CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036661EXC
5251 Zurich to 5209 Zurich Pl NE
Replace Primary Power for PNM Bore New Conduit for Primary Power.
08/31/2020 through 09/04/2020
KELLY CABLE - Martin Sanchez , (505) 917-3706Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036359EXC
ACADEMY From RUBY To TRUCHAS
Curb-cut and Drive-pad Construction
08/31/2020 through 09/04/2020
COA Parks Construction - Pete Saiz, (505) 857-8664Contact :
Project Date(s) :
:Details Eastbound right lane, bike lane, and sidewalk closure on Academy Rd. along Arroyo Del OsoGolf Course.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020036650EXC
ACADEMY From MOON To LAYTON
Install crosswalks and symbols. Reflectorize thermo plastic markings.
08/31/2020 through 10/31/2020
HIGHWAY SUPPLY- Renee Tafoya, (505) 345-8295Contact :
Project Date(s) :
:Details Various lane closures using Truck mounted ArrowBoard Mobile operation on Academy at its intersection with Walmart access and Moon.
Southbound lane closure Truck mounted ArrowBoard Mobile operation on Ventura north of Academy using
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 1 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020035438EXC
CANDELARIA From GIRARD To CARLISLE
Bridge repair.
06/29/2020 through 08/31/2020
HASSE CONTRACTING - Travis Hasse, (505) 263-2558Contact :
Project Date(s) :
:Details Phase 1: Eastbound and Westbound right lane closure on Candelaria between Girard andRichmond. Traffic will be maintained in the left lanes in both directions.Phase 2: Eastbound and Westbound left lane closures and center two way left turn lane closureon Candelaria between Girard and Richmond.Traffic will be maintained in the right lanes in both directions.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020036628EXC
4411 CARLISLE BLVD NE
bore new fiber to address.
08/31/2020 through 09/09/2020
KELLY CABLE - James Richardson, (505) 280-4383Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure on Montgomery west of Carlisle.Traffic will be maintained in the center and left lanes in both directions.Southbound right lane and sidewalk closure on Carlisle south of Montgomery.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 2 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036659EXC
2640 Carlisle Blvd NE
08/31/2020 through 08/31/2020
WILSON CONST- Perez Ciddio , (503) 349-7679Contact :
Project Date(s) :
:Details Northbound right lane and sidewalk closure on Carlisle north and South of Menaul.ITC-Intermittent Traffic ControlIntermittent Traffic Control will be at the intersection of Menaul and Carlisle (between 11AM and4PM). Traffic will be held for a brief periods of time (no more than 5 minutes).
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Various lanes closed one at a time from 9:00Am to 3:00PM.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 3 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036240EXC
CARLISLE From CANDELARIA To COMANCHE
Paving Work on Carlisle (Night Work 9PM to 6AM)Utility Adjustments (Day Time) "Continuous Until Complete". See Attached Schedule &Corresponding TCP's.08/16/2020 through 09/14/2020
ALBUQUERQUE ASPHALT- Brian W Loughridge, (505) 991-5916Contact :
Project Date(s) :
:Details Phase 1 (8/16/20) Night Work: Northbound and Southbound left turn deceleration lane clsoureson Carlisle between Candealria and Comanche.Phase 2(8/17/20) Night Work: Northbound left lane and center lane closure on Carisle betweenCandealria and Comanche.Phase 3(8/18/20) Night Work: Northbound right lane and center lane closure on Carlislebetween Candealria and Comanche.Phase 4(8/19/20) Night Work: Southbound left lane and center lane closure on Carlisle betweenComanche and Candelaria. Part of northbound right lane will be closed at the intersection ofComanche.Phase 5(8/20/20) Night Work: Southbound right lane and center lane closure on Carlislebetween Comanche and Candelaria.Phase 6(8/24-8/30): Northbound and Southbound left lanes and center two way left turn laneclosure on Carlisle between Candelaria and Comanche.Phase 7(8/31-9/6): Northbound right lane closure on Carlisle between Candelaria andComanche.Phase 8:(9/7-9/14) Southbound right lane and center lane closure on Carlisle betweenComanche and Candelaria.
LANE CLOSURE FROM 8 P.M. TO 6 A.M. ONLY. NIGHT TIME WORK.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete. DAYTIME.
Permit NumberLocationProject
:
:
:
2020036679EXC
13000 CEDARBROOK AVE NE
REPLACE GAS SERVICE.
09/01/2020 through 09/11/2020
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 4 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036372EXC
CENTRAL From EUBANK To JUAN TABO
Central Ave Between Eubank & Juan Tabo NE.
08/19/2020 through 09/02/2020
FRANKLIN'S EARTHMOVING - Hector Perez , (505) 991-2200Contact :
Project Date(s) :
:Details Westbound center lane and left lane closure on Central between Juan Tabo and Eubank. Trafficwill be maintained in the right lane.If permitted closure shall be from block to block.Maximum work zone length permitted is 1600'.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020036681EXC
1941 CHANDELLE LOOP NE
RAISE GAS METER.
09/01/2020 through 09/11/2020
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036529EXC
900 CHELWOOD PARK BLVD NE
Bike Lane and North Bound Lane Closure for Water & Sewer.
08/31/2020 through 09/04/2020
SUNSHINE PLUMBING - Joseph Santangelo Jr., (505) 296-3188Contact :
Project Date(s) :
:Details Northbound total closure on Chelwood Park between Lomas and Alice.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 5 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2019027609EXC
6301 EAGLE ROCK AVE NE
Road Closure to Direct Incoming and Outbound Traffic
04/09/2019 through 04/01/2021
COA - Joaquin Rimbert - SOLID WASTE, (505) 261-3347Contact :
Project Date(s) :
:Details Through access on Eagle Rock Ave. at Eagle Rock Convenience Center will be closed(Between San Pedro and Obsidian). All traffic will be directed into Eagle Rock ConvenienceCenter
SATURDAY AND SUNDAY ONLY7:30AM TO 1:30PMSEEK ALTERNATE ROUTE
This closures will take place 7-days per week during the COVID-19 stay-at-home order.
