CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room 1 “Conseil” AFE – CIE France 17, rue de l’Amiral Hamelin 75016 Paris Participants Refer to the tabled list “13.14 D2 Meeting 2013 Attendance List.pdf” Note: In the voting results shown in these minutes, all votes are considered Yes unless noted in the No or Abstain columns. “All” means that the vote was carried unanimously. Note: Common CIE Abbreviations used in this document: ADD: Associate Division Director BA: CIE Board of Administration CB: CIE Central Bureau CD: Committee Draft CollTool: Collaboration Tool CP: Code of Procedure D2: CIE Division 2 (likewise, D1 is Division 1 etc.) DD: Division Director DD2: Division Director, CIE Division 2 DE: Division Editor DS: Division Secretary ED: Enquiry Draft GS: CIE General Secretary ILV: International Lighting Vocabulary JTC: Joint Technical Committee NC: National Committee TC: Technical Committee TCC: Technical Committee Chair TM: CIE Technical Manager TN: Technical Note ToR: Terms of Reference VPP: Vice President Publications VPT: Vice President Technical WD: Working Draft 13.01 Opening and Overview of the Agenda DD2 (Peter Blattner) opened the meeting at 09:10 and welcomed the division members and the guests. Attendees to the meeting observed a duration of silence in respect for Dr Gerhard Rösler, who passed away late last year. Note: Some additional items were covered in the meeting that were not in the published agenda, namely: 13.06.16 and 13.07.09 through to 13.07.12. 13.01.01 Meeting Documents Refer to CollTool for all tabled meeting documents. The list of the meeting’s documents is given in the annex of these minutes. Agenda V4 is considered as the final version. 13.01.02 Introduction of Participants The D2 management committee introduced themselves.

Upload: others

Post on 10-Jul-2020

13 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Annual Meeting 2013

Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00

Venue Room 1 “Conseil”

AFE – CIE France 17, rue de l’Amiral Hamelin 75016 Paris

Participants Refer to the tabled list “13.14 D2 Meeting 2013 Attendance List.pdf” Note: In the voting results shown in these minutes, all votes are considered Yes unless noted in the No or Abstain columns. “All” means that the vote was carried unanimously. Note: Common CIE Abbreviations used in this document: ADD: Associate Division Director BA: CIE Board of Administration CB: CIE Central Bureau CD: Committee Draft CollTool: Collaboration Tool CP: Code of Procedure D2: CIE Division 2 (likewise, D1 is

Division 1 etc.) DD: Division Director DD2: Division Director, CIE Division 2 DE: Division Editor DS: Division Secretary ED: Enquiry Draft

GS: CIE General Secretary ILV: International Lighting Vocabulary JTC: Joint Technical Committee NC: National Committee TC: Technical Committee TCC: Technical Committee Chair TM: CIE Technical Manager TN: Technical Note ToR: Terms of Reference VPP: Vice President Publications VPT: Vice President Technical WD: Working Draft

13.01 Opening and Overview of the Agenda DD2 (Peter Blattner) opened the meeting at 09:10 and welcomed the division members and the guests. Attendees to the meeting observed a duration of silence in respect for Dr Gerhard Rösler, who passed away late last year. Note: Some additional items were covered in the meeting that were not in the published agenda, namely: 13.06.16 and 13.07.09 through to 13.07.12.

13.01.01 Meeting Documents Refer to CollTool for all tabled meeting documents. The list of the meeting’s documents is given in the annex of these minutes. Agenda V4 is considered as the final version.

13.01.02 Introduction of Participants The D2 management committee introduced themselves.

Page 2: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 2 of 25

13.01.03 Apologies D2 Officers Division Editor, Jim Gardner (Email) Division Members Austria, Wolfgang Bechter (Email 2013-04-02) Finland, Erkki Ikonen (Email 2013-03-27), proxy: Maksim Shpak Hong Kong, Tse-ming Chung (Email 2013-03-27) Korea, Seung-Nam Park (Email 2013-03-28), proxy: Dong-Hong Lee Norway, Tore Ledaal (Email 2013-03-28) Poland, Jerzy Pietrzykowski (Email 2013-03-28) Sweden, Stefan Kallberg (Email 2013-03-27) Netherlands, Daniel Bos (Email 2013-04-12), proxy: Menno Schakel USA, C. Miller (Email 2013-04-16) proxy: Yoshi Ohno TC Chairs TC2-29 George Eppeldauer (Email 2013-03-14) TC2-57 Balazs Kranicz (Email 2013-04-08) TC2-60 Emma Woolliams (Email 2013-04-12) TC2-62 Walter Steudtner (Email 2013-04-08) TC2-66 Janos Schanda (Email 2013-04-12) TC2-70 Danny Rich (Email 2013-03-14) TC2-75 Hsueh-ling Yu (Email 2013-03-27) Supportive Members Osram, Walter Steudtner (Email 2013-04-08) Zumtobel, Klaus Meyer-Pohl (Email 2013-03-27)

13.01.04 Division Members (with/without voting rights), Supportive Members The list of current division members and supportive members is tabled below. 25 official country members or proxies with voting rights were present:

Country Official D2 member D2 meeting 2013

AUSTRALIA Tony Bergen Present

AUSTRIA Wolfgang Bechter Absent

BELGIUM Jean-Michel Deswert Proxy (Guy Vandermeersch)

BRAZIL Carla Thereza Coelho Present

CANADA Joanne C. Zwinkels Present

CHINA Jiangen Pan Present

CROATIA Bruno Martinic Absent

CZECH REPUBLIC Marek Smid Present

DENMARK Carsten Dam-Hansen Present

FINLAND Erkki Ikonen Proxy (Maksim Shpak)

FRANCE Gaël Obein Present

GERMANY Georg Sauter Present

GREAT BRITAIN Teresa M. Goodman Present

HONG KONG T.M. Chung Absent

HUNGARY Peter Csuti Present

INDIA V.D.P. Sastri Absent

ISRAEL Dan Scheffer Absent

ITALY Maria Luisa Rastello Present

JAPAN Hiroshi Shitomi Present

KOREA (REPUBLIC OF) Seung Nam Park Proxy (Dong-Hong Lee)

Page 3: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 3 of 25

Country Official D2 member D2 meeting 2013

MALAYSIA John See Keat Siang Absent

NETHERLANDS Daniel Bos Proxy (Menno Schakel)

NEW ZEALAND Kathryn Nield Present

NORWAY Tore Ledaal Absent

POLAND Jerzy Pietrzykowski Absent

ROMANIA Mihai Simionescu Absent

RUSSIAN FEDERATION Raissa Stolyarevskaya Present

SERBIA Vladan Skerovic Absent

SLOVAK REPUBLIC Roman Dubnicka Present

SLOVENIA (REPUBLIC OF) Grega Bizjak Present

SOUTH AFRICA Reinhardt Sieberhagen Present

SPAIN Joaquin Campos Acosta Present

SWEDEN Stefan Källberg Absent

SWITZERLAND Peter Blattner Present

TURKEY Kamuran Türkoglu Present

UKRAINE TBN

USA Cameron Miller Proxy (Yoshi Ohno)

After the meeting info: Thorsten Gerloff replaces Georg Sauter as Official D2 Member for Germany.

