c&i systems wbpdcl
DESCRIPTION
.,kjninjinjnikiiiTRANSCRIPT
-
Theme:
Power plant C&I (IPC) systems
&
Tending to Zero Forced Outage
by
Internalization of Best Practices
-
Presentation Outline:
1.Some definitions & basics of Pressure, Flow & Temp. measurement
2. Categorization of C&I systems based on location of application
3. Division of power plant C&I systems based on functionality & type of application
4.Evolution of C&I systems and latest trend in technology
5.NTPC at a glance and maintenance practices of C&I systems
6. Some case studies
-
Measurement: Pressure
Outline:
Some DefinitionsPressure UnitsManometersElastic Pressure SensorsElectrical Pressure SensorsPressure SwitchesSnubbers & Siphon Tubes -
Measurement: Pressure
Terminology
Accuracy : Closeness with which an instrument reading approaches the true value of the variable being measured.Precision : A measure of reproducibility of the measurements; i.e. given a fixed value of a variable, precision is a measure of the degree which successive measurements differ from one another.Sensitivity : The ratio of output signal or response of the instrument to a change of input or measured variable.Resolution : The smallest change in measured value to which the instrument will respond.Error : Deviation from the true value of the measured variable. -
Measurement: Pressure
Repeatability refers to the ability of a pressure sensor to provide the same output with successive applications of the same pressure.
Hysteresis is a sensor's ability to give the same output at a given pressure while increasing and decreasing the pressure.
-
Measurement: Pressure
Pressure : Definitions
Definition: Force per unit area
Absolute pressure
Atmospheric pressure
Differential pressure
Gauge pressure
Importance : Pressure measurement is critical for safe and optimum operation of processes such as steam generation, hydraulic equipment operation, air compression, vacuum processing etc.
-
Measurement: Pressure
Zero Reference , Gauge, Absolute, Atmospheric Pressure
Any pressure above atmosphere is called gauge pressure
Any pressure below atmosphere is a vacuum (negative gauge pressure)
Absolute pressure (psia) is measured from a perfect vacuum
Differential Pressure has no reference to either absolute vacuum or atmospheric pressure
-
Measurement: Pressure
Units
The SI unit for pressure is the Pascal (Pa);1Pa= 1 Nm-2 Non-SI unit pound (Lb) per square inch (psi) and bar are commonly usedPressure is sometimes expressed in grams-force/cm2or as kgf/cm2 (KSC)1 atm=1.03 ksc=14.696 psi=760mmHg=10000 mmWC
=101325 Pa
Standard pressure:Pressure of normal (standard) atmosphere is defined as standard pressure
-
Measurement: Pressure
Pressure Measuring devices
Manometers
using water ,mercury and other liquids of known density
For measuring low pressures.
Mechanical/Elastic Pressure Sensors
Electrical Pressure Transducers
For measuring pressure of all ranges for telemetering purposes.
Manometer:
A simple pressure standard
May be used for gauge, differential, and absolute measurements with a suitable reference.
Useful mainly for lower pressure work because the height of the column of mercury will otherwise become very high.
The difference in column heights gives the pressure reading
-
Measurement: Pressure
Elastic Pressure Sensors
The basic pressure sensing elements:
A: C-shaped Bourdon tube , B: Helical Bourdon tube , C: flat diaphragm
D: Convoluted diaphragm, E: Capsule , F: Set of bellows
-
Measurement: Pressure
Electrical Pressure Sensors
Potentiometer Sensor
Inductive
Capacitive PiezoelectricStrain GaugeUsually generate output signals in the mV range (spans of 100 mV to 250 mV). In transmitters, these are amplified to the voltage level (1to 5 V) and converted to current loops, usually 4-20 mA dc -
Measurement: Pressure
Pressure Switches
Applications
Alarm (Status)
Shutdown (Hi/Lo Limits)
Control (ON/OFF)
A switch is an instrument that automatically senses some process variable (such as pressure) and provides an on/off signal relative to some reference point.
Sensing
Element
Conditioning
Circuit
Bourdon Tube
Bellows
Diaphragm
Strain Gauge
Mechanical Switch
Transistor
Set Point
-
Measurement: Pressure
High Pressure In High Temperature
* When high process temperatures are present, various methods of isolating the pressure instrument from the process are used.
* These include siphons, chemical seals with capillary tubing for remote mounting, and purging.
Snubbers & its use
Chemical Seal
Siphon
-
Measurement: Pressure
Pressure Snubbers
To filter out pressure spikes, or to average out pressure pulses, snubbers are installed between the process and the instrumentInstrument indicates avg pr.Snubber Before use After use
when one is interested in the measurement of fast, transient pressures (such as to initiate safety interlocks on rising pressures), snubbers must not be used, as they delay the response of the safety system.
-
Measurement: Pressure
Chemical Seal or diaphragm Protector
Chemical seals are used when media can falsify the pressure measurements due to high temperature, high viscosity or their property to crystallise
-
Measurement: Pressure
Siphon
A siphon is a coiled tube. This coil provides a large cooling surface and the trap created prevents the condensate from draining away.
A siphon is required for hot condensing. fluids, such as steam, to assure a liquid trap.
It is used to prevent live steam from entering and damaging the device.
It is used to protect the instrument from hydraulic or thermal shocks.
The two most common forms of siphon tube are the 'U' and Pigtail types.
-
Measurement: Flow
Types of flow meters:
Orifice Flow meter
Vortex flow meter
Ultrasonics flow meter
Coriolis Mass Flow meter
Major issues for selecting flow meters
Orifice Flow-meters
Several sensors rely on the pressure drop or head occurring as a fluid flows by a
resistance. The relationship between flow
rate and pressure difference is determined
by the Bernoulli equation.
-
Measurement: Flow
Orifice Flow-meters
An orifice plate is a restriction with an opening smaller than the pipe diameter which is inserted in the pipe; the typical orifice plate has a concentric, sharp edged opening.
Because of the smaller area the fluid velocity increases, causing a corresponding decrease in pressure.
The flow rate can be calculated from the measured pressure drop across the orifice plate, P1-P3.
The orifice plate is the most commonly used flow sensor, but it creates a rather large non-recoverable pressure due to the turbulence around the plate, leading to high energy consumption.
-
Measurement: Flow
Venturi Tube
The change in cross-sectional area in the venturi tube causes a pressure change between the convergent section and the throat, and the flow rate can be determined from this pressure drop. Although more expensive that an orifice plate; the venturi tube introduces substantially lower non-recoverable pressure drops
-
Measurement: Flow
Pitot Tubes
Pitot tubes were invented by Henri Pitot in 1732 to measure the flowing velocity of fluids. Basically a differential pressure (dp) flow meter, a pitot tube measures two pressures: the static and the total impact pressure.
Pitot tubes are used to measure air flow in pipes, ducts, stacks, and liquid flow in pipes, open channels.While accuracy and rangeability are relatively low, pitot tubes are simple, reliable, inexpensive, and suited for a variety of environmental conditions, including extremely high temperatures and a wide range of pressures. -
Measurement: Flow
Pitot Tubes
A single-port pitot tube can measure the flow velocity at only a single point in the cross-section of a flowing stream. The probe must be inserted to a point in the flowing stream where the flow velocity is the average of the velocities across the cross-section, and its impact port must face directly into the fluid flow. -
Measurement: Flow
Pitot Tubes
The point velocity of approach (VP) can be calculated by taking the square root of the difference between the total impact pressure (PT) and the static pressure (P) and multiplying that by the C/D ratio, where C is a dimensional constant and D is density:
The pitot tube measures the static and dynamic (or impact) pressures of the fluid at one point in the pipe. The flow rate can be determined from the difference between the static and dynamic pressures which is the velocity head of the fluid flow. -
Measurement: Flow
Vortex Flow-meters
This measuring principle is based on the fact that vortices are formed downstream of an obstacle in afluidflow, e.g. behind a bridge pillar. This phenomenon is commonly known as the Krmn vortex street. -
Measurement: Flow
Vortex Flow-meters
This is detected by a sensor, such as capacitive sensor and fed to the electronic processor as a primary, digitized, linear signal.
Capacitive sensors with integrated temperature measurement can directly register the massflow of saturated steam as well.
Universally suitable for measuring liquids, gases and steam Largely unaffected by changes in pressure, temperature and viscosity High long-term stability (lifetime K factor), no zero-point drift No moving parts Marginal pressure loss -
Measurement: Flow
Ultrasonic flow-meters
Swimming against theflow requires more power and more time than swimming with theflow. Ultrasonic flow measurement is based on this elementary transit time difference effect.
