city of barrie consultation report for infrastructure ... hall/planning-and... · infrastructure...

166
Project No. TP110135 City of Barrie Consultation Report for Infrastructure Master Plans Municipal Class Environmental Assessment

Upload: others

Post on 05-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

Project No. TP110135 Appendix A

City of Barrie Consultation Report for Infrastructure Master Plans Municipal Class Environmental Assessment

danny.stone
Text Box
FINAL
Page 2: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

Consultation Report Updates from November 13, 2013 Version Appendix A, Comments PIC #3 & #4, response to comment 48 (text in red was added): The gravity system south of Mapleview Drive has been extended to the greatest extent possible, based on City of Barrie Design Standards. Land beyond the gravity service area will be outletted to the proposed pumping station. However, upon further reviews there became a need to move the lands to Phase 1 to enable logical development of the Hewitt’s Neighbourhood and the phasing boundary was amended. This does not include the (developers) lands as only the Mapleview Drive frontage is serviceable by gravity. (The developers) engineers should be advised that the phasing line in the Master Plan which is on the west side of (the development) is the phasing line and it is not possible to move. 

Page 3: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page i

EXECUTIVE SUMMARY

This Consultation Report was prepared by AMEC Environment & Infrastructure (AMEC). The summary captures the key discussion points from the Infrastructure Master Plans, Municipal Class Environmental Assessment (Class EA) process, Public Consultation Process and the Public Information Centres (PIC) Nos. 1 to 4. It is not intended as a verbatim transcript of events of comments received. Since the Secondary Plan and Growth Management process for the City of Barrie were held in conjunction with the process, a number of comments received contain issues outside of the Municipal Class EA process, but are addressed herein. If you have any questions or comments regarding the summary please contact:

Mr. Wayne Bando, P. Eng Infrastructure Planning Engineer City of Barrie 70 Collier Street, Box 400 Barrie, Ontario L4M 4T5 Tel: (705) 739-4220 ext. 5153 Fax: (705) 792-4247 Email: [email protected]

Mr. Paul Smeltzer, P. Eng. Consultant Project Manager AMEC Environment & Infrastructure 3215 North Service Road Burlington, Ontario L7N 3G2 Tel: (905) 335-2353 Toll Free: 1-866-751-2353 Fax: (905) 335-1414 Email: [email protected]

Page 4: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page ii

TABLE OF CONTENTS

Page

1.0 THE CITY OF BARRIE INFRASTRUCTURE MASTER PLANS MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT .................................................................... 1

2.0 CLASS ENVIRONMENTAL ASSESSMENT APPROACH ............................................... 3 3.0 SCHEDULE ..................................................................................................................... 7 4.0 PROJECT ORGANIZATION ............................................................................................ 8 5.0 STAKEHOLDER AND AGENCY CONSULTATION ....................................................... 10 6.0 SUMMARY OF FEEDBACK .......................................................................................... 17

List of Tables Table 3.1 Schedule .............................................................................................................. 7 Table 6.1 Summary of Public / Agency Consultation ......................................................... 17

List of Figures Figure 1.1 Key Plan / Study Area .......................................................................................... 2 Figure 2.1 Municipal Class EA Process ................................................................................ 5 Figure 2.2. Master Plan Process within the Municipal Class EA Process ............................... 6 Figure 4.0 Study Organization .............................................................................................. 9

List of Appendices Appendix ‘A’ - Public Consultation Appendix ‘B’ - Agency Consultation

Page 5: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 1

1.0 THE CITY OF BARRIE INFRASTRUCTURE MASTER PLANS MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

City of Barrie has completed infrastructure Master Plans for newly annexed lands, south of the City’s 2010 boundary. The Master Plans Include:

• Water Supply; • Water Distribution and Storage; • Wastewater Treatment; • Wastewater Collection; • Stormwater Management and Drainage; and • Multi Modal Active Transportation.

The Barrie-Innisfil Boundary Adjustment Act, 2009 (Bill 196) extended the southern boundary of Barrie to include 2,293 hectares (approximately 5,700 acres) of land previously in the Town of Innisfil, effective January 1, 2010. In addition, the City has prepared a Growth Management Strategy to determine how the requirements of the Provincial Growth Plan (PGP) for the Greater Golden Horseshoe (2006) will be met, addressing the PGP population and employment forecasts for Barrie in 2031 of 210,000 and 101,000, respectively. In co-ordination with the Secondary Plan process, Infrastructure Master Plans have been completed for the recently annexed lands (formerly part of the Town of Innisfil) as well as infill and intensification areas within the former City boundaries. Master Plans are long range plans which integrate infrastructure requirements for existing and future land use with environmental assessment planning principles. The Master Plans provide the framework for future project specific studies, works and developments benefitting the City of Barrie. The works are distributed geographically throughout the Annexed Lands and former City of Barrie (ref. to Figure 1.1: Key Plan / Study Area) and implemented over an extended phased period of time. The Master Plans identify and evaluate the infrastructure requirements of the Annexed Lands and former City of Barrie for the full build-out. The servicing of the three (3) Land Use Options for the Annexed Lands to build-out was developed and presented at Public Information Centre #2. The Master Plans address the requirements of Phase 1 & 2 of the Municipal Class EA process and will identify a list of recommended projects (expansion / upgrades to existing and construction of new infrastructure) necessary to meet the growing demands on specific systems. Each project identified has been categorized as a Schedule A, A+, B or C activity in accordance with Municipal Class EA process (ref. Figure 1.2). As part of the Class EA process, four (4) Public Information Centres were held in order to provide stakeholders an opportunity to examine and provide comments regarding the Master Plan for the City of Barrie Annexed Lands. Comments provided have assisted the Project Team in the determination of the Preferred Options.

Page 6: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 2

Figure 1.1. Key Plan / Study Area

Page 7: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 3

2.0 CLASS ENVIRONMENTAL ASSESSMENT APPROACH The Ontario Environmental Assessment Act (EA Act) identifies two types of environmental assessment and approval processes: i. Individual EAs are large complex projects with extensive potential for environmental

impacts, for which a Terms of Reference and an individual environmental assessment are carried out and submitted to the Ministry of the Environment for approval.

ii. Class EAs including projects which are approved subject to compliance with an approved Class EA process. Projects proceed provided that this approval process is followed and the proponent has complied with the EA Act requirements.

Class Environmental Assessment Process The Class Environmental Assessment process is a mechanism by which planning and approving of municipal servicing is provided in an efficient, timely, economical and environmentally responsible manner. It represents a consistent, streamlined and easily understood process for planning and implementing municipal infrastructure projects. Under the Ontario Environmental Assessment Act, projects are classified as approved, subject to screening, subject to a Class Environmental Assessment (Class EA), or subject to a full Environmental Assessment. This project is classified as being subject to the Class EA process and being conducted according to the requirements outlined in the Municipal Engineers Association document titled Municipal Class Environmental Assessment (October 2000, as amended 2011). Consistent with the Municipal Class EA, the study approach has been designed to meet the following objectives: i. Protection of the environment, including natural, social and economic components of the

environment. ii. Participation of a broad range of stakeholders in the study process to allow for sharing of

ideas, education, testing of creative solutions and developing alternatives. iii. Documentation of the study process in compliance with all phases of the Municipal Class

EA process. The Class EA process classifies projects according to their level of complexity and potential environmental impacts (ref. Figure 2.1). These are termed “Schedules” and are summarized below: • Schedule A and A+ projects involve minor modifications to existing facilities.

Environmental effects of these projects are generally small; therefore, the projects are considered pre-approved.

Page 8: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 4

• Schedule B includes improvements and minor expansion to existing facilities. There is a potential for some adverse environmental impacts and, therefore, the proponent is required to proceed through a screening process, including consultation with those affected. Schedule A projects are required to proceed through Phases 1, 2 and 5 of the Municipal Class EA process.

• Schedule C includes the construction of new facilities and major expansion of existing facilities. These projects proceed through the environmental assessment planning process outlined in the Municipal Class EA document and are required to fulfill the requirements of all five phases of the Municipal Class EA process.

Master Plans are one form of Class EA project representing long range plans which integrate infrastructure requirements for existing and future land use with environmental assessment planning principles. The following characteristics distinguish the Master Planning Process from other processes:

a) The scope of Master Plans is broad and usually includes an analysis of the system in order to outline a framework for future works and developments. Master Plans are not typically undertaken to address a site-specific issue.

b) Master Plans typically recommend a set of works which are distributed

geographically throughout the study area and which are to be implemented over an extended period of time. Master Plans provide the context for the implementation of the specific projects which make up the plan and satisfy, as a minimum, Phases 1 and 2 of the Class EA process (ref. Figure 2.2). Notwithstanding that these works may be implemented as separate projects, collectively they are part of a larger management system. Master Plan studies in essence conclude with a set of preferred alternatives and, therefore, by their nature, Master Plans will limit the scope of alternatives which can be considered at the implementation stage.

Page 9: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 5

Figure 2.1. Municipal Class EA Process

Page 10: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 6

Figure 2.2. Master Plan Process within the Municipal Class EA Process

The City of Barrie Master Plan Approach # 2 involved the preparation of a Master Plan document at the conclusion of Phases 1 and 2 of the Municipal Class EA process where the level of investigation, consultation and documentation are sufficient to fulfil the requirements for Schedule B projects. Accordingly, the final public notice for the Master Plan will become the Notice of Completion for the Schedule B projects within it. Schedule C projects, however, will need to fulfil Phases 3 and 4 prior to filing an ESR(s) for public review. The Master Plan would provide the basis for future investigations for the specific Schedule C projects identified within it. The Municipal Class EA requires notification of, and consultation with, relevant stakeholders. The Project Team ensured that stakeholders were notified early in the planning process, and throughout the study. Figure 2.2: Master Plan Process within the Municipal Class EA Process illustrates a simplified version of the Municipal Class EA process for this Master Plan.

A Notice of Completion will be submitted for Schedule A, A+ and B Projects of the Master Plan

Page 11: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 7

3.0 SCHEDULE The study was initiated in December 2012, with public and stakeholder consultation commencing in January 2011. Project milestones follow in the table below:

Table 3.1. Schedule Date

Start up meeting December-01-10 Meeting with Lake Simcoe Region Conservation Authority January-17-11 Notice of Commencement mailed to stakeholders, agencies and municipal staff, and information about the Study was published on the City website. January-28-11 Notice of Commencement published in the Barrie Examiner January-28 & 29-11 Technical Advisory Committee Meeting March-04-11 Technical Advisory Committee Meeting March-04-11 Williams Treaty Bands First Nations meeting April-07-11 Chippewa’s of Georgian Island First Nations meeting April-08-11 Ministry of Natural Resources, Natural Heritage System meeting April-08-11 Natural Environment Work Plan Review with Lake Simcoe Region, Conservation Authority Nottawasaga Valley Conservation Authority and Ministry of Natural Resources April-15-11 Meeting with Lake Simcoe Region Conservation Authority and Nottawasaga Valley Conservation Authority April-18-11 Donnelly Law / Huron – Wendat First Nation meeting April-20-11 Metis Nation of Ontario meeting May-16-11 Technical Sub Committee Meeting June-21-11 Technical Sub Committee Meeting July-18-11 Technical Advisory Committee Meeting July-27-11 Public Information Centre # 1 held at MacLaren Art Centre, 37 Mulcaster Street, Barrie, from 4:00 p.m. to 7:00 p.m. September-13-11 Technical Sub Committee Meeting October-03-11 Technical Advisory Committee Meeting October-07-11 Technical Advisory Committee Meeting November-30-11 Ministry of Natural Resources & Ministry of Municipal Affairs & Housing. meeting March-02-12 Notice of Public Information Centre # 2 advertised in newspaper (Barrie Examiner) and mailed to stakeholders, agencies and municipal staff, and information about the PIC was published on the City website. April-17 & 18-12 Public Information Centre # 2 held at Liberty North, 100 Caplan Avenue, Barrie, from 6:00 p.m. to 9:30 p.m. April-25-12 Notice of Public Information Centre # 3 advertised in newspaper (Barrie Examiner) and mailed to stakeholders, agencies and municipal staff, and information about the PIC was published on the City website. February-20 & 27-13 Public Information Centre # 3 held at Liberty North, 100 Caplan Avenue, Barrie, from 6:00 p.m. to 9:30 p.m. March-06-13 Notice of Public Information Centre # 4 advertised in newspaper (Barrie Examiner) and mailed to stakeholders, agencies and municipal staff, and information about the PIC was published on the City website. March-15 & 18 Public Information Centre # 4 held at City Hall, 70 Collier Street, Barrie, from 5:00 p.m. to 9:00 p.m. April-03-13

Page 12: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 8

4.0 PROJECT ORGANIZATION The Project Team consisted of staff from the following organizations: Proponent: City of Barrie

Eric Hodgins, Project Coordinator and Growth Management Coordinator Wayne Bando, Project Coordinator and Infrastructure Planning Engineer

Prime Consultants: Macaulay Shiomi Howson Ltd. Elizabeth Howson, Principal AMEC Environment & Infrastructure Ron Scheckenberger, Principal Consultant, Project Manager Paul Smeltzer, Principal Consultant, Project Manager Genivar Michelle Albert, Director, Water and Wastewater Operations Erick Peissel, Vice President Transportation - Ontario

Sub Consultants: Parrish Geomorphic John Parish Blackport & Associates Bill Blackport XCG Consultants Harold Chard Brook McIlroy Inc. Anne McIlroy Watson & Associates Economists Ltd. Jamie Cook Natural Resource Solutions Inc. David Stephenson Dougan & Associates Kristina Shaw-Lukavsky Unterman McPhail Richard Unterman Archaeological Services Inc. Zeeshan Abedin DBH Soil Services Inc. Dave Hodgson GLPi Glenn Pothier Macaulay Shiomi Howson Ltd. Dave Yauk W. Scott Morgan and Associates Ltd. Scott Morgan Cosburn Giberson Landscape Architects Stephanie Fraser

Page 13: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 9

The following Study Organization Figure 4.1: illustrates the project team / stakeholder / agency and proponent interaction for this study. The development of this Master Plan has been directed and reviewed by a Project Team, which has been comprised of representatives from various departments at the City of Barrie, project team, stakeholders, and agencies. A total of 5 meetings have been convened with this Project Team during the course of this study regarding the review and comment of the analyses completed for this study.

