city · chintels metropolis, sector-108 gurgaon construction linked payment plan city version:...
TRANSCRIPT
Chintels Metropolis, Sector-108Gurgaon
C I T Y
P R I C E L I S T & P A Y M E N T P L A N S
Towers: A1, B1 & C1
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car
Parking Space | SBA is subject to change
Notes:
RERA REGISTRATION NO.: 86 OF 2017 FROM HRERA
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.T1.1.9
TOWER A1
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
12,302,037
1,476,244
Basic Sale Value with GST in ` (A = BSV+GST) 13,778,281
Saleable Built-up Area in sq.ft. (SBA)
a
1,381.01
Unit Particulars
Type of Apartment
Green facing - ` 350 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
177,000
Maintenance Deposit in ` 276,202
Total Other Charges in ` (B) 1,132,123
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 14,910,404
External & Infrastructure Development Charges (EDC & IDC) in ` 383,921
Other Charges
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Terrace Roof Slab / 31st January 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc./ 31st March 2020, whichever is later
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
10% of A
500,000
100%
60% of A
12.5% of A
12.5% of A
5% of A
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.T1.1.9
TOWER A1 & B1
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car
Parking Space | SBA is subject to change
Notes:
RERA REGISTRATION NO.: 86 OF 2017 FROM HRERA
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Terrace Roof Slab / 31st January 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc./ 31st March 2020, whichever is later
10% of A
500,000
100%
60% of A
12.5% of A
12.5% of A
5% of A
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
b
1,711.29
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
15,244,171
1,829,301
17,073,472
Green facing - ` 350 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
236,000
Maintenance Deposit in ` 342,258
Total Other Charges in ` (B) 1,348,997
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 18,422,469
External & Infrastructure Development Charges (EDC & IDC) in ` 475,739
Other Charges
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.T1.1.9
TOWER B1
Notes:
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car
Parking Space | SBA is subject to change
RERA REGISTRATION NO.: 86 OF 2017 FROM HRERA
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
c
2,003.45
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
17,846,733
2,141,608
19,988,341
Green facing - ` 350 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B)
External & Infrastructure Development Charges (EDC & IDC) in `
295,000
236,000
400,690
1,488,649
21,476,990
556,959
Other Charges
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Terrace Roof Slab / 31st January 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc./ 31st March 2020, whichever is later
10% of A
500,000
100%
60% of A
12.5% of A
12.5% of A
5% of AOn Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.T1.1.9
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of Two Car
Parking Space | SBA is subject to change
Notes:
RERA REGISTRATION NO.: 86 OF 2017 FROM HRERA
d
2,072.90
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
19,294,553
2,315,346
21,609,899
Green facing - ` 500 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
236,000
Maintenance Deposit in ` 414,580
Total Other Charges in ` (B) 1,521,846
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 23,131,745
External & Infrastructure Development Charges (EDC & IDC) in ` 576,266
Other Charges
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Terrace Roof Slab / 31st January 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc./ 31st March 2020, whichever is later
10% of A
1,000,000
100%
60% of A
12.5% of A
12.5% of A
5% of A
TOWER C1
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.T1.1.9
TOWER C1
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of Two Car
Parking Space | SBA is subject to change
Notes:
RERA REGISTRATION NO.: 86 OF 2017 FROM HRERA
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Terrace Roof Slab / 31st January 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc./ 31st March 2020, whichever is later
10% of A
1,000,000
100%
60% of A
12.5% of A
12.5% of A
5% of A
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
21,812,740
2,617,529
24,430,269
e
2,343.44
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
Green facing - ` 500 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
236,000
Maintenance Deposit in ` 468,688
Total Other Charges in ` (B) 1,651,164
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 26,081,433
External & Infrastructure Development Charges (EDC & IDC) in ` 651,476
Other Charges
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
Chintels Metropolis, Sector-108Gurgaon
C I T Y
