CITY COUNCIL GOALS & OBJECTIVES. TOP PRIORITY. Street Valley Gutters 33 installed by Public Works 35 installed by contractor Pipe Replacement Program 34 replaced by Public Works 55 replaced by contractor 6 major street crossings replaced Swales Rehabilitation – 10 miles - PowerPoint PPT PresentationTRANSCRIPT
CITY COUNCIL GOALS & OBJECTIVES
TOP PRIORITY
• Street Valley Gutters • 33 installed by Public Works• 35 installed by contractor
• Pipe Replacement Program• 34 replaced by Public Works• 55 replaced by contractor• 6 major street crossings replaced
• Swales • Rehabilitation – 10 miles • 6 Months Response to Complaints – 70 miles
• Water Reuse System Master Plan• Final draft under review – present to City Council June 2011
• CRA for Northeast• Incorporated in Prosperity 2021 Strategic Plan • Request for Qualifications received and evaluated• Contract presented to City Council for approval June
2011• Stormwater System Hydraulic Modeling• 2 Sections completed• 2 Additional Sections – near completion
• Road Resurfacing (50 miles)• 2010 program completed• 2011 program contract let – construction Summer
2011
• Neighborhood Signs and City Gateway• Standard prototype design completed• Country Club Cove neighborhood sign completed• Palm Coast Parkway east entrance
o Panther installed and dedicated o Under design o Construction – pending funding
• City trail signage plan and map completed (Trek It Out)• Repair uplighting and fountains at I-95/Palm Coast
Parkway• Continued implementation of South Belle Terre
Median improvements• Community Center Concept Plan• Completed
• City Economic Development and Incentive Policy • Prosperity 2021 Strategic Plan completed• See Executive Summary for status of individual projects
• Video Cameras/Emergency Phones for Parks and Paths• Ralph Carter – completed• Heroes Park – out to bid• Holland Park – under design, construction pending funding• Future improvements pending funding
• Stormwater Utility Ordinance• Ordinance adopted• Implementation underway
HIGH PRIORITY
• Coquina Coast Saltwater Desalination Project • Phase II-A preliminary design underway and scheduled to be
completed Fall 2011 • Phase II-B preliminary design, final design and construction
pending funding• Matanzas Woods Interchange (Flagler County Project)• Preliminary design underway
• FiberNET: Expansion• Contract with Hospital signed and implemented • Contract with School District approved – implementation
Summer 2011 • Contract with O2 Secure Wireless signed • Completed numerous miscellaneous expansion projects to
individual businesses - ongoing
• Accessible Police Substation: Direction• No plans at this time to relocate or add Sheriff substation in
Palm Coast• Commercial Area Strategy
• Incorporated into Prosperity 2021 Strategic Plan• Old Kings Road 4-Laning (North of Palm Coast Parkway)
• PD&E study underway and is scheduled to be completed by Fall 2011
• Final design – FDOT funding in 2013 • Construction – pending funding
• City Hall• Preliminary concept developed and presented to community • Additional detail information pending
• Beachside Sewer System• Under design • Agreement with County pending • Construction in 2011/2012
• Pre-Permitting and Speculative Building Ordinance• Incorporated into Prosperity 2021 Strategic Plan • Requests for letters-of-interest sent to business park owners
• Roberts Road Business Park Strategy• Incorporated into Prosperity 2021 Strategic Plan• Request for Qualifications received and evaluated• Contract to be presented to City Council for approval June
2011
MODERATE PRIORITY
• Neighborhoods Assessment and Plan • Incorporated in Prosperity 2021 Strategic Plan• Implemented abandoned property enforcement
program • Neighborhood Stabilization Phase I implemented • Neighborhood Stabilization Phase III approved and
implementation initiated • CDBG Grant for home improvements approved
• Contract for Northeast area plan pending approval June 2011
• Concept Plan of FPL Easement (Belle Terre Parkway/ Royal Palms Parkway) for Recreational Uses• Draft concept plan developed and presented to FPL for
approval• Concept plan to be presented to City Council Summer 2011
• Parks and Recreation Fee Structure• Proposed structure completed • To be presented to City Council June 2011