Figure 4.1. Study Organization

ProponentCity of Barrie

Technical Advisors Simcoe CountyLSRCA/NVCA

MNR, MOE, MTCLUtilities

Public

First NationsExternal Agencies

ProvincialFederal

Public Authorities

StakeholdersProperty

Owners/UsersResidents

Business Community

Page 14: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 10

5.0 STAKEHOLDER AND AGENCY CONSULTATION Phase 1 Consultation A Notice of Commencement, detailing the study area, summarizing the objectives of the study and requesting comments, was submitted to relevant stakeholders, property owners and organizations by mail January 17, 2011. In addition, a Notice of Commencement was published by the City of Barrie in the Barrie Examiner newspaper January 28 & 29, 2011. A Technical Advisory Committee (TAC) was formed in March 2011, at the study onset to ensure the goals and objectives of the project were being met at all stages of the project and coordination opportunities were considered. The TAC included representation from the Lake Simcoe Region Conservation Authority, Nottawasaga Valley Conservation Authority, Ministry of Municipal Affairs and Housing, Ministry of Transportation, Ministry of Natural Resources, Ministry of Environment, Ministry of Tourism, Culture and Sport, Simcoe County District School Board, Simcoe Muskoka Catholic District School Board, Metrus and the East Moratorium Landowners Group. The TAC provided valuable input to the Master Plan during meetings held on four (4) separate occasions on March 4, July 27, October 7 and November 30, 2011. City of Barrie, agencies and stakeholders who actively participated in consultation included the following:

City of Barrie Town of Innisfil Township of Essa Ministry of Municipal Affairs and Housing Ministry of Transportation Ministry of Natural Resources Ministry of Environment Ministry of Tourism and Culture Lake Simcoe Region Conservation Authority Nottawasaga Valley Conservation Authority Simcoe County District School Board Simcoe Muskoka Catholic District School Board Metrus East Moratorium Landowners Group Allendale Community Development Corporation

Agency Consultation Through early consultation and discussion with the above Agencies, issues and comments relating to the Master Plans were identified and addressed through meetings and correspondence with between the City of Barrie, the Project Team and the regulatory Agencies (ref. Appendix ‘B’).

Page 15: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 11

Website and Social Media Since 2011 the project website (www.barrie.ca/City%20Hall/growth/Pages/default.aspx) has been well used by the public. The Master Plan web pages were visited considerably throughout the duration of the project. The project website is promoted as the main source for all project information. For the works associated with this Master Plan the web pages provide:

• Schedule of meetings and events; • Public contact information; • Upcoming meetings; • An online comment link as part of the public feedback; • Public Information Centre notices; • Public Information Centre presentation materials and display boards; • Reports; • Issues in your neighbourhood, and • Terms and definitions.

All communications with stakeholders and the public have included the website link in order to encourage use of the website. An online comment link to provide comments was available on the project website. Public Information Centre # 1 As a discretionary option of the Municipal Class Environmental Assessment, Public Information Centre # 1 (PIC) on September 13, 2011, was held at MacLaren Art Centre, 37 Mulcaster Street, from 4:00 p.m. to 7:00 p.m. The Public Information Centre Notice was advertised in newspaper (Barrie Examiner) and mailed to stakeholders, agencies and municipal staff on the project contact list, August 25 & 27 2011, and information about the Public Information Centre was published on the City website. The Public Information Centre was attended by individuals representing members of the public, Town of Innisfil and Simcoe County, engineering firms and the development industry all signing the register. The event was organized as an open house and presentation led by Project Team members. Participants had the opportunity to review the display boards prepared to summarize the project’s objectives, obtain information, and discuss and provide comments on topics of interest related to the design and planning elements of the project. The purpose of the Public Information Centre was to obtain early feedback from stakeholders and the public about the various elements of the Infrastructure Master Plans. The Public Information Centre also gave the public an opportunity to inform project team members about valuable local knowledge that may influence the engineering design. The presentation and boards were broken down by topic area, are outlined below and available in Appendix ‘A’.

Page 16: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 12

For these events topics included:

• Purpose and Objectives; • Municipal Class Environmental Assessment process; • Existing Conditions (Background Information and Land Use); • Problem/Opportunity Statement; • Need and Justification; • Water Storage and Distribution objectives; • Water Supply Objectives; • Wastewater Collection Objectives; • Wastewater Treatment Objectives; • Surface Water Hydrology Objectives; • Surface Water Hydraulics Objectives; • Stormwater Management Objectives; • Hydrogeology Objectives; • Hydrological System Framework; • Transportation Objectives and Traffic Study Overview; • Natural Heritage Objectives and Environmental Inventories; • Cultural and Built Heritage Objectives; • Archaeological and Aboriginal Engagement; • Evaluation Criteria; • Next steps, and • Various drawings were also presented including Existing Conditions and Preliminary

Layout drawings. The Public Information Centre was relatively well attended by members of the public, stakeholders, media and agency members with 120 attendees signing the register. Refer to Appendix ‘A’ for the sign in sheets. There were approximately twenty (20) project team members in attendance at the event representing the City of Barrie and the city’s project consultants. Responses from the Notice of Commencement and Public Information Centre # 1 were received from several stakeholders and agencies. Additionally, consultation meetings were held with agency representatives from the Lake Simcoe Region Conservation Authority, Nottawasaga Valley Conservation Authority. Phase 2 Consultation Consultation with agencies and the public during Phase 2 of the Class EA process included meetings with stakeholders and agencies, a Notice of Public Information Centre # 2, 3 and 4, hosting of Public Information Centre # 2, 3 and 4 and a Notice of Completion.

Page 17: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 13

The Technical Advisory Committee provided further input to the Master Plan during a meeting held on January 20, 2011. To ensure that members of the public and stakeholders were given adequate notice of Public Information Centre # 2, an advertised notice was placed in the community newspaper; the Barrie Examiner on April 17 and 18, 2012 prior to the event. A total of 422 notification letters and 28 emails were sent to public, stakeholders, agencies, media and municipal staff. Also, information regarding Public Information Centre # 2 was advertised on the City of Barrie project website. To view a copy of the event newspaper notification, refer to Appendix 'A' – Public Consultation. Public Information Centre # 2 was held April 25, 2012 at Liberty North, 100 Caplan Avenue, Barrie, from 6:00 p.m. to 9:30 p.m. The purpose of Public Information Centre # 2 was to give an opportunity to provide comments and obtain feedback from stakeholders and the public regarding the various elements of the proposed Land Use Options for the City of Barrie Annexed Lands and the evaluation approach and criteria. Public Information Centre # 2 further provided the public an assurance that their comments will assist the Project Team in the determination of a Preferred Land Use Concept. Once the Preferred Option was identified, a detailed analysis on development requirements was undertaken and the Draft Master Plan prepared. Public Information Centre # 2 also provided an opportunity to obtain feedback on the infrastructure requirements for the Annexed lands and City as a whole. Individuals and parties, that requested to be kept informed of the Class EA process, were notified of the date that the Preferred Land Use concept would be presented to the City of Barrie’s General Committee so that deputations could be coordinated through the City if required. They would also be kept informed of additional meetings held in the fall of 2012. A comment sheet was provided to promote the opportunity of providing input/comments regarding the studies. All comments were requested to be returned by Wednesday, May 9, 2012. A copy of the Public Information Centre notices, letters to stakeholders and agencies, a copy of the presentation, and copies of all comments received and written responses regarding Public Information Centre # 2 are contained in Appendix ‘A’ – Public Consultation. A general summary of Public/Agency comments received through consultation to date is presented in Appendix ‘A’ – Public Consultation. AMEC staff gave a presentation on the preferred set of solutions / recommendations, followed by a question and answer period. Public Information Centre # 2 was well attended by 120 people signing the registry. The display boards and presentation were broken down by topic area, study objectives and key findings. The topics are outlined below and the boards and presentation were available online.

Page 18: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 14

Public Information Centre # 2 topics included:

• Purpose and Objectives; • Municipal Class Environmental Assessment process; • Problem/Opportunity Statement; • Growth Management Strategy - 2031 • Constraints • Land Use Options - Annexed Area Build-out • Water Storage and Distribution; • Water Supply; • Wastewater Collection; • Wastewater Treatment; • Surface Water Hydrology; • Surface Water Hydraulics; • Stormwater Management; • Hydrogeology; • Hydrological System Framework; • Transportation Objectives and Traffic Study Overview, and • Natural Heritage and Environmental Inventories; • Economic / Financial Evaluation • Evaluation Criteria; • Next steps, and • Various drawings were also presented including Existing Conditions and the three (3)

Land Use Option Alternatives drawings. On March 6, 2013, Public Information Centre # 3 was announced via newspaper advertisement in the Barrie Examiner, a notice was mailed to stakeholders, agencies and municipal staff on the project contact list and was published on the City website. To view a copy of the event newspaper notification, refer to Appendix B – Public Consultation. The Public Information Centre was held at Liberty North, 100 Caplan Avenue, Barrie, from 6:00 p.m. to 9:00 p.m. Public Information Centre # 3 was attended by individuals representing members of the public, Town of Innisfil, Simcoe County, engineering firms and the development industry. In total 145 people signed the register. A comment sheet was provided to promote the opportunity of providing input/comments regarding the studies. All comments were requested to be returned by Wednesday, March 13, 2013. AMEC staff gave a presentation on the preferred set of solutions, Master Plan recommendations and the Fiscal Impact Approach followed by a question and answer period. The display boards and presentation were broken down by topic area, study objectives and key findings. The topics are outlined below and the boards and presentation were available online.

Page 19: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 15

Public Information Centre # 3 topics included:

• Introduction • Purpose • Study Area • Class Environmental Assessment Process • Problem/Opportunity • Plan and Study Summaries • Water Storage and Distribution Master Plan

o Detailed Cost Calculation - Annexed Lands - Water • Wastewater Collection Master Plan

o Wastewater Servicing Cost • Biosolids Management • Wastewater Treatment Master Plan • Water Supply Master Plan

o Summary of Required Upgrades and Costs • Drainage & Stormwater Master Plan

o Summary and Cost o Retrofit Assessment

• Transportation Master Plan o Road Diets and Roundabouts o Active Transportation Network o Active Transportation Principles and Vision o Capital Cost Estimate and Breakdown by Phase

• Assessing the Fiscal Impacts of Growth • Next steps, and • How to Provide Your Comments

On March 15, 2013, Public Information Centre #4 was announced via newspaper advertisement in the Barrie Examiner; a notice and comment sheet was mailed to stakeholders, agencies and municipal staff on the project contact list and was published on the City website. To view a copy of the event newspaper notification, refer to Appendix B – Public Consultation. The Public Information Centre was held April 3, 2013 at City Hall, 70 Collier Street, Barrie, from 5:00 p.m. to 9:00 p.m. Public Information Centre # 4 was attended by individuals representing members of the public, Simcoe Muskoka Catholic District School Board, engineering firms and the development industry. In total 59 people signed the register. A comment sheet was provided to promote the opportunity of providing input/comments regarding the studies. All comments were requested to be returned by Wednesday, April 17, 2013 AMEC and Genivar staff gave presentations on the preferred set of solutions and Master Plan recommendations followed by a question and answer period. The display boards and presentation were broken down by topic area, study objectives and key findings. The topics are outlined below and the boards and presentation were available online.

Page 20: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 16

Public Information Centre # 4 topics included:

• Introduction • Class Environmental Assessment Process • Study Area • Water Storage and Distribution Master Plan • Wastewater Collection • Stormwater Management Retrofit Assessment • Drainage & Stormwater Master Plan • Stormwater Management Retrofit Assessment • Recommended Infrastructure Improvements • Next steps, and • How to Provide Your Comments

Page 21: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 17

6.0 SUMMARY OF FEEDBACK Legislated and additional opportunities were provided to the public for additional comments and feedback regarding the study by providing extra Public Information Centres held at the beginning and at the end of the study. A copy of the Public Information Centre notices and all the comments received is provided in Appendix ‘A’. Table 6.2 is a summary of the comments received through public and agency consultation.

Table 6.1. Summary of Public / Agency Consultation

Comment / Question Received from Stakeholders Response / Commitments

Need to develop Complete Communities

The preferred design has been developed to provide for reduced congestion for present and future (2027) traffic volume conditions.

Accommodate Cyclists and Pedestrians

Both a multi-use path and a sidewalk will be provided for the full length. A multi use path system is preferred as it is most appropriate for the anticipated usage, and consumes less space.

Will City growth and stormwater quality and quantity be incorporated into Stormwater Management designs?

Growth has been allocated based on Provincial Policy. The Study shall conform and with all applicable legislation including the Lake Simcoe Protection Plan.

