cic api 570 ( 8 )api-578

44
Cairo Inspection Company Eng. Ibrahim Eldesoky ASNT NDT-LEVEL III ASME AUTHORIZED INSPECTOR 8

Upload: ibrahim-eldesoky

Post on 10-Mar-2015

754 views

Category:

Documents


33 download

TRANSCRIPT

Page 1: CIC API 570 ( 8 )api-578

Cairo Inspection Company

Eng. Ibrahim Eldesoky

ASNT –NDT-LEVEL III

ASME AUTHORIZED INSPECTOR

8

Page 2: CIC API 570 ( 8 )api-578

2Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

The purpose of RP 578 is to provide

guidelines for a material and QA system to

verify the composition and alloy components

within the piping system are consistent with

the specified construction materials to

minimize the potential for release of toxic or

hazardous liquids or vapors.

Page 3: CIC API 570 ( 8 )api-578

3Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

RP 578 also provides guidelines for material

control and material verification programs on

ferrous and non-ferrous alloys of new and

existing systems specifically covered by B 31.3

(New Process Piping) and API 570 (In Service

inspection) during:

Construction

Installation

Maintenance

Inspection

Page 4: CIC API 570 ( 8 )api-578

4Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

RP 578 applies to metallic alloy materials

purchased for use:

Directly by the owner.

Indirectly through vendors, fabricators, or

contractors.

Includes the supply, fabrication and erection of

these materials.

Page 5: CIC API 570 ( 8 )api-578

5Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

1.2 Alloy Substitutions in Carbon Steel

Systems

When determining if carbon steel systems

require material verification, the owner/user

should consider what effect the process

stream could have on a substituted alloy

material.

Substitutions of hardenable alloy materials in

carbon steel systems have resulted in failure

and loss of containment.

Page 6: CIC API 570 ( 8 )api-578

6Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

Examples:

Wet H2S

Hydrofluoric acid

And sulfuric acid

Page 7: CIC API 570 ( 8 )api-578

7Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

1.3 Roles and ResponsibilitiesConsideration should be given to the roles and

responsibilities that each group involved in the material

verification program has. Groups within the operating plant

or shops of contractors, vendors or fabricators should have

roles and responsibilities clearly defined and documented.

Groups can include:

Purchasing

Engineering

Warehousing/receiving

Operations

Reliability

Maintenance

Inspection

Page 8: CIC API 570 ( 8 )api-578

8Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

2.0 References

Refer to the listed referenced

publications in Section 2.

3.0 Definitions

Refer to section 3 for definitions

related to Material Verification

Programs.

Page 9: CIC API 570 ( 8 )api-578

9Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.0 Extent of Verification

4.1 General

The owner/user should establish a written

material verification program indicating the

extent and type of PMI testing to be conducted

during construction of:

New piping systems

Retroactively on existing piping systems

Maintenance and repair

Alterations

Page 10: CIC API 570 ( 8 )api-578

10Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

A. The owner/user should consider

performing a high percentage of

examinations for higher-risk systems.

B. Lower risk-systems could have random

sampling performed.

C. Material substitution problems tend to

be random and small sampling may not

locate all substitutions.

Page 11: CIC API 570 ( 8 )api-578

11Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.2 New Construction Q/A Material

Verification Program

Covers shop and field fabrication of

alloy pipe.

Prior to being put into service.

Is restricted to pressure containing

boundaries.

Page 12: CIC API 570 ( 8 )api-578

12Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.2.1 ResponsibilitiesThe owner/user or designee is responsible for:

A. Determining the extent of examination

needed.

B. Verify implementation and conduct of the

program is performed in accordance with RP

578.

C. Verify that alloy materials placed into service

are as specified.

D. Documentation of the material program is in

accordance with this recommended practice.

Page 13: CIC API 570 ( 8 )api-578

13Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.2.2 Material Verification Test

Procedure ReviewWhen PMI testing is performed by the

material supplier or third-party agency; the

owner/user should review and approve the

adequacy of the material verification

program and testing procedure of the

fabricator or material supplier prior to

testing.

Page 14: CIC API 570 ( 8 )api-578

14Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.2.3 Scheduling of Material

Verification TestingPMI testing should be conducted at a time

that ensures that proper alloy materials have

been used in the fabrication of an

identifiable assembly.

4.2.4 Mill Test ReportAlthough this is an important part of a

material QA program, MTRs should not be

considered a substitute for PMI testing.

