CIPTEC
Danmarks Mejeritekniske SelskabThursday the 06-12-2018
TORBEN GRUND PEDERSEN – SALES ENGINEER
ÅFFood & Pharma, Randers
Torben Grund Pedersen
Sales Engineer
2
ÅF at a glance
FOODTECH 2018 3
ÅF in Denmark
FOODTECH 2018 4
We are surrounded by data …
5
PLANT CIP OPERATIONS ARE OVERWHELMED BY DATA
50-100Daily Washes
MultipleObjects
Production Variables
DataSources
CHALLENGES IN CIP
6
TOO MUCH DATA
FEELING OF
OVER-CLEANING
UNFORESEEN
PROBLEMS
CHALLENGES IN CIP
7
CIP Cleans are controlled by:
─ Temperature
─ Conductivity
─ Flow
─ Time
But when the cleaning starts, you put on a blindfold!
CHALLENGES IN CIP
8
CIP Cycles are based on empirical averages
─ Average times are generally too long
─ Wasting valuable time and resources
─ But in some cases can also fall too short
─ Risking the safety of your product
CHALLENGES IN CIP
You need to ensure your equipment is clean, every time.
But you also need to ensure that you are not wasting valuable resources.
Diversey® CIPTEC™ allows you to remove the blindfold and visualise your
CIP cleans … to see the unseen!
9
PART 2
How does CIPTEC work?
10
HOW DOES CIPTEC WORK?
Spectophotometer
Measures soil in ppm levels
11
HOW DOES CIPTEC WORK?
Measures light inside CIP line
UV
VIS
NIR
12
Chemicals in rinses
Soil in liquids
Accuracy to 0.5 ppm
HOW DOES CIPTEC WORK?
Forward and return sensors measure the
soil in each line throughout the CIP clean
This data can be plotted to accurately
show the stages of the CIP clean
13
Sensors areinstalled to
all forward and return
CIP lines on the CIP
center
Returnsensors
Forwardsensors
CIPflow
CIPflow
Disinfection Rinse Acid CausticData
Logging Unit
Object to becleaned
HOW DOES CIPTEC WORK?
Example of Intake Pipe CIP Cleaning
14
HOW DOES CIPTEC WORK?
Example of Intake Pipe CIP Cleaning
15
HOW DOES CIPTEC WORK?
Example of Intake Pipe CIP Cleaning
16
HOW DOES CIPTEC WORK?
Example of Intake Pipe CIP Cleaning
17
HOW DOES CIPTEC WORK?
Effectiveness of each CIP Phase
18
HOW DOES CIPTEC WORK?
CIPTEC collects the data from multiple CIP runs to model the distribution of cleans
19
HOW DOES CIPTEC WORK?
20
Effective Safety Overwash
Time, water and energy wasted
Gräddpastör
— Intermediate rinse
— Intermediate rinse
fwd
— 9min 30s
— Recommendation
— 7 min
Gräddpastör
— Caustic
— Acid 18min 09s
— Recommendation
10min
Gräddpastör
— Final rinse
— Final rinse fwd
11min
— Recommendation
5min
Gräddpastör
— ~7 min margin
phase current 6 Σ Proposal savings
prerinse 5min 42s - 5min 42s -
caustic 28min 54s 11min 11s
15min 00s 13min 54s
intermediate
9min 30s 6min 59s 5min 30s 4min 00s
acid 18min 09s 0min 0s 10min 00s 8min 09s
final rinse 10min 59s 3min 40s 5min 00s 5min 59s
total 1h 29min 49s
57min 47s 32min 02s
PART 3
CIPTEC – Value delivered
26
VALUE DELIVERED
27
Plant Intake 100 mill litres 200 mill litres 300 mill litres 500 mill litres
Total Savings 310 k EUR 560 k EUR 780 k EUR 1.2 k EUR
Product Recovery(0.50 EUR/litres *)
200,000 litres 380,000 litres 540,000 litres 850,000 litres
Water & Effluent(2.50 EUR/m³ *)
20,000 m³ 33,000 m³ 43,000 m³ 63,000 m³
Energy & Electricity(45.00 EUR/MWh *)
1,000 MWh 1,900 MWh 2,600 MWh 3,900 MWh
Chemicals(0.45 EUR/kg *)
5,000 kg 13,000 kg 24,000 kg 60,000 kg
CIP Time(30.00 EUR/h *)
3,600 h 6,600 h 9,000 h 13,500 h
Note: Estimate values are based on data from over 200 factories
*Rounded average cost
PART 4
CIPTEC Implementation Process
30
Example of Project Implementation Schedule
Project name
MonhtFebruary March April May June July August September October November December
Action ResponsibleCalendar Week
Cumulative week
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
Project signed Both 5 -7
Delivery of the sensors Diversey 11 0
Mechanical assembly of the equipment Customer 12 1
Start up of the sensors Diversey 13 2
Data Collection Diversey 13 2
1st Changes of times meeting Both 19 8
1st Changes of times Customer 19 8
2nd Proposal for changes of times send customerDiversey
27 16
2nd Changes of times Customer 28 17
Report meeting Both 37 26
Roadmap for next actions Diversey 37 26
CIPTEC helps to resolve the challenges in CIP
1. Harnessing data to improve performance
2. Eliminating over-cleaning without risking safety
3. Allowing for unforeseen problems
32
Thank you for your attention!
33