  • 7/31/2019 Christian Coututrier

    1/15

    Overview of centralized biogasplants projects in France

    Will the new economic incentives overcome the nontechnical barriers ?

    Christian CouturierSOLAGRO

    75 Voie du TOEC

    31075 Toulouse Cedex [email protected]. 05 67 69 69 69www.solagro.org

    www.lebiogaz.info

  • 7/31/2019 Christian Coututrier

    2/15

    Biomethane production & use

    Biomethaneproduction

    114 PJ Landfill gas37 PJ

    Entericfermentations

    50 PJ

    Slurrystorage

    24 PJ

    Biogas plants

    3,4 PJ

    Flared biogas

    15 PJ

    Atmosphere

    94 PJ

    Used biogas

    8,8 PJ

    Power plants5,7 PJ

    Boilers, driers& furnaces

    3,1

    Power

    1,7 PJ

    (460 GWh)

    Heat used

    2,4 PJ

    Losses

    4,7 PJ

    Self-consumption 0,7 PJ

    5,4

    17

    Sources : CITEPA,SOLAGROLast energy data

    updating : 2005

  • 7/31/2019 Christian Coututrier

    3/15

    Trends

    Biogas production : +10% / year during thelast decade

    Power production from biogas : +18% / year

    Landfill gas schemes : +23 MW in 2006(+33% of capacity)

    MSW methanization plants :I 3 plants under operation (150.000 t)

    I 12 new plants under construction or planned (>

    1.000.000 t)

    Agriculture sectorI Farm scale plants : 3-4

    I CAD : 0

    In operation

    In construction

    Planned

    CalaisLille

    Forbach

    Metz

    Saint-L

    Angers

    Clermont-Ferrand

    MontpellierMarseille

    RoanneBourg-en-Bresse

    Amiens

    Varennes-Jarcy

    Blanc-Mesnil

    Romainville

    La Martinique

  • 7/31/2019 Christian Coututrier

    4/15

    New economic incentives

    Energy efficiency bonus

    0

    5

    10

    15

    20

    2530

    35

    0% 20% 40% 60% 80% 100%

    Global efficiency

    Bonus,

    /MW

    h

    Global efficiency = ( Power + Heat* ) / 97% x Fuel* Including digester heating

    Price for electricity from biogas

    Feed-in tariff, revised in july 2006

    70

    75

    80

    85

    90

    95100

    105

    110

    115

    0 500 1 000 1 500 2 000 2 500 3 000

    Power, kW

    Biogas plants

    Landfill gas

    Biogas plant,< 150 kW el,

    efficiency > 75 % :

    140 /MWh

  • 7/31/2019 Christian Coututrier

    5/15

    CAD projects in France

    FERTI-NRJGEOTEXIA

    TIPER

    PROBIOGAS

    JARNY

    LES

  • 7/31/2019 Christian Coututrier

    6/15

    CAD projects in France

    ~5

    ~5

    ~7

    5,5

    16

    Investment(M)

    95 %

    75 %

    75 %

    0 %

    50 %

    Manure(%)

    Districtheating

    Foodindustry

    Foodindustry,

    steam andwater

    Foodindustry

    Self-use

    Heat use

    Farmerscooperative created20Studies2005JARNY

    [Lorraine]

    Case-study for the PROBIOGASprogramme

    10 km biogas canalization

    44Studies2005PROBIOGAS

    [Midi-Pyrnes]

    Local association undercreation (farmers &municipalities)

    52Studies2005TIPER

    [PoitouCharentes]

    Private project, includes 89farmers for digestate use

    38Permitting2001FERTI-NRJ

    [Picardie]

    Production of a solid fertilizer ;nitrate vulnerable zone

    Partnership farmersorganization / private company

    60Permitting2000GEOTEXIA[Brittany]

    CommentsSize(Tg)

    StatusProjectstart-up

  • 7/31/2019 Christian Coututrier

    7/15

    Non technical barriers

    n1 : Heat use

    Renewable heat issuesI Heat = 50% of final energy consumption

    I Hot water = efficient heat carrier from producer to consumers

    I Distribution => canalizationsI District heating in France : 3% of the housing ; mainly big cities

    I Heat for industry ; but need for steam (only 17% of the fuel energy can beconvert to steam with a gas motor ; and a gas turbine produces less electricity)

    SolutionI Development of district heating : European Directive for renewable heat ; long-

    term financing ;

    I Looking for heat consumption (housing, services, industry)

    I Construction of canalizations for hot water or for biogas, according to the

    distance between the biogas plants and the heat consumers

  • 7/31/2019 Christian Coututrier

    8/15

    Capdenac Gare : food

    industry, steam consumers

    Mean distance fromfarms to CAD plant :