Permit NumberLocationProject
:
:
:
2020036657EXC
EUBANK From EUBANK To QUINTESSENCE
Install crosswalks and symbols. Reflectorize thermo plastice markings.
08/31/2020 through 10/31/2020
HIGHWAY SUPPLY- Renee Tafoya, (505) 345-8295Contact :
Project Date(s) :
:Details Various lane closure using Truck Mounted Arrow Board Mobile operation on Eubank at itsintersection of Quintessence.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Various lanes closed one at a time from 9:00Am to 3:00PM.
Permit NumberLocationProject
:
:
:
2020036696EXC
INDIAN SCHOOL From HARVARD To INDIAN SCHOOL
SPLICE MUX ON SOUTH SIDE OF INDIAN SCHOOL SIDEWALK AND SHOULDERCLOSURE.09/04/2020 through 09/05/2020
CABLECOM - Javier Gonzalez, (505) 264-3965Contact :
Project Date(s) :
:Details Eastbound right lane, bike lane and sidewalk closure on Indian School west of Harvard.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 6 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036248EXC
INDIAN SCHOOL From LOUISIANA To PENNSYLVANIA
Directional Bore - UG Conduit Placement
08/17/2020 through 08/31/2020
DEL RIO CONSTRUCTION - Karen O'Kelly, (505) 884-2088Contact :
Project Date(s) :
:Details Eastbound right lane, bike lane, and sidewalk closure on Indian School Rd. between LouisianaBlvd and Pennsylvania Rd.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036217EXC
JEFFERSON From SINGER To OSUNA
Median Construction on Jefferson fromOsuna to Singer - Inside lane closure in both directions.08/10/2020 through 10/30/2020
LEE LANDSCAPES - Lee Scott , (505) 822-8722Contact :
Project Date(s) :
:Details Phase 1:Northbound and Southbound left lane closures between Osuna and Jefferson Plaza.Traffic will be maintained in the right lanes in both directions.Phase 2:Northbound and Southbound left lane closures between Jefferson Plaza and Ellison.Traffic will be maintained in the right lanes in both directions.Phase 3: Northbound and Southbound left lane closures between North of Ellison and Singer.Traffic will be maintained in the right lanes in both directions.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036491EXC
1001 JUAN TABO NE
Sewer Main Cleaning - TCP-032037 - Lomas Blvd Bt Juan Tabo Blvd & Marcella St - EB DLLC.
08/31/2020 through 09/02/2020
ABCWUA - Arlo Gonzales , (505) 239-0089Contact :
Project Date(s) :
:Details Eastbound right lane and center lane closure on Lomas between Grace and Juan Tabo.Westbound both left turn lane closures on Lomas east of Juan Tabo.Northbound and Southbound left turn lane closure on Juan Tabo at its intersection with Lomas.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 7 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036562EXC
JUAN TABO From LOMAS To SUMMER
Directional Bore - Place Conduit and Fiber
08/24/2020 through 09/04/2020
VOLT INC- Danny Padilla, (505) 573-4954Contact :
Project Date(s) :
:Details Phase I: East and westbound outside lane and sidewalk closures on Lomas Blvd at Juan TaboBlvd.Phase II: Northbound right lane and sidewalk closure on Juan Tabo Blvd between Lomas Blvdand Summer Ave.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036512EXC
612 MCKNIGHT AVE NE
GAS SERVICE REMOVAL.
08/24/2020 through 09/04/2020
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020035970EXC
8333 MONTGOMERY BLVD NE
BORE NEW FIBER TO ADDRESS
08/24/2020 through 08/31/2020
KELLY CABLE - James Richardson, (505) 280-4383Contact :
Project Date(s) :
:Details Southbound right lane and sidewalk closure on Montgomery north of Wyoming. Traffic will bemaintained in the center and left lanes.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 8 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036239EXC
1516 MOON ST NE
Moon St NE-1516, 1512, 1500, 1417, 1413, 1409, 1405, 1401, 1536, 1532, 1520Gas Service.08/24/2020 through 09/19/2020
TLC - Ramon Lopez, (505) 389-8474Contact :
Project Date(s) :
:Details Total street closure on Moon between Constitution and Indian School.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Follow detour
Permit NumberLocationProject
:
:
:
2020036553EXC
6801 PROMENADE AVE NE
DRIVE APRONS AND SIDEWALKS.
08/27/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036610EXC
310 & 328 Rhode Island St NE
Install Anodes on one day between these dates.
08/31/2020 through 09/11/2020
NM GAS - Leo Sanchez, (505) 259-8559Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036535EXC
MONTGOMERY From SAN MATEO To MONTGOMERY
CLOSE EXISTING DRIVEPAD - INSTALL 40ft CURB AND GUTTER - 40 ft SIDEWALK.
08/31/2020 through 09/03/2020
CHAVEZ CONCRETE - Dan Chavez , (505) 881-1330Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Contractor must have an employee present at all times to escort pedestrians through the workzone since both directions of the sidewalk will be closed simultaneously. OR contractor mustcreate a temporary ADA compliant pedestrian path around the work zone.SAFE AND ADEQUATE PEDESTRIAN ACCESS MUST BE MAINTAINED AT ALL TIMES.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 9 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036179EXC
SAN PABLO From CHICO To CENTRAL
Install new waterline and sewer line and demo abandoned fire line for new International DistrictLibrary.08/11/2020 through 09/01/2020
BRADBURY STAMM CONSTRUCTION - Aaron Stricker, (505) 681-8234Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036632EXC
3109 San Pedro Dr NE
Lane Closure for Sewer Repair.