• Building, Permitting and Inspection Processes: Simplification/Streamlining• Completed
MAJOR PROJECTS
• Indian Trails Sports Complex• Driveway extension
o Design completedo Construction - Summer 2011
• Storage Buildingo Under designo Construction - Fall 2011
• North Pavilion Concession Stand o Design completedo Construction - Fall 2011
• Central Park Improvements (Phase II B)• Design completed• Construction - Summer 2011
• Bridge Rehabilitation Program• Club House Waterway (Palm Harbor Pkwy. near marina)
o Substantially complete• College Waterway (Palm Harbor Pkwy. near Yacht Club)
o Under designo Construction - pending funding
• Old Kings Road (South)/Lehigh Trail/Town Center Boulevard Intersection Realignment• Project on hold – private development driven
• Graham Swamp Trail (Phase I)• Completed
• Belle Terre Parkway Multi-Purpose Path• Phase I completed • Phase II substantially complete • Phase III contract let – construction Summer 2011
• Ravenwood Drive and Whiteview Parkway Multi-Purpose Path (Phase I)• Completed
• Canal Control Structure (one replacement per year)• BA-1 Weir completed • Rippling Waterway completed • Ditch 10 completed• Crandell Cove completed• Big Mulberry Creek completed
• Bulldog Drive• PD&E completed• Under design • Construction - Summer 2012
• Water Distribution System Improvements: Citation Boulevard to Old Kings Road Loop• C ontract approved • Construction - Summer 2011???
• Waterfront Park• Completed
• Children’s Memorial Garden on FIND Linear Trail System• Completed
• Royal Palms Parkway Pedestrian Path and Left Turn Lane at Point Pleasant Drive• Completed
• Easthampton Boulevard Multi-Purpose Path• Completed
• Belle Terre Parkway Median Landscape and Irrigation• 2010 Phase completed• 2011 – Construction – Summer 2011
OTHER MAJOR ACCOMPLISHMENTS
• Guardrail Safety Improvements• Ongoing city-wide improvements as needed
• Pavement Marking• 2010 program completed• Current year program to be completed in summer 2011
• North Pine Lakes Parkway Improvements• Design to be completed in summer 2011• Construction in 2012
• Graham Swamp Trail Phase II• Under design• Construction pending funding
• Belle Terre Parkway 4-Laning• Completed
• Palm Harbor Parkway Extension• Under design• Pending right-of-way acquisition• Construction pending funding
• Palm Coast Parkway 6-Laning• Under design• Construction 2012/2013
• Holland Park Renovation• Under design• Construction pending funding
• Community Development Software• To be completed in summer 2011
• Longs Landing• Contract for design to Council in June 2011• Construction pending funding
• Wellfield and Wells• Water Plant #3 wellfield to be completed in fall 2011• Water Plant #2 well completed
• Water Treatment Plant #2 upgrades• Out with RFQ for engineering design services
• Wastewater Treatment Plant #1 upgrades• Under design• Construction pending funding
• Lift Stations and Pump Stations• Construction 2010 and summer 2011• Old Kings Road pump station design completed
• Force Mains• Whiteview construction 2011
• Wastewater Treatment Plant #2• Under design• Construction pending need and funding
• Rymfire Drive Multi-Use Path – Ralph Carter Park to Lehigh Trail• Under design• Construction to be completed in 2011
• Belle Terre Parkway Multi-Use Path – Phase III• Under design• Construction to be completed in 2011
• Whiteview Parkway Multi-Use Path – Phase II• Under design• Construction to be completed in 2011
• Belle Terre Parkway Multi-Use Path – Connection from Fire Station 25 to Town Center• Design complete• Construction to begin after issuance of SJRWMD permit• Construction to be completed in 2011
• Palm Harbor Multi-Use Path• Design-Build project• Out to bid• Design to begin in summer 2011• Construction to be completed in 2012
• Gold Certified “Green City” with numerous green projects and awards
• Approved 2 major Comp Plan amendments with associated DRI’s
• Implemented electronic utility bills • Expanded our community events to 33 in 2010• Completed renovation to the Dog Park and
stabilized the parking lot at Holland Park• Established the Business Assistance Center
• Revamped Employee Health Insurance Program • Self-Insured • High deductible • Established employee health clinic
• Launched our social media program with the theme of Discover Palm Coast