P R I C E L I S T & P A Y M E N T P L A N S
Towers: A2, B2 & C2
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Thirteenth Floor Roof Slab / 31st December 2019, whichever is later
On Completion of Seventeenth Floor Roof Slab / 31st March 2020, whichever is later
On Completion of Terrace Roof Slab / 30th June 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc. / 30th September 2020, whichever is later
10% of A
500,000
100%
40% of A
10% of A
10% of A
12.5% of A
12.5% of A
5% of A
TOWER A2
Notes:
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car
Parking Space | SBA is subject to change
RERA REGISTRATION NO.: 115 OF 2017 FROM HRERA
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.T2.1.8
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
12,302,037
1,476,244
Basic Sale Value with GST in ` (A = BSV+GST) 13,778,281
Saleable Built-up Area in sq.ft. (SBA)
a
1,381.01
Unit Particulars
Type of Apartment
Green facing - ` 350 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
177,000
Maintenance Deposit in ` 276,202
Total Other Charges in ` (B) 1,132,123
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 14,910,404
External & Infrastructure Development Charges (EDC & IDC) in ` 383,921
Other Charges
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
TOWER A2 & B2
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Notes:
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car
Parking Space | SBA is subject to change
RERA REGISTRATION NO.: 115 OF 2017 FROM HRERA
Version: CLP.T2.1.8
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
b
1,711.29
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
15,244,171
1,829,301
17,073,472
Green facing - ` 350 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
236,000
Maintenance Deposit in ` 342,258
Total Other Charges in ` (B) 1,348,997
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 18,422,469
External & Infrastructure Development Charges (EDC & IDC) in ` 475,739
Other Charges
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Thirteenth Floor Roof Slab / 31st December 2019, whichever is later
On Completion of Seventeenth Floor Roof Slab / 31st March 2020, whichever is later
On Completion of Terrace Roof Slab / 30th June 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc. / 30th September 2020, whichever is later
10% of A
500,000
100%
40% of A
10% of A
10% of A
12.5% of A
12.5% of A
5% of AOn Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
TOWER B2
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car
Parking Space | SBA is subject to change
Notes:
RERA REGISTRATION NO.: 115 OF 2017 FROM HRERA
Version: CLP.T2.1.8
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Thirteenth Floor Roof Slab / 31st December 2019, whichever is later
On Completion of Seventeenth Floor Roof Slab / 31st March 2020, whichever is later
On Completion of Terrace Roof Slab / 30th June 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc. / 30th September 2020, whichever is later
10% of A
500,000
100%
40% of A
10% of A
10% of A
12.5% of A
12.5% of A
5% of A
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
c
2,003.45
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
17,846,733
2,141,608
19,988,341
Green facing - ` 350 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B)
External & Infrastructure Development Charges (EDC & IDC) in `
295,000
236,000
400,690
1,488,649
21,476,990
556,959
Other Charges
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in `
TOWER C2
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of Two Car
Parking Space | SBA is subject to change
Notes:
RERA REGISTRATION NO.: 115 OF 2017 FROM HRERA
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.T2.1.8
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Thirteenth Floor Roof Slab / 31st December 2019, whichever is later
On Completion of Seventeenth Floor Roof Slab / 31st March 2020, whichever is later
On Completion of Terrace Roof Slab / 30th June 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc. / 30th September 2020, whichever is later
10% of A
1,000,000
100%
40% of A
10% of A
10% of A
12.5% of A
12.5% of A
5% of A
d
2,072.90
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
19,294,553
2,315,346
21,609,899
Green facing - ` 500 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in ` 236,000
Maintenance Deposit in ` 414,580
Total Other Charges in ` (B) 1,521,846
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 23,131,745
External & Infrastructure Development Charges (EDC & IDC) in ` 576,266
Other Charges
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
TOWER C2
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Notes:
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Deposit are yet to be ascertained and will be payable by the Customers at
the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand
note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other
statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of Two Car
Parking Space | SBA is subject to change
RERA REGISTRATION NO.: 115 OF 2017 FROM HRERA
Version: CLP.T2.1.8
Expression of Interest Amount in ` (EOI)
Amount Payable within 30 Days from EOI Date (Less EOI Amount Paid)
Payment Schedule
EDC & IDC Charges Payable within 30 Days from EOI Date
Amount Payable within 90 Days from EOI Date
On Completion of Thirteenth Floor Roof Slab / 31st December 2019, whichever is later
On Completion of Seventeenth Floor Roof Slab / 31st March 2020, whichever is later
On Completion of Terrace Roof Slab / 30th June 2020, whichever is later
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts etc. / 30th September 2020, whichever is later
On Offer of Possession - Basic Sale Value (A) & 100% Other Charges (B) excluding EDC & IDC
10% of A
1,000,000
100%
40% of A
10% of A
10% of A
12.5% of A
12.5% of A
5% of A
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
21,812,740
2,617,529
24,430,269
e
2,343.44
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
Green facing - ` 500 / sq.ft. - to be added to BSV As Applicable
Preferred Location Charges
Clubhouse Charges including GST in ` 295,000
Service Charges (Charges for Electricity, Water, Sewerage, etc.) including GST in ` 236,000
Maintenance Deposit in ` 468,688
Total Other Charges in ` (B) 1,651,164
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B) 26,081,433
External & Infrastructure Development Charges (EDC & IDC) in ` 651,476
Other Charges
Chintels Metropolis, Sector-108Gurgaon
C I T Y
P R I C E L I S T & P A Y M E N T P L A N
Tower: C3
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.C3.1.2
TOWER C3
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
As ApplicableLakelet facing - ` 500 / sq.ft. to be added to BSV
Preferred Location Charges
295,000
236,000
414,580
1,521,846
23,596,075
576,266
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in `
Clubhouse Charges including GST in `
Service Charges including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value Excluding Registration & Stamp Duty in ` (C = A+B)
10% of A
100%
1,120,000
10% of A
6%
6%
6%
7%
7%
7%
7%
7%
7%
10% of A
5%
5%
Expression of Interest Amount in `
Payment Schedule
Booking Amount Payable within 30 Days from Booking Date (Less Expression of Interest Amount Paid)
EDC & IDC Charges Payable within 30 days from booking date
Payable within 90 Days from Booking Date
Payable within 120 Days from Booking Date
On Completion of Foundation Works
On Completion of Basement Roof Slab
On Completion of First Floor Roof Slab
On Completion of Fifth Floor Roof Slab
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc.
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) excluding EDC & IDC
On Completion of Ninth Floor Roof Slab
On Completion of Thirteenth Floor Roof Slab
On Completion of Seventeenth Floor Roof Slab
On Completion of Twenty First Floor Roof Slab
On Completion of Terrace Roof Slab
Notes:
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Service Charges are as per the prevailing rates and subject to change | Electricity, Water, Sewerage and other Infrastructure
Charges are yet to be ascertained and will be payable by the Customers at the time of possession | Registration and Stamp duty charges are not included in above pricing &
shall be payable by the Customers at the time of possession | Demand note for payment will be on the basis of completion of the milestone attributed to the particular
Tower / Wing in the project in which the apartment is located | Any other statutory charges which may be imposed by the authorities from time to time will also be payable
by the Customers at actual | Basic Sale Value is inclusive of Two Car Parking Spaces | SBA is subject to change
d
2,072.90
RERA REGISTRATION NO.: RC/REP/HARERA/GGM/2018/12
19,709,133
2,365,096
22,074,229
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.C3.1.2
TOWER C3
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
As ApplicableLakelet facing - ` 500 / sq.ft. to be added to BSV
Preferred Location Charges
295,000
236,000
468,688
1,651,164
651,476
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in `
Clubhouse Charges including GST in `
Service Charges including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B)
10% of A
100%
1,120,000
10% of A
6%
6%
6%
7%
7%
7%
7%
7%
7%
10% of A
5%
5%
Expression of Interest Amount in `
Payment Schedule
Booking Amount Payable within 30 Days from Booking Date (Less Expression of Interest Amount Paid)
EDC & IDC Charges Payable within 30 days from booking date
Payable within 90 Days from Booking Date
Payable within 120 Days from Booking Date
On Completion of Foundation Works
On Completion of Basement Roof Slab
On Completion of First Floor Roof Slab
On Completion of Fifth Floor Roof Slab
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc.
