Page 1: Chip Eng Seng Construction Site Visit

Executive Project Manager Mr. Koh Keow Beng

ITINERARY

Page 2: Chip Eng Seng Construction Site Visit

TAMPINES N6C

1A/1B

Page 3: Chip Eng Seng Construction Site Visit

SITE MAP

Page 4: Chip Eng Seng Construction Site Visit

ITINERARY

TIME ACTIVITY

1300 ARRIVAL & PASS EXCHANGE

1315 IN HOUSE SAFETY INDUCTION

1330 WAH MANAGEMENT

“FALL PREVENTION PLAN”

1400 TOURING EXHIBITS ON INNOVATION & WAH COMPLIANCES

1415 SITE TOUR (BLOCK 601A & 601B)

1530 TEA BREAK

1550 WAH LEADER IN CONSTRUCTION.

“BETTERMENT OF WAH AWARENESS”

1620 Q & A

1635 DEPARTURE FROM TAMPINES N6C 1A/1B

Page 5: Chip Eng Seng Construction Site Visit

ROUTE OF SITE WALK

ASSEMBLY POINT

MTBM AREA 601A 601B

ASSEMBLY POINT 601A 601B ASSEMBLY POINT

Page 6: Chip Eng Seng Construction Site Visit

CONTINGENCY PLAN

IN CASE OF ADVERSE WEATHER CONDITIONS, ALL TO

PROCEED TO CES SITE MEETING ROOM . TWO VIDEO SLIDE

SHOWS WILL BE PRESENTED:

“PRECAST PLANKS INSTALLATION”

“DOUBLE TIER COLUMN INSTALLATION”

Page 7: Chip Eng Seng Construction Site Visit
Page 8: Chip Eng Seng Construction Site Visit

WSH Officer Swee Ken Peng

Safety Introduction Training

Page 9: Chip Eng Seng Construction Site Visit
Page 10: Chip Eng Seng Construction Site Visit

TITLE:

PROPOSED PUBLIC HOUSING DEVELOPMENT

COMPRISING 6 BLOCKS OF 14 STOREY, 1 BLOCK OF 15

STOREY & 8 BLOCKS OF 16 STOREYS FLATS, 2 STOREY

CARPARK WITH ROOF GARDEN, COMMERCIAL &

COMMUNAL FACILITIES, PRECINCT PAVILIONS AND ESS

AT TAMPINES AVE 9 WITH PROPOSED PARK (TAMPINES N6

C1A & 1B WITH PARK) TAMPINES PLANNING AREA

Page 11: Chip Eng Seng Construction Site Visit

11

SITE LOCATION

Gate 1 Gate 2

Residential Blocks

Page 12: Chip Eng Seng Construction Site Visit

12

Page 13: Chip Eng Seng Construction Site Visit

There are male and female toilets situated at the ground level of the site

office.

For female visitors please do ask for the lock combination number from

our site admin.

FEMALE MALE

Page 14: Chip Eng Seng Construction Site Visit
Page 15: Chip Eng Seng Construction Site Visit
Page 16: Chip Eng Seng Construction Site Visit

16

Safety

Helmet with chin strip

Visitors Pass

Safety Shoes

Page 17: Chip Eng Seng Construction Site Visit
Page 18: Chip Eng Seng Construction Site Visit

Siren will be blasted by tower

cranes

during an emergency

evacuation. In an orderly

manner, all visitors are to

assemble at assembly point.

DO NOT PANIC and run in

haphazard manner. Keep calm

while proceeding to assembly

point.

We are here

601A & BMai

n

Gat

e

Assembly

Point

Page 19: Chip Eng Seng Construction Site Visit
Page 20: Chip Eng Seng Construction Site Visit

Lifting areas are cordoned off with red & white tape / temporary movable barricades and

warning signage are displayed to alert and warn all Stakeholders

“DO NOT ENTER INTO THE LIFTING ZONE”.Kindly consult consent from the individual by Lifting Supervisor before entering the lifting

zone.

Page 21: Chip Eng Seng Construction Site Visit

21

Be aware of protruding rebar, slippery roads etc when walking on site.

Page 22: Chip Eng Seng Construction Site Visit

Do NOT goof/play or conduct horse

play on site.

Be aware of your surroundings and

follow the traffic rules.

SAFETY IS ALWAYS FIRST.

THANK YOU FOR YOUR COOPERATION

HOPE YOU HAVE AN ENJOYABLE TIME

ON BOARD TAMPINES N6C 1A/1B

Page 23: Chip Eng Seng Construction Site Visit

Presentation by

WSH Officer Swee Ken Peng

Fall Prevention Plan

Page 24: Chip Eng Seng Construction Site Visit

Prepared By:

_________________________

WSHO Swee Ken Peng

Approved By:

_________________________

EPM Koh Keow Beng / PM Qin Xu HuiRev 20

19th Oct 2016

Fall Prevention Plan For

Tampines N6C1A/C1B

Page 25: Chip Eng Seng Construction Site Visit

Project information

25

PROPOSED PUBLIC HOUSING DEVELOPMENT COMPRISING 6

BLOCKS OF 14-STOREY, 1 BLOCK OF 15-STOREY & 8 BLOCKS

OF 16 STOREYS FLATS, 2-STOREY CARPARK WITH ROOF

GARDEN, COMMERCIAL & COMMUNAL FACILITIES, PRECINCT

PAVILIONS & ESS AT TAMPINES AVENUE 9 WITH PROPOSED

PARK (TAMPINES N6 C1A & 1B WITH PARK) (TAMPINES

PLANNING AREA

Page 26: Chip Eng Seng Construction Site Visit

Policy for Fall Prevention

Chip Eng Seng Contractors (1988) Pte Ltd is committed in providing a safe work environment for itsemployees to prevent occupational injuries due to falls.

Fall Prevention Plan is an integral part of our commitment to a safe working environment. At any timewhen worker is exposed to fall from height hazards, we will implement control measures fromengineering controls to PPE to reduce the risk level.

Fall Prevention is achieved through hierarchy controls that will involve all levels of management.Supervisors and workers are expected to access the risks associated with the task and ensure thatproper mitigation is in place to protect them while climbing and working at height. Where worker isunsure of the methods, equipment or procedures to reduce the risk they are to seek direction fromtheir supervisors

The application of this policy shall be outlined within the fall prevention plan and shall be responsibilityof every worker within the company. This policy is supported by the highest level of management andshall be enforced without exception. CES is committed to reduce and ultimately eliminate anyaccident/incident resulting from working at height.

26

Page 27: Chip Eng Seng Construction Site Visit

Purpose of Fall Prevention Programme

• To Establish Guidelines And Procedures To Protect Everyone Engaged InExternal & Internal Work Activities That Expose Them To Potentials FallsFrom Heights And & Falling Objects And Various Rescue Methods.