08/31/2020 through 09/01/2020
SUNSHINE PLUMBING - Joseph Santangelo Jr., (505) 296-3188Contact :
Project Date(s) :
:Details Southbound total closure and Center two way left turn lane closure on San Pedro betweenArvilla and Alta Monte.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Follow detour
Permit NumberLocationProject
:
:
:
2020036656EXC
SAN PEDRO From HOLLY To SAN PEDRO
Install crosswalks and symbols. Reflectorize thermo plastic markings.
08/31/2020 through 10/31/2020
HIGHWAY SUPPLY- Renee Tafoya, (505) 345-8295Contact :
Project Date(s) :
:Details Various lane closure using Truck Mounted Arrow Board Mobile operation on San Pedrobetween San Antonio and Holly.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Various lanes closed one at a time from 9:00Am to 3:00PM.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 10 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036251EXC
TRAMWAY From LOMAS To TRAMWAY
Median and Decal Lane Work.
08/31/2020 through 09/25/2020
TLC - Noah Griego , (505) 697-7544Contact :
Project Date(s) :
:Details Phase 1: Eastbound left lane closure on Lomas Between Nakomis and Tramway.Phase 2: Westbound right lane and sidewalk closure on Lomas between Tramway Blvd. andPawnee.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036652EXC
VENTURA From SAN FRANCISCO To FREEDOM
Install Cross walks and symbols. Reflectorize thermo plastic markings.
08/31/2020 through 10/31/2020
HIGHWAY SUPPLY- Renee Tafoya, (505) 345-8295Contact :
Project Date(s) :
:Details Various lane closures using Truck Mounted Arrow Board mobile operation on Ventura.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Various lanes closed one at a time from 9:00Am to 3:00PM.
Permit NumberLocationProject
:
:
:
2020036550EXC
6928 & 6924 Walnut Creek Dr NE
DRIVE APRONS AND SIDEWALKS.
08/27/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036551EXC
6927 WALNUT CREEK DR NE
DRIVE APRONS AND SIDEWALKS.
08/27/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 11 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHEAST North of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036669EXC
904 WASHINGTON ST NE
Curb and gutter / Driveway Apron.
09/01/2020 through 09/15/2020
EC CONSTRUCTION - Efren Caraveo , (505) 288-1780Contact :
Project Date(s) :
:Details Parking lane and sidewalk closure on Washington.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036608EXC
500 & 515 Wisconsin St NE
Install Anodes on one day between these dates.
08/31/2020 through 09/11/2020
NM GAS - Leo Sanchez, (505) 259-8559Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020035225EXC
WYOMING From MONTGOMERY To GUTIERREZ
Champion Express Carwash - Entrance Construction and UG Utility Placement
06/17/2020 through 09/04/2020
UNIVERSAL CONTRACTORS- Gilbert, (505) 884-0400Contact :
Project Date(s) :
:Details Following phases will be on Wyoming Blvd just north of Montgomery Blvd.Phase I: Northbound right lane and sidewalk closure.Phase II: Northbound double inside lane closure.Phase III: North and southbound inside lane closure.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020036675EXC
5925 Wyoming Blvd NE
Tree Trimming /lane closure south bound middle & right lane closure from Cubero Dr to approx50' to the south.09/01/2020 through 09/01/2020
Baca's Trees - Dora Nicole, (505) 899-6666Contact :
Project Date(s) :
:Details Southbound right lane, middle lane and sidewalk closure on Wyoming south of Cubero.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 12 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020034967EXC
12TH ST And MENAUL BLVD
ROUND-A-BOUT CONSTRUCTION
05/27/2020 through 11/20/2020
STAR PAVING - David Espinosa , (505) 280-0438Contact :
Project Date(s) :
:Details Phase I: Eastbound right lane and sidewalk closure on Menaul Blvd between 12th St. and 8thSt.Phase II: Total closure of 12th St. between Menaul blvd and Matthew Ave., and a Westbounddouble lane closure on Menaul Blvd between 8th St. and 12th St. with two-way trafficmaintained in the eastbound lanes.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020036594EXC
5124 2nd st nw
Repair Emergency gas line leak- Damaged Line.
08/21/2020 through 09/04/2020
NM GAS- Rebecca Krajicek, (505) 697-3127Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Northbound right lane and sidewalk closure on 2nd St. South of Hilton
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036428EXC
4TH From MCKNIGHT To HAINES
REPLACE RING AND COVERS-POUR COONCRETE COLLARS NB SB TRAFFIC SPLIT.WO# 1079912.08/21/2020 through 08/31/2020
ABCWUA- Matthew Montano, (505) 977-1265Contact :
Project Date(s) :
:Details Southbound right lane closure with southbound traffic being maintained in the center of the roadon 4th St. between McKnight and Hanes.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 13 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036658EXC
ALAMEDA From ALAMEDA PARK To ALAMEDA
Install crosswalks and symbols. reflectorize thermo plastic markings.
08/31/2020 through 10/31/2020
HIGHWAY SUPPLY- Renee Tafoya, (505) 345-8295Contact :
Project Date(s) :
:Details Various lane closure using Truck Mounted Arrow Board Mobile operation on Alameda at itsintersection with Alameda Park.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Various lanes closed one at a time from 9:00Am to 3:00PM.
Permit NumberLocationProject
:
:
:
2020036637EXC
COTTONWOOD From NM 528 To COTTONWOOD
Emergency WTRLN-1160194-MAIN LEAK.