How will this project affect the water table?

Groundwater and source water protection is an important consideration in the development of the lands. The Study Team includes a hydrogeologist.

Will there be any new Recreational Facilities included in any of the plans?

The City of Barrie has identified a need for additional recreational facilities as part of the Annexed Land development.

Concern that wetland and woodland preservation be included in plans.

The Natural Heritage System will provide for the protection of environmentally significant features. This will include wetlands, treed areas, watercourses, pasture, etc.

Address the potential for transportation alternatives.

An Active Transportation Master Plan is proposed for the study. This will include a discussion of all modes of transportation and an evaluation process to determine the preferred strategy.

Disapproval of Annexation and proposed development.

The Annexed Lands have been identified for growth within the Provincial Policy Plan. The City is undertaking the Secondary Plan and the development of Master Servicing Plans in order to meet the needs of the City and the Province.

Page 22: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 18

Will City growth and stormwater quality and quantity be incorporated into Stormwater Management designs?

Growth has been allocated based on Provincial Policy. The Study shall conform and with all applicable legislation including the Lake Simcoe Protection Plan.

How will this project affect the water table?

Groundwater and source water protection is an important consideration in the development of the lands. The Study Team includes a hydrogeologist.

Concern that wetland and woodland preservation was not well represented in planning of any of the Options.

The Provincial Policy Statement, Lake Simcoe Protection Plan and the City’s Official Plan provide for the protection for provincially, regionally and locally significant designated natural areas including wetlands and woodlands. All options provide for the protection of a linked natural heritage system that will protect significant natural areas as well as buffers and linkages.

Potential for conflict between designated development lands and the surrounding natural ecosystem.

The Growth has been allocated based on Provincial Policy. All work shall conform with all applicable MNR and MOE legislation including the Lake Simcoe Protection Plan.

Opposed to Annexation and proposed designated development lands.

The Provincial Growth Plan has identified the City of Barrie as an Urban Growth Centre and allocated significant population and employment growth to the City of Barrie over the next 20 years. The annexation provides an opportunity for the City of Barrie to balance its future growth between residential intensification within ‘Former Barrie’ and greenfield projects in the annexed area. Development of the annexed lands will be phased in accordance with policies included in the Secondary Plan. The City of Barrie is undertaking the Secondary Plan and the development of Master Servicing Plans in order to provide sustainable development for the City of Barrie and the Province.

Concern with storm water runoff as it could impact on designated development lands.

Stormwater management is being investigated in detail and various Best Management Practices are being considered. The Master Plan and Secondary Plan will address concerns with stormwater in detail.

Concerns of conflict with regards to City of Barrie changing Town of Innisfil Official Plan boundaries and Zoning. E.g.: Cement plant beside residential.

The Secondary Plan will address Land Use for the lands annexed from Innisfil. Background documents include the Innisfil Official Plan and Zoning Bylaws. These documents have been and will continue to be considered as part of the project progression. Existing legal uses will be recognized as legal conforming or legal non-conforming uses.

Page 23: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 19

Provincially significant wetlands should have a much higher ‘Ranking’ than those that are locally significant.

The ranking has been selected using input from public consultation, and professional and academic judgment. Locally significant features will be considered and mitigated in the following phases of the EA process.

Various roads, rail, parks, Natural Heritage Systems, School locations and Public Spaces conflict with private development concepts/plans.

The Preferred Concept has been selected. Reflecting a balanced approach to development and the results of the technical background studies.

That the Municipality review, consider and incorporate specific details pertaining to various issues. (Eg: SWM, phasing, trails, boundaries, etc.)

The Municipality and project team have investigated a broad range of solutions based in part on input from members of the public, governing agencies engineering firms and the development industry to ensure issues and concerns have been addressed through the professional experts on the project team.

Efficient and Cost Effective Infrastructure Investment

Total capital costs associated with growth within the former City of Barrie City limits and Annexed Area to 2031 are in accordance with the Preferred Growth Option selected through the Master Plan process.

Master Plan Adoption A Council Meeting in City Hall Council Chambers was to be held to present the Master Plan and provide a presentation outlining the study findings and strategies. Public Review of Master Plan While the Master Plan addresses need and justification at a broad level, more detailed studies for each of the recommended projects included in the Master Plan will be required subsequent to the Municipal Class Environmental Assessment Master Plan Process. All parties having expressed an interest in the project have been notified by letter, regarding the completion of the study and filing of the Master Plan. In addition, a Notice of Completion has been placed in the Barrie Examiner newspaper, and mailed to agencies and stakeholders in accordance with the requirements of the Class EA.

Page 24: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 20

Copies of the Master Plan will be made available for 30 days for public review at the following locations: Clerk’s Desk, City of Barrie City Hall 70 Collier Street, Box 400 Barrie, ON L4M 4T5 Phone: 705-739-4220 Monday to Friday: 8:30 a.m. to 4:00 p.m. Saturday and Sunday: Closed.

Barrie Public Library, Downtown Library 60 Worsley Street Barrie, ON L4M 1L6 Phone: 705-728-1010 Monday to Thursday: 9:30 a.m. to 9:00 p.m. Friday: 9:30 a.m.to 5:00 p.m. Saturday: 9:30 a.m. to 5:00 p.m. Sunday: 12:00 p.m. to 5:00 p.m.

Online: www.barrie.ca/City%20Hall/growth/Pages/default.aspx A review period of not less than thirty (30) days will be provided, during which comments will be received from stakeholders and agencies. Should stakeholders raise issues with Schedule B projects that cannot be resolved through discussion with City and Consultant staff, the stakeholder may request the Minister of Environment to require the City of Barrie to complete an individual EA in accordance with Part II of the EA Act. This is known as a “Part II Order”. However, it is anticipated that all concerns will be resolved through discussion between the City of Brantford and the concerned party. Consultation Conclusion The City of Barrie Infrastructure Master Plans and Municipal Class Environmental Assessment public consultation component has complied with the requirements of the Municipal Class EA for providing the public with opportunities to ask questions of the Project Team, review the preferred design alternatives, and discuss issues related to the project, including traffic and environmental considerations. A copy of the Public Information Centre notices, letters to stakeholders and agencies, copies of the presentations, and copies of all comments received, written responses, a general summary of Public/Agency comments received regarding Public Information Centre # 1 and 4 through consultation to date is presented in Appendix ‘A’ – Public Consultation.

Page 25: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report November 2013

Project No. TP110135 Page 21

Written by: Danny Stone, Environmental Planner

AMEC Environment & Infrastructure

Signature:

Date:

Reviewed by: Paul Smeltzer, Principal Consultant, Project Manager AMEC Environment & Infrastructure

Signature:

Date:

Tuesday, November 12, 2013

Tuesday, November 12, 2013

Page 26: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report

Project No. TP110135 Appendices

Appendix ‘A’

Public Consultation

Page 27: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report

Project No. TP110135 Appendices

Notice of Commencement

Page 28: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report

Project No. TP110135 Appendices

Public Information Centre #1

Page 29: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

1

Sept. 13, 2011

City of BarriePUBLIC INFORMATION CENTRE #1

DISPLAY BOARDS

PUBLIC INFORMATION CENTRE #1Infrastructure Master PlansMunicipal Class Environmental Assessment

1

Sept. 13, 2011

A series of coordinated Planning and Infrastructure Master Plan studies arebeing undertaken by the City of Barrie to address infill / intensification andgreenfield development within the former City boundary and the developmentpotential of annexed lands from the Town of Innisfil, to analyze opportunitiesand constraints, develop and evaluate alternative solutions, recommend the

Introduction

preferred alternative solutions and document the Class EnvironmentalAssessment planning process in a Study Report, as well as to prepare aSecondary Plan for the annexed lands.

The Municipal Class Environmental Assessment (EA) Study was initiated by theCity of Barrie to address existing and anticipated water, wastewater, stormwaterand transportation demands and identify system improvements required tomeet f t re demands

2

meet future demands .

A Notice of Study Commencement was published by the City of Barrie in theBarrie Examiner newspaper on January 28th and 29th, 2011.

Page 30: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

2

Sept. 13, 2011

The purpose and objectives of the Infrastructure Master Plans are to:Identify and develop implementation and support strategies for Drainage andStormwater Management, Wastewater Collection & Treatment, Water Supply &

Master Plan - Purpose and Objectives

g , , pp yDistribution and Transportation Master Plans.Find the balance between protecting the natural environment, enhancingeconomic competitiveness and fostering a healthy, sustainable and completecommunity.Identify and evaluate system(s) requirements of the Study Area for the 2011 –2031 planning horizon to meet the anticipated system needs, and to providepreliminary system servicing alternatives.

3

Sept. 13, 2011Master Plan - Purpose and Objectives (cont’d)

To establish remaining capacities in the existing systems and identify systemimprovements required to meet future demands that:

- Provide a selection of preferred servicing alternatives for the subject lands;- Identify the location, extent and sensitivity of existing natural and social

environments;- Identify impacts to the economic environment;- Develop and establish mitigation measures for any impacts to natural and

social environments;- Develop conceptual designs for development areas; and- Provide Assessments for Cultural Heritage Archaeology Agriculture Natural

4

Provide Assessments for Cultural Heritage, Archaeology, Agriculture, NaturalHeritage and Finance.

Page 31: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

3

Sept. 13, 2011Study Area

5

Sept. 13, 2011Class Environmental Assessment Process

The Master Plan studies are required to satisfy the Class EnvironmentalAssessment (Class EA) process as outlined in the Municipal EngineersAssociation document titled "Municipal Class EnvironmentalAssessment,” (Oct 2000, as amended in 2007).A Master Plan is defined as a Long Range Plan which integratesA Master Plan is defined as a Long Range Plan which integratesinfrastructure requirements for existing and future land use withenvironmental planning principles. These plans examine the wholeinfrastructure system or group of related projects, in order to outline aframework for planning subsequent projects and/or developments. TheMaster Plans will address the requirements of Phase 1 & 2 of theMunicipal Class EA process.Secondary Plan will address the desirability of coordinating the planningprocesses and approvals under the Planning Act and the Environmental

6

processes and approvals under the Planning Act and the EnvironmentalAssessment Act, with the intent and requirements of both Acts being met.This coordination will result in streamlining the planning and approvalsprocess and improved environmental protection.

Page 32: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

4

Sept. 13, 2011Class Environmental Assessment Process (cont’d)

All Master Plans will assess the capacity of the existing systems,quantify the availability of surplus capacity, identify system constraints /issues and identify a list of recommended projects (expansion /upgrades to existing and construction of new infrastructure) necessaryto meet future growth demands on the systems.The Evaluation Criteria will be consistent with the requirements of theClass EA Process and the Planning Act.Each project identified will be categorized as a Schedule A, A+, B or Cactivity in accordance with Municipal Class EA process.As part of the process, public and agency consultation will beundertaken and detailed development and evaluation of alternativestrategies will be examined in accordance with the requirements for

7

strategies will be examined in accordance with the requirements forimplementation.

Sept. 13, 2011

Approved –may proceed

Identify the problem or

opportunity

PHASE 1 PHASE 2

Complete contract drawings and tender

documents

PHASE 3 PHASE 4 PHASE 5PROBLEM OR OPPORTUNITY

ALTERNATIVE SOLUTIONS

ALTERNATIVE DESIGN CONCEPTS FOR

PREFERRED SOLUTIONENVIRONMENTAL STUDY REPORT

IMPLEMENTATION

Identify Alternative Design Concepts

Complete Environmental Study Report (ESR)

Environmental Study

Identify alternative solutions to problem or

opportunity

Class Environmental Assessment Process

Determine applicability of Master Plan

approach

Order granted Order*

Optional formal mediation

Notice of Completion to review

agencies &

Opportunityfor Order*Request to

Ministerwithin

30 days ofnotification

Opportunityfor Order*Request to

Ministerwithin

30 days ofnotification

If no Order*may proceed

Discretionary public consultation to review problem or opportunity

Proceed to construction and operation

Monitor for environmental provisions and commitments

4

5

3

2

Discretionary

Consult review agencies & previously interested &

directly affected public

Detail inventory of natural, social and economic

environment

Indentify impact of alternative designs on

environment, and mitigating measures

Evaluate Alternative Designs: identify

Recommended Design

Select Preferred

Schedule A/A+

Opportunity to request Minister within 30 days of

Notification to request an Order

Notice of Study Completion to review agencies and public

Environmental Study Report (ESR) placed on

public record

Copy of Notice ofCompletion to MOE-EA

branchIdentify impact of Alternative Solutions on

the environment and mitigating measures

Evaluate Alternative Solutions: identify recommended

solutions

Consult review agencies and public re: Problem or

Opportunity and Alternative Solutions

Inventory natural, social, economic

environment

Select Schedule(Appendix 1)

8

Order granted,proceed as

per Minister’sDirection or

abandonproject

Matterreferred

to mediation

Order*deniedwith orwithout

Minister’sconditions

agencies & public

Schedule C

IndividualE.A

Schedule B

Discretionary public

consultationto review

Preferred Design

Review environmental significance & choice

of schedule

Design

Preliminary finalizationof Preferred Design

Indicates possible eventsIndicates mandatory events

Indicates probable events

Mandatory public contactpointsDecision points on choice of scheduleOptional

Part II Order*

Select Preferred Solution

Review and confirm choice of schedule

We are here

Page 33: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

5

Sept. 13, 2011Background Information Reviewed

As part of the study, a desktop review of existing and future conditionswas completed. The objective of the review was to establish the needand justification for improvement and identification of environmentalconstraints and sensitivities through determination of baselineconditionsconditions.