• To Implement Guidelines And Procedures Through Effective Education /Training, Substitution, Engineering & Administrative Controls AndEnforcement To Meet Corporate Objective In Eliminating Accidents DueTo Fall From Height Therefore Achieving Zero Accidents

27

Page 28: Chip Eng Seng Construction Site Visit

ResponsibilitiesMr. Swee Ken peng (WSHO) is appointed as competent person to develop, implement, maintain and evaluate the Fall Prevention Plan.

Employer

Ensure that there is proper allocation of manpower and resources to ensure that the procedure is implemented at all site and reviewing the FPP quarterly with EHS department to ensure its effectiveness.

Employee

• Responsible for complying with the procedure•To bring management’s attention of any unsafe or hazardous conditions and practices that may cause injury to either themselves or any other employees•Understand and adhere to the procedures outlined in this Fall Prevention Plan.•Report of any incident/ near misses that may cause injuries to the workers

Executive Project Engineer/Project Engineer/Site Manager /Site Supervisor/Archi Coordinator/ M&E Coordinator

•Responsible for implementing the procedure on site•Ensure that workers are trained and briefed on the hazards and control measures before commencement of work.•Ensure that workers are donned in the correct type of PPE and also ensure the correct use of the PPE.•Responsible for monitoring compliance.•Ensure that all required resources are available before commencement of work.•Participate in formulation and review of FFP

28

Page 29: Chip Eng Seng Construction Site Visit

Responsibilities

Site EHS Department

• Responsible in monitoring compliance with procedures, routine inspection for works at height.• Identification of high risk activities during the joint conduction of Risk Assessment and Safe Work Procedures and recommendation of control measures to minimise the risk level• Conduct training to the employees and supervisors in recognising fall hazards and use of fall restraints and fall arrest system• Review of the FPP with relevant stakeholders to ensure its effectiveness

29

Page 30: Chip Eng Seng Construction Site Visit

ResponsibilitiesWork at Height Supervisor

1.To ensure that the person working at height in a workplace only after he has received adequate safety and health training to familiarize himself with the hazards associated with work at height and the precautions to be observed.2.To inspect and ensure any travel restraint system or any fall arrest system to be used in a workplace to carry out at the workplace any work at height are in good working conditions and are safe to use.3.To inspect and ensure the anchorage and anchorage line of the travel restraint system or fall arrest system at the start of every work shift to ensure that they are in good working conditions and are safe for use. 4.To immediately remove from service and such anchorage or anchorage line which is found to be defective.5.To immediately enters the results of every inspections referred to in sub-paragraph (2 & 3 ) into a register containing such details as may be required by the Commissioner before the end of the work shift.6.To ensure no hazardous work at height without permit to work.7.To ensure application for a permit-to work to carry out any hazardous work at height shall be made by the supervisor of the person who is to carry out the hazardous work at height.8.Briefs / trains workers on the safe work procedures, risk assessment, in-house rules and regulations, and othersafety requirements in Tool Box Meetings or other appropriate training means, as applicable, and maintain such training records.9.To ensure PPE and fall prevention equipment are adequate and in good conditions (eg. Safety helmet, safety boots, safety belt / harness and hand gloves, etc).10.To ensure safe means of access or egress to the work area are provided

30

Page 31: Chip Eng Seng Construction Site Visit

ResponsibilitiesWork at Height Supervisor

11.To ensure all persons subjected to falling risks are equipped with Personal Fall Arrest System (PFAS).12.To ensure edge protection provided when there is falling risk.13.To inspect anchorage and lifeline installed.14.To ensure travel restraint system used to exclude persons from falling risk.15.To ensure material, equipment and work tools are placed at least 1m away from edges of building.16.To ensure materials, equipment and work tools are checked and free of damage or defect.17.To ensure adequate lightings are provided along the access and the work area.18.To ensure adequate and secured life line with padding against wear and tear are provided.19.To ensure barricade are erected to prevent fall from height.20.To ensure work area in good working conditions.21.To ensure safety measures are implemented before apply the Permit To work.22.To ensure personnel are adequately trained to perform work at height.23.As a Risk Assessment team member to supports the WSH Officer in the identification of measures in the safe work procedures / practices and risk assessment report for works intended for execution24.As an Emergency Rescue Team member shall assist ERT Warden and Emergency Coordinator during an emergency rescue operation.25.As a member of site organization (refer to the Organization chart) you have to follow the instruction from the Project Director , Project Manager and to guide the supporting staffs

31

Page 32: Chip Eng Seng Construction Site Visit

ResponsibilitiesWork at Height Assessor

1.Assess whether all reasonably practicable measures have been taken to ensure the safety and health of the person who will be carrying out the hazardous work at height; and2.inspect the site (including its surroundings) where the hazardous work at height is to be carried out together with the supervisor of the person who is to carry out the work, to ensure that the hazardous work at height can be carried out with due regard to the safety and health of the person and any other person at work in the factory who may be affected.3.If the work-at-height safety assessor is satisfied that the hazardous work at height can be carried out in the factory with due regard to the safety and health of persons who are to carry out the hazardous work at height and of other persons at work in the factory who may be affected, he shall endorse the application for the permit-to-work and forward the endorsed application to the authorised manager.4.It shall be the duty of the work-at-height safety assessor to exercise all due diligence when performing his functions in relation to the evaluation and endorsement of an application for a permit-to-work under paragraphs (1) and (2).

32

Page 33: Chip Eng Seng Construction Site Visit

ResponsibilitiesWork at Height Authorised Manager

The authorized manager for any hazardous work at height at a factory may issue a permit-to-work in relation to any hazardous work at height which is to be carried out in the factory if the authorised manager is satisfied that

1.there has been a proper evaluation of the risks and hazards involved in the carrying out of the work based on the available information;2.no incompatible work which may pose a risk to the safety and health of other persons at work in the factory will be carried out at the same time in the same vicinity as the hazardous work at height;3.all reasonably practicable measures will or have been taken to ensure the safety and health of the persons who carry out or are to carry out the hazardous work at height; and4.all persons who are to carry out the hazardous work at height are informed of the hazards associated with it.5.An authorised manager who issues a permit-to-work in respect of any hazardous work at height shall retain a copy of the permit-to-work.6.It shall be the duty of the authorised manager to exercise all due diligence when performing his function in relation to the issuance of a permit-to-work under paragraph (1).7.Subject to regulation 28, a permit-to-work shall be valid for the period stated therein, and if the hazardous work at height for which the permit-to-work is issued is not completed within the validity period, a fresh application shall be made in accordance with regulation 22.