Page 15: CIC API 570 ( 8 )api-578

15Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.2.5 Components Covered in a Material

Verification Program

Examples:a. pipe lengths

b. pipe fittings

c. flanges

d. special forgings

e. processes valves and RVs

f. instruments

h. weld overlays or cladding

i. bolting

j. expansion joints and bellows

Page 16: CIC API 570 ( 8 )api-578

16Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.2.6 PMI Testing of Welding Consumables

Should PMI one electrode or wire sample

form each lot or package of alloy weld rods.

Should compare remainder of the lot to

sample to verify markings are correct.

Because of alloying elements in flux, PMI testing

of weld metal is an acceptable alternative

provided it is conducted immediately after

welding or during the welding process.

Page 17: CIC API 570 ( 8 )api-578

17Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.2.6.1 Longitudinal Pipe and Fitting Welds

Should receive random PMI of the base

metal and weld metal.

4.2.6.2 Autogenous welds

If required, it only necessary to test the base

metals.

4.2.7 PMI testing of Components Supplied

by a Distributor

A higher degree of PMI testing should be

performed due to the potential for material

mix-ups.

Page 18: CIC API 570 ( 8 )api-578

18Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.3 Material Verification Program For

Existing Piping Systems

Section covers alloy piping in service where

material verification programs were not in

accordance with 4.2

Material verification is limited to

pressure containing components and

attachments welds.

Page 19: CIC API 570 ( 8 )api-578

19Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.3.1 Responsibilities

The owner/user is responsible for:

Determining if a retroactive material

verification program is required for existing

piping systems.

Prioritizing the piping systems to receive

retroactive PMI testing.

Determining the extent of PMI testing

required.

Page 20: CIC API 570 ( 8 )api-578

20Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.3.2 Prioritizing piping systems for retroactive

PMI Testing

When determining if retroactive PMI testing is

necessary, the owner/user should consider the

following:

a. likelihood of material mix up

b. consequence of a failure

c. reason for alloy specification

d. related historical data- non-conformance report

Owner/user should establish a methodology for

prioritizing PMI testing. Methodology may be based

on a qualitative or quantitative risk analysis.

Page 21: CIC API 570 ( 8 )api-578

21Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.3.2.1 Carbon Steel Substitutions in Low Alloy

Steel Systems.

Historically, low alloy steel has the greatest number

of material non-conformances with serious

consequences.

4.3.2.2 Other Factors to Consider When

Prioritizing Piping Systems

Site specific or experienced-based factors should

be considered when prioritizing piping systems.

Factor to consider:

A. Constructions and maintenance practices.

B. Reasons for the alloy specification

Page 22: CIC API 570 ( 8 )api-578

22Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.3.3 Component Prioritization FactorsPiping components may have a higher likelihood or

inadvertent substitutions of a non-specific material.

Examples are:

a. warm up and bypass lines on pumps or check

valves.

b. small diameter piping systems.

c. valves and other removable devices

d. thermowells

e. bolting

f. piping as apart of a packaged system

g. components without an ASTM stamp

Page 23: CIC API 570 ( 8 )api-578

23Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.3.4 Factors to Consider when Determining

the Extent of PMI testing

a. Historical inspection material verification

records.

b. Number of plant modifications.

c. Material control during original fabrication.

d. Material verification program during

construction and fabrication.

e. Consequence of release.

f. Likelihood of corrosion/degradation.

Page 24: CIC API 570 ( 8 )api-578

24Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.4 Material Verification Program as Element

of Maintenance Systems

Concepts in 4.2 and API 570 should be reviewed

and applied as applicable.

4.4.1 Responsibilities

It is the owner/user’s responsibility to verify

programs are designed and implemented to

support the MI of alloy piping.

A material verification procedure should also

be written to address the repair of piping

systems during maintenance outages.

Page 25: CIC API 570 ( 8 )api-578

25Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.4.2 Control of Incoming Materials and

Warehousing

PMI testing can be as part of receiving function

or performed at the supplier’s location (as a

condition of release for shipment).

Material verification in the warehouse should be

regarded as a QA practice to minimize potential

discrepancies during subsequent PMI testing

but should not be regarded as an alternative to

PMI testing of fabricated systems when

required.

Page 26: CIC API 570 ( 8 )api-578

26Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

4.4.3 Maintenance Repairs of Piping

Systems

Important to consider PMI testing of

the repair materials.

Page 27: CIC API 570 ( 8 )api-578

27Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

5.1 Material Verification Program Test Method

Objectives

Methods of RP 578 are intended to ID alloy

materials and not intended to establish the exact

conformance of material to a particular spec.

Depending on the test method used, PMI

testing may identify the nominal composition of

the material.

ID of materials by visual stamps/markings

alone should not be considered a substitute for

PMI testing.