In order to be able to assess the impacts (both positive and negative)related to proposed system improvements, field investigations, inconjunction with the desktop inventory, are being conducted for thefollowing disciplines / services.

Natural HeritageWater Storage and

Biosolids ManagementMulti-modal Active Transportation

9

Water Storage andDistributionWater SupplyWastewater CollectionWastewater Treatment

Multi modal Active TransportationCultural and Built HeritageArchaeologicalAgricultureDrainage & Storm Water Management

Sept. 13, 2011

City of Barrie Official Plan (June 2009)Places to Grow Act, 2005Provincial Policy Statement, 2005Existing Barrie South PCSWMM Model (2009)Barrie South Sanitary Master Plan (2009) (BSSMP)City of Barrie Intensification Study (April 2009)

Background Information Reviewed (cont’d)

City of Barrie Intensification Study (April 2009)Ministry of the Environment Design Guidelines For Sewage Works (2008)City of Barrie Sanitary Sewage Collection System Design Guidelines (Dec.1983)Barrie North and Barrie Industrial Sanitary System PCSWMM ModelsPlaces To Grow – Growth Plan for the Greater Golden Horseshoe, 2006The Lakes Simcoe and Couchiching - Black River SPA Part 1 ProposedAssessment Report (January 2010)Lake Simcoe Protection Plan (June 2009)

10

Lake Simcoe Protection Plan (June 2009)Soils Map of Simcoe County, Soil Survey Report No. 29 (1959)City of Barrie Infiltration and Inflow Study (Final Report September 2009)Water and Wastewater Rate Structure ReviewInformation Provided by Land Owners within the Study Area

Page 34: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

6

Sept. 13, 20112009 Official City Plan

11

Sept. 13, 2011

The Provincial Growth Plan (as amended by proposed amendmentNo.1 which is not yet approved) sets out a population and employmentallocation of 210 000 persons and 101 000 jobs by 2031 for the City of

Land Use Planning Documents

allocation of 210,000 persons and 101,000 jobs by 2031 for the City ofBarrie. The City has initiated a Growth Management Strategy todetermine how the requirements of the Provincial Growth Plan will bemet.

The City of Barrie Official Plan 2009 establishes the overall land useand municipal infrastructure for the area including goals and policies toguide development. The Provincial Policy Statement and the Growth Plan

12

g p ytake precedence in the event of a conflict

Page 35: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

7

Sept. 13, 2011

“To ensure the City of Barrie long‐term servicing needs are met to2031 and beyond, with consideration of projected future demandsresulting from Provincially mandated intensification nodes andcorridors and greenfield areas within the former City boundary

Problem/Opportunity Statement

corridors and greenfield areas within the former City boundaryand, ultimate development within the recently annexed lands, thatare safe; well‐managed; in accordance with governing policiesrelated to sustainability, protection and preservation of naturalheritage and environment; delivered in a fiscally responsiblemanner; in full compliance with applicable legislation, regulationsand guidelines and; integrated with the City’s other infrastructure,planning, and growth management responsibilities.”

13

p g, g g p

Sept. 13, 2011

The analysis of the existing water storage and distribution system anddevelopment of expected future flows based on land use will beconducted utilizing the current 2009 InfoWater model and will include:

A d t t th 2009 d l t i l d th l t th f

Water Storage and Distribution - Objective

An update to the 2009 model to include the last three years of newwatermain distribution system installation data and evaluation of the phasedwater distribution system requirements of the study area for the planningperiod 2011 – 2031 in five year increments (note: current model includesOut to Boundary (OTB) to 2021)

Preliminary servicing alternatives for up to 3 draft Secondary Planningalternatives

The models will be recalibrated and expanded to include intensification

14

The models will be recalibrated and expanded to include intensificationnodes, corridors and greenfield areas identified in the City’s formerboundary and greenfield development areas in the annexed lands.

Page 36: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

8

Sept. 13, 2011

The existing distribution system within the City of Barrie consists ofapproximately 600km of mains ranging from 32mm to 1200mm indiameter.

Th t d li d i ki t t l ti f i t l

Water Storage and Distribution - Existing System

The system delivers drinking water to a population of approximately140,000 residents. Based on the City of Barrie Drinking WaterSystem 2010 Annual Report, the City has 12 wells in production, 2 in-ground reservoirs, 3 water towers and 6 booster pumping stationsfeeding 5 major pressure zones throughout the City. The pressurezones consist of: Zones 1, 2 North (2N), 3 North (3N), 2 South (2S)and 3 South (3S).

15

The primary zones are controlled by elevated tanks and reservoirsand some zones have locally reduced or boosted pressureareas. The approximate ground elevation of the service area rangesfrom 218m to 316m.

Sept. 13, 2011Water Storage and Distribution - System Schematic

16

Page 37: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

9

Sept. 13, 2011

Statistics from the Water Efficiency Master Plan (March 2006):

Since 1995 water use per capita has fallen by 100 L/c/d ;

Water Storage and Distribution -Water Conservation

Water Efficiency Programs account for at least 20% of this reduction;Residential water use in the City of Barrie is low by Canadian standards at 194L/c/d;This is 28% below Ontario’s average of 271 L/c/d;This is 40% below Canada’s average of 326 L/c/d;Savings in deferred capital expenditure are estimated at $4,500,000 for theCorporation based on the reduction in water use; and

17

Residents save over $1,000,000 annually by participating in Water EfficiencyPrograms.

Sept. 13, 2011

The objective of this study is to complete a Water Supply Master Plan toidentify and evaluate the water supply requirements in the City of Barriefor the period 2011 – 2031 in consideration of additional growth in thenewly annexed lands as well as revised population and employmentgrowth forecasts within the existing municipal boundary The study will

Water Supply - Purpose

growth forecasts within the existing municipal boundary. The study willprovide recommendations on the preferred water supply strategy andwill address the requirements of Phases 1 and 2 of the Municipal ClassEA processFor the preferred alternative:

– Develop conceptual drawings;– Provide recommendations on how to sequence expansions;

18

– Provide capital and lifecycle cost estimates for inclusion in the City’s longrange financial model; and

– Identify construction planning considerations including constructability,phasing, sequencing, tie-ins, specific procedures and scheduling.

Page 38: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

10

Sept. 13, 2011

The City of Barrie is currently serviced by twelve (12) groundwater wellsproviding a current production capacity of 99 Million Litres a Day(MLD). Two additional wells are currently in the design stage. Oncecommissioned, the total well production capacity will increase to 113MLD

Water Supply

MLD.Also, the City of Barrie is in the final stages of commissioning a SurfaceWater Treatment Plant (SWTP) located on the south shore ofKempenfelt Bay. The SWTP will supply the south part of the City.The plant has been planned for an ultimate capacity of 240 MLDhowever, it will be constructed using a phased approach.The first phase of the project (currently being commissioned) is for a

19

capacity of 60 MLD.All water supply facilities are owned and operated by the City of Barrie.

Sept. 13, 2011Water Supply - Water System

Sept. 13, 2011

20

Page 39: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

11

Sept. 13, 2011

The work will assess the capacity of the existing trunk system, quantifythe availability of surplus capacity, identify system constraints / issuesand identify a list of recommended projects (expansion / upgrades toexisting and construction of new infrastructure) necessary to meet futuregrowth demands on the system.

Wastewater Collection - Objective

A review of the proposed intensification and greenspace development areaswithin the existing City boundary and proposed greenfield land use in theannexed lands;Schematic servicing concepts for up to three draft Secondary Planalternatives;Capital/operating/maintenance/replacement cost information in a formatthat is compatible with the City of Barrie Long Range Financial Plan (LRFP)model;

21

;An analysis of the projected capital and life cycle costs in the LRFP;Results of the above analysis; andA Class EA Phase 1 & 2 Document including recommendations for thePreferred Alternative Solution.

Sept. 13, 2011

To establish remaining excess capacity in the existing Barriewastewater collection system and identify system improvementsrequired to meet future demands.

Wastewater Collection - Purpose

To identify and evaluate the phased wastewater collection systemrequirements of the Study Area for the planning period 2011 – 2031and to provide preliminary servicing alternatives for the draftSecondary Planning alternatives in five year increments.

Finalize the preliminary wastewater collection system concept for thepreferred secondary plan alternative.

22

Page 40: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

12

Sept. 13, 2011

Barrie South Pumping Station Locations

Wastewater Collection -Existing Sanitary Infrastructure

65km of sanitary trunk sewers

459km of local sewers

11 active major pumping stations

1 sewage treatment plant

23

Legend

Sept. 13, 2011

Establish future effluent quality requirements for the WPCC;Develop alternative solutions for additional WPCC capacity, evaluatealternative solutions and recommend a preferred alternative;Develop a biosolids management plan for the City;

Wastewater Treatment - Evaluation Process

Assess the WPCC effluent outfall sewer capacity;Provide hydraulic profiles for the individual components and overall systemsincluding future equipment for average, maximum, peak hour and peak flowrates;Develop conceptual drawings for any required WPCC upgrades;Provide recommendations on how to sequence required expansions /upgrades;

24

Provide capital and lifecycle cost estimates for inclusion in the City’s longrange financial model; andIdentify construction planning considerations including constructability,phasing, sequencing, tie-ins, specific procedures and scheduling.

Page 41: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

13

Sept. 13, 2011

The City of Barrie Water Pollution Control Center (WPCC) is the largestwastewater treatment facility located on the shores of Lake Simcoe.The Barrie WPCC is a tertiary treatment facility.

Wastewater Treatment -Water Pollution Control Center

The current rated average day flow (ADF) capacity of the plant is57,100 m3/d and a peak design flow of 135,720 m3/d.The City is in the process of expanding the plant to 76,000 m3/d and apeak design flow of 156,000 m3/d.Biosolids, which have been stabilized at the Barrie WPCC, aretransferred to a municipally owned and operated offsite biosolidsstorage facility.

25

The biosolids are then applied to land for final disposal.

Sept. 13, 2011 Wastewater Treatment -Water Pollution Control Centre & Biosolids Storage Facility

26

Page 42: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

14

Sept. 13, 2011 Wastewater Treatment -Biosolids Storage Facility

27

Sept. 13, 2011

Objective/Purpose:To determine the rate of runoff due to rainfall and snow melt from existing“natural land use” conditions.

Water Resources - Surface Water Hydrology

MethodsComputer programs (models) are developed to represent the existing landuse topography and soil properties. Rainfall data is used in the model togenerate runoff rates in the watercourses which are then used to establish“targets” for planning future flood and erosion management systems.

28

Page 43: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

15

Sept. 13, 2011

Land Use Plan: Existing ConditionsWater Resources - Surface Water Hydrology

Sept. 13, 2011

29

Sept. 13, 2011

Study-Specific Considerations and RequirementsThe annexed lands are within the jurisdiction of two Conservation Authorities andcover five subwatersheds:

Water Resources - Surface Water Hydrology

Subwatershed Regulating Authority

B C k S b t h d N tt V ll C ti

The hydrologic assessment considers the unique nature of each Subwatershed,and the requirements of the respective Regulating Authority This information will

Bear Creek Subwatershed Nottawasaga Valley Conservation AuthorityThornton Creek Subwatershed

Lovers Creek SubwatershedLake Simcoe Region Conservation

AuthorityHewitts Creek Subwatershed

Sandy Cove Creek Subwatershed

30

and the requirements of the respective Regulating Authority. This information willbe used in the subsequent stages of the study process to tailor the stormwatermanagement recommendations to the specific needs of each area to protectdownstream properties and watercourses from flooding and erosion and alsomaintain a sustainable water balance and water quality in the receiving streamsafter urbanization.

Page 44: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

16

Sept. 13, 2011

Subwatershed PlanWater Resources - Surface Water Hydraulics

Sept. 13, 2011

31

Sept. 13, 2011

Objective/Purpose:To provide an indication of the depth, velocity (speed) and extent of water flowing in openwatercourses during storms of varying severity, to guide the protection of private property,public infrastructure and environmental systems.

Methods

Water Resources - Surface Water Hydraulics

Computer programs (models) are developed to numerically represent the configuration ofexisting streams, valleys, bridges, and culverts. Runoff rates generated from the hydrologicassessment are used as input to generate water levels and floodplains, and thereby establishrequirements for protecting future properties within the development area from flooding. Inaddition, the hydraulic models also inform the engineers and stream specialists on criticalinformation related to the depth of flow and velocity during potential erosion-causing stormevents.

Study-Specific Considerations and Requirements

32

A database of the grades and sizes of the existing bridges and culverts has been compiledfrom information provided by the Lake Simcoe Region Conservation Authority and theNottawasaga Valley Conservation Authority, as well as local surveys completed on behalf ofthe study stakeholders and AMEC. The field information will be used to update the floodlinemapping through the study area as well as offer insight into stream characteristics.

Page 45: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

17

Sept. 13, 2011

Regulations and ConstraintsWater Resources - Surface Water Hydraulics

Sept. 13, 2011

33

Sept. 13, 2011

What are they?Stormwater Management Retrofits are modifications to existing stormwatermanagement facilities and/or existing outlet points of storm sewers which currentlydischarge to streams/lakes without stormwater management, in order to provide aform of stormwater management/treatment. This technique is typically applied for the

f t t lit t l ( d ti t ll t t l l i t ff)

Water Resources - Stormwater Management Retrofits

purpose of stormwater quality control (reductions to pollutant levels in storm runoff).