33

Page 34: Chip Eng Seng Construction Site Visit

List Of Applicable Legal And Other Requirements Relevant To The Fall Prevention Plan

• Workplace Safety and Health Act• Workplace Safety and Health (Amendments) Acts 2008• Workplace Safety and Health (General Provisions) Regulations• Workplace Safety and Health (Construction) Regulations• Workplace Safety and Health (Risk Management) Regulations• Workplace Safety and Health (Incident Reporting) Regulations• Workplace Safety and Health (Scaffolds) Regulations 2011• Workplace Safety and Health (Working At Height) Regulations 2013• Workplace Safety and Health (Working At Height) Regulations 2014 Amendment• Singapore Standards CP 14: 1996 – Code of Practice for Scaffolds• Singapore Standards CP 20: 1999 - Code of Practice for Suspended Scaffolds• Singapore Standards CP 63 : 1996 (2005) – Code of Practice for The Lifting of Persons in Work Platforms suspended from

Cranes• Singapore Standard CP 79 : 1999 – Code of Practice for Safety Management System for Construction Worksites• Singapore Standard SS 506: Part 1: 2009 – Specification for OSH Management System• Singapore Standard SS 506: Part 2: 2009 – General Guidelines for the implementation of OSH Management System• Singapore Standard SS 508: Part 5: 2013 Graphical symbols — Safety colours and safety signs—Registered Safety Sign • Singapore Standard SS 528: Part 1: 2006- Personal Fall Arrest System: Full Body Harness• Singapore Standard SS 528: Part 2: 2006- Personal Fall Arrest System: Lanyards and Energy Absorber• Singapore Standard SS 528: Part 3: 2006- Personal Fall Arrest System: Self-retracting lifelines• Singapore Standard SS 528: Part 4: 2006- Vertical Rails and Vertical lifelines incorporating a sliding type fall arrestor• Singapore Standard SS 528: Part 5: 2006- Connectors with self locking and self closing gates• Singapore Standard SS 528: Part 6: 2006- Specifications for fall arrest system :System Performance Test • Singapore Standard SS 536 : 2008 – Code of Practice for the Safe Use of Mobile Cranes (Formerly CP 37 : 2000)• Singapore Standard SS 580 : 2012 - Code of Practice for Formwork• Singapore Standard SS 559 : 2010 – Code of Practice for Safe Use of Tower Crane • Code of Practice for Working Safely at Height (Published October 2009 by MOM)• Code of Practice for Working Safely at Height 2013• CES In-House Rules and Regulations

34

Page 35: Chip Eng Seng Construction Site Visit

Company Procedures For Compliances

To Set Up A Sub Committee For All Relevant Sub

Contractors Responsible For Fall Prevention Plan And

As Well As The Rescue Parties Together With The

Rescuing Procedures & Methods.

35

Page 36: Chip Eng Seng Construction Site Visit

Hazard Identification and Risk Assessment

Formulation of Risk Assessment and SWP

Contract Awarded

Kick Off Meeting

Formation Of RA Team

Hazard Identification

Risk Evaluation

Implementation Of Control

Measures

Residual Risk Evaluation

Additional Control Measures

Signature and Approval

Implementation

Monitoring

Review

Work Completed

RA to be Jointly Conducted By RA Team

which consists of CES Staff and Sub con

relevant personnel.

Through monitoring, CES will evaluate to

ensure that all control measures adopted

are effective to minimise the risk level to as

low as reasonably practicable if not a review

to be done.

Objective of the meeting is to inform the

Subcon on the requirements of CES and

other statutory requirements.

Scheduled of Kick Off Meeting within two

weeks.

Endorsement By RA Team And Approval

By Site Top Management Representative

36

Page 37: Chip Eng Seng Construction Site Visit

Hazard Identification and Risk Assessment

5 * 5 Matrix to use to evaluate the

risk level

37

Page 38: Chip Eng Seng Construction Site Visit

Types of Training

1. Safety Kick-off Meeting Before Work Commencement

2. In- House Safety Induction Course Before Work Commencement

3. Weekly In House Training By Sub-Con

4. Specific Work Training By Sub-con

5. Weekly Mass Tool Box Training By Safety Personnel

6. Monthly Safety Committee Meeting / Weekly Site Inspection

7. Safety Promotion To Raise Awareness

8. Implementing FPP to All Workers Associated With Working At

Height

38

Page 39: Chip Eng Seng Construction Site Visit

Various Types of Inspection Frequency

1. Daily Inspection By WSHO.

2. Daily & Spot Check Inspection By CES WSHS

3. Standing Supervision By Sub Con WSHS

4. Weekly Safety Committee Inspection By WSHO

5. Weekly Scaffold Inspection By Scaffold Supervisor

6. Monthly Corporate Inspection

7. Weekly P&T Consultants Inspection

8. Quarterly HDB Audit

9. Ad-Hoc Inspection By WSHO & EPM.

39

Page 40: Chip Eng Seng Construction Site Visit

Summary of Work Activities That Requires Fall Prevention Plan

1. Repair And Maintenance Works And Refilling Diesel Operation On The Boring Rig.

2. Setting Up And Dismantling Of Kent ledge Operation.3. Use Of Man cage To Access For Setting Up And Dismantling Of Kent ledge

Operation. 4. Measurement Works And Welding Works Near Bored Hole.5. Installation of Slot On Barricade Near Bored Hole.6. Installation of 6m high hoarding. (Hoarding Post Runner)7. Installation of 6m high hoarding. (Hoarding Panel /Zinc sheet)8. Installation Of Runner. (Construction of Site Office and Worker Quarter)9. Installation Of Corridor Access. (Construction of Site Office and Worker

Quarter)10. Installation Of Corridor Railing. (Construction of Site Office and Worker

Quarter)11. Installation Of Corridor Railing and Overhang shelter using Boom Lift.12. Installation of Main Beam. (Construction of Site Office and Worker Quarter)

40

Page 41: Chip Eng Seng Construction Site Visit

Various Rescuing Methods1. Personnel

Victim is accessible by rescue team. Rescue Team need not use any rescue equipment

2. Man-Cage• Victim Is Not Accessible By Rescue Team. Use Of Man Cage Hoisted By Crawler

Crane To Bring The Victim Down.

3. For Difficult Cases-To call SCDF and wait for SCDF experts to arriveClassification of Difficult Cases

• Victim Fainted Eg. Unconscious, No Response to call• Unreachable by Rescue Team even using method 2 and 3.• Got Stuck in Structure – Rebar , Starter Bar or Concrete Structure etc.• Victim complaining about extreme pain when touched.• Injured sustain fractures or serious injuries• Body Torn Apart• Death Cases

41

Page 42: Chip Eng Seng Construction Site Visit

Various Rescuing Methods

To use the following machineries if available to reach the victim by using pull in method.

Scissor Lift Boom Lift

Machinery

42

Page 43: Chip Eng Seng Construction Site Visit

Various Rescuing Methods

To use the following machineries if available to reach the victim by using pull in method.