08/25/2020 through 09/01/2020
ABCWUA - Ron Vigil, (505) 289-3583Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Southbound right lane closure on Cottonwood between American and NM528.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Permit NumberLocationProject
:
:
:
2020036687EXC
4608 Driftwood Ave NW
Pole changeout in backyard. Parking Wilson construction bucket trucks in front of residence.
09/03/2020 through 09/03/2020
WILSON CONST- Perez Ciddio , (503) 349-7679Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 14 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036542EXC
601 GALLATIN NW
Bore to get Fiber Optic to new building at address.
08/26/2020 through 08/31/2020
KELLY CABLE- Perri Sanchez, (505) 343-1144Contact :
Project Date(s) :
:Details Eastbound total closure with eastbound traffic being maintained in the westbound left lane onFortuna east and west of Gallatin.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036649EXC
GOLDEN From DELLYNE To MONTANO
Hot in Place Recycling of Asphalt Pavement.
08/31/2020 through 09/05/2020
DUSTROL- Aaron Alshouse, (915) 217-5145Contact :
Project Date(s) :
:Details Total street closure on Golden between Montano and Dellyne.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Follow detour
Permit NumberLocationProject
:
:
:
2020036665EXC
GOLF COURSE From DRIFTWOOD To GOLF COURSE
OVERLASH 72 CT FIBER OPTIC SIDEWALK AND SINGLE LANE CLOSURE.
09/01/2020 through 09/03/2020
CABLECOM - Javier Gonzalez, (505) 264-3965Contact :
Project Date(s) :
:Details Southbound right lane, bike lane and sidewalk closure on Golf Coursed north and south ofDriftwood. Traffic will be maintained in the left lane.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 15 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036156EXC
LADERA And TESSA
Sidewalk and lane closures on Ladera and Tessa
08/25/2020 through 09/08/2020
KELLY CABLE- Brian Schalipp, (505) 604-1469Contact :
Project Date(s) :
:Details Eastbound right lane, bike lane, and sidewalk closure on Ladera Dr. at Tessa, and a northboundparking lane and sidewalk closure on Tessa at Ladera.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036563EXC
LOMAS From LOMAS To 4TH
Sign Installation.
08/28/2020 through 08/30/2020
TLC - Cody Walton , (505) 362-7847Contact :
Project Date(s) :
:Details Westbound right lane and sidewalk closure using Truck Mounted Arrow Board Mobile Operationon Lomas east of 4th St.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036674EXC
2109 Meadowview Dr NW
New Drivepad and replace sidewalk.
09/01/2020 through 09/08/2020
PYRAMID CONCRETE - James Hidalgo , (505) 830-4300Contact :
Project Date(s) :
:Details Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020036482EXC
1776 Montano NW
E/B Curbside lane closure. Emergency expose paved over valve and valve repair.
08/14/2020 through 09/06/2020
ABCWUA- Fran Smull, (505) 259-3501Contact :
Project Date(s) :
:Details Eastbound parking lane and sidewalk closure on Montano in front of address.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 16 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036704SU
MONTANO From GOLDEN To PICTURE ROCK
Fiber Splice
09/02/2020 through 09/02/2020
ADB - Michael Duran, (636) 249-4830Contact :
Project Date(s) :
:Details Westbound right lane, bike lane, and sidewalk closure on Montano Rd. at Golden Ave.
WATCH FOR BIKES! BICYCLISTS ARE ALLOWED USE OF FULL LANE.
Permit NumberLocationProject
:
:
:
2020036433EXC
MONTANO From UNSER To WHITEMAN
Directional Bore - Place UG Conduit
08/18/2020 through 08/31/2020
ARMOR COMMUNICATIONS - Kevin Gonzales, (505) 917-8940Contact :
Project Date(s) :
:Details Eastbound right lane, bike lane, and sidewalk closure on Montano Rd. between Unser Blvd andWhiteman Dr.Southbound parking lane and sidewalk closure on Whiteman Dr. south of Montano Rd.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036317EXC
N DIVERSION CHANNEL From OSUNA To PAN AMERICAN
Bicycle trail between Osuna & I-25, Various walking trail bridge repairs. Repairing bridgetransitions, We will only close 2 bridges at a time to minimize trail closures.08/17/2020 through 09/11/2020
FRANKLIN'S- Howard Ross, (505) 884-6947Contact :
Project Date(s) :
:Details Bridge closure on Bike Trail on North Diversion Channel.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 17 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036282EXC
OSUNA From EDITH To CHAPPELL
Directional Bore - Place UG Conduit
08/13/2020 through 09/04/2020
ADB - Andy Barton, (636) 744-5610Contact :
Project Date(s) :
:Details Phase I: Eastbound sidewalk and shoulder closure on Osuna Rd between Edith Blvd and VistaDel Norte.Phase II: Eastbound right lane and sidewalk closure on Osuna Rd. between Vista Del Norte andChappell Rd.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036651EXC
OSUNA From VISTA DEL NORTE To CHAPPELL
Install cross walks and symbols. Reflectorize thermo plastic markings.
08/31/2020 through 10/31/2020
HIGHWAY SUPPLY- Renee Tafoya, (505) 345-8295Contact :
Project Date(s) :
:Details Various lane closures on Osuna west of Chappel.Various lane closure on Vista Del Norte east of Osuna.All closures above will be Truck Mounted Arrow Board mobile operation.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Various lanes closed one at a time from 9:00Am to 3:00PM.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 18 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036636EXC
PARADISE From JUSTIN To CHAPARRAL
Hot in Place Recycling of Asphalt Pavement.