Why are they used?Stormwater Management Retrofits are an effective method to address stormwatermanagement requirements for future infill development and redevelopment areaswithin existing urban areas. These types of developments are generally smaller sites,nestled within built-up areas. Rather than providing separate on-site stormwatermanagement systems for each individual site, development would contribute fundstoward constructing more centralized and efficient stormwater management retrofits at

34

toward constructing more centralized and efficient stormwater management retrofits atstrategic locations within the subwatershed on a priority basis premised on overalleffectiveness.

Page 46: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

18

Sept. 13, 2011

Stormwater Retrofit PlanWater Resources - Stormwater Management Retrofits

Sept. 13, 2011

35

Sept. 13, 2011

What are the benefits?Stormwater Management Retrofits provide improved stormwater quality (reducedpollutant loadings to the receiving watercourse), lower overall construction costs,lower long-term operation and maintenance costs as compared to individual on-sitefacilities In addition strategic stormwater management retrofits can increase

Water Resources - Stormwater Management Retrofits

facilities. In addition, strategic stormwater management retrofits can increaseoverall environmental benefits by providing protection to those locations whichrequire it the most.

The Lake Simcoe Protection Plan requiresthat phosphorus loadings be reducedbeyond current Provincial standards.Stormwater Management Retrofits representa key strategic opportunity to satisfy the

36

requirements under the Plan, by treatingboth existing and future development areas.

Page 47: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

19

Sept. 13, 2011

What are they?Stormwater Management Practices are different technologies and approacheswhich can be constructed to address the requirements for controlling andmanaging stormwater quality erosion and quantity (flooding and groundwater

Water Resources - Stormwater Management Practices

managing stormwater quality, erosion and quantity (flooding and groundwaterrecharge) from new development.What do they look like?A variety of practices are available, with each addressing different requirements.Some practices are able to treat the runoff from larger areas, while some are betterable to treat smaller areas and thereby must be distributed throughout thedevelopment area closer to the “source” of the runoff.

37

Sept. 13, 2011

Some common examples of stormwater managementpractices are:Constructed wet ponds and wetlandsGrassed swales

Water Resources - Stormwater Management Practices

Bioswales

Grassed swalesInfiltration galleriesBiofiltersRain gardensPermeable pavementGreen roofs

Infiltration Galleries Grassed Swales

Green Roofs

Permeable Pavement Wet Ponds

Rain Gardens

38

Page 48: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

20

Sept. 13, 2011

Objective/Purpose:To protect the groundwater supported features including aquifers, aquaticsystems and wetlands.

Water Resources - Hydrogeology

Methods:Existing hydrogeologic information will be assessed to present anunderstanding of the groundwater flow system and its ecosystem linkages.Current field data from other components of this study will be integratedinto the hydrogeological assessment. The ongoing refinement of thehydrogeologic characterization will provide the hydrogeologic sensitivitywhich will direct management strategies and the scope of future studies.

39

Sept. 13, 2011

Preliminary Findings:The groundwater flow system within and adjacent to the annexed lands consistsof a multi-aquifer flow system made up of a number of water producing aquiferswhich are utilized for municipal and domestic water usage. Groundwaterrecharge is relatively high within and adjacent to the annexed lands.

Water Resources - Hydrogeology

The upper groundwater flow system provides groundwater discharge to thecoldwater reaches of Lovers Creek, Hewitts Creek, Bear Creek and SandyCove Creek.

Although the municipal aquifer vulnerability is low the overall recharge functionto the multi-aquifer system is important on a larger scale.

A more refined understanding of the larger scale functional hydrogeologicsensitivity is expected as more information becomes available within this study

40

sensitivity is expected as more information becomes available within this study.The smaller scale detailed understanding which would direct specific land usechange and groundwater management strategies is expected to be carried outin future studies.

Page 49: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

21

Sept. 13, 2011Water Resources - Hydrogeology

Groundwater Recharge & Wellhead Protection

41

Source: Background and Options Report

Sept. 13, 2011Water Resources - Hydrogeology

Groundwater Recharge & Wellhead Protection

42

Source: Background and Options Report

Page 50: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

22

Sept. 13, 2011

A series of water quality models to represent subwatershed areas withinthe study area is being developed using CANWETTM 4 software.

The calibrated models will help identify and quantify sources of elevated

Hydrological System Framework -Phosphorus Loading Analysis

phosphorus which contribute to eutrophication and poor aquatic healthunder existing conditions.

Working toward the objectives of the Lake Simcoe Protection Plan,proposed development plan options will be assessed through modelsimulation scenarios to evaluate compliance with phosphorus loadingobjectives.

Beneficial management practice (BMP) technologies will be assessed to

43

Beneficial management practice (BMP) technologies will be assessed todetermine the level of load reduction that could be realized.

Sept. 13, 2011

A series of data including: land use, soils, topography, animalpopulations, climate, stream and watershed delineation are used asinput to the CANWETTM model.

Hydrological System Framework -Modeling Method

Stormwater management ponds and rural BMPs are added to themodel from available mapping and imagery.

44

Page 51: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

23

Sept. 13, 2011

CANWETTM Output will be Represented Spatially and Temporally

Sample Output

Hydrological System Framework

45

Sept. 13, 2011

Characterize stream morphology through analysis of desktop andfield data.Identify erosion hazards of watercourses within the annexed lands

Hydrological System Framework -Stream Morphology

Identify erosion hazards of watercourses within the annexed lands(i.e. meander belt widths).Define geomorphological constraints within development areas.Methods used to gather geomorphological information to feed into“Classification and Management of Headwater DrainageFeatures”.

46

Page 52: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

24

Sept. 13, 2011Hydrological System Framework -

Reach Delineation

Defined as a length of channel 200 m to 2 km long.Displays similarities in physical characteristics.Similar controlling and modifying influencesSimilar controlling and modifying influences.Reaches initially defined for all watercourses within “AnnexedLands West and East” using aerial photographs.Areas are refined following site visit and field reconnaissance.

47

Sept. 13, 2011

Annexed Lands West

Hydrological System Framework - Reach DelineationSept. 13, 2011

Lover’s Creek4, 6, 7-9

Bear Creek1&2

48

Baxter Creek1&2

Page 53: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

25

Sept. 13, 2011Hydrological System Framework - Reach Delineation

Annexed Lands East

Sept. 13, 2011

Hewitt’s Creek

1-5

Sandy CoveCreek

1-4

49

Lovers Creek

1-3

Sept. 13, 2011

Define extent of all existing and expected meander migration andprocesses.Meander axis defined by drawing line following down-valley orientation

Hydrological System Framework -Meander Belt Width Assessment

Meander axis defined by drawing line following down-valley orientationof meander pattern.Preliminary belt width established by drawing parallel lines alongoutermost meanders of existing planform.Final belt width defined through application of factor of safety.Completed for defined reaches (i.e. bed and banks defined).

50

Page 54: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

26

Sept. 13, 2011

Rapid Geomorphic Assessment (RGA) – indication of channelstability (where channel defined).

Hydrological System Framework -Rapid Field Assessments

≤ 0.20 In Regime Little to no instability observedTransitional or

Rapid Stream Assessment Technique (RSAT) – indication ofstream health.

0.21-0.40 Transitional or Stressed Frequent evidence of instability

≥ 0.41 In Adjustment Evidence of instability is widespread

Channel Stability Erosion/Deposition Instream

HabitatWater Quality

Riparian Conditions

Biological Indicators

51

6 factors, rated out of total score of 50< 20 Low, 20-35 Moderate, > 35 High

Stability Habitat Quality Conditions Indicators

Sept. 13, 2011

Annexed Lands West

Hydrological System Framework - Initial Findings

Creek Channel definition Channel stability(RGA)

Stream Health (RSAT)

Bear Creek Majority of reaches poorly defined /

undefined

In regime to transitional

Moderate

Baxter Creek Mostly no defined channel, ditch in

places

In regime Moderate

Lover’s Creek (branches 4 6-9):

Many reaches undefined some are

Mainly transitional or stressed

Moderate

52

(branches 4, 6-9): undefined, some are slight depressions

stressed

*for defined channels only

Page 55: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

27

Sept. 13, 2011Hydrological System Framework -

Initial Findings

Annexed Lands EastCreek Channel definition Channel stability

(RGA*)Stream Health

(RSAT*)Lover’s Creek (branches 1-3)

Majority defined, except LOV001

In regime Moderate

Hewitt’s Creek Mostly defined channel. Marshy and

hummocky banks, beaver activity

In regime to transitional

Moderate

Sandy Cove Creek Generally undefined, dry channels debris

In regime to transitional

Moderate

53

dry channels, debris jams in downstream

SAN-002

transitional

*for defined channels only

Sept. 13, 2011

Completed Background Report and Draft Technical Memorandum 1

Each contains sections for:

Transportation -Multi-Modal Active Transportation Master Plan (MMATMP)

- Roadway Assessment (including macro and micro model anddetermining transit implications)

- Active Transportation Study- Parking Study (focused on downtown, waterfront, and Allandale

areas)

Background Report also reviews overall planning principles,MMATMP scope and deliverables, and the Class EA process

54

(Phases 1 and 2)

- Three technical memoranda, each followed by a round of consultation

Page 56: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

28

Sept. 13, 2011

Accommodation of projected population and employment growthonto the existing transportation network between now and 2031;Development of a safe, connected, and functional activetransportation network through the entire City;Orientation of new development around active transportation and

Transportation - Objectives and Issues

p ptransit to reduce auto dependence;Determination of user priority on roadways;Lack of roadway capacity on many arterial and collector roads toaccommodate future auto demand;Lack of capacity on the Highway 400 corridor to meet future autodemand;Increase in demand and reduction of supply for downtown parkingdue to intensification of the downtown;

55

due to intensification of the downtown;Increase in demand for waterfront parking due to City growth; andAccess modes to GO stations: limited parking to be available atAllandale Waterfront GO.

Sept. 13, 2011

Existing Conditions- Capacity deficiencies on:

AnneFerndaleMapleview

LakeshoreCundles / Duckworth

EssaHarvie / Big Bay Point

Transportation - Roadway Assessment

- Road expansion for these corridors planned by 2014Future Issues

- With no further improvements, roadway deficiencies are projected along:AnneMapleviewEssaHarvie

HuroniaDunlopTiffinWellington

FairviewBayfieldSunnidaleYonge

56

- Expanded roadway network extension in annexed lands- Potential Highway 400 interchanges at Harvie / Big Bay Point and McKay

(10th Line)

Big Bay PointBryne

ArdaghLittle

Page 57: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

29

Sept. 13, 2011 Transportation - Roadway Assessment

Existing Conditions

57

Sept. 13, 2011 Transportation - Roadway Assessment (cont’d)

Future Conditions

58

Page 58: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

30

Sept. 13, 2011

Fair pedestrian network; poor cycling network- Sidewalks

At least partially present on most arterials, collectors, localsSidewalk network is good in many neighbourhoods, though there are gapson many arterials and collectors

Transportation - Active Transportation Study (cont’d)

on many arterials and collectorsSome older neighbourhoods are missing sidewalks entirely

- On-Road Cycling FacilitiesSigned bicycle route system has three loops that intersect southwest ofdowntownThree isolated bicycle lanes; no cycling network present

- Off-Road FacilitiesFour boulevard paths, not connected with each other but three are connectedto the route system

59

yCity has many off-road trails, but most are suitable for walking only (nocycling)Bikeable trails are heavily used, such as along the waterfront

Sept. 13, 2011Transportation - Active Transportation Study

60

Existing Cycling and Trail NetworkExisting Sidewalk Network

Page 59: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

31

Sept. 13, 2011

Existing Conditions-Low parking utilization in downtown area (45% during peak interval)-Downtown utilization concentrated along Dunlop Street corridorHigher parking utilization in waterfront area (62% during peak interval)

Transportation - Parking

-Higher parking utilization in waterfront area (62% during peak interval)-Waterfront utilization very high (70% – 100%) from the downtown to TiffinStreet (summer months)

Future Conditions-Planned intensification of downtown area will reduce municipal parkingsupply and create additional parking demand

-Centennial Park Redevelopment will add some parking supply-City growth will increase parking demand along waterfrontLi it d ki il bl t f t All d l W t f t GO St ti

61

-Limited parking available at future Allandale Waterfront GO Station

Sept. 13, 2011 Transportation - Parking (cont’d)

62

Waterfront Peak Parking Downtown Peak Parking

Page 60: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

32

Sept. 13, 2011Natural Heritage

Objective:Characterize the aquatic, wetland and terrestrial resources in the studyareaIdentify a Natural Heritage System (NHS) for protection, includingSecondary Plan as well as input to Master Plan components

Background ReviewWildlife: Field Inventories- Winter Wildlife- Amphibians- Snakes- Breeding BirdsVegetation: Field Inventories- Vegetation Communities

Vascular Flora Inventories

63

- Vascular Flora InventoriesAquatic: Field Inventories- Aerial survey- Roadside surveys- Headwater origins survey

Sept. 13, 2011Natural Heritage - Aquatic Features

64

Page 61: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

33

Sept. 13, 2011Natural Heritage - Framework

Background sources and high level review of key natural features inthe area identify very similar patterns, focused on clusters of existingwetlands, natural woodlands and watercourses.There are substantial existing east-west and north-south connections

id i bj t l d d i hb i l d (i L C k)considering subject lands and neighbouring lands (i.e. Lovers Creek).Connections are providedassociated with watercourses.