13.01.05 TCs, Reportership, Liaisons The current list of TCCs, reporterships and liaisons is tabled.

13.02 Minutes of the CIE D2 Meeting 2012 (Hangzhou) The minutes of the CIE D2 meeting from 2012, held in Hangzhou, China, is tabled.

ID Ref Decision Yes No Abs

13.D01 13.02 To accept the minutes of the previous meeting as tabled without amendment

All

13.02.01 Review of Resolutions and Actions DD2 read through the list of actions (tabled) from the 2012 meeting and, where relevant, their completion dates. All actions except 3 missing status reports of reportership were accomplished. These open actions are addressed in 13.07.

13.03 Division Director's Report DD2 gave a summary (tabled) of activities in the 7 months since last meeting:

• D2 ballots o New D2 officers o New JTC on the revision of S009 o Current ballot on TC2-49

• Dealt with “old” TCs o Introduction of an automatic procedure for “old” TCs to be at CD within 6 months or they

would automatically be closed o Most old TCs became very active just before deadline

Page 4: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 4 of 25

o 2 TCs in CD, 2 close to WD o For the remaining TCs, questionnaire sent out to TC members and experts. In most

cases, they were considered to be out-dated.

• Review of D2 documents was undertaken

• TC2-71 CIE standard o Close collaboration with CEN TC 169 WG7 (EN13032-4) o Many measurement laboratories were involved (NMIs/industry) o Includes state-of-the-art measurement techniques o Currently in WD ballot, EN13032-4 evolves in parallel o There are 2 new EC regulations, the standard is needed urgently

• JTCs established

• High activities in a number of TCs

• Preparation of Centenary meetings

• Preparation of expert workshop in October

13.03.01 News from CIE CB, BA-/ DD-Meetings DD2 gave a summary (tabled) of recent news and outcomes from CB/BA/DD meetings.

• 2 new liaisons/MOUs: o ILDA (International Association of Lighting Designers) o GLA (Global Lighting Association)

• President-elect for 2015-2019 is Yoshi Ohno

• Past-president Franz Hengstberger has now left the board

• BA approved a new form of publication: Technical Note (TN). o Will be freely available for download from the CIE website o May be prepared by a TC or a reportership to get information out quickly o Has balloting to ensure quality

• BA approved new Associate Division Director (ADD) Dr Hiroshi Shitomi

• [Maybe of interest to D2] New TC in D1 TC1-91 Skin Colour Database. Involves uncertainties, so we request D2 be involved in this TC

• BA approved new D2 officers o Tony Bergen (AU) – Division Secretary o Armin Sperling (DE) – ADD

• Proposal to differentiate between Technical Reports and Standards in terms of speed and process

• Decision to replace unanimity for TC ballot for CIE Standards with consensus (in line with ISO Procedures):

o two thirds majority o only one vote per country o Division member to appoint who is “head of delegation” in case of multiple TC members

from same country o [Note: For technical reports, if there are problems reaching unanimity, then there is the

possibility for referring to the independent review panel. In addition minority opinions can be included in a technical report, but not in a standard.]

• New by-laws approved, including updated process for NCs in arrears. If a country is suspended or expelled, then country members lose their privileges including voting rights, TC chairmanship and positions on board.

• Further discussion on and updating of the Code of Procedure, proposal sent, comments collected.

• Publications update: o Four new/updated publications in the past year. o Many publications are sold without the 2/3 discount, hence possibility to encourage these

people to become NC members o CIE 198 is popular

• New developments in publications o Application to include CIE publications in the Book Citation Index

Page 5: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 5 of 25

o Perhaps also Proceedings Citation Index o Cooperation with German BEUTH Verlag o New products such as (single) multiuser PDFs and a PDF-print bundle

• Joint TCs o There are increasing activities between divisions (eg: health issues, flicker, mesopic),

hence inter-divisional JTCs are now available. o Also inter-organisational JTCs between CIE and other organisations.

13.03.02 Outcome CIE Strategy Workshop 19th, 20th November 2012 DD2 gave a summary (tabled) of outcomes from the CIE Strategy Workshop

• The board and stakeholders had a strategy workshop in Manchester in 2012

• Many strategic goals established for 2013-2018, including “To be faster and more relevant without sacrificing quality”

• Also action planning goals established

13.03.03 ISO/TC/274 “Light and Lighting” DD2 gave a summary (tabled) of the design and intention of this new ISO TC.

• New ISO TC was proposed by the German standards organisation

• This TC will be for applications rather than fundamentals

• CIE decided to work with this to try to gain from this

• Preparing for constitutional meeting on July 2, 2013 in Berlin

• CIE GS will be chairing this TC.

• Subcommittees proposed: o SC1 for co-ordination of CIE standards, this will help streamline the voting process for

joint CIE/ISO standards. o SC2 for light and lighting product and system application standards. o [Note: the structure is only proposed but it will be discussed at the constitutional meeting

mentioned above]

• The TC is designed to be complementary to CIE, not overlapping Some division members expressed their concerns that the ISO TC will take on a role that should be taken by CIE in some fields. DD2 agreed that the ISO TC will have some impact on the work of the CIE; however the risks are minimized if CIE is able to deliver the standards in reasonable time. Furthermore, the ISO TC is chaired by CIE GS, hence CIE has some influence on the ISO work. Finally the ISO TC represents an opportunity for CIE to spread their knowledge wider and in particular to have closer contact to the ISO TCs dealing with light and lighting.

13.03.04 International Year of Light DD2 gave a summary (tabled) of the plan to have an International Year of Light in 2015.

• Idea planned to have an International Year of Light in 2015

• To highlight the importance of light and optical technologies

• Currently at UN general assembly in New York

Page 6: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 6 of 25

13.03.05 IEA/GLA/CIE workshop, 7 to 8 March 2013 Tokyo Tony Bergen gave a summary (tabled) of the outcomes of this meeting.