Man Cage

Machinery

43

Page 44: Chip Eng Seng Construction Site Visit

Various Rescuing Methods

Rescue Methods

Rescue by using a rope as temporary measure to wait for rescue

44

Page 45: Chip Eng Seng Construction Site Visit

Various Rescuing Methods

Rescue Methods

Recovery position after rescuing

This recovery position shall be briefed to all rescuer or site personnel after

victim is being rescued which should be maintained as follow

45

Page 46: Chip Eng Seng Construction Site Visit

Fall Protection equipment

Maintenance of Fall Protection Equipment

• Daily inspection by sub-con WSHS during daily tool box

meeting

• Weekly Inspection shall be conducted on individual full body

safety harness & man cage by sub-con WSHS on respective

inventories and witnessed by CES WSHS Ramesh

• Checklists of the Inspection shall be kept on site and made

readily available for verification

46

Page 47: Chip Eng Seng Construction Site Visit

Fall Protection equipment

Check points for Full Body Safety Harness

FULL BODY

SAFETY HARNESS

(with Shock Absorber)

1) Webbing : Check that the webbing has no frayed

edges, loose or broken stitching, burns and cuts.

2) Lanyard : Check that the lanyard has no frayed

edges, loose or broken stitching, burns and cuts.

3) D-Ring / Dorsal Anchor Point : Check that the D-

Ring is not cracked or distorted.

4) Buckle : Check that the buckle is not loose, broken

or distorted.

5) Shock Absorbers: Check for any wear and tear of

the material.

47

Page 48: Chip Eng Seng Construction Site Visit

Fall Protection equipment

Proper Wearing of Safety Harness

Step 1

Hold your harness by the "D" ring and

shake out any kinks, ensuring the

straps are not tangled or twisted.

Step 2

Hold the harness up by the shoulder straps

and ensure leg straps hang free.

Step 3

Pass your arms through shoulder straps

48

Page 49: Chip Eng Seng Construction Site Visit

Fall Protection equipment

Proper Wearing of Safety Harness

Step 4

Connect the chest buckle.

Step 5

Adjust the rear “D” so that it is

between the shoulder blades and

within the users reach. A rear “D”

that is too high or too low will

cause the body to take an

undesirable position during a fall

arrest situation. 49

Page 50: Chip Eng Seng Construction Site Visit

Fall Protection equipment

Proper Wearing of Safety Harness

Step 6

Pull the harness down at the back so

the sub pelvic strap sits under the

buttocks. DO NOT twist or cross the

straps.

Step 7

Connect the leg buckles and adjust

all webbing so that the harness fits

comfortably without restricting free

movement or pinching.

50

Page 51: Chip Eng Seng Construction Site Visit

Emergency Response & Rescue Team (ERRT)

51

Page 52: Chip Eng Seng Construction Site Visit

Emergency Response & Rescue Team (ERRT)

52

Page 53: Chip Eng Seng Construction Site Visit

Rescue Procedures Adopted By Site Management

• Upon Accident Occurred

• Site Main Controller (EPM Koh Keow Beng / PM Qin Xuhui) To Assess Situation and Make Decision

• Concurrently, Site Clerk activate SCDF Via calling 995 (If Needed)

• Site Incident Controller (WSHO Swee Ken Peng / WSHC Palani & Kevin Lam) Activate All Rescue Personnel on Standby and Stop All Work Activities.

• Site Main Controller Together With All Rescue Team To Decide Which Rescue Method Is More Feasible (Based on Victim’s Condition and Location)

• Decision & Method To Be Made For The Rescue And The Action.

• Based on decision by Site Main Controller (EPM Koh Keow Beng / PM Qin Xuhui), Site Incident Controller (WSHO Swee Ken Peng / WSHC Palani & Kevin Lam) lead Emergency Recue Team (based on availability) to safely bring down the victim.

• First Aider (WSHC Palani & Kevin Lam) To Apply First Aid For Victim If Necessary.

• Traffic Marshal (Murugesan) To Clear The Way For SCDF And Ambulance

• Arrival Of SCDF

• Site Main Controller (EPM Koh Keow Beng / PM Qin Xuhui) Report The Situation To The SCDF Officer

53

Page 54: Chip Eng Seng Construction Site Visit

Work Activities

for

General Works

54

Page 55: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresConstruction Worker Quarter Zinc Roofing (CES)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

Zinc Roof at

Worker Quarter

Engineering Controls

Provision of proper work platform for worker to

access to the working height.

Administrative Controls

1.Permit to Work to applied to ensure all safety

measures are complied.

2.RA and SWP briefing to the workers prior to

commencement of work

3. Scaffold erect and inspect by qualified Erector

and Supervisor.

4. Do not climb over the guardrail of the scaffold

5. Work within the work platform of the scaffold

PPE

All Workers to be equipped with Safety Harness

and anchored to the guardrail of the mobile

scaffold

Responsible Person-

1.WSHC Palani

2.WSHC Kevin Lam

3.WSHS Rajes

4.WSHS Rahman

5.WSHS Kartick

6.WSHS Maha

7.WSHS Rana

8.WSHS Mahbub

9.WSHS Sundaram

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

55

Page 56: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection of Barricade At Excavation Pit (CES)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection of

Barricade At

Excavation Pit &

Trench

Engineering Controls

Provision of Fall Restrain System for workers

erecting the barricade

Administrative Controls

1.Daily Toolbox briefing

2.RA and SWP briefing to the workers prior to

commencement of work

3. Training by WSH Personnel

4. Use of restrain system to erect the barricade at

the edge of excavation

PPE

All Workers to be equipped with Safety Belt and

anchored to Horizontal Life Line

Responsible Person-

1.WSHC Palani

2.WSHC Kevin Lam

3.WSHS Rajes

4.WSHS Rahman

5.WSHS Kartick

6.WSHS Maha

7.WSHS Rana

8.WSHS Mahbub

9.WSHS Sundaram

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

56

Page 57: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresMaintenance Works At ECM (CES)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Maintenance

Works At ECM

Engineering Controls

Provision of safe means access to ECM

treatment tank

Administrative Controls

1.Daily Toolbox Briefing

2. RA and SWP briefing to the workers prior to

commencement of work

3. Inspection by WSHS to ensure the stability of

safe mean access

PPE

All Workers to be equipped with belt and

anchored to the guardrail

Responsible Person-

1.ECO Nurul

2.WSHC Palani

3.WSHC Kevin Lam

4.WSHS Rajes

5.WSHS Rahman

6.WSHS Kartick

7.WSHS Maha

8.WSHS Rana

9.WSHS Mahbub

10.WSHS Sundaram

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

57

Page 58: Chip Eng Seng Construction Site Visit

Work Activities

for

Structural Works

58

Page 59: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresWorking at Excavated Pit & Trench

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Carried out work

in Excavated Pit

& Trench

Engineering Controls

Provision of proper access/egress into the

excavated trench

Administrative Controls

1.Supervisor to ensure that the trench has been

inspected at least by site engineer daily and after

every downpour and COS for excavated trench

has been received

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by WSH Personnel to ensure the

stability and rigidity of the access

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

59

Page 60: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresWorking at Excavated Pit & Trench

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection Of

Barricade on

Pile cap

Engineering Controls

Provision of proper access/egress for safety

workers to access to the top of pile cap to install

the top rail and mid rail.