08/27/2020 through 08/29/2020
DUSTROL- Aaron Alshouse, (915) 217-5145Contact :
Project Date(s) :
:Details Phase 1: Westbound right lane and bike lane closure on Paradise between Justin andChaparral. Traffic will be maintained in the left lane.Phase 2: Eastbound and Westbound left lanes and center two way left turn lane closure onParadise between Chaparral and Justin.Phase 3: Eastbound right lane and bike lane closure on Paradise between Chaparral andJustin. Traffic will be maintained in the left lane.Work Zone length shall be between two major intersections or work in maximum permitted workzone length of 1600' interval.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Permit NumberLocationProject
:
:
:
2020035794EXC
PASEO DEL NORTE From N DIV CN DRG ROW To PASEO DEL NORTE
emergency to assess the sewer line
07/16/2020 through 09/09/2020
RMCI - Ron Fernandez , (505) 250-4207Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036452EXC
SEVEN BAR LOOP From COTTONWOOD To SEVEN BAR LOOP
Sign installation.
08/28/2020 through 08/30/2020
TLC - Cody Walton , (505) 362-7847Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
Eastbound and Westbound right lane closure using Truck Mounted Arrow Board Mobileoperation on 7 Bar Loop at its intersection with Cottonwood.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 19 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
NORTHWEST North of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020035941EXC
UNSER From LADERA To LAURELWOOD
Crack sealing.
07/27/2020 through 09/11/2020
DISMUKE CONSTRUCTION- Randy Carter, (505) 884-1633Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036300EXC
2051 WHITE SQUALL NW
DRIVE APRONS AND SIDEWALKS.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036288EXC
8819 WIND SOCK NW
DRIVE APRONS AND CITY WALKS
08/13/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 20 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036540EXC
3022 CENTRAL SE
Bore new fiber to address.
08/26/2020 through 09/02/2020
KELLY CABLE - James Richardson, (505) 280-4383Contact :
Project Date(s) :
:Details Southbound parking lane and sidewalk closure on Richmond south Central.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036297EXC
2005 BURROWING OWL SE
DRIVE APRONS AND SIDEWALKS.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036671EXC
2024 BURROWING OWL SE
DRIVE APRONS AND SIDEWALKS.
09/01/2020 through 09/15/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036216EXC
2023 BURROWING OWL SE
DRIVE APRONS AND SIDEWALKS.
08/19/2020 through 09/09/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 21 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036516EXC
CENTRAL From HARVARD To STANFORD
DIRECTIONAL BORE
08/24/2020 through 08/29/2020
Diverse Development - Paul Santillanes, (505) 804-1592Contact :
Project Date(s) :
:Details East and westbound right lane, parking lane, and sidewalk closure on Central Ave betweenHarvard Dr. and Stanford Dr.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020034282EXC
1300 CENTRAL AVE SE
Construction of new parking garage for PresbyterianHospital.04/20/2020 through 04/20/2021
ENTERPRISE BUILDERS CORP- Michael McCourt, (505) 857-0050Contact :
Project Date(s) :
:Details Total street closure Silver between Sycamore and Spruce.Northbound left lane closure on Spruce between Silver and Central.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Permit NumberLocationProject
:
:
:
2020036304EXC
13300 CENTRAL SE
Pull asphalt and valve settlement.
08/20/2020 through 09/09/2020
ABCWUA - Carlos A. Sena , (505) 289-3545Contact :
Project Date(s) :
:Details Eastbound right lane and center lane closure on Central west of Tramway.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 22 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036616EXC
CENTRAL From CENTRAL To ASH
Emergency wo 1158491 valve repair.
08/24/2020 through 08/31/2020
ABCWUA - Ron Vigil, (505) 289-3583Contact :
Project Date(s) :
:Details Emergency utility work. Various lanes closed and potential sidewalk closures. Seek alternateroute.
Westbound bus lane closure on Central near Ash. Working behind existing work zone.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020035940EXC
CENTRAL From WYOMING To ZUNI
ENITE CONDUIT REPLACEMENT FOR THE CITY for TIM BROWN, COA ENGINEERINGDEPARTMENTMULTIPLE LANE CLOSURE.07/27/2020 through 09/08/2020
MWI - Belen Mora Solano, (505) 508-0744Contact :
Project Date(s) :
:Details -Westbound right lane closure using Truck Mounted Arrow Board Mobile operation on Centralwest of Wyoming.
Westbound left lane and left turn lane closure using Truck Mounted Arrow Board Mobileoperation on Central east of Wyoming.-Westbound right lane and Eastbound left turn lane closure on Central at its intersection withWyoming.
-Westbound left lane and left turn lane closure on Central east of Wyoming.Westbound left turn lane closure on Central east of Wyoming.-Southbound right lane closure on Wyoming north of Central.Northbound left turn lane closure on Wyoming south of Central.-Southbound left lane and left turn lane closure on Wyoming north of Central.Northbound left turn lane closure on Wyoming south of Central.-Southbound left turn lane and northbound right lane closure on Wyoming at its intersection withCentral.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 23 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036559EXC
CENTRAL From YALE To CENTRAL
Sign Installation.
08/28/2020 through 08/30/2020
TLC - Cody Walton , (505) 362-7847Contact :
Project Date(s) :
:Details Eastbound and Westbound right lane and sidewalk closure using Truck Mounted Arrow BoardMobile Operation on Central at its intersection with Yale.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Permit NumberLocationProject
:
:
:
2020036646EXC
CHICO From CENTRAL To GROVE
Cap waterline at Chico and Grove and add valve. Demo sanitary sewer back to manhole inintersection.08/31/2020 through 09/11/2020
BRADBURY STAMM CONSTRUCTION - Aaron Stricker, (505) 681-8234Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036664EXC
COPPER From SAN PEDRO To DOMINGO
Hot in Place Recycling of Asphalt Pavement.