• CIE GS Martina Paul and Tony Bergen attended this workshop (Tony as D2 / TC2-71 representative)

• The main outcome desired was that the new CIE Draft Standard Test Method for photometry of LED lamps, luminaires and modules would be the basis in future of all testing and recommendations from the IEA 4E SSL Annex

• The outcome was successful; they plan to use the CIE (draft) standard for any future inter-laboratory comparisons.

13.04 D2 Administration DD2 gave a summary (tabled) of D2 administrative matters

• Formal proceeding for balloting was decided in Hangzhou meeting

• New TC proposals for this meeting will not be decided at this meeting (except one): they will be decided by email ballot.

• Important to remember that division members are representing their country consensus view, not necessarily personal view.

• For TC ballots, the responsibility is the TCC; CD and other ballots are responsibility of CB

• Collaboration tool is available and should be used for all formal correspondence such as drafts, minutes, agendas etc. (quick emails for exchanges of ideas without use of collaboration tool are of course OK).

o It is also possible for a TCC to appoint a TC secretary to manage the documentation on the collaboration tool

o TC status reports are mandatory annually – even if it is “no progress”. o It is up to the TC to determine how best to manage their documents, including naming

conventions etc. o To edit a document you can download then edit then upload again – the original

document will stay.

• WebEx is also available to schedule real-time online meetings.

• The following points were proposed by CIE GS at the DD meeting for discussion in the division: o Quality assurance:

� List of TC members must be validated before going to TC Ballot

• Must be at least 5 people from 5 different countries (CIE member countries) at all times

� Latest draft should not be older than two years � TC ballots and the participation must be documented (official templates are

available) � DE to properly review the document before sending to CB � CB may decide to reject the document if too much editing is required � TC Chair has maximum of one month to respond to any comments on the drafts � If these steps cannot be properly followed then the CB may decide to close the

TC o Resource management:

� Only one TC per TCC

• Suggestion: if one TC is in CD then perhaps the TCC should be allowed to chair another TC

� We will maintain an official list of “TC Collectors” and notorious non-deliverers � TCC has the right to reject application for TC membership � Proposal for a requirement that there be at least two meetings per year � Comment: need to have a bit of flexibility in the timing in some circumstances � Comment: it is important to have principles and have clear reasons for the

principles o Prioritising our work

Page 7: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 7 of 25

� Prepare TC proposals well before the discussion takes place, make a proposal

for the potential impact for the work � Division should have a strategy, determine what is needed and expected from

us. � Conditions for new TCs:

• Title, ToR, 5 persons of 5 different member countries

• Work plan

• Summary of the motivation for the TC

• [Note: during this meeting it was discussed that there will soon be a “TC impact form” available and the meeting agreed by consensus that new TC proposals should also include this form]

• D2 ballot procedure as previously discussed

• A short discussion took place and members agreed to consider the points proposed as recommendations and exceptions should be possible.

13.04.01 D2 All Experts Room DD2 gave a summary of the intention of this CollTool room

• Exchange of information/communication for people other than TCCs, division members, etc.

• Includes public information, ~ six emails per year

• To join, send email to DD2 ([email protected])

13.04.02 New D2 officers DD2 announced the retirement of two long-term Associate Directors and summarised their CIE careers (tabled) and announced the new appointments to the D2 management team.

• Guy Vandermeersch o Has been active in CIE since 1975 London o Significant contributor to:

� CIE 043-1979 � CIE 070-1987 � CIE 084-1989 � CIE 018.2-1983 � CIE 063-1984 � CIE 121-1996 � CIE 121-SP1:2009

o Will remain active in new TC updating CIE 121

• Georg Sauter o Started at PTB in 1978 o Organised the “robot-goniophotometer” at PTB o Retired from PTB in 2007 o Active in CIE since 1987 Venice o Active in very many TCs o Most prominently CIE 198-2010 o ADD since 1997

• New division officers: o Armin Sperling (DE) Associate Division Director o Tony Bergen (AU) Division Secretary

Page 8: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 8 of 25

13.05 Division Editor’s Report DD2 read the Division Editor’s Report (tabled)

• Important Note: DE uses the collaboration tool to check TC activity.

• The meeting acknowledged the important work Jim does and the prompt manner in which he responds.

13.06 Progress Reports Technical Committees

13.06.01 Overview of the Status of TCs DD2 summarised a spreadsheet (tabled) showing the status of all TCs.

13.06.02 Future of TC2-28

• At last meeting this TC was given the automatic procedure for closure if not nearly completed, subject to review at this meeting.

• Questionnaire sent to TC members and other experts (12 sent, 5 responses): o Mostly considered out of date (4-1) o 3 people interested in contributing significantly, 1 interested, 1 not interested o 2 people offered to co-chair o Generally considered to be useful and worthwhile, but a lot of updating is needed.

• Several possibilities to move forward: o Take the key points and issue a TN (short and quick), then new TC that would expand on

that TN in order to produce a TR (New Zealand has some interest in chairing) o Put document into archive, which would be a shame given that the document contains so

much important information.

• Proposal to close the TC, create a reportership to produce a TN and make recommendations for the new TC.

ID Ref Decision Yes No Abs

13.D02 13.06.02 To close TC2-28 All

ID Ref Decision Yes No Abs

13.D03 13.06.02 To create a reportership, with Teresa Goodman as reporter, to write and issue a TN summarising the key points of the TC2-28 draft report and make recommendations for a new TC to expand on the information contained in that TN.

All

After the meeting info: This reportership is labelled R2-64.

13.06.03 Reconfirmation of TCC of TC 2-29

• TCC George Eppeldauer has been in place for four years, needs reconfirmation (or otherwise) according to the COP.

• No communications in the past year

• No formal members registered on collaboration tool

• Consensus is that it is very important that it will not be ready to be finished within one year

• It was reported that the TCC’s work situation has changed which makes it difficult to contribute time to the CIE work

Page 9: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 9 of 25

• There are few active contributors (members) of the TC

ID Ref Decision Yes No Abs

13.D04 13.06.03 • Confirm TCC of TC2-29 for six months;

• TCC must update the membership list and register members with CollTool

• TCC must prepare a workplan

• Ask TC members to contact TCC

• Call for new members

• If TCC doesn’t complete these tasks then a new TCC shall be sought.