Administrative Controls

1.Training on sequential steps on safe erection of

barricade on pile cap conducted to all relevant

stakeholders before commencement of work

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4. Inspection by WAH Supervisor

PPE

Workers are equipped with safety harness and

WAH Supervisor to ensure that all personnel

involved in the activities are anchored properly to

a secured point . Eg the rebar column

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

60

Page 61: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresConcreting Works at Height

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Concreting Works

At Height

Engineering Controls

Provision of Barricade to edge of Pilecap and

proper access/egress point

Administrative Controls

1.Permit to Work to applied to ensure all safety

measures are complied.

2.RA and SWP briefing to the workers prior to

commencement of work.

3. Inspection by WAH Supervisor

PPE

Workers are equipped with safety harness or

safety belt and WAH Supervisor to ensure that

all personnel involved in the activities are

anchored properly to guardrail

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

61

Page 62: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresRebar Works At Heights 4.3 m

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Rebar Works Engineering Controls

Provision of proper working platform- mobile

scaffold

Administrative Controls

1.Use of mobile scaffold to access to the column

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4. Provision of Mobile Scaffold erected by

qualified erector and inspect by Scaffold

Supervisor

5. Workers to stand and work within the platform

and anchored their safety harness to the

guardrail

6. Scaffold erect by ASC

PPE

Worker to put on safety harness and anchorage

onto the guardrail of the mobile scaffold .

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

62

Page 63: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresConstruction of External Staircase & Wall Form At Height

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Construction of

External Staircase

& Wall Form

Engineering Controls

Provision of proper working platform – mobile scaffold

Administrative Controls

1.Use of mobile scaffold for erection of formwork for

the wall

2.Scaffold access to the external staircase erect by

qualified erector and inspect by Scaffold Supervisor

3.Permit to Work to applied to ensure all safety

measures are complied.

4.RA and SWP briefing to the workers prior to

commencement of work

5. Inspection by WSHS and WAH Supervisor

6. Scaffold erect by ASC

7. Workers to stand and work within the platform and

anchored their safety harness to the guardrail .

8 Worker must not climb over the guardrail and only

work within the work platform

9. Scaffold to be sit on firm concrete ground

PPE

Safety harness anchorage to guardrail of the mobile

scaffold

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

63

Page 64: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresConstruction of 4.3 Column

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Construction of

4.3 Column

Engineering Controls

Provision of proper working platform – mobile

scaffold and work bench

Administrative Controls

1.Use of mobile scaffold for erection of formwork

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4. Inspection by WSHS and WAH Supervisor

5. Scaffold erect by ASC

6. Workers to stand and work within the platform

and anchored their safety harness to the

guardrail

7. Use of work bench for working height less than

2.5m

PPE

Safety harness anchorage to guardrail of the

mobile scaffold

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

64

Page 65: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresFormworks Erection & Dismantle of Formwork ( Height Not More Than 3m)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Formworks

Erection &

Dismantle

(Height not more

than 3m)

Engineering Controls

Provision of Work Bench

Administrative Controls

1.Usage of work bench to erect and dismantle of

formwork

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4. Inspection by WSHS and WAH Supervisor

5. The work bench must be placed on the level

ground.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department .

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

65

Page 66: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresInstallation of Lift Shaft Platform

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

Lift Shaft

Platform

Engineering Controls

1.Provision of work platform

Administrative Controls

1.Training of Installation of Lift Shaft Platform

was conducted

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, WSHS and WAH

Supervisor

5. Use of Work Bench

PPE

Safety Harness anchorage at the lift line provided

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong (

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

66

Page 67: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection of False Work At First Storey Slab (Not more than 4m)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection of False

Work At First

Storey Slab Not

more than 4m

Engineering Controls

1.Provision of safe work platform

Administrative Controls

1.Ensure at least 500mm work platform provided

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, Formwork Supervisor

WSHS and WAH Supervisor

PPE

Safety Harness anchored to the scaffold frame

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

67

Page 68: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection & dismantling of column formwork

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection &

dismantling of

column

formwork

Engineering Controls

1.Provide of scaffolding platform

Administrative Controls

1.Ensure at least 500mm work platform provided

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, Formwork Supervisor

WSHS and WAH Supervisor

PPE

Safety Harness anchored to the scaffold frame

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

68

Page 69: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection & dismantling of ceiling shade formwork

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection &

dismantling of

ceiling shade

formwork

Engineering Controls

1.Provide of scaffolding platform

Administrative Controls

1.Ensure at least 500mm work platform provided

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, Formwork Supervisor

WSHS and WAH Supervisor

PPE

Safety Harness anchored to the scaffold frame

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

69

Page 70: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection & dismantling of staircase wall formwork

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection &

dismantling of

staircase wall

formwork

Engineering Controls

1.Provide of scaffolding platform

Administrative Controls

1.Ensure at least 500mm work platform provided

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, Formwork Supervisor

WSHS and WAH Supervisor

PPE

Safety Harness anchored to the scaffold frame

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

70

Page 71: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection and dismantling of column formwork

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection &

dismantling of

column

formwork

Engineering Controls

1.Provide of scaffolding platform

Administrative Controls

1.Ensure at least 500mm work platform provided

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, Formwork Supervisor

WSHS and WAH Supervisor

PPE

Safety Harness anchored to the scaffold frame

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

71

Page 72: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection and dismantling of GI props at kitchen yard

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection &

dismantling of GI

propping at

kitchen yard

Engineering Controls

1.Provide of scaffolding platform

Administrative Controls

1.Ensure at least 500mm work platform provided

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, Formwork Supervisor

WSHS and WAH Supervisor

PPE

Safety Harness anchored to the scaffold frame

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

72

Page 73: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresWork at the edge of the building (Air Con Ledge)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Work at the edge

of the building

(Air Con Ledge)

Engineering Controls

Provision of hard barricade

Administrative Controls

1.Training on work at edge of the building (air

con)

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto the water pipe opening

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

73

Page 74: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresWork at the edge of the building (Air Con Ledge & yards)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Work at the

edge of the

building (Air

Con Ledge &

Yards) use of

safety screen

Engineering Controls

Provision of Safety Screen

Administrative Controls

1.Training on work at edge of the building (air

con)

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the Precast lifting

points

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

74

Page 75: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection and dismantling of formwork along corridor