Two sensors mounted on the pipe simultaneously send and receive ultrasonic pulses. At zeroflow, both sensors receive the transmitted ultrasonic wave at the same time, i.e. without transit time delay.When thefluid is in motion, the waves of ultrasonic sound do not reach the two sensors at the same time. -
Measurement: Flow
Ultrasonic flow-meters
This measured "transit time difference" is directly proportional to theflow velocity and therefore toflow volume. By using the absolute transit times both the averaged fluid velocity and the speed of sound can be calculated. Ultrasonic flow meters measure the difference of the propagation time (transit time) of ultrasonic pulses propagating in (normally an inclination angle around 30 to 45 is used) flow direction and against the flow direction. This time difference is a measure for the averaged velocity of the fluid along the path of the ultrasonic beam -
Measurement: Flow
Ultrasonic flow-meters
Advantages:
With homogeneousfluids, the principle is independent of pressure, temperature, conductivity and viscosity Usable for a wide range of nominal diameters Direct meter installation on existing pipesNon-invasive measurement No pipe constrictions, no pressure losses No moving parts. Minimum outlay for maintenance and upkeep -
Measurement: Flow
Coriolis Mass Flow-meters
If a moving mass is subjected to an oscillation perpendicular to its direction of movement, Coriolis forces occur depending on the massflow. A Coriolis massflow meter has oscillation measuring tubes to precisely achieve this effect.Coriolis forces are generated when afluid (= mass)flows through these oscillating tubes. Sensors at the inlet and outlet ends register the resultant phase shift in the tube's oscillation geometry.
-
Measurement: Flow
Coriolis Mass Flow-meters
The processor analyzes this information and uses it to compute the rate of massflow.
Advantage
This principle is used in a huge range of industry sectors, including pharmaceuticals, chemicals and petrochemicals, oil and gas, food etc.
-
Measurement: Flow
Major issues for selecting flow-meters
Accuracy
Repeatability
Linearity
Reliability
Range/Span
Dynamics(Response time)
Safety
Maintenance
Cost
-
Measurement: Temp.
Measurement Devices
Thermocouples Resistance Thermometers Thermistors Bimetallic Thermometers Acoustic Pyrometers Local Instruments -
Measurement: Temp.
Thermocouple
IT IS BASED ON SEEBECK EFFECT WHICH SAYS THAT WHEN HEAT IS APPLIED TO A JUNCTION OF TWO DISSIMILAR METALS AN EMF IS GENERATED WHICH CAN BE MEASURED AT THE OTHER JUNCTION
T/C Connection
COMPENSATING CABLE
HOT JUNCTION
TO DDC CARDS
TERMINAL END CJC BOX
-
Measurement: Temp.
Thermocouple
Types of T/C:E,J,K,T,R,S,B
K (Chromel & Alumel; Ni-Cr &Ni-Al) Type: mostly used in power plant for low temp. application )
R (Platinum & Platinum-Rhodium) Type: Used for high temp. application. Highly resistant to oxidation & corrosion
Advantages: - Disadvantages: -
- Low Cost - Sensitivity low & low voltage output
- No moving parts, less likely to be broken. susceptible to noise
-Wide temperature range. - Accuracy not better than 0.5 C
-Reasonably short response time. - Requires a known temperature
- Reasonable repeatability and accuracy. reference
-
Measurement: Temp.
RESISTANCE THERMOMETER (RTD)
THE RESISTANCE OF A CONDUCTOR CHANGES WHEN ITS TEMPERATURE IS CHANGED .THIS PROPERTY IS UTILISED TO MEASURE THE TEMPERATURE.
Rt = Ro (1+dT)
WHERE = TEMP CO- EFFICIENT OF RESISTANCE ; dT = TEMPERATURE DIFFERENCE
When discussing RTDs, following must be considered:
Wiring configuration (2, 3 or 4-wire)
Self-heating
Accuracy RTD types:
Stability 1. Platinum (Range -200 C to 600 C )
Repeatability 2. Copper (Range -100 C to 100 C )
Response time 3. Nickel (Range -60 C to 180 C )
-
Measurement: Temp.
THERMISTORS
THERMISTORS ARE GENERALLY COMPOSED OF SEMICONDUCTOR MATERIALS.THEY HAVE A NEGATIVE COEFFICIENT OF TEMPERATURE SO RESISTANCE DECREASES WITH INCREASE IN TEMP.
Making use of Negative Temperature Coefficient characteristics, thermistor and can be applied in temperature compensation, inrush current limit, precision temp. control (temp. coefficient very large compared to RTC & T/C) etc.
BIMETALLIC THERMOMETERS
ALL METALS EXPAND OR CONTRACT WITH TEMPERATURETHE TEMPERATURE COEFFICIENT OF EXPANSION IS NOT THE SAME FOR ALL METALS AND SO THEIR RATES OF EXPANSION AND CONTRACTION ARE DIFFERENTUSAGE: IN PROCESS INDUSTRIES FOR LOCAL TEMPERATURE MEASUREMENTS
OVERLOAD CUTOUT SWITCH IN ELECTRICAL APPARATUS
-
Measurement: Temp.
ACOUSTIC PYROMETER
Acoustic Pyrometer is a non-contact measurement device that obtains highly accurate instantaneous gas temperature data in any area of the boiler, helping improve combustion efficiency. For measurement of temperatures across large spaces of known distance in a noisy, dirty and corrosive environment such as a coal-fired utility boiler, or a chemical recovery boiler. The Velocity of Sound in a medium is proportional to the Temperature.LOCAL INDICATION
LIQUID IN GLASS THERMOMETERMERCURY IN STEEL THERMOMETERBIMETALLIC THERMOMETER -
Power Plant C&I systems
1.Field instruments/ input & output instruments
Various measuring instruments like Transmitters, RTD, Thermocouples, Pr. & temp. gauges, speed & vibration pick ups etc. (Analog inputs)
Various Pr., Temp. & limit switches, for Interlock , protections & feedback of control element (Binary inputs)
Output devices like solenoids, EP converters, Positioners etc. for controlling final control element
Final control elements like Power cylinder, Pneumatic/ motorized actuators etc.
-
Power Plant C&I systems
2. Control Systems
Various control cabinets for acquiring field signal (both analog & binary inputs), processing the signals as per control logic and issuing output command to output devices (Binary & analog).
Various control desk devices like command consoles, Push button modules, indicators, recorders, CRTs, PC based Operator Work Stations (OWS) etc. for human machine interface for monitoring & control of the plant
Power supply system(UPS)/ chargers with battery backups to ensure uninterrupted power supply of desired quality for the control system
-
Power Plant C&I systems
3. Analyzers
The availability, reliability & efficiency of boiler unit hinge around the close control of chemical regimes of working fluid i.e. water/steam as well as combustion in the boiler. The instruments monitoring the chemical regimes and combustion are generally called analytical instruments. These instruments fall under three category
Water/ Steam Analyzers
Gas analyzers
Smoke monitors
HIGH PURITY WATER IS ESSENTIAL TO MINIMISE
SCALING
CORROSION
CARRY OVER
EMBRITTLEMENT
-
Power Plant C&I systems
ANALYZERS AND MEASURMENT LOCATION
ON LINE gas analyzers for measurement of flue gas oxygen, carbon mono-oxides, carbon di-oxides, oxides of sulpher & nitrogen at various location of boiler.
ON LINE analyzers for measurement of conductivity, pH, silica, dissolved oxygen, phosphate, hydrazine, chloride, sodium etc. at various points in the water & steam cycle of boiler & turbine area (SWAS-steam & water analysis system).
ON-LINE opacity monitors for measurement of dust concentration in flue gas
ON LINE analyzers for measurement of conductivity, pH, silica, dissolved oxygen etc. at various ION exchangers of DM plant .
-
Power Plant C&I systems
TYPICAL VALUES OF CHEMICAL PARAMETERS BEING MEASURED (SWAS)
SAMPLE
PARAMETER
UNIT
LIMIT
DM WATER
a) Conductivity
b) Cation Conductivity
S/cm
-
Power Plant C&I systems
4. Laboratory Instruments & Setup
Activities of C&I Lab
CALIBRATIONREPAIRTESTING with proper documentation & recordsCALIBRATION:
Pressure switch , Transmitter , GaugeTemperature switch , Transmitter , GaugeFlow Transmitter Level Switch -
Power Plant C&I systems
4. Laboratory Instruments & Setup
REPAIR:
1. ELECTRONIC CARDS
3. POWER SUPPLY MODULES
TESTING:
1. ELECTRONIC MODULES
2. RELAYS
3. POWER SUPPLY MODULES
-
Power Plant C&I systems
4. Laboratory Instruments & Setup
Different standard instruments with traceability up to national standard . These insts. include Standard Gauges, Multimeters, Resistance boxes, mA sources, oscilloscope, signal generator etc. for calibration of measuring instruments.
Dead Weight tester, Comparator, Temperature bath, Vacuum pump, manometer, soldering stations etc.
Test benches with standard power supply sockets (e.g. 24VDC, 48VDC, 220VDC, 110VAC, 230VAC etc.) in each bench depending on requirement.
Laboratory should be air-conditioned with monitoring of temp., humidity and barometric pressure. Also, proper provision for handling electronic cards (floor mats, ESD protective bags/ anti static bags etc.)