All

13.06.04 Future of TC2-32

• This TC was given the “automatic procedure” for closure if not at CD by this meeting

• Questionnaire sent out (9 sent, 2 responses) o 1 response considered it to be state-of-the-art, 1 said it needs significant revision

• There is a lot of useful information, but some is out-of-date and it needs significant editing

• Suggestion that the report should be done in D4

• There are TC members from only 4 countries

ID Ref Decision Yes No Abs

13.D05 13.06.04 • Close TC2-32

• Archive the current report on CollTool

• Request the TCC to proceed through D4 if he wishes to continue with the publication

• If D4 does not take on the TC then we reconsider at next D2 meeting

All

13.06.05 Reconfirmation of TCC of TC 2-50

• The TCC Richard Distl has been in place for four years, needs reconfirmation (or otherwise) according to the COP.

• No TC meeting has been scheduled at this meeting due to the lack of input and short time since last meeting.

ID Ref Decision Yes No Abs

13.D06 13.06.05 Confirmation of TCC of TC2-50 for another four years

All

13.06.06 Future of TC2-53

• This TC was given the “automatic procedure” for closure if not at CD by this meeting

• TCC passed away late last year

• DD sent questionnaire to TC members and experts (15 sent, 9 responses) o Large variation of opinions on relevance, mainly that the document is outdated or that the

needs of industry have changed o No offers to take up TCC, four interested in contributing

• There was considerable work done several years ago, but little in the past year, still several sections missing entirely

Page 10: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 10 of 25

• There should be new information soon, due to a European collaborative project (EMRP IND52) which will be finished soon. The topic of the report is needed in the industry.

ID Ref Decision Yes No Abs

13.D07 13.06.06 Close TC2-53, save the current draft in archive and input it into the EMRP IND52 project. Create a reportership on the topic.

All

After the meeting info: This reportership is labelled R2-65, Gaël Obein agrees to take on the reportership.

13.06.07 Future of TC2-56

• This TC was given the “automatic procedure” for closure if not at CD by this meeting

• Questionnaires were sent (10 sent, 1 response) o Response: it would be useful but no possibility to contribute

• The publication already exists, this TC was to make a standard

ID Ref Decision Yes No Abs

13.D08 13.06.07 Close TC2-56 All

13.06.08 Discussion on TC 2-60, Resignation of TCC

• The TCC Emma Woolliams recently sent a letter of resignation o The document had already been at committee ballot stage o Subsequent information has come which requires significant editing of the document

• Jim Gardner offered to take on the chair to completion, to make the document consistent with current sampling theory.

• Many opinions that the document should not go too much into sampling theory and the advanced methods and that we should accept this as an “interim” report, not targeted at a high level.

ID Ref Decision Yes No Abs

13.D09 13.06.08 Change TCC of TC2-60 to Jim Gardner All

• The meeting thanked Emma Woolliams for her hard work on this TC over many years.

13.06.09 TC2-65: Reconfirmation of TCC, TN on mesopic lumen

• The TCC Teresa Goodman has been in place for four years, needs reconfirmation (or otherwise) according to the COP.

• No status report has been received for this meeting

• There was a TC meeting and a workshop at the Hangzhou meeting.

• There will be two technical notes prepared.

• Suggestion that there should be a Webex meeting within six months.

ID Ref Decision Yes No Abs

13.D10 13.06.09 Confirmation of TCC of TC2-65 for another four years

All

Page 11: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 11 of 25

ID Ref Action Who Deadline

13.A01 13.06.09 TCC of TC2-65 needs to submit a status report within four weeks

Teresa Goodman 2013-05-15

13.06.10 TC2-66: Change of ToR

• The TCC was not present so this matter was not discussed

• After the ED commenting stage, the TM, VPP and GS proposed to publish the outcome of TC2-66 as an amendment to the ILV. Because the ILV is a CIE standard, the ToR of TC2-66 needs to be changed.

ID Ref Decision Yes No Abs

13.D11 13.06.10 Change ToR of TC to “To Review LED and LED assemblies related terms and definitions in other international and regional organizations and prepare a standard for CIE”

All

13.06.11 TC2-68: TN on Definitions

• IEC is also working on a performance standard for OLEDs, also on definitions

• Hope that IEC and CIE can achieve common definitions and perhaps create a liaison

• Intention is to produce a TN this year, also to have a TC meeting at Slovenia meeting

13.06.12 TC2-71: Status

• There were around 200 comments on the WD ballot

• The TC will meet during this meetings schedule to discuss the most contentious of these comments

After meeting info: At the TC2-71 meeting held in Paris two days after the D2 meeting, it was mainly the comments dealing with negative votes that were discussed. Because there were some quite substantial changes in the document a second WD ballot will be initiated. This second ballot will follow the new procedures agreed at the BA meeting in Paris (2/3 majority rule and 1 vote per country).

13.06.13 TC2-17: Status

• The revitalised TC is very active, there has been significant progress since the last meeting

• Currently at WD status, one person voted against, independent review panel has given the report to an external expert, the TCC implemented the changes suggested by the independent reviewer, review panel accepted the changes, the dissenting member maintains his dissent about one value in one table, independent review panel evaluating, should go to CD status within the next six months.

13.06.14 TC2-47: TC Ballot on WD: Deadline 2013-05-05

• Have had several Webex meetings over the previous few months

• The TC will meet during this meetings schedule

• Comments have been received by DE

• TC Members are asked to reply by 2013-05-05

Page 12: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 12 of 25

13.06.15 TC2-37: TC Ballot on CD: Deadline 2013-04-21

• Currently in CD ballot stage, deadline 2013-04-21

13.06.16 TC2-72

• Currently waiting on the outcome of TC2-60

• TCC needs to resign because he does not have further support for CIE work

• TC is considered to be very important for evaluation of uncertainty of spectral measurement and chromaticity

• A call was made for a replacement TCC but there were no volunteers

• Richard Young indicated that TC2-51 should be finished within 12-18 months and he was prepared to act as interim chair of TC2-72 while another is sought

• Concern was raised that Richard already chairs one TC and will also be proposing another new TC at this meeting, and will thus violate the “one TC chairmanship per person” rule, however in the absence of other volunteers this was overruled.

ID Ref Decision Yes No Abs

13.D12 13.06.16 • Richard Young take on TCC for the interim

• Call be made for a TCC and TC members in CollTool

All

13.07 Reporterships

13.07.01 R2-49 “Standardization of Broad-Band UV Measurements” and proposal for new TC

• The reporter George Eppeldauer requested the establishment of a new TC in line with the report, and he has received support from D2 members from several countries

• Discussion: Concern was expressed about the calibration of broadband UV meters based on radiation from a single line source. Suggestion made that 254 nm should also (or alternatively) be used. 365 nm LEDs and blacklights with 365 filters are also used in industry to calibrate meters at this wavelength. Concern was expressed that a new TC may produce a report that is contradictory to TC2-47. In addition, ISO 3059:2012 “Non-destructive testing – Penetrant testing and magnetic particle testing - Viewing conditions” prepared by ISO/TC 135/SC2 mainly covers this subject. Are we responsible for these measurements as it is UV and not visible light? Measuring the power without knowing the wavelength is not useful/relevant. Who is this report aimed at? The reporter is already TCC of one TC.