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection &

dismantling

Formwork along

corridor

Engineering Controls

1.Provision of hard barricade

No erection and dismantling of falsework and

formwork are allowed when scaffolding were

dismantled and in the mid of provision of safety

screen.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.CES PE Mike Phui / Individual block engineers

6.EHS Department

Responsible person are to inform and educate all

relevant workers performing the work activities

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

75

Page 76: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection and dismantling of formwork along corridor

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection &

dismantling

Formwork along

corridor

Engineering Controls

1.Provide of scaffolding platform

Administrative Controls

1.Ensure at least 500mm work platform provided

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, Formwork Supervisor

WSHS and WAH Supervisor

PPE

Safety Harness anchored to the scaffold frame

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.CES PE Mike Phui / Individual block engineers

6.EHS Department

Responsible person are to inform and educate all

relevant workers performing the work activities

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

76

Page 77: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresWork at along of the corridor

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good

Business Sense

Work at along the

corridor

(falsework &

formwork erection

& dismantling)

Elimination Controls

Timber to be installed at ground level before hoisting

to eliminate the risk of workers exposed to falling from

the edge of the building or any open sides.

Engineering Controls

1.Provision of Safety screen.

Administrative Controls

1.Training on work at edge of the building (air con)

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, WSHS and WAH Supervisor

PPE

Safety Harness anchored on the Precast lifting points

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

5.CES PE Mike Phui / Individual block engineers

6.EHS Department From

Responsible person are to inform and educate all

relevant workers performing the work activities

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

77

Page 78: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresWork at the edge of the building (Air Con Ledge & yards)

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Work at the edge

of the building (Air

Con Ledge &

Yards) use of

safety screen

Engineering Controls

Provision of Scaffolding

Administrative Controls

1.Training on work at edge of the building (air

con)

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the Precast lifting

points

Responsible Person-

1.Responsible Person-

2.Site Manager Sun Xin Lou

3.Project Manager Lou Xian Zhong

4.Site Manager Tai Teck Whong

5.Site Supervisor (Formwork, Rebar, Precast &

Concreting)

6.CES PE Mike Phui / Individual block engineers

7.EHS Department From

Responsible person are to inform and educate all

relevant workers performing the work activities

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

78

Page 79: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresWork at the void area

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Work at the

Void area

Engineering Controls

Provision of hard barricade

Administrative Controls

1.Training on work at edge of the building.

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto RC column

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

79

Page 80: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF BARRICADE FOR THE STAIRCASE CORRIDOR

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

barricade for the

staircase corridor

Engineering Controls

Provision of anchorage point on the staircase corridor

for worker to anchor their safety harness while

installing barricade along the edge of the building

Ensure that there is proper access and egress

(temporary metal staircase)

Administrative Controls

1. Training on Safe Installation of staircase corridor for

workers by CES WSHC

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work

4. Supervisor to ensure that proper anchorage point is

selected (Lifting Point of precast wall)

5. Precast Supervisor ,CES WSHC and Sub

contractor WSHS to check on the worker safety

harness before worker commences their precast

installation.

6. Precast supervisor to ensure all workers are

hooking their safety harness on the anchorage point

before work commences

PPE

Workers to wear safety harness and anchored to the

guardrail of the barricade

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

80

Page 81: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESWORK CARRIED OUT NEAR OR AT THE VOID AREA OF THE BLOCK

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Work carried out

near or at the

void area of the

block

Engineering Controls

Ensure that there is proper access and egress

(temporary metal staircase)

Provision of anchorage point on the rebar

structure or precast beam for worker to anchor

their safety harness while installing working

platform

Administrative Controls

1. Permit to Work to applied to ensure all safety

measures are complied.

2. RA and SWP briefing to the workers prior to

commencement of work

PPE

Workers to be equipped with effective fall arrest

system with adequate lifeline used

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

81

Page 82: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF PRECAST PLANKS

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation Of

Precast Planks

Engineering Controls

1. Provision of SRL & easy barricade for worker to anchor

their safety harness while installing precast slab and floor

opening cover with BRC mash.

2. Ensure that there is proper access and egress (temporary

metal staircase).

3. Site engineer to plan the sequence of installing the precast

slab to prevent from overlapping to other precast slab that

can cause worker to fall from height.

Administrative Controls

1.Training on Safe Installation of precast component planks

to workers by CES WSHC

2.Permit to Work to applied to ensure all safety measures are

complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Supervisor to ensure that proper anchorage point is

selected (Lifting Point of precast slab)

5.Precast Supervisor ,CES WSHC and Sub contractor WSHS

to check on the worker safety harness before worker

commences their precast installation.

6.Precast supervisor to ensure all workers are hooking their

safety harness on the anchorage point before work

commences

7. Implementation of Color Flag System – Yellow

8. Only appointed personnel shall allowed to carry out the

work

PPE

Workers to anchored the safety harness to the life lines

anchored to the anchor point at the slab

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast & Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

82

Page 83: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESPRECAST SLAB INSTALLATION WORK CARRIED OUT AT 2ND STOREY OF THE CONSTRUCTION LEVEL AND OTHER LEVEL

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Precast slab

installation work

carried out at

2nd storey of the

construction

level and other

level

Engineering Controls

1. Provision of barricade with netting surrounding the

construction level for workers to carry out precast slab

installation

2. Provision of metal tagging to cover the opening gap

that the precast slab fails to install

Administrative Controls

1. WSH supervisor to ensure all workers are hooking

their safety harness on the anchorage point on the

constructed rebar to prevent the workers from falling

from height.

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work

4. CES WSHC, WSHS and Sub contractor WSHS to

check and ensure the erected barricade is safe to use.

5. CES WSHC, WSHS and Sub contractor WSHS to

inform worker to hook their safety harness on the

lifting point of the precast slab or temporary barricade

area

6. Implementation of Clour Flag System – Yellow

7. Only appointed personnel shall allowed to carry out

the work

PPE

Safety harness to anchored at the slab anchor or life

lines

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

83

Page 84: Chip Eng Seng Construction Site Visit

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation

&

dismantling

of barricade

at the edge

of the

building at

construction level

Engineering Controls

Provision of PE design for anchorage point on the

floor for precast installers to hook onto to prevent

precast installer from falling from height

Administrative Controls

1.Training of Safe Installation & dismantling of

barricade post at the edge of the building at

construction level to all relevant personnel

2.Permit to Work to be applied and ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Precast Supervisor ,CES WSHC and Sub contractor

WSHS to check on the worker safety harness before

worker commences their precast installation.

5.Precast supervisor to ensure all workers are

hooking their safety harness on the anchorage point

before work commences

6. Implementation of Color Flag System – Red

PPE

All Workers to be equipped with Safety Harness

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department.