Page 28: CIC API 570 ( 8 )api-578

28Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

5.2 PMI Test Methods

Portable x- ray fluorescence

portable optical emission spectroscopy

laboratory chemical analysis

There are also alloy-sorting techniques may

be appropriate. These techniques can

include magnetic testing to differentiate

between ferritic and austenitic.

Page 29: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 29

5.2.1 Portable X-ray Fluorescence

5.2.2 Portable Optical Emission Spectrometry

5.2.3 Chemical Laboratory Chemical Analysis

5.2.4 Other Qualitative Tests

5.2.4.1 Chemical Spot Testing

5.2.4.2 Resistivity Testing

5.2.4.3 Other Techniques

Page 30: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 30

5.3 Equipment Calibration

Calibrate or verify the test equipment as

specified by the equipment manufacturer

PMI test procedure should provide frequency

interval.

If the manufacturer does not provide

calibration procedures, the owner/user should

establish them.

Procedures should include calibration

verification using certified standards.

Page 31: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 31

5.4 Equipment Precision

Should be consistent with established

test objectives (see 5.1).

When composition is required, the

owner/user should establish the

acceptable precision and repeatability.

Page 32: CIC API 570 ( 8 )api-578

32Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

5.6 Safety Issues

Should consider electrical arching and

hot spots.

Consider appropriate electrical and hot

work permits.

Take safety precautions when handling

chemicals used in chemical spot testing.

Page 33: CIC API 570 ( 8 )api-578

33Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

6.0 Evaluation of PMI Test Results

6.1 Material Acceptance Methods

Confirmation of materials by the use of

relevant material specifications (e.g.

ASME Sec II or ASTM).

Materials can be classified through

qualitative sorting techniques.

Page 34: CIC API 570 ( 8 )api-578

34Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

When PMI testing indicates alloying elements

are outside the material specification ranges,

the owner/ user can choose to allow the use of

the materials provide a knowledgeable person

confirms that the material will perform

satisfactorily in the service.

If portable or qualitative PMI testing leads to

a potential rejection, a more accurate analysis

may be used to determine component

acceptance.

Page 35: CIC API 570 ( 8 )api-578

35Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

6.2 Dissimilar Metal Welds And Weld Overlays

When testing dissimilar welds, consider the

effects of dilution, which occurs during, weld

deposition.

6.3 Follow-Up PMI Testing After Discovery Of A

Nonconformity

If a representative sample is rejected, all of that

lot should be considered suspect and more

extensive inspection should be conducted of the

remaining lot.

Page 36: CIC API 570 ( 8 )api-578

36Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky

7 Marking and Record-keeping

7.1 Materials Identification Process

Acceptable examples:

a. Color coding by alloy

b. Stamp marking

c. Documentation of PMI results and

test locations

Page 37: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 37

7.1.1 Color Coding/Marker

If visual identification (color coding or marking)

is required by the material verification program,

records of the alloy material/ color-code

combinations should be maintained by the

owner/user.

Color-coding is not a substitute for permanent

manufacturers markings required by ASTM or

other material specs.

Page 38: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 38

7.1.2 Marking or Components

Documentation process should specify one of

the following:

If the marking system is to remain for the

expected life of the component.

the marking system is only to be

temporary.

Page 39: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 39

7.2 Material Certifications.

Should not be considered a substitute

for PMI testing.

7.3 Shop And Field PMI Test

Documentation

Page 40: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 40

7.4 New And Existing Piping System

Documentation

Records of results for PMI testing should

be kept as long as the piping system exists

in its original location.

Should consider PMI testing prior to

placing relocated components into service

for piping that has no records of material

verification

Page 41: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 41

7.5 PMI Test Records

Test records should contain:

a. Reference to the PMI test procedure(s)

used.

b. Date of testing.

c. Test instruments identification number or

serial number (where appropriate)

Page 42: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 42

d. Name of each person and company

performing the test.

e. Results of the test.

f. Basis and action for resolving and

documenting PMI test including those that

have been left in service.

g. Documentation of the criteria used for

prioritization of piping systems and the extent

of PMI testing performed.

Page 43: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 43

7.6 PMI Test ProceduresShould include:

Techniques used

Equipment calibration

Qualification requirements for PMI

test performed

The testing methodology

Documentation requirements

Page 44: CIC API 570 ( 8 )api-578

Cairo Inspection Company (CIC) Www. CIC-Egypt.com Eng. Ibrahim Eldesoky 44

7.7 Traceability To Field Components

The information in 7.5 should be reported

in such a manner that they are traceable to

the point of installation.