water Treatment Plant $37,000,000 $18,500,000 $55,500,000Watermain - Brookdale Avenue $1,400,000 $700,000 $2,100,000EMS Headquarters $3,400,000 $1,700,000 $5,100,000Multi-Sports Arena $18,442,930 $13,995,158 $32,438,088Multi-Purpose Room & Gymnasium $1,398,600 $701,400 $2,100,000St. Theresa Splashpad $167,000 $83,250 $250,250Reg Campbell Park - Ball Lighting $149,850 $110,000 $259,850

All Projects $97,748,188

Page 34: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Projects Funded - 2010 Budget

The Municipal contribution for the following projects have been funded in the 2010 Budget submission:

1. New Watermain – Brookdale Avenue is a capital project that was included in the 2010 Water & Sewer Budget.

2. St. Theresa Splash Pad is a capital project that is included in the Parks and Recreation 2010 Budget submission.

3. Reg Campbell Park Lighting is a capital project that is included in the Parks and Recreation 2010 Budget submission.

Page 35: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

Projects Requiring Long Term Financing

1. Waste Water Treatment Plant – The City will require approximately $11,100,000 in long term financing for this project. The annual contributions to reserves of $1,000,000 could be replaced by principal and interest payments to fund this project over a 20 year term.

Reserve Balance - Oct.'09 $3,390,2652010 Contribution $1,000,0002011 Contribution $1,000,0002012 Contribution $1,000,000Projected Reserve - 2013 $6,390,265

City of Cornwall Share $17,500,000Less: Reserve $6,390,265Financing Required $11,109,735

Page 36: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

2. Emergency Medical Services Facility – The City will require approximately $1,700,000 in financing for this project and the payments will be fully funded through lease payments from EMS:

Projects Requiring Long Term Financing con’t

Rate Annual Payments

20 Year Term 4.69% $133,00050% = $66,500

25 Year Term 4.92% $120,00050% = $60,000

30 Year Term 5.05% $111,20050% = $55,600

* Rates effective February 5, 2010

NOTE: The lease payments will be shared

50% with the Ministry of Health and the

remaining would be shared between the City

of Cornwall and the SD&G Counties at the

cost sharing ratio.

Page 37: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

3. Multi-Sports Arena – The City portion of funding is approximately $13,995,158. Fundraising via “3 + 1” Project 2010 has committed to raise $2,000,000. The remaining $11,995,158 will need to be financed via a long term loan.

Projects Requiring Long Term Financing con’t

Rate Annual Payments

20 Year Term 4.69% $950,000

25 Year Term 4.92% $845,000

30 Year Term 5.05% $785,000

* Rates effective February 5, 2010

Annual Principal & Interest Payments

Page 38: CITY OF CORNWALL U PDATE TO VARIOUS INFRASTRUCTURE AND STIMULUS PROJECTS

4. Multi-Purpose Room & Gymnasium - The City portion of this project is approximately $701,400 which could be financed over a 5 or 10 year term:

Projects Requiring Long Term Financing con’t

Rate Annual Payments

5 Year Term 2.66% $152,00010 Year Term 3.76% $85,500

* Rates effective February 5, 2010

Annual Principal & Interest Payments