ID Ref Decision Yes No Abs

13.D13 13.07.01 • The D2 Management + VP Publications compile a list of the issues raised in this meeting regarding the proposed TC

• The list of issues be sent to the reporter for addressing

• If the reporter wishes to again propose the TC then the new TC impact form should also be used

All

Page 13: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 13 of 25

ID Ref Action Who Deadline

13.A02 13.07.01 D2 Management + VP Publications compile a list of the issues raised in this meeting regarding the proposed TC and send to the reporter for response

D2 Management + VP Publications

2013-05-29

13.07.02 R2-50 “Metric for Comparison of Luminous Intensity Distributions”

• The reporter Udo Kruger spoke to his report (tabled)

• Discussion: A wider test comparison should be organised, perhaps within D2. The handling of measurement uncertainties for luminous intensity are challenging. The suggested metric should be used in TC2-62. Software will be available to demonstrate the LID comparisons, please email Udo Kruger for more details. Comment: this metric would be useful for on-going characterisations and quality rating of goniophotometers

13.07.03 R2-51 Characterization and Measurement of LED Lighting Sources with Dynamic Control and proposal of new TC

• The reporter Jiangping (Rosa) Wang made a presentation (tabled) outlining the intent of the TC.

• Discussion: Important topic, particularly given the discussion on electrical measurement. Should the study of LED control system performance be decoupled from the AC supply? Organisations such as US DOE are already asking questions about how we determine characteristics of lighting in dimmed state. Perhaps this TC should wait until the TC2-71 standard is implemented? What does this TC offer that isn’t already part of other existing test methods? Experts from other divisions should be involved. Perhaps we need more study on what gaps there are currently and therefore what problems we need to solve. What is the effect on the human needs to be separated from what is the effect on the measurement/performance. Will these products still be used and be more or less dominant in the future? So therefore is there the demand? Many of these products are not good enough to make reliable measurements. Have IEC or other organisations already worked on this?

ID Ref Decision Yes No Abs

13.D14 13.07.03 • The D2 Management + VP Publications compile a list of the issues raised here

• The list of issues be sent to the reporter for addressing

• If the reporter wishes to again propose the TC then the new TC impact form should also be used

All

ID Ref Action Who Deadline

13.A03 13.07.03 D2 Management + VP Publications compile a list of the issues raised in this meeting regarding the proposed TC and send to the reporter for response

D2 Management + VP Publications

2013-05-29

Page 14: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 14 of 25

13.07.04 R2-52 Flicker measurement and flicker index study on solid state lighting

• The reporter Kuei-Neng (Gilbert) Wu gave a presentation (tabled)

• Discussion: there is work on-going in D1, but this focusses on the effects rather than the measurement methods. There needs to be cooperation and collaboration. We need not just descriptions of how to do measurement, but also a metric. There is also IEEE committee working on this (measurement), Yoshi Ohno is on this committee, there needs to be information flow between him and the reporter.

13.07.05 R2-53 “Glare Rating Measurement by ILMD”

• The reporter Kuei-Neng (Gilbert) Wu gave a presentation (tabled).

• Conclusion: the ILMD method is good, more work is on-going.

13.07.06 R2-54 “Internal quantum efficiency measurement for LED wafers”

• The reporter Cong Chen could not be here, a proxy of the reporter, Jiangen Pan, gave a brief presentation (tabled).

• Intention is to complete the report within the next year, no TC proposal.

13.07.07 R2-62 Revision of D2 documents related to luminous flux and luminous intensity distribution and proposal of two new TCs

• The reporter Tony Bergen gave a presentation (tabled).

• Recommendation that two new TCs be created: o The Photometry and Goniophotometry of Lamps and Luminaires (Chair: Tony Bergen

(AU)) o Integrating Sphere Photometry and Spectroradiometry (Chair: Dong-hoon Lee (KR))

• Discussion: Should electrical characteristics also be included in more details? Should the two TCs be run in tandem rather than in parallel? [A quick poll of attendees suggested parallel is OK]

ID Ref Decision Yes No Abs

13.D15 13.07.07 That two new TCs be created:

• The Photometry and Goniophotometry of Lamps and Luminaires (Chair: Tony Bergen (AU))

• Integrating Sphere Photometry and Spectroradiometry (Chair: Dong-hoon Lee (KR))

To be confirmed by Division Ballot once the work plans and TC impact form are complete as per the D2 ballot procedure for new TCs

All

ID Ref Action Who Deadline

13.A04 13.07.08 Formal D2/BA ballot including title, ToR, initial members, work plan and TC impact form to be completed and submitted for Division Ballot for creation of the new TC The Photometry and Goniophotometry of Lamps and Luminaires

Tony Bergen 2013-05-29

Page 15: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 15 of 25

ID Ref Action Who Deadline

13.A05 13.07.08 Formal D2/BA ballot including title, ToR, initial members, work plan and TC impact form to be completed and submitted for Division Ballot for creation of the new TC Integrating Sphere Photometry and Spectroradiometry

Dong-hoon Lee 2013-05-29

ID Ref Decision Yes No Abs

13.D16 13.07.07 That R2-62 be closed All

13.07.08 R2-63 “Revision of CIE 63-1984” and proposal of new TC

• The reporter Richard Young gave a presentation (tabled).

• The document is still accurate in the main but many parts need to be extended or updated.

• Discussion: Other TCs already cover the principles of this document, but not all aspects. This document is intended to be a complete document for spectroradiometry of sources. Other reports and TCs use spectroradiometers, but this report is about the fundamentals of the equipment and the quantities. Important to note that this TC should focus on the measurements and not the equipment and not overlap other TCs.

• Richard Young is proposed as TCC in the interim, another TCC is sought given that Richard is already chair of two TCCs.