09/01/2020 through 09/12/2020
DUSTROL- Aaron Alshouse, (915) 217-5145Contact :
Project Date(s) :
:Details 1. Total road closure on Harper between Pan American Frontage and San Mateo Access.2. Eastbound total closure on Copper between San Mateo and San Pedro. Flagging operationwill be used to direct traffic through work zone.3. Total street closures between Central and Copper on the following streets: Alvarado, Cagua,Cardenas La Veta, Laguayra, Madison, Palomas and Valencia.4. Total street closure on Zia between Madeira and Valencia.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Follow detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 24 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036299EXC
1808 DUKE CITY SE
DRIVE APRONS AND SIDEWALKS.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020035772SU
EUBANK From INNOVATION To GIBSON
KAFB/SNL Eubank Gate Closure - Canopy Construction
07/17/2020 through 11/27/2020
MAC GC ELECTRIC - Jody Williams, (505) 508-6991Contact :
Project Date(s) :
:Details Various outside and inside lane closures on Eubank Blvd at the SNL Eubank Gate.
Permit NumberLocationProject
:
:
:
2020033805SU
GIBSON From RIDGECREST To SAN MATEO
COVID-19 Testing Site Road Closure
03/18/2020 through 08/31/2020
VA Hospital - Byron Secatero, (505) 205-0612Contact :
Project Date(s) :
:Details Southbound thru lane closure on San Mateo at Gibson, westbound left turn lane closure onGibson at San Mateo, and a total southbound closure of Ridgecrest south of Gibson.24-7 Closure
Permit NumberLocationProject
:
:
:
2020036685EXC
GRANITE From MOUNTAIN To GEORGENE
Install 2-transformers in backyards using Crane.
09/02/2020 through 09/02/2020
WILSON CONST- Darian Vigil, (505) 280-2789Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 25 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036617EXC
INDIAN SCHOOL From MORNINGSIDE To ALTURA VISTA
Bridge Maintenance
08/31/2020 through 09/11/2020
HASSE CONTRACTING - Travis Hasse, (505) 263-2558Contact :
Project Date(s) :
:Details Various lane closures on Indian School Rd. bridge between Morningside and Sunningdale.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036564EXC
LOMAS From LOMAS To STANFORD
Sign Installation.
08/28/2020 through 08/30/2020
TLC - Cody Walton , (505) 362-7847Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure using Truck Mounted Arrow Board Mobile Operationon Lomas east of Stanford.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036298EXC
11440 MANZANO VISTA SE
DRIVE APRONS AND SIDEWALKS.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036203EXC
11435 MANZANO VISTA SE
DRIVE APRONS AND SIDEWALKS.
08/19/2020 through 09/09/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 26 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036663EXC
3216 MONTE VISTA NE
REPLACE RING AND COVER-POUR CONCRETE COLLAR ONE WAY ROAD C
08/31/2020 through 09/14/2020
ABCWUA- Matthew Montano, (505) 977-1265Contact :
Project Date(s) :
:Details Eastbound right lane closure on Monte Vista at its intersection with Campus/Wellesley.Total closure on Wellesley south of Monte Vista.Southbound total closure on Campus south of Wellesley.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
INSPECTION REQUIRED!!!AN EXCAVATION INSPECTION IS REQUIRED FOR THIS PERMIT PRIOR TO ASPHALT ORCONCRETE PAVING. Please email [email protected] or call 924-3416 and requestan inspection. The excavation site must be prepped and ready for asphalt or concrete paving atthe time of inspection. Please reference the address(s) or location description, permit number,date of inspection, AM or PM inspection, and a valid contact number.
Permit NumberLocationProject
:
:
:
2020036302EXC
6109 OLDENBERG SE
DRIVE APRONS AND SIDEWALKS ON 6105 AND 6109 OLDENBERG.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036591EXC
708 Princeton SE
W/O 1146539 NB and SB lane closure in a residential area plus NB Sidewalk closure.
08/20/2020 through 09/06/2020
ABCWUA- Fran Smull, (505) 259-3501Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 27 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036211EXC
11444 ROCK SQUIRREL SE
DRIVE APRONS AND SIDEWALKS.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036631EXC
ROCKY TOP From ROCKY TOP To JUAN TABO
Landscape / Irrigation. On the Southside of Rockytop Dr SE, just west of juan Tabo SE.
08/28/2020 through 09/04/2020
HILLTOP LANDSCAPE - Lisa Saiz, (505) 898-9690Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036686EXC
820 San Mateo NE
Installation of a new overhead transformer on theexiting pole H16C843 & perform system improvement/OH maintenance work on the pole.09/03/2020 through 09/04/2020
WILSON CONST- Perez Ciddio , (503) 349-7679Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Follow detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 28 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036497EXC
550 SAN MATEO BLVD SE
BORE NEW FIBER TO ADDRESS.
08/24/2020 through 09/04/2020
KELLY CABLE - James Richardson, (505) 280-4383Contact :
Project Date(s) :
:Details Northbound and Southbound right lane and sidewalk closure on San Mateo between Centraland Zuni.Northbound and Southbound right lane closure using Truck Mounted Arrowboard Mobileoperation on San Mateo between Central and Zuni.Simultaneous closure of sidewalk on both sides of the road not permitted.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Sidewalk closure only, continuously until complete
Permit NumberLocationProject
:
:
:
2020036643EXC
1923 Silver Dollar Dr SE
Drivepad, sidewalk closure.
09/01/2020 through 10/04/2020
JA VARGAS CONSTRUCTION- Julian Vargas, (505) 321-8206Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036676EXC
3720 Spirit Dr SE
Install T-3 3 phase xfmr.