-
Power Plant C&I systems
4. Laboratory Instruments & Setup
Essential Tools/ Infrastructure for Repairing & testing
1. IN-CITCUIT IC TESTER
2. ESD WORK STATION
3. ULTRASONIC CARD CLEANER
4. STORRAGE OSCILLOSCOPE
5. LOGIC ANALYSER
6. THERMOCOUPLE SIMULATOR
7. VIDEO PATTERN GENERATOR
8. EPROM PROGRAMMER
-
Power Plant C&I systems
C&I systems of Boiler
FSSS (Furnace safeguard supervisory system)
Open loop control system (interlock & protections) of boiler auxiliaries
Secondary Air Damper control system (SADC)
Hydrastep for drum level measurement
Measurements, Protection & Control of Coal Feeders
-
Power Plant C&I systems
FSSS
FUNCTIONS OF F.S.S.S
1. FURNACE PURGE SUPERVISION
2. OIL GUNS ON/OFF CONTROL
3. PULVERISERS/FEEDERS ON/OFFCONTROL
4. SECONDARY AIR DAMPERS CONTROL
5. FLAME SCANNER INTELLIGENCE
6. BOILER TRIP PROTECTIONS
-
Power Plant C&I systems
FSSS
WHY AT ALL A PROTECTIVE SYSTEM IS REQUIRED FOR THE BOILER?
THE BOILERS FURNACE IS CONTINUOUSLY FED WITH HIGH CALORIFIC VALUE ATOMISED FUEL WHICH IS IN THE PROCESS OF CONTINUOUS BUT CONTROLLED COMBUSTION.
COMBUSTION-THE PROCESS
COMBUSTION IS A RAPID BURNING OF OXYGEN WITH FUEL RESULTING IN RELEASE OF HEAT. AIR IS ABOUT 21% OXYGEN AND 78% NITROGEN BY VOLUME. MOST FUELS CONTAIN CARBON, HYDROGEN AND SULPHUR. A SIMPLIFIED COMBUSTION PROCESS COULD BE
CARBON+OXYGEN=CARBONDIOXIDE+ HEAT
HYDROGEN+DO =WATER VAPOUR + HEAT
SULPHUR +DO =SULPHURDIOXIDE+ HEAT
WHICH MEANS THAT THE FINAL DESIRED PRODUCT OF THE PROCESS IS HEAT WHICH WE REQUIRE TO BOIL THE WATER
-
Power Plant C&I systems
FSSS
COMBUSTION-THE PROBLEM : WHEN THIS CONTROLLED BURNING GOES OUT OF CONTROL DUE TO AN IMBALANCE IN THE FUEL/AIR RATIO, THERE IS EITHER A FUEL RICH MIXTURE OR A FUEL LEAN MIXTURE. IN BOTH CASES THE FLAME QUALITY BECOMES POOR. THERE IS A CHANCE OF FUEL ACCUMULATION WHICH CAN LATER ON IGNITE SUDDENLY AND CAUSE EXPLOSIONS.
SO FSSS IS USED FOR SAFE AND ORDERLY STARTUP AND SHUTDOWN OF BOILER THROUGH VARIOUS INTERLOCKS AND PROTECTIONS
THE PROTECTIVE SYSTEM IN THE BOILER IS DESIGNED BASICALLY TO PREVENT OCCURRENCE OF SUCH SITUATIONS BY TAKING ADVANCE ACTIONS.
-
Power Plant C&I systems
N.F.P.A Guide line & Boiler Protection
N.F.P.A- National Furnace Protection Association, USA
Deals with protection for various types of furnace
Protection of Pulverized fuel fired boiler is governed by Section-85c
Different categories of protection:
a) Mandatory, b)Mandatory & automatically generated, c) Optional but alarm has to be there
-
Power Plant C&I systems
BOILER FLAME & FLAME SCANNERS
It looks rather static, but in reality the fire energy fluctuates rapidly. The Fuel and Oxygen in the uncontrolled fire constantly burn as in small explosions and then sucks new Fuel & Oxygen to the flames. This process causes the flame flicker.
Flicker frequency for oil
flame is more than that of coal flame.
-
Power Plant C&I systems
INTENSITY RELATIVE TO WAVELENGTH
-
Power Plant C&I systems
FLAME SCANNERS
-UV Scanners
-Visible Range Scanners (Safe scan-1&2)-Used for both Oil & Coal Flame
-IR Scanners (UR600 of ABB)
SAFE FLAME SCANNER
-
Power Plant C&I systems
C&I systems of Turbine
ATRS (Automatic Turbine Runup system)
Turbine Governing System
Turbovisory Instruments & turbine protections
Interlock, Protection & Control of HPBP system
Open loop control system (interlock & protections) of turbine auxiliaries
Interlock & protections of Seal Oil & Stator water system
-
Power Plant C&I systems
C&I systems for control & MIS
-Automatic Control System (ACS)
-DATA Acquisition system(DAS)
-Distributed Digital Control Monitoring
and Information System
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
PROCESS: Process refers to the method of changing or refining raw materials to create the desired end product. The raw materials may undergo physical, chemical, or thermal state changes during the Process.
Process is of Two Types :A) Continuous and B) Batch
Continuous Process is one where the change of state of Input into Output occurs continuously.
Ex.: Power Plant Process, Petroleum Industry etc.
Batch Process is one where a Batch of the Product is produced and the Process stops till production of next Batch is started.
Ex.: Automobile Production
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
PROCESS CONTROL: Process control techniques are developed over the years to have
Quality of the end productEconomy of productionAbility to cater to emergencies and bring the process to safe shutdown.CONTROLLED CONDITION: The physical quantity or condition of a process or machine which is to be controlled
CONTROL SYSTEM: An arrangement of elements interconnected and interacting in such a way that it can maintain some condition of a process or machine in a prescribed manner
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
OPEN AND CLOSED LOOP CONTROL:
A Closed Loop Control (CLCS) is one where a Process Variable is measured, compared to a Set Value and action is taken to correct any Deviation or Error from Set Value. The continuous Measurement of PV and its comparison to Set Point closes the Loop.
An Open Loop Control(OLCS) is one where the PV is not compared with Set Value and action taken, but action is taken without regard to conditions of PV.
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
OPEN LOOP CONTROL:
Open Loop Control is accomplished by the following means:
Group ControlSub-Group ControlSub-Loop ControlDrive Level ControlProgrammable Logic Control(PLC)Group Control : Start and Stoppage of a Group of equipment is accomplished by Group Control(GC).Ex. :CEP GC, Equipment Cooling GC etc.
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
OPEN LOOP CONTROL:
Sub-Group Control : Start and Stoppage of an equipment with its associated auxiliaries in Step-Sequence manner is done by Sub-Group Control. Operator intervention is not required in Sub-Group Control(SGC).
Sub-Loop Control: Start and Stoppage of auxiliaries of an equipment is carried out by Sub-Loop Control(SLC)
Drive Level Control : Start and Stop or Opening and Closure of a Drive is carried out by Drive Control. The Drive logic shall have Protection, release ,auto and manual commands and these are executed as per pre-determined logic.
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
CLCS TERMINOLOGY:
Desired Value or Set Point : The value of the variable/parameter which needs to be controlled at the required condition.
Process Variable(PV) : The present value of the Parameter of Process at that particular instant. This is sometimes referred as Measured Value.
Error/Deviation : It is the Difference between Set Point and Process Variable, and can be +ve or ve. It has three components: a) Magnitude b) Duration and c) Rate of change.
Controller : A Controller is a device that receives data from a Measurement Instrument, compares the data with the Set Point and if necessary, signals a Control element to take Corrective action. This Corrective action ensures that the PV shall always be maintained at the Set Value.
The Controller can be a) Electronic, b) Pneumatic and c) Hydraulic type.
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Controller types: Functionally, Controllers can bea) Continuous and b) Step Controllers.
Depending on the control loop; controller action can be adjusted as (i) Direct acting:-Increase of process value increases controller output
(ii) Reverse acting:- Increase of process value decreases controller output
Control Element : The Control or Correcting Element is the part of the Control System that acts to physically change the Manipulated Variable.Ex. : Control Valves, Louvers or Dampers, Solenoids, Pump Motors etc.
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Bump less Transfer : The arrangement where the transfer from auto to manual mode does not affect the process.Proportional Control : The Proportional (P) action responds only to a change in the magnitude of Error(e) i.e. controller output changes by an amount which is proportional to error.Output change of Controller in % = (Error change in %)(Gain), where Gain is called the Controller gain. The reciprocal of Gain is termed as Proportional Band(PB) and is expressed in %.
Proportional Band(PB): The change in deviation required to cause the output of the controller to change from one extreme to the other.
Integral Control : In Integral Control, the Controller output is a function of the Duration of Error(e). -
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Hence, the Controller output is the time Integral of Error and the time set is Integral Action Time(IAT) i.e. IAT can be defined as time taken for the integral action to change output by the same amount as the proportion action .
Usually, both P and I Controls are combined and the Controllers are tuned to minimize Error(e) and controller is termed as PI controller.
