Page 1: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

October 23, 2017

CIGRE US National Committee

2017 Grid of the Future Symposium

FirstEnergy Smart Grid Experiences

Grid of the Future

Mark J. Vallo PE

Manager Smart Grid Technology

Page 2: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

FirstEnergy Electric System

■ 6,000,000 customers

■ 65,000-square-mile service

territory

■ 10 electric utility operating

companies in six states

■ 24,000 miles of transmission

lines

■ Approximately 268,000 miles of

distribution lines

■ Approximately 15,600

employees

CIGRE / FirstEnergy DOE Experience, Grid of the Future October 23, 2017 2

DoE Pilot Area

Page 3: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

FirstEnergy Smart Grid - Major Experiences

■ DOE – Dept. Of Energy Grant AARA

– Distribution Automation

– Volt / VAR Control

– Consumer Behavior Study

– Smart Meters

– Integrated Distributed Energy Resource

■ Grid of the Future (GoTF)

– Advanced Meter Infrastructure (AMI)

– Distribution Automation (DA)

– Integrated Volt Var Control (IVVC)

– ADMS

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 3

Page 4: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

DOE Smart Grid Modernization Initiative

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future4

Project Scope

Total Project Cost =

$115M

Period of performance = 5

years (ends June 1, 2015)

Goals

Reliability improvement to

64 circuits

Volt /VAR optimization to

46 circuits

Load & consumption

reduction, supporting

Energy Efficiency Goals

Zero OSHA

Zero DART Incidents

CIGRE / FirstEnergy DOE Experience, Grid of the Future October 23, 2017 4

Page 5: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

FirstEnergy Distribution Automation

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 5

Collectively each of these DA implementations

add up to greater than 25% improvement in

overall circuit CMI

■ FISR

– Fault Isolation Service Restoration

1. Electronic Recloser isolates fault to

fewer number of customer

2. Automatic Restoration completes partial

restoration

3. Control Center puts the crew on the

repair quicker

Page 6: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

CIGRE / FirstEnergy DOE Experience, Grid of the Future 6October 23, 2017

FirstEnergy OH CEI Smart Grid Pilot

Page 7: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Safety First, Safety Last, Take it Home

■ Hot Line Tag

■ Lockout / Fault Isolate Single Phase

■ Only Switch Three Phase

■ Test, Test, Test

■ Regression Test Software Revisions

■ Train, Operational Confidence

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 7

Page 8: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Distribution Automation

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 8

Fewer Outages

Quicker Restoration

Page 9: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Distribution Automation

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 9

Sub B

Sub A

Fault

R4

R8 R6

R7

R3

R1

R9

R5

R2A2

A1

B1

B2

Fewer Outages

Quicker Restoration

Our CEI SmartGrid

has reduced the

number of sustained outages by 12%

and reduced outage duration by 26%

Page 10: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Substation LoV – (Loss of Tx)

■ Substation Loss of Transmission Supply

– April 10, 2015 at 10:39 pm

– All 22 reclosers on the four NL circuits reported a LoV

– By design, FISR initiated 90 seconds after the LoV.

– FISR operated correctly restoring service to (4) circuits

– 24 reclosers 5,382 customers

– 556,600 CMI saved

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 10

Page 11: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Top Customer Outage Minutes Saved

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 11

169,539 CMI Saved

L-2-LA OX Sub LoV

417,375 CMI Saved

■ Other Smart Grid DA Events

– PG3-P1 – Fault – 154,026 CMI Saved

– QZ2-P1 – Fault – 128,346 CMI Saved

– OX Sub – LoV(Tx) – 200,030 CMI Saved

– NP3-P1 – Fault – 109,886 CMI Saved

– PN3-P1 – Fault – 111,687 CMI Saved

Page 12: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Innovation - Automated Recloser Protection Settings

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 12

SETTING_GROUP 0

RECLOSERID

SG Notes_SG NUMSOURCESn_SG SOURCESUB_SG SOURCEFEEDERn_SG SETTINGn_SG

SETTING_GROUP 1R01 R01,YKT2_539,T2-539-2 7GR 539S4

SETTING_GROUP 1R02 R02,YKT2_696,T2-696-2 6WG 696S4

SETTING_GROUP 1R03 R03,YK57352,57352 6TV 573S4

SETTING_GROUP 1R04 R04,YK69622,69622 3WG 696S1

SETTING_GROUP 1R05 R05,YKT5_573,T4-573-2 9TV 573S4

SETTING_GROUP 1R06 R06,YK57342,57342 6TV 573S1

SETTING_GROUP 1R07 R07,YK64312,64312 2RT 643S1

SETTING_GROUP 1R08 R08,YK53922,53922 6GR 539S1

SETTING_GROUP 1R09 R09,YK53942,53942 6GR 539S4

Page 13: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Smart Grid Benefits beyond DA Reliability