09/01/2020 through 09/02/2020
AMERICAN POWER LLC (ATKINSON)- Patrick Garcia, (505) 379-0729Contact :
Project Date(s) :
:Details Southbound right lane and sidewalk closure on Spirit south Luv.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 29 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036677EXC
424 Stanford Dr SE
PNM will need plan to close Garfield Ave SE betweenStanford Dr SE to Columbia Dr SE. PNM will also need to close the Alley between Stanford DrSE and Columbia Dr SE from Coal Ave SE to Garfield Ave SE. PNM needs to work on poles inthe alley and by Garfield so PNM will be parking line trucks here.09/01/2020 through 09/02/2020
WILSON CONST- Perez Ciddio , (503) 349-7679Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036303EXC
6032 STRAND LOOP SE
DRIVE APRONS AND SIDEWALKS. - 6024 Strand Loop Added.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036662EXC
127 Tennessee
Crossing from west to east at central and zuni. Crossing Tennessee St SE Setting up inproperty.08/31/2020 through 09/04/2020
KELLY CABLE - Martin Sanchez , (505) 917-3706Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036668EXC
221 TULANE DR SE
Remove existing drivepad and replace with a new extended drive pad. Remove and replacedamaged sidewalk.09/01/2020 through 09/08/2020
STAR PAVING- Christopher cruz, (505) 877-0380Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 30 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHEAST South of Central and East of RR Tracks
Permit NumberLocationProject
:
:
:
2020036301EXC
6101 & 6105 WYETH SE
DRIVE APRONS AND SIDEWALKS.
08/20/2020 through 09/10/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036672EXC
6109 WYETH DRIVE SE
DRIVE APRONS AND SIDEWALKS
09/01/2020 through 09/22/2020
ASPEN CONCRETE- Irma Lopez, (505) 839-1968Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036490EXC
ZUNI From UTAH To ZUNI
Pulled asphalt settlement WO#119571.
08/26/2020 through 09/15/2020
ABCWUA - Carlos A. Sena , (505) 289-3545Contact :
Project Date(s) :
:Details Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Westbound lane closure on Zuni at its intersection of Utah. Traffic will be maintained in the twoway left turn lane.Southbound total closure on Utah north of Zuni.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 31 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036456EXC
2ND From COPPER To TIJERAS
Repairing Curb/Gutter.
08/21/2020 through 08/29/2020
COA Fred Montoya (Street Maint.), (505) 857-8017Contact :
Project Date(s) :
:Details Southbound right lane and sidewalk closure on 2nd St. between Tijeras and Copper.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Permit NumberLocationProject
:
:
:
2020036660EXC
3RD From CENTRAL To SILVER
Manhole inspections; Opening, vacuuming (ifnecessary), entering, and inspecting 6 PNM manholes in area;08/31/2020 through 09/02/2020
PNM - Jeanette Lopez , (505) 620-9373Contact :
Project Date(s) :
:Details Total street closure on 3rd St between Gold and Silver.Alley closure between Central and Gold east and west of 3rd St.Alley closure between Gold and Silver east and west of 3rd St.Intersection closure:Westbound total closure on Gold east of 2nd St.Northbound total closure on 2nd St. north of Gold.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036678EXC
500 53rd ST SW
INSTALL NEW GAS SERVICE.
09/01/2020 through 09/11/2020
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 32 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036684EXC
5TH From COPPER To MARQUETTE
Manhole inspections; Opening, vacuuming (ifnecessary), entering, and inspecting 4 PNM manholes in area;09/02/2020 through 09/04/2020
PNM - Jeanette Lopez , (505) 620-9373Contact :
Project Date(s) :
:Details Northbound right lane closure with northbound traffic being maintained in the center of the roadon 5th St. between Copper and Marquette.Eastbound left lane closure on Tijeras east of 5th St.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036492EXC
513 62nd ST SW
v
08/20/2020 through 09/10/2020
ABCWUA - Barney Baca, (505) 459-0986Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036496EXC
521 62nd St SW
Setback.
08/20/2020 through 09/10/2020
ABCWUA - Barney Baca, (505) 459-0986Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020035755EXC
BRIDGE And OLD COORS
Bridge Blvd Reconstruction Phase ICN A30050307/13/2020 through 10/06/2020
AUI- Corey Bond, (505) 966-6387Contact :
Project Date(s) :
:Details Northbound double thru lane closure on Old Coors at Bridge Blvd. North/south traffic will bemaintained in the two southbound lanes.Eastbound double thru lane and center turn lane closure on Bridge Blvd at Old Coors.East/west traffic will be maintained in the two westbound lanes.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 33 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036648EXC
BRIDGE From FOOTHILL To OLD COORS
Installing gas main line and services.
08/31/2020 through 10/23/2020
DUB-L-EE - Joseph Montoya, (505) 918-0041Contact :
Project Date(s) :
:Details Eastbound double thru lane and center turn lane closure on Bridge Blvd at Old Coors.East/west traffic will be maintained in the two westbound lanes.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036560EXC
CENTRAL From RIO GRANDE To CENTRAL
Sign Installation.
08/28/2020 through 08/30/2020
TLC - Cody Walton , (505) 362-7847Contact :
Project Date(s) :
:Details Eastbound right lane and sidewalk closure using Truck Mounted Arrow Board Mobile Operationon Central at its intersection with Rio Grande.
LANE CLOSURE FROM 6 A.M. to 10 P.M. ONLY
This traffic control setup includes a flagging operation, use caution and be prepared to stop.
Permit NumberLocationProject
:
:
:
2020035614SE
COPPER From 10TH To 8TH
07/11/2020 through 12/19/2020
DOWNTOWN GROWERS' MARKET, (505) 252-2959Contact :
Project Date(s) :
:Details Downtown Growers Market
Eastbound closure of Copper Ave between 10th and 8th St. Total closure of 8th St. betweenCentral Ave and Copper Ave.Every Saturday 8AM to 12PM.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 34 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020035942EXC
DENNIS CHAVEZ From 98TH To RIO CLARA
CRACK SEALING 2020.