Derivative Control : Derivative or Rate Controllers output is Proportional to the rate of change of Error(e). The Control action is termed as D. The action is to apply an immediate response that is equal to the P+I action that would have occurred some time in the future.
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Important Closed Loop Controls in a Thermal Power Plant:
a) Furnace Draft Control
b) Boiler Drum Level Control
c) HOT well & D/A level control
d) Main Steam Temperature Control
e) Air and Fuel Flow to Boiler Control
f) SH & RH spray control
g) Coordinated Master Control(CMC)
h) Turbine Speed, Pressure and Load Control
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Coordinated Master Control
This is an integrated automatic control of unit operation. There is a continuous co ordination between boiler and turbine control to maintain a balance between steam generation and steam consumption.
Boiler Follow Mode (BFM)
Turbine Follow Mode (TFM)
Co-ordinated Master Control (CMC)
Runback Mode
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Boiler Follow Mode (BFM)
Unit load control from turbine local load set point
Change in turbine load set point will modulate turbine CVs
Boiler master output gets corrected to maintain throttle pr dev.
Boiler control will follow turbine control
BLI signal as feed forward signal for boiler firing rate control
Result - Boiler acts as throttle pr controller where turbine is in load controller mode
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Turbine Follow Mode (TFM)
Unit target load set point goes to boiler master
Change in BLI will modulate turbine CVs
Boiler master output gets corrected to maintain Unit load dev.
Turbine control will follow boiler control
Load deviation as feed orward signal for boiler firing rate control
Result - Boiler acts as load controller where turbine is in pressure controller mode
-
Power Plant C&I systems
AUTOMATIC CONTROL SYSTEM & POWER PLANT CONTROL LOOP
Coordinated Master Control
Unit load is set from unit master.
Unit master demand is limited by unit capability , TSE margins and unit max/min load set points.
Unit target load is derived from unit master after the limitations.
Unit target load is used as feed forward signal to the boiler firing rate control.
Turbine control utilises the unit load as turbine load set point after adapting the same by steam generation delay.
In TG throttle pressure is maintained by correcting the BMD output depending on the throttle pr dev.
Result: Balance is achieved between steam generation and steam consumption PROPER COORDINATION BETWEEN BOILER CONTROL AND TURBINE CONTROL
-
Power Plant C&I systems
DATA ACQUISITION SYSYTEM-DAS
WHY DAS IS REQUIRED IN THERMAL POWER PLANTS ?
SAFE & RELIABLE OPERATION OF THE UNIT OR EQUIPMENTSASSIST CONTROL ROOM OPERATORS BY PROVIDING TIMELY ANNUNCIATION OF ALL ABNORMAL CONDITIONSPROVIDE DETAILED INFORMATION ON THE PLANT PERFORMANCEPROVIDE MANAGEMENT WITH ACCURATE RECORDS ON THE PAST PLANT PERFORMANCE FOR ANALYSIS -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
3 MAJOR FUNCTIONS OF DAS:
DATA ACQUISITION DATA PROCESSING DATA REPRESENTATIONThe Major Parts
Process Control Units ( PCU ) Computer Interface Unit ( CIU ) Termination Units ( TU ) Buffer Terminal Cabinets ( BTC ) -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
TYPES OF DATA (Input): Analog & Digital
Analog inputs:
1. Thermocouple Input ( mV )
K-Type T/C ( Cr-Al ) : For temp < 600 Deg C& used in Flue Gas path after FSH outlet.R-Type T/C ( Pt-Pt-Rh ) : For temp > 600 Deg C used in PSH & FSH region of FG path.2. RTD Input ( Resistance )
Pt-100 RTD : For Brg. Temp measurement.Cu-53 RTD : For HT motor & Generator Stator winding temp. measurement. -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
Analog inputs:
3. 4 20 Ma Input
Coming from Pr. / Flow Transmitters.Coming from Signal Distribution Cards of automatic control system4. 0 10 Volt Input
Coming from ATRS cabinets Used for Turbine Brg. Temp. /Vibration measurement.DIGITAL INPUTS
These are coming directly from switches or relay contacts of other systems (FSSS, ATRS, ACS etc.)
-
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
DIGITAL INPUTS (TYPES)
LOW RESOLUTION : The scanning time of inputs is 1 second.HIGH RESOLUTION : The scanning time is 1 millisecond. These are called Sequence Of Events ( SOE ) Inputs.PULSE INPUT : For calculation of Total Coal Flow, Total Air Flow etc. -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
FUNCTIONS OF DAS:
Alarm Management.
Production of hardcopy print outs in different printers.
Operator Guidance Messages.
Graphic Displays of plant sub-systems.
Trending of analog variables on recorders.
Sequence Of Events ( SOE ) recording following unit / equipment trip conditions.
Efficiency calculations
-
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
DATA PROCESSING: It has the following parts
COMPUTER PROCESSING UNIT ( CPU )BULK ( SOLID STATE ) MEMORY WITH BATTERY BACKUP MAGTAPE UNITCOMMUNICATION CABINET & MODEMMOVING HEAD DISC DRIVE VIDEO HARD COPIERTREND RECORDERUNIT CONTROL DESK & PROG. ROOM CRTPRINTERS -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
Features:
REAL TIME VARIABLE CALCULATIONSumming, Subtraction, Maximum , Minimum, Averaging, Hourly & Daily integration, rate of changes & comparison of limits etc.
ON-LINE DATABASE EDITION1.Assign points to any process parameter
2.Scan, Off-scan , Delete , Activate , inactivate a process parameters , calculated points when reqd.
3.Change the Engg. Unit
4.Change the range , alarm limits & dead bands
5.Change the scan frequency
6.Review total analog and digital points depending on its quality flag like alarm , channel failure , off-scan etc.
-
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
ALARM MANAGEMENT:
All the analog points which cross their normal limits or all the digital points which go into their alarm state come on the alarm CRT with associated time & blink as long as the alarms remain unacknowledged.Alarm will come in RED colourIf all the pages are full (normally no. of alarm pages & alarm per page is predefined) and any new alarm comes , then oldest alarm will disappear from the alarm page as FIFO basisAlarm print out will be available in alarm printer -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
DATA REPRESENTATION:
Printed outputs of displays /collection of data in different formats like :1.Copy Screen
2Alarm Print out
3.Log Print out
CRT Displays1.Alarm CRT display
2.Utility CRT display
-
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
DATA REPRESENTATION:
TYPES OF TREND LOG PRINOUTS
TIME ACTIVATED EVENT ACTIVATED DEMAND LOGSSOE PRINTOUTTIME ACTIVATED LOG:
Automatic Triggered Logs Sample frequency is 1 Hour.(Normally) Time of trigger can be specified -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
TIME ACTIVATED LOG:
Max. 15 nos. of points can be assignedNormally printed in the logging printer in UCBExamples :1.Shift Log
2.Efficiency Log
3.Boiler Drum / Tube Metal Temp. Log
4.FSH / RH Metal temp. excursion Log
EVENT ACTIVATED LOG:
Automatic Triggered Logs Used for Unit or Equipment Outage Analysis Minimum Sample frequency is 10 seconds. -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
EVENT ACTIVATED LOG:
Max. 36 points can be assigned in a log Logs are triggered by a Trip flag Normally printed on Logging Printer in UCB Pre & Post triggered points can be specified Examples :1.Post Trip Analysis Log ( PTL )
2.TG. Shutdown Analysis Log
3.Boiler Startup Log.
4.Turbine / Generator Diagnostic Logs
-
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
DEMAND LOG:
Not Automatic Triggered Logs Logs can be printed on operators demand Sample frequency is generally 1 Hour. Logs are printed in Logging Printer in UCB -
Power Plant C&I systems
DATA ACQUISITION SYSYTEM
SEQUENCE OF EVENTS ( SOE )
THE MAIN FEATURES ARE:
Determines First Cause Of Trip Determines sequence of events or alarms Scanning Time is 1 millisecond. It is a Stand Alone SystemMax. 256 nos. of Protection related digital points can be assigned Automatic Triggered when any point in alarm -
Power Plant C&I systems
DDCMIS
WHAT IS DDCMIS ?