■ Reduction in Switchman/ Troubleman hours

■ Reduced truck rolls

■ Safety Intangibles

■ DSO situational awareness

■ Engineering troubleshooting and planning tool

■ Aid to storm management

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 13

Page 14: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Smart Grid Challenges

FE Smart Grid Communications

CIGRE / FirstEnergy DOE Experience, Grid of the Future 14October 23, 2017

Technologies evaluated• 700 MHz

• 1.4 GHz

• CDMA

• Tropos Mesh radio

Page 15: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

1.4 GHz Performance

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 15

Dark Red great coverage

Orange Yellow marginal

coverage

Blue zero no coverage

Doubled the number of 1.4

GHz towers from 6 to 12

but saw no significant

improvement.

ALWAYS IN MITIGATION

MODE

Conclusion: 1.4 GHz was

not providing needed

performance

Page 16: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

NetComm Recloser Uptime early 2015 vs 2017

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 16

2015 2017

Page 17: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

FE Integrated Volt/Var Control

Reliability focused

• Maximize Power Quality - Optimize voltage

levels, flatten voltage, prevent voltage sags

• Reactive Support - Provide reactive support to

the transmission system

• Respect Voltage Limits - 106% to 98% of

nominal, minimizes device operation

Energy efficiency / cost savings focused

• Loss Minimization - Flatten voltage, reduce

losses - both kW & kVAR

• Minimize Demand - Reduce kW while still

providing acceptable voltage

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 17

Page 18: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Integrated Volt/VAR Control

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 18

Reduced customer energy usage and improved power quality through

automated voltage management

Page 19: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

19

Distribution Grid of the Future

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future

Improve

SCADA

visibility

for DSOs

Page 20: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Distribution Grid of the Future – SCADA & ADMS

20CIGRE / FirstEnergy DOE Experience, Grid of the Future October 23, 2017

Page 21: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Grid of the Future Core Components

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 21

Page 22: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

22

Distribution Platform EnhancementsPreparing for a Modern Grid

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future

Page 23: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Benefits of an Integrated Smart Grid Solution

CIGRE / FirstEnergy DOE Experience, Grid of the Future 23

■ Provides line of sight for grid operators all the way down to

the consumer endpoint

– DA & IVVC devices can be coordinated to optimize results

– AMI meters provide service level voltage

– IVVC can help synchronize voltages

■ Adds flexibility to accommodate distributed generation,

storage potential and other advanced distribution

technologies

October 23, 2017

Page 24: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Grid of the Future Expectations

Continue providing safe, reliable and affordable service while

adapting the system to support:

More

customer

choices

More energy

usage information

Integrating

renewables and

distributed

energy resources

Integrating

new technologies

Greater

flexibility to

restore outages

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 24

Page 25: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Questions

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 25

Page 26: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Appendix

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future 26

Page 27: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

27

■ Traditional circuit design brought power from a generating source

to the substation and then to end use customers

Reclosers R1, R3, R6, R7

Breakers A1, A2, B1, B2

Circuit Ties for DA

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future

Page 28: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Circuit Ties (continued)

■ Customer Benefits: allow customers to be served from multiple

sources; facilitates modern grid architecture

28

Example: Fault

occurs between A2

and R3; Customers on

remainder of circuit

can be restored by a

manually closing a

normally open switch

shortening the duration

of their outage

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future

Circuit Ties w/

Manual Switches

Still Requires a

Truck Roll

Page 29: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Reconductoring for DA

■ When creating new circuit ties, wire size needs to be increased

to accommodate new power flows on the lines

■ Customer Benefits: facilitates power flows from multiple sources;

improves the resiliency of the line making it better able to

withstand adverse weather conditions

29

Line workers reconductoring a circuit

October 23, 2017CIGRE / FirstEnergy DOE Experience, Grid of the Future

Page 30: CIGRE US National Committee 2017 Grid of the Future Symposium · Our CEI SmartGrid has reduced the number of sustained outages by 12% and reduced outage duration by 26%. Substation

Reclosers

■ Reclosers divide up the distribution circuit into small sections

■ Customer Benefits: improved restoration times and fewer

outages by isolating faults to smaller groups of customers

30

Example: Fault

occurs between

A2 and R3; R3

automatically

opens; R9 or R4

automatically

closes and

remaining

customers on

circuit experience

momentary

outage