Citizens Information MeetingKirby Road Sidewalks

Chesterbrook Elementary School to Halsey Road &Halsey Road to Franklin Avenue

Preliminary Design

November 9, 2016Fairfax County

Dranesville District

County of Fairfax, Virginia

2

Introduction/ Welcome

Supervisor Foust

Department of Transportation

County of Fairfax, Virginia

3Department of Transportation

Contacts• Supervisor Foust’s Office• Fairfax County Department of Transportation

(FCDOT)– Transportation Design (TDD)– Capital Projects (CPTED)

• Fairfax County Department of Public Works & Environmental Services (DPWES)– Construction (UDCD)– Land Acquisition (LAD)

• Design Consultant (WRA)

County of Fairfax, Virginia

4

Meeting Agenda• Context and Background• Summary of Preliminary Design Options• Schedule• Q & A• “Open House”

Department of Transportation

County of Fairfax, Virginia

5

Context• County’s 2012 Dialogue on Transportation• Included in 2014 Bond Issue

Department of Transportation

County of Fairfax, Virginia

6Department of Transportation

N

Project Limits

Limits of New Sidewalk

Kirby RoadHalsey Road

Franklin Ave

County of Fairfax, Virginia

7

Existing Conditions

Existing Crosswalk at Chesterbrook Elementary School

Department of Transportation

County of Fairfax, Virginia

8

Existing Conditions

Looking west towards Halsey Road

Department of Transportation

County of Fairfax, Virginia

9

Existing Conditions

Looking west towards Franklin Avenue

Department of Transportation

County of Fairfax, Virginia

10

Existing Conditions

Crosswalk at Franklin Avenue

Department of Transportation

County of Fairfax, Virginia

11

Improvements Will Include• New Concrete Curb & Gutter on Existing Edge of

Pavement• New 5’-6’ Wide Sidewalk and

Curb Ramps• New Concrete Driveway Entrances• New Storm Drain Inlets and Pipes• New Road Pavement and Striping• Design to VDOT Criteria

Department of Transportation

County of Fairfax, Virginia

12

Potential Impacts• Relocation or upgrade of existing utilities

(underground and/or overhead)• Tree Impacts

– In right-of-way and on private property

• Fences • Grading back slopes

Department of Transportation

County of Fairfax, Virginia

13

Sidewalk Options – ‘Alternative 1’• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –

Requires VDOT Waiver

Department of Transportation

NEW CURB & GUTTER

4’ GRASS BUFFER STRIP

NEW 5’ WIDE SIDEWALK

County of Fairfax, Virginia

14

Sidewalk Options – ‘Alternative 1’• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –

Requires VDOT Waiver

Department of Transportation

NEW CURB & GUTTER

NEW 6’ WIDE SIDEWALK

County of Fairfax, Virginia

15

Sidewalk Options – ‘Alternative 1’• 5’ Sidewalk, 4’ Buffer & 6’ Sidewalk (No Buffer) –

Requires VDOT Waiver

Department of Transportation

SIDEWALKCURB RAMPDRIVEWAY REPLACEMENTLIMITS OF DISTRUBANCEGRADING/CONSTRUCTION EASEMENTPROPOSED RIGHT OF WAYDRAINAGE EASEMENTPROPOSED TREE REMOVAL X

County of Fairfax, Virginia

16

Sidewalk Options – ‘Alternative 2’• 5’ Sidewalk, 4’ Buffer – VDOT Standard

Department of Transportation

NEW CURB & GUTTER

4’ GRASS BUFFER STRIP

NEW 5’ WIDE SIDEWALK

County of Fairfax, Virginia

17

Sidewalk Options – ‘Alternative 2’• 5’ Sidewalk, 4’ Buffer – VDOT Standard

Department of Transportation

SIDEWALKCURB RAMPDRIVEWAY REPLACEMENTLIMITS OF DISTRUBANCEGRADING/CONSTRUCTION EASEMENTPROPOSED RIGHT OF WAYDRAINAGE EASEMENTPROPOSED TREE REMOVAL X

County of Fairfax, Virginia

18

• Limits of Disturbance show the approximate area affected by construction.

• Driveways, fences, andtrees may be impactedon properties adjacentto the project.

• If private property is to be impacted during construction, we will obtain an easement or right-of-way before work begins.

Will the Project Impact My Property?

Department of Transportation

LIMITS OF DISTURBANCE

County of Fairfax, Virginia

19

Land Acquisition Process• Will occur after pre-final design complete.• Plats will be prepared showing easements

and/or right-of-way needed.• Land Acquisition Agent will contact

property owners to negotiate.

Department of Transportation

County of Fairfax, Virginia

20

Construction • We will coordinate with

property owners well in advance.

• Fences may be temporarily removed & replaced. Relocation to private property may be necessary, if within the right-of-way.

• Work hours are set by VDOT.

Department of Transportation

County of Fairfax, Virginia

21

Preliminary Schedule

• Intermediate Design – Early 2017• Pre-Final Design – Fall 2017• Land Acquisition – Mid to Late 2018• Final Design – Late 2018/Early 2019• Construction – 2019

Department of Transportation

County of Fairfax, Virginia

22Department of Transportation

Questions?

County of Fairfax, Virginia

23

http://www.fairfaxcounty.gov/fcdot/pedestrian/kirbyroad.htm

Submit Comments on Project Website