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) excluding EDC & IDC
On Completion of Ninth Floor Roof Slab
On Completion of Thirteenth Floor Roof Slab
On Completion of Seventeenth Floor Roof Slab
On Completion of Twenty First Floor Roof Slab
On Completion of Terrace Roof Slab
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Service Charges are as per the prevailing rates and subject to change | Electricity, Water, Sewerage and other Infrastructure
Charges are yet to be ascertained and will be payable by the Customers at the time of possession | Registration and Stamp duty charges are not included in above pricing &
shall be payable by the Customers at the time of possession | Demand note for payment will be on the basis of completion of the milestone attributed to the particular
Tower / Wing in the project in which the apartment is located | Any other statutory charges which may be imposed by the authorities from time to time will also be payable
by the Customers at actual | Basic Sale Value is inclusive of Two Car Parking Spaces | SBA is subject to change
Notes:
e
2,343.44
RERA REGISTRATION NO.: RC/REP/HARERA/GGM/2018/12
22,281,428
2,673,771
24,955,199
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
26,606,363
Chintels Metropolis, Sector-108Gurgaon
C I T Y
P R I C E L I S T & P A Y M E N T P L A N S
Tower: C4
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.C4.1.2
TOWER C4
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Service Charges are as per the prevailing rates and subject to change | Electricity, Water, Sewerage and other Infrastructure
Charges are yet to be ascertained and will be payable by the Customers at the time of possession | Registration and Stamp duty charges are not included in above pricing &
shall be payable by the Customers at the time of possession | Demand note for payment will be on the basis of completion of the milestone attributed to the particular
Tower / Wing in the project in which the apartment is located | Any other statutory charges which may be imposed by the authorities from time to time will also be payable
by the Customers at actual | Basic Sale Value is inclusive of Two Car Parking Spaces | SBA is subject to change
Notes:
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
As ApplicableLakelet facing - ` 500 / sq.ft. to be added to BSV
Preferred Location Charges
295,000
236,000
414,580
1,521,846
23,596,075
576,266
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in `
Clubhouse Charges including GST in `
Service Charges including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value Excluding Registration & Stamp Duty in ` (C = A+B)
10% of A
100%
1,120,000
10% of A
6%
6%
6%
7%
7%
7%
7%
7%
7%
10% of A
5%
5%
Expression of Interest Amount in `
Payment Schedule
Booking Amount Payable within 30 Days from Booking Date (Less Expression of Interest Amount Paid)
EDC & IDC Charges Payable within 30 days from booking date
Payable within 90 Days from Booking Date
Payable within 120 Days from Booking Date
On Completion of Foundation Works
On Completion of Basement Roof Slab
On Completion of First Floor Roof Slab
On Completion of Fifth Floor Roof Slab
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc.
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) excluding EDC & IDC
On Completion of Ninth Floor Roof Slab
On Completion of Thirteenth Floor Roof Slab
On Completion of Seventeenth Floor Roof Slab
On Completion of Twenty First Floor Roof Slab
On Completion of Terrace Roof Slab
d
2,072.90
19,709,133
2,365,096
22,074,229
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
RERA REGISTRATION NO.: 12 OF 2019 FROM HARERA
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
TOWER C4
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
As ApplicableLakelet facing - ` 500 / sq.ft. to be added to BSV
Preferred Location Charges
295,000
236,000
468,688
1,651,164
651,476
Other Charges
External & Infrastructure Development Charges (EDC & IDC) in `
Clubhouse Charges including GST in `
Service Charges including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value excluding Registration & Stamp Duty in ` (C = A+B)
10% of A
100%
1,120,000
10% of A
6%
6%
6%
7%
7%
7%
7%
7%
7%
10% of A
5%
5%
Expression of Interest Amount in `
Payment Schedule
Booking Amount Payable within 30 Days from Booking Date (Less Expression of Interest Amount Paid)
EDC & IDC Charges Payable within 30 days from booking date
Payable within 90 Days from Booking Date
Payable within 120 Days from Booking Date
On Completion of Foundation Works
On Completion of Basement Roof Slab
On Completion of First Floor Roof Slab
On Completion of Fifth Floor Roof Slab
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc.