65

Sept. 13, 2011Natural Heritage - Framework (cont’d)

The delineation of the stream corridors and hazard lands is still beingexamined and will consider buffers as well as fluvial considerationsand possibly other factors.Inclusion of cultural communities such as plantations and culturalwoodlands will be considered on a case by case basis as well as inwoodlands, will be considered on a case by case basis, as well as inrelationship to clusters of natural woodlands and wetlands.Open country habitat areas will be provided associated with NHScomponents, but not all open country habitats will be identified forretention in NHS.Isolated features such as small woodlands, wetlands and somewatercourses are found in the study area. Measures to connect these

66

to the NHS will not be included. Retention of these isolated features indense urban setting would be from an amenity perspective.

Page 62: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

34

Sept. 13, 2011

Existing Conditions Report (ECR) complete.

Designated resources under the Ontario Heritage Act. (OHA).Three (3) properties located within the study lands were listed on theTown of Innisfil Heritage Register in March 2008.

Cultural and Built Heritage

g g- They are not currently listed on the City of Barrie Municipal Register

adopted under the OHA.39 cultural heritage sites of potential significance.37 built heritage sites of potential significance.A strategy will be developed to mitigate any impacts.

67

Sept. 13, 2011

Stage 1 Archaeological Assessments (literature review) ofannexed lands.1 Archaeological site bordering study area.Modeling criteria indicates a moderate level of archaeological

Archaeological and Aboriginal Engagement ProgramSept. 13, 2011

g gpotential throughout the study area.The 3 sites (ancestral Iroquoian villages) within the study areaare considered to be archaeological resources of high value.

- Each site of high value will be subject to a Stage 3 assessmentprior to development

Results of further assessments will be used to evaluatesignificance of site and develop recommendations for mitigative

68

g p gmeasures.City Staff have engaged representatives of Six (6) interestedAboriginal communities.

Page 63: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

35

Sept. 13, 2011Next Steps

Receive public comments by September 30, 2011;Refine study goals and objectives based on comments received from thepublic and review agencies.Develop up to three (3) Secondary Plan options.Develop evaluation criteria and the alternative analysis of Options.Hold Public Information Centre No. 2 in early 2012.Draft Secondary and Master Plans spring/summer 2012Present Secondary and Master Plans to Committee and Council in late2012.

69

Sept. 13, 2011

Complete a comment sheet.

By Phone, Fax, Mail or Email to:

How to Provide Your Comments

Mr. Wayne Bando, P. EngInfrastructure Planning EngineerCity of Barrie70 Collier Street, Box 400Barrie, Ontario L4M 4T5P: (705) 739-4220 ext. 5153Fax: (705) 792-4247Email: [email protected]

Mr. Paul Smeltzer, P. Eng. Consultant Project Manager AMEC Earth & Environmental 3215 North Service RoadBurlington, Ontario L7N 3G2P: (905) 335-2353 Toll Free: 1-866-751-2353 Fax: (905) 335-1414 E il l lt @

70

Email: [email protected]

Please submit comments no later than September 30, 2011(two weeks).

*Information will be collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record

Page 64: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

36

Sept. 13, 2011

Th kThank youB L A C K P O R T

& A s s o c i a t e s C o n s u l t i n g

71

Page 65: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

1

Sept. 13, 2011

City of BarriePUBLIC INFORMATION CENTRE #1

Presentation

PUBLIC INFORMATION CENTRE #1Infrastructure Master PlansMunicipal Class Environmental Assessment

1

Sept. 13, 2011

The City of Barrie is preparing a Secondary Plan, related BackgroundStudies and Infrastructure Master Plans for the annexed lands southof the City’s former boundary. The Infrastructure Master Plans willalso cover intensification and greenfield development within the City’sformer boundary. These coordinated Planning Studies and

Introduction

y gInfrastructure Master Plans are being prepared in accordance withboth the Planning Act and the Municipal Class EnvironmentalAssessment process.

The Barrie-Innisfil Boundary Adjustment Act, 2009 (Bill 196)A vision for the annexed lands and related policies/directions that willensure its successful implementationReview of existing and future condition assessmentsPl t G G th Pl f G t G ld H h Cit ’

2

Places to Grow, Growth Plan for Greater Golden Horseshoe, City’sOfficial Plan, Council’s Guiding Principles for Future Plans, results ofBackground and Master Plan studiesPlanning period 2031

Page 66: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

2

Sept. 13, 2011

The purpose and objectives of the Infrastructure Master Plans are to:

Identify and develop implementation and support strategies

Master Plan - Purpose and Objectives

Find the balance between protecting the natural environment, economics,health, sustainability and communityIdentify and evaluate system(s) requirements of the Study Area for the2011 – 2031 planning horizon to meet the anticipated system needs, andto provide preliminary system servicing alternativesTo establish remaining capacities in the existing systems and identifysystem improvements required to meet future demands

3

Sept. 13, 2011Study Area

4

Page 67: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

3

Sept. 13, 2011

Approved –may proceed

Identify the problem or

opportunity

PHASE 1 PHASE 2

Complete contract drawings and tender

documents

PHASE 3 PHASE 4 PHASE 5PROBLEM OR OPPORTUNITY

ALTERNATIVE SOLUTIONS

ALTERNATIVE DESIGN CONCEPTS FOR

PREFERRED SOLUTIONENVIRONMENTAL STUDY REPORT

IMPLEMENTATION

Identify Alternative Design Concepts

Complete Environmental Study

Report (ESR)

Environmental Study

Identify alternative solutions to problem or

opportunity

Class Environmental Assessment Process

Determine applicability of Master

Plan approach

Optional formal mediation

Notice of Completion to review

agencies &

Opportunityfor Order*Request to

Ministerwithin

30 days ofnotification

Opportunityfor Order*Request to

Ministerwithin

30 days ofnotification

If no Order*may proceed

Discretionary public consultation to review problem or opportunity

Proceed to construction and operation

Monitor for environmental provisions and commitments

4

5

3

2

Consult review agencies & previously interested & directly

affected public

Detail inventory of natural, social and

economic environment

Indentify impact of alternative designs on

environment, and mitigating measures

Evaluate Alternative Designs: identify

Recommended Design

Select Preferred D i

Schedule A/A+

Opportunity to request Minister within 30 days of

Notification to request an Order

Notice of Study Completion to review agencies and public

yReport (ESR) placed on

public record

Copy of Notice ofCompletion to MOE-EA

branchIdentify impact of Alternative Solutions on

the environment and mitigating measures

Evaluate Alternative Solutions: identify

recommended solutions

Consult review agencies and public re: Problem or Opportunity

and Alternative Solutions

Inventory natural, social, economic

environment

Select Schedule(Appendix 1)

5

Order granted,proceed as

per Minister’sDirection or

abandonproject

Matterreferred

to mediation

Order*deniedwith orwithout

Minister’sconditions

public

Schedule C

IndividualE.A

Schedule B

Discretionary public

consultationto review

Preferred Design

Review environmental significance & choice

of schedule

Design

Preliminary finalizationof Preferred Design

Indicates possible events

Indicates mandatory events

Indicates probable events

Mandatory public contactpointsDecision points on choice of scheduleOptional

Part II Order

*

Solutions

Select Preferred Solution

Review and confirm choice of schedule

We are here

Sept. 13, 2011Background Information Reviewed

As part of the study, a desktop review of existing and futureconditions was completed. The objective of the review was toestablish the need and justification for improvement andidentification of environmental constraints and sensitivities throughdetermination of baseline conditionsdetermination of baseline conditions.In order to be able to assess the impacts (both positive andnegative) related to proposed system improvements, fieldinvestigations, in conjunction with the desktop inventory, are beingconducted for the following disciplines / services.

Natural HeritageWater Storage andDistrib tion

Biosolids ManagementMulti-modal Active Transportation

6

DistributionWater SupplyWastewater CollectionWastewater Treatment

Cultural and Built HeritageArchaeologicalAgricultureDrainage & Storm Water Management

Page 68: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

4

Sept. 13, 2011

“To ensure the City of Barrie long‐term servicing needs aremet to 2031 and beyond, with consideration of projectedfuture demands resulting from Provincially mandatedintensification nodes and corridors and greenfield areas

Problem/Opportunity Statement

intensification nodes and corridors and greenfield areaswithin the former City boundary and, ultimate developmentwithin the recently annexed areas, that are safe;well‐managed; in accordance with governing policies relatedto sustainability, protection and preservation of naturalheritage and environment; delivered in a fiscally responsiblemanner; in full compliance with applicable legislation,regulations and guidelines and; integrated with the City’sother infrastructure planning and growth management

7

other infrastructure, planning, and growth managementresponsibilities.”

Sept. 13, 2011Water Storage and Distribution - Objective

The analysis of the existing water storage and distribution systemand development of expected future flows based on land use willbe conducted utilizing the current 2009 model and will include:

An update to the 2009 model to include the last three years of newwatermain distribution system installation data and evaluation of thephased water distribution system requirements of the study area forthe planning period 2011 – 2031 in five year increments (note: currentmodel includes Out to Boundary (OTB) to 2021);

Preliminary servicing alternatives for up to 3 draft Secondary Planningalternatives; and

Recalibrating models and expanding to include intensification nodes

8

Recalibrating models and expanding to include intensification nodes,corridors and greenfield areas identified in the City’s former boundaryand greenfield development areas in the annexed lands.

Page 69: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

5

Sept. 13, 2011Water Supply - Objective

The objective of this study is to identify and evaluate the water supplyrequirements in the City of Barrie for the period 2011 – 2031 inconsideration of additional growth in the newly annexed lands as wellas revised population and employment growth forecasts within theexisting municipal boundary, and will include:g p y,

Development of conceptual drawings;Recommendations on how to sequenceexpansions;Presenting capital and lifecycle costestimates for inclusion in the City’s longrange financial model; andIdentification of construction planning

9

Identification of construction planningconsiderations including constructability, ophasing, sequencing, tie-ins, specificprocedures and scheduling.

Sept. 13, 2011Wastewater Collection - Objective

The work will assess the capacity of the existing trunk system,quantify the availability of surplus capacity, identify systemconstraints / issues and identify a list of recommended projects(expansion / upgrades to existing and construction of newinfrastructure) necessary to meet future growth demands on the

A review of the proposed intensification and greenspacedevelopment areas within the existing City boundary andproposed greenfield land use in the annexed area;Schematic servicing concepts for up to three draft SecondaryPlan alternatives;Capital/operating/maintenance/replacement cost information ina format that is compatible with the City of Barrie Long RangeFi i l Pl (LRFP) d l

) y gsystem. This will include:

10

Financial Plan (LRFP) model;An analysis of the projected capital and life cycle costs in theLRFP;Results of the above analysis; andA Class EA Phase 1 & 2 Document including recommendationsfor the Preferred Alternative Solution.

Page 70: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

6

Sept. 13, 2011

The intent is to establish future effluent quality requirements for theWater Pollution Control Centre (WPCC) including:

The assessment of the WPCC effluent outfall sewer capacity;Providing hydraulic profiles for the individual components and overallsystems including future equipment for average maximum peak hour and

Wastewater Treatment - Objective

systems including future equipment for average, maximum, peak hour andpeak flow rates;Developing conceptual drawings for any required WPCC upgrades;Providing recommendations on how to sequence required expansions /upgrades;Developing alternative solutions for additional WPCC capacity, evaluatingalternative solutions and recommending a preferred alternative;Development of a biosolids management plan for the City;

11

Providing capital and lifecycle cost estimates for inclusion in the City’slong range financial model; andIdentification of construction planning considerations includingconstructability, phasing, sequencing, tie-ins, specific procedures andscheduling.

Sept. 13, 2011Water Resources

Surface Water Hydrology - Objective

The objective is to determine the rate of runoff due to rainfall andsnow melt from existing “natural land use” conditions.

Computer models are developed to represent the existing land useComputer models are developed to represent the existing land usetopography and soil properties. Rainfall data is used in the model togenerate runoff rates in the watercourses which are then used toestablish “targets” for planning future flood and erosion managementsystems.

12

Page 71: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

7

Sept. 13, 2011Water Resources

Surface Water Hydraulics - Objective

Computer models are developed to numerically represent theconfiguration of existing streams, valleys, bridges, and culverts.Runoff rates generated from the hydrologic assessment are usedas input to generate water levels and floodplains and therebyas input to generate water levels and floodplains, and therebyestablish requirements for protecting future properties within thedevelopment area from flooding. In addition, the hydraulic modelsalso inform the engineers and stream specialists on criticalinformation related to the depth of flow and velocity duringpotential erosion-causing storm events.

13

Sept. 13, 2011Water Resources - Stormwater Management Retrofits

What are they?Stormwater Management Retrofits are modifications to existing stormwatermanagement facilities and/or existing outlet points of storm sewers whichcurrently discharge to streams/lakes without stormwater management, inorder to provide a form of stormwater management/treatment. Thist h i i t i ll li d f th f t t lit t ltechnique is typically applied for the purpose of stormwater quality control(reductions to pollutant levels in storm runoff).

Why are they used?Stormwater Management Retrofits are an effective method to addressstormwater management requirements for future infill development andredevelopment areas within existing urban areas. These types ofdevelopments are generally smaller sites, nestled within built-up areas.Rather than providing separate on-site stormwater management systems

14

for each individual site, development would contribute funds towardconstructing more centralized and efficient stormwater managementretrofits at strategic locations within the subwatershed on a priority basispremised on overall effectiveness.

Page 72: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

8

Sept. 13, 2011Water Resources Hydrogeology - Objective

The objective is to protect the groundwater supported featuresincluding aquifers, aquatic systems and wetlands.