DISTRIBUTED DIGITAL CONTROL MONITORING & INFORMATION SYSTEM
Distributed means there is no centralized control and control is spread across multiple unitsDigital means processing of process information is done in digital form using micro-processor based hardwareMIS interfaces the human with process using computers -
Power Plant C&I systems
DDCMIS
TECHNOLOGICAL BACKGROUND
PROGRESS OF INSTRUMENTATION USED TO IMPLEMENT AUTOMATIC PROCESS CONTROL
LOCAL PNEUMATIC CONTROLLERSMINIATURIZED AND CENTRALIZED PNEUMATIC CONTROLLERS AT CONTROL PANELS AND CONSOLESSOLID-STATE CONTROLLERSCOMPUTERISED CONTROLS DISTRIBUTED MICROPROCESSOR BASED CONTROL -
Power Plant C&I systems
DDCMIS
Components
MAN MACHINE INTERFACE & PROCESS INFORMATION SYSTEM
DATA COMMUNICATION SYSTEM (DATA HIGH WAY)
CONTROL SYSTEM
-
Power Plant C&I systems
DDCMIS
MAN-MACHINE INTERFACE AND PLANT INFORMATION SYSTEM (MMIPS)
LATEST STATE-OF-THE-ART WORKSTATIONS AND SERVERS BASED ON OPEN-ARCHITECTURE AND INDUSTRY STANDARD HARDWARE AND SOFTWARE TO ENSURE BETTER CONNECTIVITY.e.g. HARDWARE FROM COMPAQ/DIGITAL, HP, SUN MICRO-SYSTEM OR OTHER MAJOR SUPPLIERS (LESS DEPENDENCE ON THE C&I SYSTEM SUPPLIER IN THE LONG RUN)
OPERATING SYSTEM WINDOWS-NT, OPEN-VMS OR UNIX.PROVISION OF LVSCONNECTION TO OTHER SYSTEM THROUGH STATIONWIDE WAN -
Power Plant C&I systems
DDCMIS
MMIPIS FUNCTIONALITIES
VARIOUS PLANT EQUIPMENT OPERATIONOPERATOR INFORMATIONS THROUGH VARIOUS DISPLAYSALARMS, LOGS, HISTORICAL AND LONG TERM STORAGE.PERFORMANCE AND OTHER CALCULATIONS -
Power Plant C&I systems
DDCMIS
DATA COMMUNICATION SYSTEM
LOCAL SYSTEM BUS It is just lines on the backplane of control panel to which all the modules are connected directly. It serves as communication medium between the modules.INTRAPLANT BUS(IPB) It is a coaxial cable which runs through all the panels of control system and interconnects them.LOCAL AREA NETWORK(LAN) It is a network of computers which are connected to a single point (HUB).FOR ALL BUSES REDUNDANCY IS PRESENT
-
Power Plant C&I systems
DDCMIS
CONTROL SYSTEM
FUNCTIONAL DIVISION
SG-C&I SYSTEM TG-C&I SYSTEM BOP-C&I SYSTEMHARDWARE COMPONENTS
POWER SUPPLY CONTROL PANEL ELECTRONIC MODULES -
Power Plant C&I systems
DDCMIS
Sheet1CONTROL SYSTEMPROGRAMMING &MMIPISM & SCONFIGURATIONSYSTEMCLOCKDCSSG- C&IBOP- C&ITG- C&ISYSTEMSYSTEMSYSTEMSheet2Sheet3 -
Power Plant C&I systems
DDCMIS
SG-C&I SYSTEM
BURNER MANAGEMENT SYSTEM (BMS)SOOT BLOWER CONTROL SYSTEM (SBC)SECONDARY AIR DAMPER CONTROL SYSTEM (SADC)AUXILIARY PRDS CONTROLS (APRDS)TG-C&I SYSTEM
ELECTRONIC TURBINE PROTECTION (ETP)AUTOMATIC TURBINE RUN-UP SYSTEM (ATRS)AUTOMATIC TURBINE TESTING SYSTEM (ATT)ELECTRO- HYDRAULIC TURBINE CONTROL SYSTEM (EHTC)TURBINE STRESS CONTROL SYSTEM (TSC)LP BYPASS SYSTEM (LPBP)HP BYPASS SYSTEM(HPBP)GLAND STEAM PRESSURE CONTROLGENERATOR AUXILIARY MONITORING PANEL (GAMP) -
Power Plant C&I systems
DDCMIS
BOP-C&I SYSTEM
CONSISTS OF OPEN LOOP CONTROL SYSTEM (OLCS) AND CLOSED LOOP CONTROL SYSTEM (CLCS)
OLCS - THE SEQUENCE CONTROL, INTERLOCK OF ALL THE PLANT SYSTEMS WHICH ARE NOT COVERED IN THE SG-C&I AND TG-C&I. THIS INCLUDES MAJOR AUXILIARIES LIKE FD/ID/PA FANS, AIR-PREHEATER, BFP/CEP/CWP/ BCWP , DMCWP/CLCWP AND ELECTRICAL BREAKERS.CLCS - THE MODULATING CONTROL FOR VARIOUS IMPORTANT PLANT PARAMETERS, LIKE FW FLOW (DRUM LEVEL), FURNACE DRAFT, COMBUSTION CONTROL (FUEL FLOW AND AIR FLOW), PA HDR PRESSURE CONTROL, DEAERATOR/HOTWELL/HEATER LEVEL CONTROLS ETC. -
Power Plant C&I systems
DDCMIS
WHY DDCMIS ?
VERY HIGH FLEXIBILITY FOR MODIFICATION IN CONTROL STRATEGY VERY HIGH SELF-DIAGNOSTIC VERY LOW DRIFT (ONLY IN I/O CARDS) , HENCE NO NEED OF FREQUENT RE-CALIBRATIONMUCH HIGHER RELIABILITY (BASED ON MTBF)BETTER LONG TERM SUPPORT DUE TO CHANGING TECHNOLOGYMUCH BETTER OPERATOR INTERFACE -
Power Plant C&I systems
DDCMIS
SALIENT FEATURES OF DDCMIS
INTEGRATED PLANT CONTROL FOR SG, TG AND BALANCE OF PLANT CONTROLIT MAY BE REMEMBERED THAT HISTORICALLY THE TERM DDCMIS USED REFER TO THE SO-CALLED BOP-C&I . THE SG-C&I, i.e. FSSS etc. TG-C&I i.e. ATRS, TURBINE PROTECTION etc. ORIGINALLY WERE NOT CONSIDERED UNDER DDCMIS OR DCS AS PER MANY SUPPLIERS. ONLY RECENTLY THE TYPE OF SYSTEMS FOR ALL THE SYSTEMS HAVE BECOME SIMILAR (WITH SOME DIFFERENCE WHICH WILL BE DISCUSSED LATER), WE TEND TO CONSIDER THESE SYSTEMS UNDER DDCMIS.
-
Power Plant C&I systems
DDCMIS
SALIENT FEATURES OF DDCMIS
INTEGRATED PLANT OPERATION THROUGH FULLY INTERCHANGEABLE OPERTAOR WORK STATIONS (OWS) FOR SG, TG AND BALANCE OF PLANTPROVISION OF EXTENSIVE SELF-DIAGNOSTICSUSE OF LARGE VIDEO SCREENS FOR PROJECTIONS OF VARIOUS PLANT MIMICS ETC.PROVISION OF FAULT ALARM ANALYSIS TO GUIDE THE OPERATOR TO THE MOST LIKELY EVENTPROVISION OF ADEQUATE RELIABILITY AND AVAILABILITY WITH PROPER REDUNDANCY IN SENSOR, I/O AND CONTROLLER LEVELS. -
Power Plant C&I systems
Global & National Power Scenario
Global:
Global electricity consumption 69% higher in 2020 than 200380% of energy provided from thermal sources Emerging trend from Thermal to Hydel and Renewable Energy sourcesIndian:
Total installed capacity only 1362 MW in 1947Per Capita consumption 631 units (2005-06) only with installed capacity of 1,77,000 MWGDP growth of 8%, power growth required 10%To add 1,00,000MW capacity by 2017Liberalizations of the sector -
Power Plant C&I systems
NTPC at a glance:
Installed Capacity 34199 MW
Target 75000MW by 2017
Performance:
Annual Availability 91.62%
Annual PLF 88.29%
11 stations among top 20 in the country
-
NTPC Practices to achieve goal
KEY THRUST AREAS
Zero Human ErrorImplementation of trip committee recommendations judiciously / rigorouslyIdentification of trip committee recommendations of other stationswhich are relevant and implement them
Implementation of operation memorandum wherever applicableDissemination of information about best practices followed acrossNTPC and other Power Stations
Providing proper environment for C&I equipment to reduce probability ofcard and equipment failure
-
C&I Trip Trend
Chart296-9796-9796-9797-9897-9897-9898-9998-9998-9999-2099-2099-2000-0100-0100-0101-0201-0201-0202-0302-0302-0303-0403-0403-0404-0504-0504-0505-0605-0605-0606-0706-0706-0707-0807-0807-0808-0908-0908-0909 1009 1009 1010 1110 1110 11CoalGasTotalYearNo of trips734712056369261208162349612532157824712960541146143104572582442670391857653095462672501060281644Coal tripsYear 2001-02Year 2001-02StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalStationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalFSTPS103217FSTPS103217VSTPP0200005411VSTPP0200005411FGUTPP432514FGUTPP432514TnTPS00000TnTPS00000KhSTPP01012KhSTPP01012KSTPS3201039KSTPS3201039RSTPS0022105RSTPS0022105TTPS0000000TTPS0000000SSTPS00110125SSTPS00110125NCTPS00000NCTPS00000TSTPP112TSTPP112RhSTPP246RhSTPP246SmTPP000SmTPP000BTPS300407BTPS300407Total1413816247468Total1413816247468ANNEXURE ITRIP TREND IN LAST FIVE YEARS IN C&I AREA IN COAL STATIONSYear 2002-03Year 2002-03No. Of Units: 66StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalStationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalFSTPS102115FSTPS102115VSTPP100110126VSTPP100110126FGUTPP128213FGUTPP128213TnTPS21003TnTPS21003KhSTPP11114KhSTPP11114KSTPS0020002KSTPS0020002RSTPS2000013RSTPS2000013TTPS0052209TTPS0052209SSTPS01010114SSTPS01010114NCTPS01102NCTPS01102TSTPP0000TSTPP0000RhSTPP123RhSTPP123SmTPP213SmTPP213BTPS010034BTPS010034Total1110198722261Total1110198722261Year 2003-04Year 2003-04No. Of Units: 67StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalStationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalFSTPS111407FSTPS111407VSTPP000000022VSTPP000000022FGUTPP15129FGUTPP15129TnTPS50016TnTPS50016KhSTPP00011KhSTPP00011KSTPS0010001KSTPS0010001RSTPS2010115RSTPS2010115TTPS2311007TTPS2311007SSTPS00000000SSTPS00000000NCTPS32016NCTPS32016TSTPP21216TSTPP21216RhSTPP224RhSTPP224SmTPP235SmTPP235BTPS020002BTPS020002Total2019711110261Total2019711110261Year 2004-05Year 2004-05No. Of Units: 69StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalStationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalFSTPS3323112FSTPS3323112VSTPP000011114VSTPP000011114FGUTPP00202FGUTPP00202TnTPS01113TnTPS01113KhSTPP21249KhSTPP21249KSTPS0010001KSTPS0010001RSTPS1010002RSTPS1010002TTPS1114007TTPS1114007SSTPS10000001SSTPS10000001NCTPS01001NCTPS01001TSTPP104229TSTPP104229RhSTPP000RhSTPP000SmTPP213SmTPP213BTPS000123BTPS000123Total1181415611157Total1181415611157ANNEXURE