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

Fall Prevention MeasuresInstallation & dismantling of barricade at the edge of the building at construction level

84

Page 85: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF PRECAST COMPONENT SUCH AS GABLE END WALL

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

precast

component

such as Gable

end wall.

Engineering Controls

Provision of PE design anchorage point on the

floor for workers to hook on their safety harness

while installing precast component

Administrative Controls

Precast supervisor to ensure all workers are

hooking their safety harness on the anchorage

point before work commences

Permit to Work to applied to ensure all safety

measures are complied.

RA and SWP briefing to the workers prior to

commencement of work

Precast Supervisor ,CES WSHC and Sub

contractor WSHS to check on the worker safety

harness before worker commences their precast

installation.

PPE

Workers to be equipped with safety harness and

anchored to the slab anchor point.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

85

Page 86: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF PRECAST DOUBLE TIER COLUMN

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

precast double

tier column

Engineering Controls

1.Provision of PE design anchorage point on the floor

for workers to hook on their safety harness while

installing precast component

2. Use of Double Tier Ring Ladder

Administrative Controls

1.Precast supervisor to ensure all workers are

hooking their safety harness on the anchorage point

before work commences

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Precast Supervisor ,CES WSHC and Sub contractor

WSHS to check on the worker safety harness before

worker commences their precast installation.

5. PE design for double tier ring ladder

PPE

Workers to be equipped with fall arrest system with

lifeline while accessing to the ring ladder

While installing the double tier , workers to anchorage

on the floor anchor point

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department .

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

86

Page 87: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF WINDOW FAÇADE

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation Of

Window Facade

Engineering Controls

Provision of PE design anchorage point on the

floor for workers to hook on their safety harness

while installing precast component

Administrative Controls

1.Precast supervisor to ensure all workers are

hooking their safety harness on the anchorage

point before work commences

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Precast Supervisor ,CES WSHC and Sub

contractor WSHS to check on the worker safety

harness before worker commences their precast

installation.

PPE

Workers to be equipped with safety harness and

anchored to the slab anchor point.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

87

Page 88: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF BARRICADE MESH

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation Of

barricade Mesh

for Next

Construction

Level

Engineering Controls

1.Barricade mash to be installed at openside.

2.Hook ladder to be use for this installation.

3.Precast lifting lugs to be used as anchorage points.

Administrative Controls

1.WSHS to ensure all workers are hooking their

safety harness on the anchorage point before work

commences

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4. CES WSHS, WSHC and Sub contractor WSHS to

check on the worker safety harness before worker

commences installation of barricade mesh

5. Use of buddy system to hold the ladder while

workers are working at the ladders

6. 2 workers to hold install and hold the barricade

mesh while install on top of façade wall.

PPE

Workers to be equipped with safety harness and

anchored to the slab anchor point.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

88

Page 89: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF PARAPET WALL

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation Of

Parapet Wall

Engineering Controls

1. Provision of lifeline or anchorage point on the

precast slab for worker to anchor their safety harness

while installing the parapet wall

2. Ensure that there is proper access and egress

(temporary metal staircase)

Administrative Controls

1.Training on Safe Installation of precast component

parapet wall to workers by CES WSHC

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Supervisor to ensure that proper anchorage point is

selected (Lifting Point of precast slab)

5.Precast Supervisor ,CES WSHC and Sub contractor

6.WSHS to check on the worker safety harness before

worker commences their precast installation.

7.Precast supervisor to ensure all workers are

hooking their safety harness on the anchorage point

before work commences

PPE

Workers to be equipped with fall arrest system with

lifeline while accessing to the ring ladder

While installing the double tier , workers to anchorage

on the floor anchor point

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

89

Page 90: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF UPPER PROPS TO THE PRECAST STAIRCASE WALL AT THE GROUND LEVEL

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

installation of

upper props to

the precast

staircase wall at

the ground level

Elimination

Installation of the upper prop at the ground level to

eliminate the falling hazard

Administrative Controls

1.Training on Safe Installation of precast component

to workers by CES WSHC

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Precast Supervisor & Lifting Supervisor to ensure

that he upper prop are installed at the ground level

before hoisting to the staircase

5.Precast Supervisor ,CES WSHC and Sub contractor

WSHS to check on the worker safety harness before

worker commences their precast installation.

6.Precast supervisor to ensure all workers are

hooking their safety harness on the anchorage point

provided at the mid landing

PPE

Workers to anchored their safety harness and

anchored to the anchored point at the slab

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

90

Page 91: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF HOUSEHOLD SHELTER

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation

Of Household

Shelter

Engineering Controls

Provision of ladder

Administrative Controls

1. Buddy system must be deployed to hold the

ladder while the rigger perform the rigging and

unrigging and the lifting point of the house hold

shelter

2.Worker to hook up their safety harness on the

rigging lifting point before he commences his

work.

3.RA and SWP briefing to the workers prior to

commencement of work

PPE

Workers to anchored their safety harness and

anchored to the anchored point at the slab

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

91

Page 92: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF PRECAST SUNSHADE ON CONSTRUCTION LEVEL

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

Sunshade

Precast on

construction

level

Engineering Controls

1. Provision of designated anchorage point

2. Provision of life line

Administrative Controls

1.RA and SWP to be briefed to workers before

allowing any work commencement

2.Only precast workers are allowed to enter work

area (demarcated by yellow flag system)

3.To anchor onto designated anchorage point

(marked by red arrow)

PPE

Workers to wear their full body harness with twin

lanyard and anchor to designated anchorage

point (marked by red arrow)

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

92

Page 93: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF SAFETY SCREEN

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation Of

Safety Screen

Engineering Controls

1. Provision of 3m wire rope sling

2. Provision of life line

Administrative Controls

1.WSHS to ensure all workers are hooking their

safety harness on the anchorage point before

work commences

2.Permit to Work to apply to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.WSHS ,CES WSHC and Sub contractor WSHS

to check on the worker safety harness before

worker commences installation of Safety Screen

5. Appointed and qualified Rigger/ Signalman to

carry out the works

6.Rigging and unrigging to be performed on the

construction level. Chain sling of 3m is provided.

PPE

Workers to be equipped with safety harness and

anchored to the anchor point.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

93

Page 94: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF BARRICADES AT PERIPHERAL OVERHEAD SHELTER

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

barricades on

Peripheral

Overhead

Shelter

Engineering Controls

Provision of fully metal deck

Provision of trolley step ladders

Administrative Controls

1.PE Design of POS

2.Ensure 100% tied off when access form the

parapet wall to the POS platform

3.Briefing of RA & SWP

4.Application of PTW

5.Warning signage at the work area

6.Provision of life lines and fall arrestor for

workers installing the barricades

7.Use of trolley ladder to access and egress to

the POS work platform

PPE

Workers to be equipped with safety harness

anchored to the life lines

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong (

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

94

Page 95: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF BARRICADES AT CORRIDOR SLAB

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

barricades at

corridor slab

1) Installation of Barricades for Corridor Slab

Elimination Controls

Barricade posts and mesh barrier with orange

netting were instated onto the precast corridor

slab at the ground level before hoisting to

eliminate the risk of workers exposed to falling

from the edge of the building or any open sides.

