CIGRE TB 787
WG C1.34 ISO Series 55000 Standards: Implementation and Information Guidelines for Utilities
Contents
1. Introducing CIGRE global
2. WG C1.34
3. Overview of ISO55001
4. Mandatory “Shall” Statements
5. Survey of Utilities
6. Case Studies
1. Introducing CIGRE global
A collaborative global community sharing
knowledge and expertise
• Since 1921
• 59 National Committees (NCs)
• 15000 members from over 90 countries
• 1200 organisations – incl major utilities
• 250 WGs at any time, 5000 experts
• Some of the world’s leading experts
• A unique collaborative culture
• Diverse, unbiased perspectives
from every corner of the globe
CIGRE’s 16 domains of work; each has
a dedicated Study Committee
Group A – Equipment:A1 Rotating electrical machines
A2 Power transformers and
reactors
A3 Transmission and
distribution equipment
Group B – Technologies:B1 Insulated cables
B2 Overhead lines
B3 Substations and electrical
installations
B4 DC systems and power
electronics
B5 Protection and automation
Group C – Systems:C1 Power system development
and economics
C2 Power system operation
and control
C3 Power system
environmental performance
C4 Power system technical
performance
C5 Electricity markets and
regulation
C6 Active distribution systems
and distributed energy
resources
Group D – New materials & IT:D1 Materials and emerging test
techniques
D2 Information systems and
telecommunication
What level of RE penetration
should be safely allowed in the
power system??
2. WG C1.34
• WG C1.34 launched in Feb 2016
• 4 face-to-face meetings in
Toronto, Paris, Dublin
• More than 30 members from 25
countries, in all time zones
• 25 conference calls
• TB published December 2019
(204 pps)
3. ISO55001: An Overview
• Asset risk and opportunity
• Building blocks of Policy (AMP), Strategy (SAMP),
SMART Objectives (AMOs) and Plans (AMPs)
• TB 787 emphasises value, alignment,
leadership, assurance
• Your last R1000!
4. Mandatory “Shall” Statements
• The 71 mandatory shall statements in
ISO55001 are explained in detail in the
context of electric utilities - 65 pages
• Each is explained and mapped for
applicability against the artefacts of:
• AM Policy
• SAMP
• Stakeholder Analysis
• AMOs
• AMPs
6. Case Studies
• Focus on their view of Data, Processes, Tools & Systems
requirements in the context of AM
• Three utility case studies presented – Eskom, TenneT and
Manitoba Hydro (30 pages)
• Of these 3, only TenneT was certified to ISO55001 in 2018
• Observations made while avoiding mentioning names of
solution vendors in line with CIGRE policy
Observations
• All utilities have a mass of data
that is used to manage assets
• All utilities apply business process
mapping and information manage-
ment systems, which are either developed in-house or sourced
commercial off the shelf (COTS) with customisation
• The anchor business models are Asset Owner-Asset
Manager-Asset Service Provider at TenneT but Eskom and
Manitoba Hydro use the Asset Lifecycle Model
“Since every utility has its own starting point, culture,
regulatory constraints and strategic objectives, it is
virtually impossible to develop a “one-size-fits-all”
solution to deploying ISO55001”.
Boudewijn Neijens
Convenor WG C1.34