    11 km (real)

    10 km

    8 km

    River Aveyron valley

    RiverLotvalley

    Tab le of Montbazens

    break

    Decazeville : district heating,formerly coal, now wood

    Non technical barriers

    n2 : Specific biogas canalization

    PROBIOGAZCAD project

  • 7/31/2019 Christian Coututrier

    9/15

    Non technical barriers

    n2 : Specific biogas canalization

    0

    2

    4

    6

    8

    10

    12

    14

    16

    18

    20

    0 2 4 6 8 10

    Heat used, GWh/year

    50.00

    0tons

    1 Gwh valuable heat = 10.000 tons of biomass

    I Investment : 100 k / km

    I Annual cost : 15 k / km

    I Heat value : 20-25 / MWh(gas price) + 15-25 /MWh(efficiency bonus) = 35 - 50/MWh

    I Profitability limit : 300 - 500MWh/y per km

    Barrier :I Existing regulation

    Solution :I Working group : security,

    construction, guideline

  • 7/31/2019 Christian Coututrier

    10/15

    Heatconsumers

    Steam and water

    Gas

    Water

    Norea[Maulon]

    Gastronome[Neuil]

    Heuliez[Cerizay]

    Gastronome[Moncoutant]

    Loel&Piriot ;France Champignon ;SOVILEG [Thouars]

    Riblaire[St Varent]Calcia

    [Airvault]

    BTS Industrie[Chatillon sur Thouet]

    BRM Mobilier,Wagon Automotive,

    Ville[Bressuire]

    Couvoir Boy[Allonne]

    Ville[Parthenay]

    TIPER CADProject

    Non technical barriers

    n2 : Specific biogas canalization

  • 7/31/2019 Christian Coututrier

    11/15

    Non technical barriers

    n3 : Gas injection to the grid

    BarriersI Legal status : biogas injection is lawful

    but not permitted ; specifications from

    authorities and gas operators are waitedI Health issues were cited about the

    Montech project (landfill gas upgradind):halogenated compound, heavy metals

    Solution :I Expert group of AFSSET (french agency

    for health and environment at work) sinceFeb. 2007

    Advantages for biogas injectionI High energy efficiency : not heat losses, few power consumption

    I Low risk to loose the customer

    I Production with the stream , no influence of season / night / week-endI Need for a renewable green gas in substitution to fossil gas

  • 7/31/2019 Christian Coututrier

    12/15

    Non technical barriers

    n4 : administrative barriers

    The legislation is unaware of biogas

    I No legal norm for the solid digestate, unlike aerobic compost :

    problem for the commercialization and sale

    I => AFNOR (french agency for normalization) work group dedicated to digestate from biogas plants, created in 2006

    I Regulation concerning hazard for biogas plants is not clear

    I Regulation concerning specific biogas canalization is not clear

  • 7/31/2019 Christian Coututrier

    13/15

    Non technical barriers

    n5 : the involvement of farmers

    Involvement of farmers in a CAD project : several conditions are required

    Fertilizing issuesI

    Prove that digestate is better than slurry (for exemple : N-enrichment by addingprotein rich substrates from meat industry)

    For solid manure systems :

    I Limit change for slurry spreading (same equipments)

    I Take in charge the switch to liquid digestate (equipement, storage)

    I Prove that digestate is better than compost, i.e. mineralization of organic N is

    favorable

    Economic issuesI Prove that CAD option is more profitable than farm-scale project, for each individual

    case

    I Fairly share out the benefits between all partners : farmers, waste producers, heatconsumers, plant investor

    I Afford services - storage, spreading - or money for slurry delivering

    I Dont ask for a fee from farmers : slurry is not a waste (except in N-excess areas)

  • 7/31/2019 Christian Coututrier

    14/15

    Non technical barriers

    n6 : CAD operator

    Need for a specialized developer

    I Development costs for a CAD project = some hundreds of k ;

    duration : 4 - 5 years

    I Includes : technical studies ; contracting with farmers, food industry,heat consumers, digestate users ; financement ; environmentalstudies, risks assesment ; planning ; permitting ; contracting withmanufacturers

    I => Specialized business in biogas systems engineering is required,besides partnership with farmers, municipalities, local food-industry

    I Cross-cutting concerns : energy, waste, agriculture => a newprofession

  • 7/31/2019 Christian Coututrier

    15/15

    Conclusion

    Due to the new feed-in tariffs for electricity, a new age is just

    beginning for biogas in France. In particular, biogas fromagriculture is coming back.

    Several CAD projects are under development. They will indicate

    what could be the french way for biogas from agriculture(obvisouly plural).