E i ti h d l i i f ti i b i d t tExisting hydrogeologic information is being assessed to present anunderstanding of the groundwater flow system and its ecosystemlinkages. Current field data from other components of this studyshall be integrated into the hydrogeological assessment. Theongoing refinement of the hydrogeologic characterization willprovide the hydrogeologic sensitivity which will direct managementstrategies and the scope of future studies.

15

Sept. 13, 2011

To develop a series of water quality models to representsubwatershed areas within the study area using CANWETTM 4software.

Th lib t d d l ill h l id tif d tif f

Hydrological System FrameworkPhosphorus Loading Analysis - Objective

The calibrated models will help identify and quantify sources ofelevated phosphorus which contribute to eutrophication and pooraquatic health under existing conditions.

Working toward the objectives of the Lake Simcoe Protection Plan,proposed development plan options will be assessed through modelsimulation scenarios to evaluate compliance with phosphorusloading objectives.

16

Beneficial management practice technologies will be assessed todetermine the level of load reduction that could be realized.

Page 73: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

9

Sept. 13, 2011Hydrological System FrameworkStream Morphology - Objective

The work will characterize stream morphology through the analysisof desktop and field data, identifying watercourse erosion hazards,defining geomorphological constraints and recommendations forthe “Classification and Management of Headwater Drainagethe Classification and Management of Headwater DrainageFeatures” within the development areas of the Annexation areas.

17

Sept. 13, 2011

To develop a city-wide transportation plan for a 2031 planninghorizon (2051 outlook) that models projected transportation demandand recommends improvements for all transportation modes through:

Development of a safe, connected, and functional active transportationnetwork through the entire City;

Transportation - Objectives and Issues

Orientation of new development around active transportation and transitto reduce auto dependence;Determination of user priority on roadways;Define roadway capacity needs on arterial and collector roads toaccommodate future auto demand;Quantify capacity for the Highway 400 corridor;Increase in demand and reduction of supply for downtown parking dueto intensification of the downtown;Increase in demand for waterfront parking due to City growth; and

18

Increase in demand for waterfront parking due to City growth; andAccess modes to GO stations: limited parking to be available atAllandale Waterfront GO.

Page 74: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

10

Sept. 13, 2011Natural Heritage - Objective

The objective of the work is to provide a characterization of thenatural heritage system framework of aquatic, wetland andterrestrial resources and contribute technical input for theSecondary Plan and Master Plan components for the Barrieannexed lands. To identify a Natural Heritage System (NHS) forprotectionprotection.

Background ReviewWildlife: Field Inventories

- Winter Wildlife- Amphibians- Snakes- Breeding Birds

Vegetation: Field Inventories- Vegetation Communities

19

Vegetation Communities- Vascular Flora Inventories

Aquatic: Field Inventories- Aerial survey- Roadside surveys- Headwater origins survey

Sept. 13, 2011

To determine designated and potential resources of significanceunder the Ontario Heritage Act (OHA), assess the existingcultural heritage landscapes and built heritage resources for theannexed lands, and develop a strategy to mitigate any impacts.

Cultural and Built Heritage - Objective

20

Page 75: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

11

Sept. 13, 2011

1 Archaeological site bordering study area.

Archaeological and Aboriginal Engagement ProgramSept. 13, 2011

To determine the archaeological potential of the study areaproviding recommendations for mitigative measures and develop aproactive arrangement for engaging Aboriginal communities.

g g yThe 3 sites (ancestral Iroquoian villages) within the study areaare considered to be archaeological resources of high value.

- Each site of high value will be subject to a Stage 3assessment prior to development

Results of further assessments will be used to evaluatesignificance of site.

21

Sept. 13, 2011

The Master Plans will be developed taking into consideration the requirementsof the Municipal Class EA as well as Planning Act requirements, including:

Natural Environment (wetlands, vegetation, wildlife habitat, surface water,and fisheries);

Evaluation CriteriaSept. 13, 2011

Social, Cultural, and Economic Environment (land use, noise, archaeology,cultural heritage resources, utilities, and cost);Transportation (construction disruptions, safety, travel delay/traffic capacity,and MTO freeway improvements and expansion); andEngineering (design standards, construction costs, and long termmaintenance costs).

The criteria will be weighted against development options to determine theirsignificance as well as any necessary mitigation issues.

22

Criteria OptionsEvaluation Criteria Option 1 Option 2 Option 3

Vegetation Potential impact of loss of natural areas, terrestrial ecosystems.

Wildlife Habitat Potential impacts on existing wildlife due to disturbance or loss of habitat.

Surface Water Potential impacts on surface water quality, erosion or flood potential.

Fisheries Potential impacts to fish community and habitat.

Utilities Potential adverse effects on existing utilities and opportunity to accommodate additional utilities in the future.

Construction Costs Cost to construct the proposed improvements.Long Term

Maintenance CostsCost to maintain the proposed and existing infrastructure.

Page 76: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

12

Sept. 13, 2011Next Steps

Receive public comments by September 30, 2011;Refine study goals and objectives based on comments received fromthe public and review agencies.Develop up to three (3) Secondary Plan options.Develop evaluation criteria and the alternative analysis of Options.Hold Public Information Centre No. 2 in early 2012.Draft Secondary and Master Plans spring/summer 2012Present Secondary and Master Plans to Committee and Council inlate 2012.

23

Sept. 13, 2011

Complete a comment sheet.

By Phone, Fax, Mail or Email to:

How to Provide Your Comments

Mr. Wayne Bando, P. EngInfrastructure Planning EngineerCity of Barrie70 Collier Street, Box 400Barrie, Ontario L4M 4T5P: (705) 739-4220 ext. 5153Fax: (705) 792-4247Email: [email protected]

Mr. Paul Smeltzer, P. Eng. Consultant Project Manager AMEC Earth & Environmental 3215 North Service RoadBurlington, Ontario L7N 3G2P: (905) 335-2353 Toll Free: 1-866-751-2353 Fax: (905) 335-1414 E il l l @

24

Email: [email protected]

Please submit comments no later than September 30, 2011(two weeks).

*Information will be collected in accordance with the Municipal Freedom of Information and Protection of Privacy Act. With the exception of personal information, all comments will become part of the public record

Page 77: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

02/11/2011

13

Sept. 13, 2011

Th kThank youB L A C K P O R T

& A s s o c i a t e s C o n s u l t i n g

25

Page 78: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 79: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 80: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 81: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 82: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 83: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 84: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 85: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 86: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 87: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

CITY OF BARRIE

PUBLIC INFORMATION CENTRE No.1 TUESDAY SEPTEMBER 13, 2011

COMMENT SHEET PROJECT: INFRASTRUCTURE MASTER PLANS

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT PLEASE PRINT NAME: Representing E-mail: ________________________________Telephone: (Number & Street) (Municipality) (Postal Code) Do you wish to continue to be informed of the Study progress as well as future publications?

Signature:______________________________ Date: ___________

Are you satisfied with the detail of the information presented herein, at the Public Information Centre, and provided on the City website (www.barrie.ca)?

□ □ □ □ □ Excellent Very Good Good Marginal

(Some Improvement Required)

Poor (Much Improvement

Required)

Please add a comment in support of your level of satisfaction below: Please send your comments by September 30, 2011 to one of the following: Mr. Wayne Bando, P. Eng Infrastructure Planning Engineer City of Barrie 70 Collier Street, Box 400 Barrie, Ontario L4M 4T5 P: (705) 739-4220 ext. 5153 Fax: (705) 792-4247 Email: [email protected]

Mr. Paul Smeltzer, P. Eng. Consultant Project Manager AMEC Earth & Environmental 3215 North Service Road, Burlington, Ontario L7N 3G2 P: (905) 335-2353 Toll Free: 1-866-751-2353 Fax: (905) 335-1414 Email: [email protected]

Personal information on this form is collected under the authority of the Environmental Assessment Act, Chap. E18, Section 7, and will be used in the development of a Municipal Class Environmental Assessment. Questions about this collection should be directed to the Director of Engineering, P.O. Box 400, 70 Collier Street, Barrie, Ontario, L4M 4T5, (705) 726-4242.

Yes □ No □

Page 88: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

City of Barrie Infrastructure Master Plans Public Consultation Report

Project No. TP110135 Appendices

Public Information Centre #2

Page 89: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 90: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

Municipal Freedom of Information and Protection of Privacy Act.

Page 91: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 92: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 93: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 94: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 95: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 96: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 97: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 98: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 99: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 100: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 101: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 102: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 103: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 104: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 105: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 106: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 107: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 108: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 109: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 110: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 111: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 112: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 113: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

Land use Option Alternatives

Piping Option Combination

Inside Annexed Area Capital Cost

Outside Annexed Area Capital Cost Total Capital Cost

Grand Total (incl. 15% engineering and

20% contingency)

Total By Land Use Scenario

(W1) (E2)

Landuse Option 1

1 W1+E1 $36,378,986 $15,628,742 $52,007,728 $70,210,433 2 W1+E2 $36,378,986 $15,628,742 $4,895,288 $56,903,016 $76,819,072 3 W1+E3 $42,385,083 $15,628,742 $58,013,825 $78,318,663 4 W2+E1 $30,422,429 $30,422,429 $41,070,279 5 W2+E2 $30,422,429 $4,895,288 $35,317,717 $47,678,918 6 W2+E3 $36,428,526 $36,428,526 $49,178,510 $363,275,875

Landuse Option 2

1 W1+E1 $37,376,624 $15,628,742 $53,005,366 $71,557,244 2 W1+E2 $38,588,230 $15,628,742 $4,895,288 $59,112,260 $79,801,551 3 W1+E3 $43,382,720 $15,628,742 $59,011,462 $79,665,474 4 W2+E1 $30,428,106 $30,428,106 $41,077,944 5 W2+E2 $31,639,712 $4,895,288 $36,535,000 $49,322,2516 W2+E3 $36,434,203 $36,434,203 $49,186,174 $370,610,637

Landuse Option 3

1 W1+E1 $38,632,576 $15,628,742 $54,261,318 $73,252,780 2 W1+E2 $39,187,001 $15,628,742 $4,895,288 $59,711,031 $80,609,892 3 W1+E3 $42,880,233 $15,628,742 $58,508,975 $78,987,116 4 W2+E1 $31,984,768 $31,984,768 $43,179,437 5 W2+E2 $32,539,193 $4,895,288 $37,434,481 $50,536,550 6 W2+E3 $36,232,425 $36,232,425 $48,913,773 $375,479,549

Most Costly

Least Costly

Page 114: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 115: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 116: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 117: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 118: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 119: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 120: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 121: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 122: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

Creek Drainage area Annex lands within the subwatershed Drains to Lovers Creek 5,516 ha 930 ha

Lake Simcoe Hewitts Creek 1,673 ha 301 ha Sandy Cove Creek 1,859 ha 301 ha Thornton Creek 2,124 ha 292 ha

Nottawasga River Bear Creek 2,187 ha 427 ha

Page 123: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 124: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 125: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 126: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 127: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 128: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 129: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 130: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 131: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 132: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 133: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 134: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 135: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 136: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 137: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 138: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
Page 139: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

1

April 25, 2012

1

April 25, 2012Agenda

6:00 – 7:00 pm Opportunity to review information boards and discuss questions and comments with City Staff and the Consultant Team

7:00 – 7:10 pm Welcome – Councillor Jennifer Robinson

7:10 – 8:00 pm Presentation of Study Objectives and Key FindingsPaul Smeltzer, Class EA Infrastructure Master Plan Project Lead AMEC Environment and Infrastructure

8:00 – 8:30 pm Question Period

8:30 – 9:30 pm Opportunity to review information boards and discuss questions and comments with City Staff and the Consultant Team

April 25, 2012

2

April 25, 2012

City of BarrieGROWTH MANAGEMENT STRATEGYPublic Information Centre #3PUBLIC INFORMATION CENTRE #2Municipal Class Environmental Assessment -Phases 1 and 2

Page 140: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

2

April 25, 2012

3

April 25, 2012Introduction

WelcomeStudy Team:

- Macaulay Shiomi Howson- AMEC Environment & Infrastructure- Genivar- Watson & Associates Economists- Natural Resource Solutions- Blackport & Associates

Open House FormatInformation presented for Land Use Options - Annexed Area

April 25, 2012

4

April 25, 2012Purpose of Information Centre

What is the City and Study Team requesting of the public tonight?