ID Ref Decision Yes No Abs

13.D17 13.07.08 That a new TC be created for revision of CIE 63-1984 Spectroradiometry of Sources (Chair: Richard Young (DE)) To be confirmed by Division Ballot once the title, ToR, work plan and TC impact form are complete as per the D2 ballot procedure for new TCs

All

ID Ref Action Who Deadline

13.A06 13.07.08 Prepare formal D2 ballot for the new TC, including the title, ToR, work plan, initial members and the TC impact form

Richard Young 2013-05-29

ID Ref Decision Yes No Abs

13.D18 13.07.08 That R2-63 be closed All

13.07.09 R2-57 “Monitoring Progress of IEC TR 62778”

• The reporter Hiroshi Shitomi gave a presentation (tabled).

• Comment: We have a new JTC5, which is covering this area.

Page 16: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 16 of 25

13.07.10 R2-59 “Discussion on Definition of BRDF”

• The reporter Joanne Zwinkels gave a presentation (tabled).

• No changes to the ILV are being considered at the moment, but the reporter has sought input from a number of experts (from NIST, NRC, MSL, LNE and METAS) regarding problems with the existing definition and presented a recommendation for an improved definition to be considered by D2 when the ILV is next undergoing revision.

• The reportership to stay open for the moment.

13.07.11 R2-45 “Measurement of the Illumination Uniformity for Critical Applications”

• No reports have been received for some years and the reporter Meena Lysko is no longer in contact with the division

ID Ref Decision Yes No Abs

13.D19 13.07.11 That R2-45 be closed All

13.07.12 R2-60 “Discussion on the definition of Luminance/Radiance”

• Proposed change of reporter from Georg Sauter to Teresa Goodman

• The reportership should include liaison/reporting of what is happening in JTC2

ID Ref Decision Yes No Abs

13.D20 13.07.12 Change the reporter of R2-60 to Teresa Goodman

All

13.08 Liaisons L2-3 ISO TC 6: a written report prepared by the liaison officer Joanne Zwinkels was tabled L2-4 IEC TC 34: the liaison officer Guy Vandermeersch gave a brief verbal report. There will be a new standard released early next year. L2-7 IALA: DD and DS visited IALA at their HQ and had good discussions with IALA management and gave a presentation to their conference. They have publically available reports that can be downloaded freely. Possibility also for a MOU – to be taken up at a higher level. L2-9 PRESCO: the liaison officer Yoshi Ohno gave a brief verbal report. This has mainly been addressed in TC2-66. There are now some discrepancies again due to them making some small changes. TC2-66 is in AD stage.

13.08.01 Responsibilities of Liaison officers There is a COP for Liaison Officers. The CIE expects that its Liaison Officers for have liaison status only, not actually be members of the other organisation to avoid conflict of interest. Comment: this only applies where there is overlap and not where the two organisations have different interests.

Page 17: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 17 of 25

ID Ref Decision Yes No Abs

13.D21 13.08.01 That Guy Vandermeersch retains his liaisonship with IEC TC 34, but we are seeking someone to replace him to be the CIE liaison to IEC TC 34.

24 1

13.09 New TCs and Reportership

13.09.01 New TC (TC2-77): Fundamental Concepts

• A proposal (tabled) was made by Tony Bergen for a standing TC which is geared to social interaction of D2 members at division meetings, in line with D4’s unofficial TC4-11.

• The TC would use CollTool to provide information about the social functions and assist coordination and organisation.

• Given that there is no technical content for this TC, it was decided that it should be approved at this meeting (subject to Board approval) rather than by email ballot.

ID Ref Decision Yes No Abs

13.D22 13.09.01 That a new TC be created: Fundamental Concepts (Chair: Tony Bergen (AU))

23 2

13.09.02 New Reportership: TN on Colour difference of light sources

• A proposal for a new reportership was received (tabled) and DD2 spoke to it.

ID Ref Decision Yes No Abs

13.D23 13.09.02 That a new Reportership be created: TN on Colour difference of light sources (Reporter: Yoshi Ohno (US))

All

After the meeting info: This reportership is labelled R2-66.

13.09.03 New Reportership: TN on quantities relating photobiological and photometry

• A proposal for a new reportership was received (tabled) and DD2 spoke to it.

ID Ref Decision Yes No Abs

13.D24 13.09.03 That a new Reportership be created: TN on quantities relating photobiological and photometry (Reporter: Peter Blattner (CH))

All

After the meeting info: This reportership is labelled R2-67.

Page 18: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 18 of 25

13.09.04 New Reportership: Measurement of light output degradation of LED light source

• A proposal for a new reportership was received (tabled) and the proposer Pei-ting Chou spoke to it.

• Comment: This is not a responsibility of CIE D2. The reportership should look into this and see what other organisations are doing.

ID Ref Decision Yes No Abs

13.D25 13.09.04 That a new Reportership be created: Measurement of light output degradation of LED light source (Reporter: Pei-ting Chou (TW))

24 1

After the meeting info: This reportership is labelled R2-68.

13.09.05 New Reportership on CIE file format for LID

• This item was omitted due to insufficient time

13.10 D2 Strategy / Technical Discussions

13.10.01 JTC2 (CIE-CCPR)

• The chair, Yoshi Ohno, spoke on this.

• This JTC relates to the revision of the Principles Governing Photometry to implement the CIE mesopic system to the SI and to include other CIE standard spectral luminous efficiency functions.

• The role of this JTC is to implement CIE 191 into that document on fundamental quantities.

• A third draft is under review.

13.10.02 CIE/CCPR workshop

• The workshop convenor Maria Louisa Rastello spoke to this.

• There will be a workshop meeting this coming Monday at BIPM, primarily regarding whether to change the base unit for photometry from the candela to the lumen.

• Other topics include the mise en pratique and current activity relating to mesopic photometry.

13.10.04 Co-chair D2 for JTC1

• Teresa Goodman was proposed as co-chair for JTC1

ID Ref Decision Yes No Abs

13.D26 13.10.04 That Teresa Goodman be co-chair for JTC1 All

Page 19: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 19 of 25

13.11 Review of Published D2 Publications

• DD2 conducted a survey in 2011, a report has been tabled.

• Please provide feedback within 1 month.

ID Ref Action Who Deadline

13.A07 13.11 Send feedback on “13.11 DIV2_Publications_Review.xls” to DD2

all Division members

2013-05-29

13.12 D2 Meetings and Symposia 13.12.01 D2 TC meetings 2013 and Conference, Paris, feedback

• If there is feedback on the technical aspect of the Conference and TC meetings, please send to DD to try to improve practices in future.

13.12.02 CIE Expert Workshop on Measurement Uncertainty and Sampling Theory in Photometry and Radiometry, 8 to 9 October 2013

• A proposal was given (tabled) for this workshop, which was spoken to by DD2.

• It will be followed by a two day Slovenian national conference, abstracts can be submitted up until June.