I CONTD.TRIP TREND IN LAST FIVE YEARS IN C&I AREA IN COAL STATIONSYear 2005-06Year 2005-06No. Of Units: 71StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalStationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalFSTPS2125FSTPS2125VSTPP11VSTPP11FGUTPP123FGUTPP123TnTPS21115TnTPS21115KhSTPP224KhSTPP224KSTPS11KSTPS11RSTPS21137RSTPS21137TTPS12115TTPS12115SSTPS11SSTPS11NCTPS314NCTPS314TSTPP145TSTPP145RhSTPP11RhSTPP11SmTPP11SmTPP11BTPS11BTPS11Total81096514144Total81096514144Year 2006-07Year 2006-07No. Of Units: 73StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalStationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Unit # 9Unit # 10TotalFSTPS11FSTPS112VSTPP0VSTPP314FGUTPP11FGUTPP31116TnTPS112TnTPS213KhSTPP0KhSTPP33KSTPS11KSTPS112RSTPS0RSTPS0TTPS22TTPS235SSTPS11SSTPS213NCTPS112NCTPS112TSTPP1124TSTPP112RhSTPP22RhSTPP33SmTPP0SmTPP11BTPS11BTPS213Total2542220017Total4812743001039Year 2007-08No. Of Units: 74StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Unit # 9Unit # 10TotalFSTPS32218VSTPP2131122315FGUTPP311128TnTPS41218KhSTPP112KSTPS112RSTPS114219TTPS0SSTPS134NCTPS112TSTPP213RhSTPP11SmTPP123BTPS0Total1171110107222365Year 2008-09No. Of Units: 74StationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Unit # 9Unit # 10TotalFSTPSFSTPS123YearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8TotalVSTPP12142001-02103210007FGUTPP2132002-03102110005TnTPS222003-04111400007KhSTPP1232004-053323100012KSTPS1122005-06212000005RSTPS21142006-07001100002TTPS02007-08301200006SSTPS0NCTPS0VSTPPTSTPP112YearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Unit # 9Unit # 10TotalRhSTPP2132001-02020000540011SmTPP02002-0310011012006BTPS112003-0400000002002Total4547412000272004-05000011110042005-06000000010012006-07003000001042007-0800004100128FGUTPP TripsUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5TotalFGUTPP4325142001-02432514FGUTPP1282132002-03128213FGUTPP151292003-0415129FGUTPP002022004-0500202FGUTPP1232005-06123FGUTPP112006-07311162007-082132008-091211591515142552007-08200100003TnTPSYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-020000000002002-032100000032003-045001000062004-050111000032005-062111000052006-072010000032007-08102100004KhSTPPYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-020101000022002-031111000042003-040001000012004-052124000092005-062020000042006-070030000032007-08010100002KSTPSYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-023201030092002-030020000022003-040010000012004-050010000012005-060000100012006-070010100022007-08000000000RSTPSYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-020022100052002-032000010032003-042010110052004-051010000022005-060201013072006-070100000012007-08001131006TTPSYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-020000000002002-030052200092003-042311000072004-051114000072005-061211000052006-070200030052007-08000000000SSTPSYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-020011012052002-030101011042003-040000000002004-051000000012005-060000001012006-070002100032007-08000102003NCTPSYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-020000000002002-030110000022003-043201000062004-050100000012005-060310000042006-071010000022007-08000100001TSTPPYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-021100000022002-030000000002003-042121000062004-051042200092005-060001400052006-070110020042007-08001000001RhSTPPYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-022400000062002-031200000032003-042200000042004-050000000002005-060010000012006-070003000032007-08000100001SmTPPYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-020000000002002-032100000032003-042300000052004-052100000032005-061000000012006-071000000012007-08010000001BTPSYearUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Total2001-023004000072002-030100300042003-040200000022004-050001200032005-060100000012006-070200100032007-08000000000Sheet2Sheet2Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 52001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSFARAKKA11132030013100321221121430121101000Sheet1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 7Unit # 7Unit # 7Unit # 7Unit # 7Unit # 7Unit # 7Unit # 8Unit # 8Unit # 8Unit # 8Unit # 8Unit # 8Unit # 8Unit # 9Unit # 9Unit # 9Unit # 9Unit # 9Unit # 9Unit # 9Unit # 10Unit # 10Unit # 10Unit # 10Unit # 10Unit # 10Unit # 102001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSVINDHYACHAL STPP0100000200000000000300100000010100400010015101000422110000000110000002Chart11111111222222288888882222222000FGUTPPFGUTPPFGUTPPFGUTPP2007-08NO OF TRIPSUNCHAHAR102501012102021Chart3Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 42001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSTANDA0250221010110000011120011101Chart4Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 42001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSKAHALGAON0102200110100101022301114001Chart5Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 62001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSKORBA300000020000000211010100000000001103000000Cable PS tripsUnit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 7Unit # 7Unit # 7Unit # 7Unit # 7Unit # 7Unit # 72001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSRAMAGUNDAM0221000000021020110012000101101000301101010000300Sheet5Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 62001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSTALCHER THERMAL002110000312200511100021410002000000000030Sheet4Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 7Unit # 7Unit # 7Unit # 7Unit # 7Unit # 7Unit # 72001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSSINGRAULI0001000010000010000001100021000001011000022100100Sheet3Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 42001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSDADRI COAL0030010012130001001100010001Gas TripsUnit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 6Unit # 62001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSTALCHER KANIHA102100010100100024011001210000024000000020Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 42001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSRIHAND2120000422000000001000000031Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 22001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSSIMHADRI02221100131001Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 1Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 2Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 3Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 4Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 5Unit # 52001-022002-032003-042004-052005-062006-072007-08NO OF TRIPSBADARPUR30000000120120000000040010000302010GT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1CGT # 1CGT # 1CGT # 1CGT # 1CGT # 1CST # 1ST # 1ST # 1ST # 1ST # 1ST # 12002-032003-042004-052005-062006-072007-08NO OF TRIPSANTA200000011000021000220012GT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 2AGT # 2AGT # 2AGT # 2AGT # 2AGT # 2AGT # 2BGT # 2BGT # 2BGT # 2BGT # 2BGT # 2BST # 1ST # 1ST # 1ST # 1ST # 1ST # 1ST # 2ST # 2ST # 2ST # 2ST # 2ST # 22002-032003-042004-052005-062006-072007-08NO OF TRIPSAURAIYA000010000001000000100100100010100200GT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 2AGT # 2AGT # 2AGT # 2AGT # 2AGT # 2AGT # 2BGT # 2BGT # 2BGT # 2BGT # 2BGT # 2BST # 1ST # 1ST # 1ST # 1ST # 1ST # 1ST # 2ST # 2ST # 2ST # 2ST # 2ST # 22002-032003-042004-052005-062006-072007-08NO OF TRIPSDADRI GAS10321454112130501251104222211021002GT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 2AGT # 2AGT # 2AGT # 2AGT # 2AGT # 2AGT # 2BGT # 2BGT # 2BGT # 2BGT # 2BGT # 2BST # 1ST # 1ST # 1ST # 1ST # 1ST # 1ST # 2ST # 2ST # 2ST # 2ST # 2ST # 22002-032003-042004-052005-062006-072007-08NO OF TRIPSKAWAS100100000001021010211010020102140021GT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1CGT # 1CGT # 1CGT # 1CGT # 1CGT # 1CST # 1ST # 1ST # 1ST # 1ST # 1ST # 12002-032003-042004-052005-062006-072007-08NO OF TRIPSJHANOR