07/27/2020 through 09/11/2020
DISMUKE CONSTRUCTION- Randy Carter, (505) 884-1633Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036514EXC
721 EDITH BLVD SE
REPLACE GAS SERVICE.
08/24/2020 through 09/04/2020
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036634EXC
401 EDITH ST NE
SB lane closure for fire line installation by mini wo.
08/31/2020 through 09/03/2020
RODGERS PLUMBING - Norm, (505) 243-9703Contact :
Project Date(s) :
:Details Southbound right lane, bike lane and sidewalk closure with southbound traffic being maintainedin the center of the road on Edith.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036612EXC
HAZELDINE From BROADWAY To HAZELDINE
INSTALL NEW GAS SERVICE.
08/31/2020 through 09/11/2020
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Follow detour
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 35 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036690EXC
LOMAS From 1ST To BROADWAY
Overhead Fiber Placement
08/31/2020 through 09/12/2020
ADB - Andy Barton, (636) 744-5610Contact :
Project Date(s) :
:Details Westbound right lane and sidewalk closure on Lomas Blvd between Broadway Blvd and 1st St.
CONSTRUCTION PERMITTED BETWEEN 7 A.M. AND 7 P.M. ONLY
Permit NumberLocationProject
:
:
:
2020036613EXC
1400 MOUNTAIN ROAD NW
INSTALL NEW GAS SERVICE
08/31/2020 through 09/11/2020
NM GAS - Steve Baca, (505) 401-7540Contact :
Project Date(s) :
:Details Eastbound total closure with flagging operation to maintain two way traffic on Mountain west of14th St.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020036670EXC
BRIDGE BLVD FROM OLD COORS TO GOFF
Roadway Resurface and Utility Improvements
08/27/2020 through 11/27/2020
AUI- Corey Bond, (505) 966-6387Contact :
Project Date(s) :
:Details Eastbound double thru lane and westbound center turn lane closure on Bridge Blvd east of OldCoors Dr. Two-way traffic will be maintained in the westbound lanes.Northbound double thru lane, right turn lane, and left turn lane closure on Old Coors Dr. atBridge Blvd. Two-way traffic will be maintained in the southbound lanes.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 36 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036593EXC
10012 Pilar Ave SW
Repair Emergency gas line leak.
08/20/2020 through 09/04/2020
NM GAS- Rebecca Krajicek, (505) 697-3127Contact :
Project Date(s) :
:Details
Permit NumberLocationProject
:
:
:
2020036624EXC
SAGE From 98TH To UNSER
Place conduit and fiber. E. B. right lane closure on Sage from 98th to Unser.
08/31/2020 through 09/04/2020
LIGHT CONNECTIONS - Steve Litle , (303) 809-7696Contact :
Project Date(s) :
:Details Eastbound right lane, bike lane and sidewalk closure on Sage between 98th St. and Unser.Maximum permissible length for construction zone is 1600'.
LANE CLOSURE FROM 9 A.M. TO 4 P.M. ONLY.
Permit NumberLocationProject
:
:
:
2020035989SU
SILVER From 5TH To 4TH
Street Closure for Stucco Siding
07/29/2020 through 01/29/2021
HB CONSTRUCTION - Erik Matthews , (505) 208-2368Contact :
Project Date(s) :
:Details Total closure of Silver Ave between 4th St. and 5th St.Closure will be in place continuously until project is complete.
Total closure of 4th St. between Gold Ave and Silver Ave due to damaged bridge. Closure willbe in place until a solution is determined through structural analysis.
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html
Fri, August 28 2020Page 37 of 38
CITY of ALBUQUERQUETRAFFIC NEWS
This report does not contain any of the road or lane closures resulting from New Mexico Department ofTransportation Projects.
Traffic News
For 29-Aug-20 through 05-Sep-20
All Scheduled Work is Weather Permitting
SOUTHWEST South of Central and West of RR Tracks
Permit NumberLocationProject
:
:
:
2020036509EXC
UNSER From GWIN To BRIDGE
Removal and Replacement of 2 handicap Ramps.
08/20/2020 through 09/04/2020
FRANKLINS - Tania Saucedo , (505) 884-6947Contact :
Project Date(s) :
:Details Northbound right lane, bike lane and sidewalk closure on Unser at its intersection with Gwin.Traffic will be maintained in the left lane.Total street closure on Gwin east of Unser.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Permit NumberLocationProject
:
:
:
2020036402EXC
VOLCANO From 90TH To CENTRAL
Aerial and Directional bore for Comcast Fiber.
08/31/2020 through 09/03/2020
M3 COMMUNICATIONS LLC - Roberto Magana , (505) 977-2205Contact :
Project Date(s) :
:Details Phase 1: Total street closure on Volcano between 92 St. and 90th St.Phase 2: Westbound sidewalk and shoulder closure on Volcano west of 90th St.Phase 3: Northbound parking lane and sidewalk closure on 90th St. between Frontage andVolcano.-Southbound parking lane and sidewalk closure on 92 St. north of Volcano.Phase 4: Eastbound right lane closure using Truck Mounted Arrow Board Mobile operation onCentral.
Construction permitted between 6AM and 10PM. Closures are continuous until construction iscomplete
Follow detour
Permit NumberLocationProject
:
:
:
2020036645EXC
617 Walter St SE
Install new curb cut.
08/31/2020 through 09/01/2020
CARREON CONSTRUCTION - Diego Carreon, (505) 440-2612Contact :
Project Date(s) :
:Details
Construction Services DivisionDepartment of Municipal DevelopmentOffice (505) 924-3400Fax (505) 924-3408
www.cabq.gov/construction/report.html