• Prior to the workshop (i.e. on 7 October 2013) there is a possibility to hold TC meetings.

• Additional information to be found on the conference webpage: www.sdr.si/sl/div2.html

13.12.03 CIE LIGHTING QUALITY & ENERGY EFFICIENCY 2014 & D2 meeting & CIE Expert Workshop OLED: 2014, Kuala Lumpur Malaysia, 23 to 30 April 2014

• A presentation was given (tabled) which was briefly spoken to by DD2.

• Proposal was given to have a specific workshop on OLEDs.

• One part could be with invited speakers only, other part could be open.

13.12.04 Other Events: NEWRAD Conference 23 to 27 June 2014, Helsinki, Finland

• A presentation was given (tabled) which was briefly spoken to by DD2.

• Further information is available on the NEWRAD website http://newrad2014.aalto.fi/.

13.12.05 CIE Quadrennial Session 2015. June 26th - July 4th 2015. Manchester, England

• DD2 spoke briefly about the conference.

• A website will be updated shortly.

13.12.06 Lux Europa in in Krakow, Poland, 17-18 September 2013.

13.13 Any other business

Page 20: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 20 of 25

• None

13.14 Review of the meeting

• This was not done due to insufficient time

13.15 End of the Meeting: 18:25 pm Tony Bergen D2 Secretary 2

nd June 2013

Page 21: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 21 of 25

Annex 1: List of Meeting documents Note: Refer to CollTool to download the documents 13.01 CIE D2 Meeting 2013 Agenda V4.doc 13.01.03 Apologies as of 2013-04-17.docx 13.01.03 Apologies Dr Walter Steudtner.docx 13.01.04 D2 members as of 2013-03-25.xlsx 13.01.05 CIE D2 TCs Reporterships Liasons as of 2013-06-16b.docx 13.02 D2 Meeting 2012 Minutes V2.doc 13.02.01 Action list of CIE-2013-04-14.docx 13.02.01 Decision list of CIE-2012-17_20.docx 13.03 DD Report.pptx 13.03.01 CIE Code of Procedure_amend2013_v15.docx 13.03.01 News from BA BA1312_By-Laws_Amend2013.docx 13.03.01 News from CIE- Technical Notes.docx 13.03.02 Outcome CIE Strategy Workshop.pptx 13.03.03 ISO TC 274.pptx 13.03.04 International Year of Light.pptx 13.03.05 CIE Delegation to IEA-GLA Meeting Tokyo March 2013.pptx 13.04 D2 Administration.pptx 13.05 Editors report Paris 2013.doc 13.06 Status of TCs as of 2013-04-13.xlsx 13.06.02 TC2-28 Draft 8.1 Sept 2012.docx 13.06.02 TC2-28 questionnaire- compilation of reply.xlsx 13.06.04 CIE 2-32 Working Draft for TC Ballot.pdf 13.06.04 TC2-32 questionnaire- compilation of reply.xlsx 13.06.06 Report TC 2-53 Draft 4.1 Bp.docx 13.06.06 TC2-53 questionnaire- compilation of reply.xlsx 13.06.07 TC2-56 Draft 01 Unc work.doc 13.06.07 TC2-56 questionnaire- compilation of reply.xlsx 13.06.08 TC2-60 resignation of TCC.docx 13.06.10 TC2-66 Change of ToR.docx 13.07 Status Reportership as of 2013-04-16.xlsx 13.08 Status lisaion as of 2013-04-16.xlsx 13.09.01 New TC (TC2-77) Fundamental Concepts.docx 13.09.02 Technical Note Color difference of light sources Draft0.docx 13.09.03 Proposal for new terms relating photobiological and photometrical quantities V9.docx 13.09.04 New RS on Measurement of light output degradation of LED light source_Pei-Ting Chou_ed1.doc 13.11 DIV2_Publications_Review.xlsx 13.12.01 Meetings schedule as of 2013.docx 13.12.02 CIE Expert Workshop on Measurement Uncertainty and Sampling Theory in Photometry and Radiometry, 8 to 9 October 2013.doc 13.12.03 Presentation for Paris (09Apr13).ppt 13.12.04 NEWRAD2014-plan.ppt 13.14 CIE D2 Meeting 2013 Minutes v3.0.docx 13.14 D2 Meeting 2013 Attendance List.pdf L2-10 CIE Liaison Report-ICDM.ppt L2-10 CIE Liaison Report-IEC TC110-WG5(OLED).ppt L2-3 cie d1&d2 liaison report for iso tc6 -Paris2013.docx R2-33 Measurement of Laser Based Projection Displays.ppt R2-49 Proposed TC UV.DOCX R2-49 Reportership Eppeldauer UV TC report.docx R2-49 support for a new TC on broadband UV measurements.doc R2-50 Metric for Comparison of Luminous Intensity Distributions_final.pdf R2-50 TTBV_LID_Comparison_engl_V09.pdf R2-51 new TC on characterization and measurement of LED lighting sources with dynamic control.pdf R2-52 Flicker-measurement-forSSL-0417-2013.ppt

Page 22: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 22 of 25

R2-52-Flicker-2013.doc R2-53 Reportership_Glare-0417-2013.ppt R2-53-Glare Rating Measurement by ILMD.doc R2-54 status 2013-04-02.doc R2-56 Euramet.doc R2-57 Monitoring Progress of IEC TR 62778_2013-04-17.docx R2-59 Discussion on Definition of BRDF_2013 report.pptx R2-62 - Revision of D2 documents related to luminous flux and luminous intensity distribution v1.3.docx R2-62 New TCs on Goniophotometry and Integrating Sphere Photometry.pptx R2-62 Recommendations.pptx R2-63 Proposal for New TC - update to Pub 63.docx R2-63 Reportership on Update to Publication 63(1984).docx

Page 23: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 23 of 25

Annex 2: CIE Division 2 TCs, Reportership, Liaisons as of 2013-05-01 Colour coding: changed, deleted since 2012-04-16 to include decisions of this D2 meeting.