GANDHAR101001510010000001210012GT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BST # 1ST # 1ST # 1ST # 1ST # 1ST # 12002-032003-042004-052005-062006-072007-08NO OF TRIPSFARIDABAD457222941913411121GT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1AGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BGT # 1BST # 1ST # 1ST # 1ST # 1ST # 1ST # 12002-032003-042004-052005-062006-072007-08NO OF TRIPSKAYAMKULAM100001000001100011Relay MalfunctionRelay MalfunctionRelay MalfunctionRelay MalfunctionTx / SwTx / SwTx / SwTx / SwControl SystemControl SystemControl SystemControl SystemEHC / ATRSEHC / ATRSEHC / ATRSEHC / ATRSPower Supply / CablePower Supply / CablePower Supply / CablePower Supply / CableSoftware / Card failureSoftware / Card failureSoftware / Card failureSoftware / Card failureHuman Error / NRHuman Error / NRHuman Error / NRHuman Error / NRUPSUPSUPSUPSRTD / TcRTD / TcRTD / TcRTD / TcCoal 07-08Gas 07-08Coal 08-09Gas 08-09Trip Analysis 07-091020303312210100084721210118111100001110Relay MalfunctionRelay MalfunctionRelay MalfunctionRelay MalfunctionTx / SwTx / SwTx / SwTx / SwControl SystemControl SystemControl SystemControl SystemEHC / ATRSEHC / ATRSEHC / ATRSEHC / ATRSPower Supply / CablePower Supply / CablePower Supply / CablePower Supply / CableSoftware / Card failureSoftware / Card failureSoftware / Card failureSoftware / Card failureHuman Error / NRHuman Error / NRHuman Error / NRHuman Error / NRUPSUPSUPSUPSRTD / TcRTD / TcRTD / TcRTD / TcCoal 07-08Gas 07-08Coal 08-09Gas 08-09No of TripsTrip Analysis 2006-081020303312210100084721210118111100001110Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcCoal FO distribution2310711101Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcGas FO distribution030028100COAL STATION DATA 2006 - 07StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS112VSTPP2114FGUTPP426TnTPS1113KhSTPP33KSTPS22RSTPS0TTPS235SSTPS1113NCTPS22TSTPP112RhSTPP33SmTPP11BTPS1113Total1312181210139GAS STATION DATA 2006 - 07StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalAnta11Auraiya112Dadri33Faridabad145Kawas134Kayamkulam11Gandhar112Total002041010118Coal Station DataField DevicesCable FaultsStation2003-042004-052005-062006-072007-082008-092003-042004-052005-062006-072007-082008-09FSTPS11VSTPP22FGUTPP2TnTPS21111KhSTPP1KSTPS2RSTPS23TTPS213SSTPS11111NCTPS11TSTPP1RhSTPP1SmTPP211BTPS11Total1220450400880Gas Station DataField DevicesCable FaultsStation2004-052005-062006-072007-082008-092003-042004-052005-062006-072007-082008-09AntaAuraiya1Dadri13Faridabad11Kawas1KayamkulamGandhar11Total010130000410ANNEXURE IICOAL STATION DATA 2006 - 07StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS112VSTPP2114FGUTPP426TnTPS1113KhSTPP33KSTPS22RSTPS0TTPS235SSTPS1113NCTPS22TSTPP112RhSTPP33SmTPP11BTPS1113Total1312181210139GAS STATION DATA 2006 - 07StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalAnta11Auraiya112Dadri33Faridabad145Kawas134Kayamkulam11Gandhar112Total002041010118COAL STATION DATA 2007 - 08StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS246VSTPP1258FGUTPP213TnTPS11114KhSTPP112KSTPS0RSTPS13116TTPS0SSTPS1113NCTPS11TSTPP11RhSTPP11SmTPP11BTPS0Total253281231036GAS STATION DATA 2007 - 08Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalAnta0Auraiya11Dadri1124Faridabad11114Kawas112Kayamkulam0Gandhar213Total02241400114COAL STATION DATA 2008 - 09StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS1113VSTPP1124FGUTPP123TnTPS112KhSTPP123KSTPS11RSTPS1124TTPS0SSTPS0NCTPS0TSTPP112RhSTPP33SmTPP0BTPS11Total231071110126GAS STATION DATA 2008 - 09Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalAnta1113Auraiya0Dadri0Faridabad358Kawas11Kayamkulam0Gandhar22Total03002810014Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcCoal 07-0813121812101Gas 07-080020410101Coal 08-092310711101Gas 08-09030028100Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcCoal 08-092310711101Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcGas 08-09030028100Year 2006-07Year 2006-07StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalStationUnit # 1Unit # 2Unit # 3Unit # 4Unit # 5Unit # 6Unit # 7Unit # 8Unit # 9Unit # 10TotalAnta11FSTPS112Auraiya112VSTPP314Dadri1113FGUTPP31116Faridabad2125TnTPS213Kawas1124KhSTPP33Kayamkulam11KSTPS112Gandhar112RSTPS11Total430117218TTPS235SSTPS213NCTPS112TSTPP1124RhSTPP33SmTPP11BTPS213Total4912745001042Year 2006-07StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalStationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS112Anta11VSTPP2114Auraiya112FGUTPP426Dadri33TnTPS1113Faridabad145KhSTPP33Kawas134KSTPS22Kayamkulam11RSTPS11Gandhar112TTPS235Total002041010118SSTPS1113NCTPS22TSTPP2114RhSTPP33SmTPP11BTPS1113Total1512191210142Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalCoal1512191210142Gas002041010118Total15141132220260CoalGasTotalCategoryNo of trips2006-07 C&I Trip DetailsYear96-9797-9898-9999-2000-0101-0202-0303-0404-0505-0606-0707-0808-0909 1010 11Coal7356616212582606157443965465028Gas473620343247544325261830261016Total12092819615712911410482705795726044Units8383839395959799101103106108111111114Trip/unit1.441.10.9751.031.651.351.171.050.810.680.540.880.6480.54050.386CoalGasTotalYearNo of tripsC&I Trip StatusANNEXURE ITRIP TREND IN LAST FIVE YEARS IN C&I AREA IN GAS STATIONSYear 2002-03StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalAnta20024Auraiya0001113Dadri10412219Faridabad49417Kawas1002014Kayamkulam1012Gandhar1528Total191801512257Year 2003-04StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalAnta01225Auraiya0Dadri35352220Faridabad54110Kawas0021249Kayamkulam0000Gandhar01012Total8112568646Year 2004-05StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalAnta01102Auraiya0000000Dadri24012110Faridabad7119Kawas0011002Kayamkulam0000Gandhar10001Total1061123124Year 2005-06StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalAnta0Auraiya123Dadri15129Faridabad29112Kawas112Kayamkulam0Gandhar0Total3100524226Year 2006-07StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalAnta11Auraiya112Dadri1113Faridabad2125Kawas1124Kayamkulam11Gandhar112Total430117218Year 2007-08StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalAnta22Auraiya11Dadri2141210Faridabad2316Kawas1214Kayamkulam1113Gandhar1124Total481149330Year 2008-09StationGT # 1AGT # 1BGT # 1CGT # 2AGT # 2BST # 1ST # 2TotalAnta33Auraiya0Dadri0Faridabad2248Kawas11Kayamkulam0Gandhar22Total520007014AntaYearGT # 1AGT # 1BGT # 1CST # 1Total2002-03200242003-04012252004-05011022005-06000002006-07000112007-08000222008-0930000AuraiyaYearGT # 1AGT # 1BGT # 2AGT # 2BST # 1ST # 2Total2002-0300011132003-0400000002004-0500000002005-0600010232006-0710001022007-0801000012008-090000000DadriYearGT # 1AGT # 1BGT # 2AGT # 2BST # 1ST # 2Total2002-031041220192003-04353522202004-05240121102005-061512092006-0711001032007-0821412102008-090000000FaridabadYearGT # 1AGT # 1BST # 1Total2002-03494172003-04541102004-0571192005-06291122006-0721252007-0823162008-092246KawasYearGT # 1AGT # 1BGT # 2AGT # 2BST # 1ST # 2Total2002-0310020142003-0400212492004-0500110022005-0610001022006-0700110242007-0801002142008-090000101KayamkulamYearGT # 1AGT # 1BST # 1Total2002-0310122003-0400002004-0500002005-0600002006-0700112007-0811132008-090000GandharYearGT # 1AGT # 1BGT # 1CST # 1Total2002-03150282003-04010122004-05100012005-06000002006-07010122007-08101242008-0900022 -