On Offer of Possession - Basic Sale Value (A) & Other Charges (B) excluding EDC & IDC
On Completion of Ninth Floor Roof Slab
On Completion of Thirteenth Floor Roof Slab
On Completion of Seventeenth Floor Roof Slab
On Completion of Twenty First Floor Roof Slab
On Completion of Terrace Roof Slab
Notes:
EDC & IDC are pro-rated per Unit as applicable, any revision would be charged on pro-rata basis from the Customers | Goods and Service Tax is as per the prevailing
regulations & rates and subject to change | Service Charges are as per the prevailing rates and subject to change | Electricity, Water, Sewerage and other Infrastructure
Charges are yet to be ascertained and will be payable by the Customers at the time of possession | Registration and Stamp duty charges are not included in above pricing &
shall be payable by the Customers at the time of possession | Demand note for payment will be on the basis of completion of the milestone attributed to the particular
Tower / Wing in the project in which the apartment is located | Any other statutory charges which may be imposed by the authorities from time to time will also be payable
by the Customers at actual | Basic Sale Value is inclusive of Two Car Parking Spaces | SBA is subject to change
e
2,343.44
22,281,428
2,673,771
24,955,199
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
26,606,363
Version: CLP.C4.1.2RERA REGISTRATION NO.: 12 OF 2019 FROM HARERA
Chintels Metropolis, Sector-108Gurgaon
C I T Y
P R I C E L I S T & P A Y M E N T P L A N S
TO ER B3
TOWER B
Goods and Service Tax is as per the prevailing regulations & rates and subject to change | Service Charges are as per the prevailing rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Charges are yet to be ascertained and will be payable by the Customers at the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car Parking Space | SBA is subject to change
Notes:
As ApplicableGreen Facing - ` 350 / sq.ft. to be added to BSV
Preferred Location Charges
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.B3.1.1
Expression of Interest Amount in `
Booking Amount Payable within 30 Days from Booking Date (Less Expression of Interest Amount Paid)
Payment Schedule
Payable within 90 Days from Booking Date
Payable within 120 Days from Booking Date
On Completion of Basement Roof Slab
On Completion of First Floor Roof Slab
On Offer of Possession - Basic Sale Value (A)
10% of A
1,000,000
10%
10%
10%
10%
10%
On Completion of Fifth Floor Roof Slab
On Completion of Ninth Floor Roof Slab 10%
On Completion of Thirteenth Floor Roof Slab 10%
On Completion of Terrace Roof Slab 10%
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc. 5%
5%
Other Charges
Service Charges Including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value Excluding Registration & Stamp Duty in ` (C = A+B)
b
1,711.29
16,933,215
846,660
17,779,875
342,258
236,000
578, 258
18,358,133
86 2017, 115 2017, 2018 12, 12 2019 34 2019
On Offer of Possession - Other Charges (B) 100%
TOWER B
Notes:
Goods and Service Tax is as per the prevailing regulations & rates and subject to change | Service Charges are as per the prevailing rates and subject to change | Electricity, Water, Sewerage and other Infrastructure Charges are yet to be ascertained and will be payable by the Customers at the time of possession | Registration and Stamp duty charges are not included in above pricing & shall be payable by the Customers at the time of possession | Demand note for payment will be on the basis of completion of the milestone attributed to the particular Tower / Wing in the project in which the apartment is located | Any other statutory charges which may be imposed by the authorities from time to time will also be payable by the Customers at actual | Basic Sale Value is inclusive of One Car Parking Space | SBA is subject to change
As ApplicableGreen Facing - ` 350 / sq.ft. to be added to BSV
Preferred Location Charges
Chintels Metropolis, Sector-108Gurgaon
C I T YCONSTRUCTION L INKED PAYMENT PLAN
Version: CLP.B3.1.1
c
2,003.45
19,824,138
991,207
20,815,345
400,690
236,000
636,690
21,452,035
86 2017, 115 2017, 2018 12, 12 2019 34 2019
Unit Particulars
Type of Apartment
Saleable Built-up Area in sq.ft. (SBA)
Basic Sale Value in ` (BSV)
Goods and Services Tax in ` (GST)
Basic Sale Value
Basic Sale Value with GST in ` (A = BSV+GST)
Expression of Interest Amount in `
Booking Amount Payable within 30 Days from Booking Date (Less Expression of Interest Amount Paid)
Payment Schedule
Payable within 90 Days from Booking Date
Payable within 120 Days from Booking Date
On Completion of Basement Roof Slab
On Completion of First Floor Roof Slab
On Offer of Possession - Basic Sale Value (A)
On Completion of Fifth Floor Roof Slab
On Completion of Ninth Floor Roof Slab
On Completion of Thirteenth Floor Roof Slab
On Completion of Terrace Roof Slab
On Completion of Internal Plastering in all the Apartments Excluding Balconies, Utilities, Common Area, Shafts, Ducts, etc.
Other Charges
Service Charges Including GST in `
Maintenance Deposit in `
Total Other Charges in ` (B)
Total Sale Value Excluding Registration & Stamp Duty in ` (C = A+B)
On Offer of Possession - Other Charges (B)
10% of A
1,000,000
10%
10%
10%
10%
10%
10%
10%
10%
5%
5%
100%
Chintels Metropolis, Sector-108Gurgaon
C I T Y
SOBHA Sales Gallery
Sector - 108
Gurgaon - 122017, Haryana
SITE ADDRESS
www.sobhacity.comVISIT
+91 124 4706666CALL
SOBHA TO 56677
SMS
OFFICE ADDRESS
5th Floor, Rider House
Plot No. 136 - P, Sector - 44
Gurgaon - 122003, Haryana
SOBHA Limited