Growth Management Strategy (GMS)Class Environmental AssessmentPlanning for Annex AreaPresentation of Land Use Options

Page 141: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

3

April 25, 2012

5

April 25, 2012Growth Management Strategy – 2031

Long Term Growth Strategy (2031 and beyond)Complies with Provincial requirement for Municipal Comprehensive ReviewAddresses growth within pre-2010 Barrie (UGC, built boundary andgreenfields)Provides a land budget for the Annexed AreaCity and Study Team presenting information to the public

Total Barrie Population = 210,000 Total Barrie Employment = 101,000Annexed Area Population = 39,000 Annexed Area Employment = 8,800

April 25, 2012

6

April 25, 2012Secondary Plan, Background Studies & Infrastructure

Master Plans forIntensification & Annexed Lands Consolidated Work Plan

We are here

Page 142: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

4

April 25, 2012

7

April 25, 2012Planning For Growth

ProcessStudy AreaConstraints IdentificationLand Use OptionsMulti-Modal Active TransportationServicing

- Water - Wastewater- Stormwater Management

April 25, 2012

8

April 25, 2012

Determine applicability of Master Plan

approach

Order granted,proceed as

per Minister’sDirection or

abandonproject

Matterreferred

to mediation

Order*deniedwith orwithout

Minister’sconditions

Optional formal mediation

Notice of Completion to review

agencies & public

Opportunityfor Order*Request to

Ministerwithin

30 days ofnotification

Opportunityfor Order*Request to

Ministerwithin

30 days ofnotification

If no Order*may proceed

Approved –may proceed

Schedule C

IndividualE.A

2. Discretionary public consultation to review problem or opportunity

1. Identify the problem or

opportunity

PHASE 1 PHASE 2

Proceed to construction and operation

Monitor for environmental provisions and commitments

Complete contract drawings and tender

documents

PHASE 3 PHASE 4 PHASE 5

4

5

Schedule B

3

2

PROBLEM OR OPPORTUNITY

ALTERNATIVE SOLUTIONS

ALTERNATIVE DESIGN CONCEPTS FOR

PREFERRED SOLUTION

ENVIRONMENTAL STUDY REPORT IMPLEMENTATION

Discretionary public

consultationto review

Preferred Design

Review environmental significance & choice

of schedule

Consult review agencies & previously interested &

directly affected public

Identify Alternative Design Concepts

Detail inventory of natural, social and

economic environment

Indentify impact of alternative designs on

environment, and mitigating measures

Evaluate Alternative Designs: identify

Recommended Design

Select Preferred Design

Preliminary finalizationof Preferred Design

Schedule A/A+

Opportunity to request Minister within 30 days of

Notification to request an Order

Complete Environmental Study Report (ESR)

Notice of Study Completion to review agencies and public

Environmental Study Report (ESR) placed on

public record

Copy of Notice ofCompletion to MOE-EA

branch

Indicates possible eventsIndicates mandatory events

Indicates probable events

Mandatory public contactpointsDecision points on choice of scheduleOptional

Part II Order*

Identify impact of Alternative Solutions on

the environment and mitigating measures

Evaluate Alternative Solutions: identify

recommended solutions

Consult review agencies and public re: Problem or

Opportunity and Alternative Solutions

Select Preferred Solution

Inventory natural, social, economic

environment

Review and confirm choice of schedule

Select Schedule(Appendix 1)

1. Identify alternative solutions to problem or

opportunity

Class Environmental Assessment

We are here

Page 143: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

5

April 25, 2012

9

April 25, 2012Problem / Opportunity

“To ensure the City of Barrie long‐term servicing needs are met to2031 and beyond, with consideration of projected future demandsresulting from Provincially mandated intensification nodes andcorridors and greenfield areas within the former City boundaryand, ultimate development within the recently annexed lands, thatare safe; well‐managed; in accordance with governing policiesrelated to sustainability, protection and preservation of naturalheritage and environment; delivered in a fiscally responsiblemanner; in full compliance with applicable legislation, regulationsand guidelines and; integrated with the City’s other infrastructure,planning, and growth management responsibilities.”

April 25, 2012

10

April 25, 2012Constraints

What are Constraints?

Natural Heritage SystemArchaeologicalCultural HeritageBuilt HeritageHazard lands

Page 144: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

6

April 25, 2012

11

April 25, 2012

3

Land Use Options - Annexed Area Build Out1

2

April 25, 2012

12

April 25, 2012Infrastructure Master Plans

Master Plans for the Annexed Area:

Multi-Modal Active TransportationWater SupplyWater Storage and DistributionWastewater TreatmentWastewater CollectionStormwater and Drainage

Page 145: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

7

April 25, 2012

13

April 25, 2012Master Planning - Multi-Modal Active Transportation

Objective:

Develop a Multi-Modal Active Transportation System for the Annexed Landswhich balances the needs of:

Movement of goods and services,Access to residential communities,Pedestrians,Cyclists, andTransit users.

April 25, 2012

14

April 25, 2012Master Planning - Parking Study

The Parking Study was completed for the Downtown, Waterfront andAllendale Neighbourhood in April 2012. Key Findings of the Parking Studyinclude:

Parking demand will increase as development proceeds.Supply in the City, primarily in the Downtown Core, will be reduced asdevelopment proceeds.No new off-street parking is proposed beyond parking planned forCentennial Park.An increase in walking, cycling and transit ridership will reduce parkingdemand.For Allandale, public education related to area parking limitations,encouraging walking, cycling and transit to the GO Station and theimplementation of a 3 hour parking restriction were recommended.

The City has prepared a Parking Strategy Rate Review Report which isbeing considered by Council.

Page 146: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

8

April 25, 2012

15

April 25, 2012Master Planning - Multi-Modal Active Transportation

Key Findings

A new interchange for Highway 400 at McKay Road is included in theanalysis of the road network.A hierarchy of roads will be required within the annexed area.Modifications to the Land Use Options exhibited in September 2011 wereinitiated to improve the multi-modal transportation network.Upgrades to the adjacent roads will be required.Active Transportation is highly dependant on the density of road and trailnetwork.The level of Intervention for Public Transit is a key consideration in themulti-modal transportation network.

April 25, 2012

16

April 25, 2012Master Planning - Water Supply

Objective:

Identify and evaluate existing water supply for the City of Barrie and developa strategy for servicing infill and intensification areas and the annexed area.

Options considered include:

Water conservation and efficiency,Upgrade the existing 60ML/day surface water treatment plant (designedfor expansion to 240ML/day),Development of new groundwater zone within Zone 2S for annexed area,andMixing of groundwater and surface water.

Page 147: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

9

April 25, 2012

17

April 25, 2012Master Planning - Water Supply

Key Findings

Based on 2031 maximum day demand projections:- Overall, there is sufficient water supply capacity to supply the entire

City.- There is sufficient groundwater supply for north Barrie for the

infill/intensification.- The surface water treatment plant will not be capable of providing peak

day demand in Zones 2S and 3S without implementation of one of theoptions.

All options considered are capable of providing required supply, includingimproved water conservation.

April 25, 2012

18

April 25, 2012Master Planning - Water Storage and Distribution

Objective:

Based on the identification of water demands, develop a water distribution(delivery) network to provide potable water to the development areasincluding:

Industrial, commercial and institutional users,Residential,Provision for storage, andFire flows.

Page 148: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

10

April 25, 2012

19

April 25, 2012Master Planning - Water Storage and Distribution

Key Findings

System piping upgrades are required in north Barrie to serviceinfill/intensification development. These upgrades are localized andprimarily in the Downtown core.Service to the west annexed areas will require a new feedermain systemfrom the surface water treatment plant including a pumping station andsystem storage.Service to the east annexed area will require piping extension to the area.

April 25, 2012

20

April 25, 2012Master Planning - Wastewater Treatment

Objective:

Identify the available capacity within the City of Barrie Water PollutionControl Centre (WPCC) and evaluate options for wastewater treatment,including the assessment of future discharge to Kempenfelt Bay (LakeSimcoe). Options evaluated include:

Water efficiency,Inflow and Infiltration control,Phased expansion of the tertiary treatment and/or rated capacity of theBarrie WPCC,Construction of a new Barrie WPCC to replace the existing,Construction of a new satellite facility and urban development effluentreuse,Expansion of the existing Barrie WPCC and diversion of the treatedeffluent to the NVCA watershed, andExpansion of the existing Barrie WPCC and urban development effluent

re use.

Page 149: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

11

April 25, 2012

21

April 25, 2012Master Planning - Wastewater Treatment

Key Findings

The existing Barrie Water Pollution Control Centre has a rated capacityof 76 ML/day. This is sufficient to treat projected flows to the year 2028.Implementing water conservation and Inflow and Infiltration control, hasthe potential to enable the existing wastewater treatment plant meetthe development needs.Improvements to the wastewater treatment plant are required to meetLake Simcoe protection policies.

April 25, 2012

22

April 25, 2012Master Planning - Wastewater Collection

Objective:

Develop a wastewater collection system to transport wastewatergenerated within the infill/intensification and annexed area to the BarrieWater Pollution Control facility including:

Identification of pipe routing,Determination of pumping requirements, andEvaluation of upgrades to the existing system.

Page 150: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

12

April 25, 2012

23

April 25, 2012Master Planning - Wastewater Collection

Key FindingsFlow increases due to infill/intensification have a minor impact on the existingwastewater collection system.Several options are available for the development of a wastewater collection systemfor the annexed area, these include:

East Annexed AreaTwo (2) outlets are available for the service area with two options for transport of wastewater:- Primarily gravity with a pumping station servicing the eastern portion and forcemain

discharge to either the City of Barrie system or the Town of Innisfil system.- A gravity system with deep gravity sewers in the extreme eastern portion of the annexed area

outletting to the City of Barrie system.

West Annexed AreaFour (4) outlets are available for the service area with two options for transport ofwastewater:- Gravity system with major upgrades to the existing City of Barrie trunk system.- Single pumping station outletting to Huronia Road with virtually no upgrades to the

existing City of Barrie system.

April 25, 2012

24

April 25, 2012Master Planning - Stormwater & Drainage

Hydrology and hydraulics (surface water) for flooding and erosion management,Review of stormwater practices acceptable to Barrie,Hydrogeology (ground water),Assessment of water quality and in particular phosphorus loading (CANWETTM),

Objective:Stormwater and drainage impact management is a fundamental requirement in thedevelopment of lands. To assess the impact development has on stormwater, significantbackground study is required of area watercourses and features. For the City of Barrie, thisalso includes developing plans which manage the discharge of stormwater to Lake Simcoe,according to the provisions of the Lake Simcoe Protection Plan.

Watercourse classification and stream properties,Geotechnical issues such as slope stability and erosion potential,Opportunities for retrofitting existing stormwater management facilities and/orexisting storm drainage outlets,Siting of new stormwater management facilities in the annexed areas, andOpportunities for use of low impact development stormwater managementtechniques.

Background studies necessary to address the needs of stormwater and drainageassociated with new development include:

Page 151: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

13

April 25, 2012

25

April 25, 2012Master Planning - Stormwater & Drainage

Key Findings

Stormwater management and integrated drainage system design will be requiredto mitigate potential flooding risk.Soils investigations within the annexed areas indicate areas which aresusceptible to erosion as well as areas of sensitive recharge.Stormwater management facility design, stormwater retrofits and low impactdevelopment drainage techniques will be required to meet water qualityobjectives including phosphorus management to Lake Simcoe.Groundwater levels vary across the annexed area, development impacts can bemitigated through stormwater management.Existing watercourses can be protected through the inclusion sufficient land inthe form of meander belts in the Natural Heritage System.

April 25, 2012

26

April 25, 2012Economic / Financial Evaluation

Objective

Undertake a high level economic / financial evaluation based on:

Capital costs of infrastructureLifecycle replacement costOperating and maintenance costsAnticipated revenues (tax and non-tax)Development Charge implications

Page 152: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

14

April 25, 2012

27

April 25, 2012Economic / Financial Evaluation

Key Findings

Capital Fund ImpactsDevelopment charges (DCs) are the primary financing source for eligible growth-related capital works.

Operating Fund ImpactsLand Use Options 1 and 3 are expected to generate a slightly negative impact on the City’s property tax base at full build-out.

Land Use Option 2 is expected to generate a slightly positive impact on the City’s property tax base at full build-out.

April 25, 2012

28

April 25, 2012Evaluation Process

The evaluation of alternatives will be considered in the context of regionalsignificance in terms of environmental factors, the economy, and the ability toimplement Provincial and Municipal strategic directions for the annexed area.

In the evaluation of Land Use Options, weighting scenarios were developed toallow Study Team to reflect the unique issues in study area. The Study Teamdeveloped thirty-six (36) evaluation factors and a weighting scenario in consultationwith the public, stakeholders and agencies during the study and from the first PublicInformation Centre (PIC) held September 13, 2011.

Public input will be used to assist the project team in the evaluation of the Land UseOptions of the Annexed Area Infrastructure Master Plans and Secondary PlansMunicipal Class Environmental Assessment.

Page 153: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

15

April 25, 2012

29

April 25, 2012Evaluation Process

April 25, 2012

30

April 25, 2012Evaluation Process

Criteria Natural, Social & Cultural and PhysicalEnvironments

Page 154: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

16

April 25, 2012

31

April 25, 2012Evaluation Process

Criteria Drainage, Potable Water, Wastewater and Transportation

April 25, 2012

32

April 25, 2012Evaluation Process

Criteria Economic / Financial

Page 155: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

17

April 25, 2012

33

April 25, 2012Document Availability

Where can I find the background information?

Resources available online at the City of Barrie website under

www.Barrie.ca>City Hall>Growth Management>Documents and Resources

April 25, 2012

34

April 25, 2012Public Input

To ensure study success, the Study Team requests that comment sheets be submitted.

Page 156: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3

28/05/2012

18

April 25, 2012

35

April 25, 2012Next Steps

Receive public comments by Wednesday, May 9, 2012;Review, refine and consider Alternative Land Use Options based on input.Prepare Public Consultation ReportConsider Amendments to Land Use PlanPresent the Preferred Land Use Option to City June 2012Draft Secondary for 2031 Development Annexed Area and Master PlansSummer 2012Public and Agency Review of Plans Fall 2012Modify Plans and present to Council late 2012

Page 157: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 158: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 159: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 160: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 161: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 162: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 163: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 164: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 165: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle
Page 166: City of Barrie Consultation Report for Infrastructure ... Hall/Planning-and... · Infrastructure Master Plans Public Consultation Report November 2013 Project No. TP110135 Page 3
danny.stone
Rectangle