Chart2Relay MalfunctionRelay MalfunctionTx / Sw /Fld DevTx / Sw /Fld DevControl SystemControl SystemEHC / ATRSEHC / ATRSPower Supply / CablePower Supply / CableSoftware / Card failureSoftware / Card failureHuman ErrorHuman ErrorUPSUPSRTD / TcRTD / TcCoal 09-1041013148312Chart3Relay MalfunctionTx / Sw /Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman ErrorUPSRTD / Tc41013148312Chart4Relay MalfunctionTx / Sw / Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcCoal FO distribution (2008-09)2454610024Chart5Relay MalfunctionTx / Sw / Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcGas FO distribution (2008-09)152725102Sheet5ANNEXURE IICOAL STATION DATA 2006 - 07StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS112VSTPP2114FGUTPP426TnTPS1113KhSTPP33KSTPS22RSTPS0TTPS235SSTPS1113NCTPS22TSTPP112RhSTPP33SmTPP11BTPS1113Total1312181210139GAS STATION DATA 2006 - 07StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalAnta11Auraiya112Dadri33Faridabad145Kawas134Kayamkulam11Gandhar112Total002041010118COAL STATION DATA 2007 - 08StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS2338VSTPP2147115FGUTPP13228TnTPS1258KhSTPP112KSTPS112RSTPS2259TTPS0SSTPS314NCTPS22TSTPP1113RhSTPP11SmTPP33BTPS0Total2553182280265GAS STATION DATA 2007 - 08Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalAnta22Auraiya11Dadri1131410Faridabad21216Kawas1124Kayamkulam213Gandhar1214Total01475650230COAL STATION DATA 2008 - 09StationRelay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalFSTPS1113VSTPP1124FGUTPP123TnTPS112KhSTPP123KSTPS11RSTPS1124TTPS0SSTPS0NCTPS0TSTPP112RhSTPP33SmTPP0BTPS11Total231071110126GAS STATION DATA 2008 - 09Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcTotalAnta1113Auraiya0Dadri0Faridabad358Kawas11Kayamkulam0Gandhar22Total03002810014Relay MalfunctionTx / SwControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcCoal 06-0713121812101Gas 06-070020410101Coal 07-0825531822802Gas 07-08014756502Coal 08-092310711101Gas 08-09030028100Relay MalfunctionTx / Sw / Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcCoal 08-092454610024Relay MalfunctionTx / Sw / Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error / NRUPSRTD / TcGas 08-09152725102Relay MalfunctionTx / Sw /Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman ErrorUPSRTD / TcCoal 09-1041013148312Relay MalfunctionTx / Sw/Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman ErrorUPSRTD / TcGas 09-10020023000
2009-10: FORCED OUTAGE DISTRIBUTION (COAL) -
INFERENCE : 2009-10 C&I OUTAGE ANALYSISMajor factors contributing to C&I outage in 2009-10:
Control System related failure2. Field Device Failure
3. Soft ware/Card Failure
4. Power Supply/Relay failure
5. Human error
-
BEST PRACTICES COMPILED/ADOPTED IN NTPC C&I
All unit protections are provided with 2/3 logic and audio visual alarm is provided on 1/3 to operator on actuation of any one sensor wherever possible with proper approval. Use of headless RTD in tripping circuit of ID/PA/FD fans & BFPs.Resistance mapping of critical solenoids including cable during overhauls and monitoring trend to identify any defects.Marking of trip related devices and Junction Boxes marked in RED color. Regular calibration of all important instruments which have a bearing on unit safety, reliability and efficiency. Instruments are calibrated against standard instruments with traceability to NABL. -
BEST PRACTICES COMPILED/ADOPTED IN NTPC C&I
For handling of electrostatic sensitive electronic hardware, electrostatic bags, wrist straps and other ESD handling devices are employed in control panels and lab. All Laboratories are provided with ESD proof workstations. Disable removable drives of servers and workstations.Single source responsibility for software backup of DCS and storage in fire proof cabinets in two different locations.Detailed work instruction are prepared and followed for working on all trip related devices. -
BEST PRACTICES COMPILED/ADOPTED IN NTPC C&I
A single source responsibility is fixed for the generation and maintenance of system passwords so as to maintain system securityInternal quality inspection for critical checks during overhauls to ensure quality in overhaul worksNear miss situations are monitored and analyzed. The learning from this area used to formulate strategies to avoid spurious outages.All power supply voltages are monitored with a fixed periodicity and maintained within /- 10% of the rated value. -
BEST PRACTICES COMPILED/ADOPTED IN NTPC C&I
Fuses used in UPS and protection circuits are replaced with new fuses of same rating and type during every overhaul Earth voltages in control panels are monitored on a predetermined frequency and the values are recorded for trendingAll bus terminators are checked during every overhaul for ensuring integrity of bus communication in DDCMIS systemsLoad testing of power supplies for critical applications and replacement of power supply modules or electrolytic capacitor and power transistors used in power supply if found deteriorated. -
Other important actions taken for forced outage reduction
Rerouting of control & power cables in hot zonesPanel power supply monitoring in regular intervals.CER/UCB temperature and humidity monitoring online. Insisting for performance of the A/C systemChecking and tightening power supply cables during overhaulEnsuring healthiness of cabinet cooling fans. -
Other important actions taken for forced outage reduction
Panel cooling fans supply segregation from system supply with MCB / fuse.Cleaning of air filters on panels periodicallyServo valve replacement/ servicing in hydraulic drives.Individual fuse protection in 220VDC MFT for HOTV, LOTV, HORV, Scanner emergency air damper solenoids - Commissioning of non commissioned systemsSoot blowing Steam Pr.
Control valve:
Status- Actuator damaged while commissioning. BHEL has placed PO on OEM M/s MIL for procurement of damaged parts
b) Commissioning of SWAS analyzers:
Status-Procurement of Reagents for reagent based measurement (i.e. Silica etc.) is in process.
Suggested to take up with OEM (Forbes Marshall) through BHEL for commissioning of electrode based measurements (i.e. conductivity etc.)
Looking from WBPDCL Santaldih Perspective
KEY THRUST AREAS
-
Looking from WBPDCL Santaldih Perspective
c) Electromatic Relief Valve (ERV):
Status- Solenoid Installed and cabling done
d) APH Rotor stop alarm:
Status- Issue pending with BHEL for longtime. Alternative scheme through DDCMIS suggested by fixing proximity switch on APH rotor shaft at support brg. end.
APH fire detection alarm:Status- Issue pending with BHEL for longtime. Alternative scheme by measuring APH metal temp. using thermocouples in Air & Gas path may be thought of.
-
Looking from WBPDCL Santaldih Perspective
f) Commissioning/testing of Back up (Back up of MAX DNA system work stations)Push Button console for unit control:
Suggested to test the operation of various push buttons at the time of Start up/ Shutdown of unit jointly with operation.
2. Rectification of long pending problems:
a) Problem of SADC systems
Status: Operation of some of the dampers erratic and needed frequent adjustment due to unreliable performance of actuator/positioner
Suggested to procure 04 nos. actuator with positioner of reputed manufacturer for replacement in one elevation on trial basis
-
Looking from WBPDCL Santaldih Perspective
b) High PA flow to Mills:
In auto PA flow of all mills are about 30% more than characteristic flow. PA flow curve for sliding set point may be set as per mill design.
Also provision of manual set point may be explored to cater poor coal quality
3. Setting up of C&I Lab with requisite facilities
4.Enhancing reliability of Field Instruments
Proper glanding/ sealing of field instruments, control valves, routing & dressing of cables, ensuring cleanliness & closure of all LIEs etc. -
Looking from WBPDCL Santaldih Perspective
5. Sealing & Cable dressing in MAX DNA panels during unit Shutdown
6. Disabling various ports for removable drives of MAX DNA work stations for system reliability
7. Installation of ON Line printers of MAX DNA system for daily LOGs. Daily LOGs are essential for analysis of different plant parameters by O&E dept.
Replacement of unreliable instruments by quality instrumentsc) Marking of protection related JBs to avoid human error
Regular walk down check in various areas to ensure the healthiness of field instruments.
-
9.Implementation of regular cleaning schedule & preventive mtc. Schedule for Boiler, Turbine and common systems
10.Prepartion of detail job list for unit overhauling
11. Review of spares status and timely action for procurement for breakdown(corrective), preventive and overhauling maintenance.
Looking from WBPDCL Santaldih Perspective
8. Cleanliness of NETWORK ROOM & EWS room to be ensured. Monitoring of Temp. & Humidity of CER, UCB , NETWORK & EWS rooms.
-
PROGRAMMING & MMIPIS
M & S
CONFIGURATION SYSTEM
CLOCK
SG- C&I BOP- C&I TG- C&I
SYSTEM SYSTEM SYSTEM
DCS
CONTROL SYSTEM
9%22%28%2%9%17%7%2%4%Coal 09-10
Relay MalfunctionTx / Sw /Fld DevControl SystemEHC / ATRSPower Supply / CableSoftware / Card failureHuman Error UPSRTD / Tc