TCs

Technical Committee Chair

TC2-17 Recommendation for Integrated Irradiance and Spectral Distribution of Simulated Solar Radiation

Daryl Myers (pro-tempore)

TC2-28 Methods of Characterizing Spectrophotometers Teresa Goodman

TC2-29 Measurement of Detector Linearity George Eppeldauer

TC2-32 Measuring Retroreflectance of Wet Horizontal Road Markings Norbert Johnson

TC2-37 Photometry using Detectors as Transfer Standards Yoshi Ohno

TC2-40† Characterizing the Performance of Illuminance and Luminance Meters Peter Blattner

TC2-47 Characterization and Calibration Methods of UV Radiometers Armin Sperling

TC2-49 Photometry of Flashing Light Yoshi Ohno

TC2-50 Measurement of the Optical Properties of LED Assemblies Richard Distl

TC2-51 Calibration of Multi-Channel Spectrometers Richard Young

TC2-53 Multi-Geometry Colour Measurements of Effect Materials Gerhard Rösler

TC2-56† CIE/ISO Standard on Retroreflection Measurements Cameron Miller

TC2-57† Revision of CIE S014-2 Balázs Kránicz

TC2-59 Characterisation of Imaging Luminance Measurement Devices Udo Krüger

TC2-60 Effect of Instrumental Bandpass Function and Measurement Interval on Spectral Quantities

Jim Gardner

TC2-62 Imaging-Photometer-Based Near-Field Goniophotometry Walter Steudtner

TC2-63 Optical Measurement of High Power LEDs Yuqin Zong

TC2-64 High speed Testing Methods for LEDs Guenther Heidel

TC2-65 Photometric Measurements in the Mesopic Range Teresa Goodman

TC2-66 Terminology of LEDs and LED Assemblies Janos Schanda

TC2-67 Photometry of Lighting and Light-signalling Devices for Road Vehicles Gösta Werner

TC2-68 Optical Measurement Methods for OLEDs used for Lighting Thorsten Gerloff

TC2-69 CIE Classification System of Illuminance and Luminance Meters Peter Blattner

TC2-70† Standards for the Measurement of Reflectance and Transmittance

Properties of Materials Danny Rich

TC2-71† CIE Standard on Test Methods for LED Lamps, Luminaires and Modules Yoshi Ohno

TC2-72 The Evaluation of Uncertainties in Measurement of the Optical Properties of Solid State Lighting Devices, including Coloured LEDs

Richard Young ad interim

TC2-73 Measurement of Quantities Relating to Photobiological Safety of Lighting Products.

Tongsheng Mou

TC2-74 Goniospectroradiometry of Optical Radiation Sources Jiangen Pan

TC2-75 Photometry of Curved and Flexible OLED and LED Sources Hsueh-Ling Yu

TC2-76 Characterization of AC-Driven LED Products for SSL Applications Pei-Ting Chou

TC2-77 Fundamental Concepts Tony Bergen †CIE standards

TC2-77 to be approved by the board

Page 24: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 24 of 25

Reporterships

Reporter Title Reporter

R2-33 Measurement of Laser-Based Projection Displays Tonsheng Mou

R2-45 Measurement of the Illumination Uniformity for Critical Applications Meena Lysko

R2-49 Standardization of Broad-Band UV Measurements George Eppeldauer

R2-50 Metric for Comparison of Luminous Intensity Distributions Udo Krüger

R2-51 Characterization and Measurement of LED Lighting Sources with Dynamic Control

Jian Ping Wang

R2-52 Flicker measurement and flicker index study on solid state lighting Kuei-Neng (Gilbert) Wu

R2-53 Glare Rating Measurement by Image Luminance Measuring Device (ILMD)

Shau-Wei Hsu

R2-54 Internal quantum efficiency measurement for SSL products Cong Chen

R2-55 Simple Practical Guide for Measurement Uncertainty Estimations (supplement to CIE 198),

Teresa Goodman

R2-56 Monitoring Progress in Regional Metrology Organizations (RMOs), EURAMET: Maria Luisa Rastello

R2-57 Monitoring Progress of IEC TR 62778 (Application of IEC 62471 for the assessment of blue light hazard to light sources and luminaires)

Hiroshi Shitomi

R2-58 Standard lamps: availability of and alternatives to commercially available incandescent sources

Teresa Goodman

R2-59 Discussion on the definition of BRDF Joanne Zwinkels

R2-60 Discussion on the definition of Luminance/Radiance ->TN Teresa Goodman

R2-61 Review of Published D2 Publications Peter Blattner

R2-62 Revision of D2 documents related to luminous flux and luminous intensity distribution

Tony Bergen

R2-63 Revision of CIE 63-1984 Richard Young

R2-64 To summarise the key points of the TC2-28 draft report on characterization of spectrophotometers and make recommendations for a new TC

Teresa Goodman

R2-65 Multi-Geometry Colour Measurements of Effect Materials Gaël Obein

R2-66 To prepare a TN on the colour difference of light sources Yoshi Ohno

R2-67 To prepare a TN on relating photochemical and photobiological quantities to photometric quantities

Peter Blattner

R2-68 Measurement of light output degradation of LED light source Pei-ting Chou

Page 25: CIE Division 2 Annual Meeting 2013 CIE D2 Meeting 2013 Minutes v3.4.pdf · CIE Division 2 Annual Meeting 2013 Minutes of Meeting Date/Time April 17, 2013, 9:00 - 18:00 Venue Room

CIE Division 2 Draft 3.3 Annual Meeting 2013 2

nd June 2013

Page 25 of 25

Joint TCs

Technical Committee Chair

JTC-1 (D1/D2/D4/D5) Implementation of CIE 191:2010 Mesopic Photometry in Outdoor Lighting

Liisa Halonen co-chair D2: Teresa Goodman

JTC-2 (CIE-CCPR) Principles Governing Photometry Yoshi Ohno

JTC-3 (CIE-WMO) Rationalising UV Units Richard McKenzie

JTC-4 (D3/D6) Visual, Health, and Environmental Benefits of Windows in Buildings during Daylight Hours

Martine Knoop

JTC-5 (CIE-IEC): Review of IEC 62471/CIE S009 John O'Hagan co-chair D2: Hiroshi Shitomi

Liaison officers

Organisation Liaison Officers

L2-1 CCPR - Consultative Committee of Photometry and Radiometry Y Ohno to CIE DD2 to CCPR

L2-2 Division 8 A Kravetz

L2-3 ISO TC6 Paper, board & pulps J Zwinkels

L2-4 IEC TC 34: Lamps and related equipment G Vandermeersch to CIE

L2-5 ISO on reflectance and transmittance issues D Rich

L2-6 OIML (Organization of International Legal Metrology), TC11 and TC14 A. Sperling to CIE

L2-7 IALA (International Association of Lighthouse Authorities) M. Nicholson to CIE

L2-8 ISO/TC 145/SC 2 N519 J Zwinkels

L2-9 IEC/SC34A MT PRESCO with special attention to TS 62504 (Terms and definitions for LEDs in general lighting)

Y Ohno

L2-10 IEC/TC110 WG5 regarding OLED Displays T Mou