Administrative Controls

1)RA, SWP and FPP for such work activities

must be briefed to the workers before allowing

any work commencement

2)Precast Supervisor must inspect the precast

and ensure that the barricades are being instated

before commencing the installation.

3)CES Lifting Supervisor must inspect the

precast and ensure that the barricades were

instated before allowing such hoist

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

95

Page 96: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESRIGGING & UNRIGGING OF PRECAST LOAD COMPONENTS FROM TRAILER BED

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Rigging &

Unrigging of

precast load

components

1) Rigging of precast loads

Administrative Controls

1)RA, SWP and FPP for such work activities

must be briefed to the workers before allowing

any work commencement

2)Precast Supervisor must ensure all tower

crane hook block is provide with a linelife

3)Buddy system to be perform with the CES

lifting supervisor while ascending and

descending of the ladder

4)Training and briefing to be conducted to all

lifting personnel

PPE

1)Safety harness to be wore by the rigger/signal

man to facilitate the safe rigging methods.

2)Fall arrestor system to be use and hook on to

the linelife to ensure rigger expose to any fall

from height hazards.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

96

Page 97: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF BARRICADES AT AIRCON LEDGE

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

barricades at

aircon ledge

2) Installation of Barricades for Air Con Ledge

Elimination Controls

Barricade posts and mesh barrier were instated

onto the precast aircon ledge at the ground level

before hoisting to eliminate the risk of workers

exposed to falling from the edge of the building or

any open sides.

Administrative Controls

1)RA, SWP and FPP for such work activities

must be briefed to the workers before allowing

any work commencement

2)Precast Supervisor must inspect the precast

and ensure that the barricades are being instated

before commencing the installation.

3)CES Lifting Supervisor must inspect the

precast and ensure that the barricades were

instated before allowing such hoist

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

97

Page 98: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF BARRICADES AT SUNSHADE

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

barricades at

sunshade

3) Installation of Barricades for Sunshade

Elimination Controls

Barricade posts were instated onto the precast

sunshade panel at the ground level before

hoisting to eliminate the risk of workers exposed

to falling from the edge of the building or any

open sides.

Administrative Controls

1)RA, SWP and FPP for such work activities

must be briefed to the workers before allowing

any work commencement

2)Precast Supervisor must inspect the precast

and ensure that the barricades are being instated

before commencing the installation.

3)CES Lifting Supervisor must inspect the

precast and ensure that the barricades were

instated before allowing such hoist

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

98

Page 99: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESINSTALLATION OF BARRICADES AT STAIRCASE MID LANDING

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

barricades at

staircase mid

landing

4) Installation of Barricades for Staircase Mid Landing

Elimination Controls

Barricade posts were instated onto the precast

staircase wall at the ground level before hoisting

to eliminate the risk of workers exposed to falling

from the edge of the building or any open sides.

Administrative Controls

1)RA, SWP and FPP for such work activities

must be briefed to the workers before allowing

any work commencement

2)Precast Supervisor must inspect the precast

and ensure that the barricades are being instated

before commencing the installation.

3)CES Lifting Supervisor must inspect the

precast and ensure that the barricades were

instated before allowing such hoist

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

99

Page 100: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURESENCLOSURE OF CRC OPENING

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Enclosure for

CRC Opening

Engineering Controls

1. PE Design jackel plate CRC cover to enclose

the floor opening.

Administrative Controls

1)RA, SWP and FPP for such work activities

must be briefed to the workers before allowing

any work commencement

2)Precast Supervisor & Lifting Supervisor must

ensure the cover to be installed after installation

of CRC precast.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

100

Page 101: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURES CONSTRUCTION OF PNEUMATIC WASTES CONVEYANCE SYSTEM

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Construction

of

pneumatic

wastes

conveyance

system

1)Scaffold provided around the perimeter of PWCS

1)Safe means of access and egress provided to the top of

PWCS manhole

Engineering Controls

1.Provision of Scaffold

2.Provision of Vertical ladder

3.Provision of Barricade (Top and mid rail)

4.Provision of Toe boards

Administrative Controls

1.RA/SWP and FPP must be briefed to the

workers before allowing any work

commencement

2.Scaffold supervisor to inspect the scaffold after

erection and display the “Safe to Use” tag

3.Workers are only allowed to use the scaffold

when the “Safe to Use” tag is displayed

4.Only allowed to use the designated access

provided

5.To maintain three point contact while

ascending and descending from the ladder

PPE

Worker to be equipped with Safety Harness and

anchor to the Barricade.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

101

Page 102: Chip Eng Seng Construction Site Visit

FALL PREVENTION MEASURES CONSTRUCTION OF PNEUMATIC WASTES CONVEYANCE SYSTEM

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Construction of

pneumatic

wastes

conveyance

system

3) Vertical ladder provided at the top of the manhole

4) Top and bottom of ladder properly secured

Engineering Controls

1.Provision of Scaffold

2.Provision of Vertical ladder

3.Provision of Barricade (Top and mid rail)

4.Provision of Toe boards

Administrative Controls

1.RA/SWP and FPP must be briefed to the workers

before allowing any work commencement

2.Scaffold supervisor to inspect the scaffold after

erection and display the “Safe to Use” tag

3.Workers are only allowed to use the scaffold when

the “Safe to Use” tag is displayed

4.Only allowed to use the designated access provided

5.To maintain three point contact while ascending and

descending from the ladder

PPE

Worker to be equipped with Safety Harness and

anchor to the Barricade.

Responsible Person-

1.Site Manager Sun Xin Lou

2.Project Manager Lou Xian Zhong

3.Site Manager Tai Teck Whong

4.Site Supervisor ( Formwork, Rebar, Precast &

Concreting)

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

102

Page 103: Chip Eng Seng Construction Site Visit

Work Activities

for

Scaffolder

103

Page 104: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresErection/ Dismantling of Metal Scaffolding

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Erection/Disma

ntling of Metal

Scaffolding

Engineering Controls

1.Provision of lifeline to anchor the safety

harness

Administrative Controls

1.Training for erection of scaffold

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Scaffold Supervisor

5. Provision of fall arrestor system.

PPE

Workers are equipped with safety harness and

WAH Supervisor to ensure that all personnel

involved in the activities are anchored properly to

scaffold frame and barricade

Responsible Person-

1.Project Manager

2. Site Supervisor

3. Scaffold Supervisor

4.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

104

Page 105: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresSafe Access to Construction Level

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Safe Access

to

Construction

Level

Engineering Controls

1.Provision of lifeline to anchor the safety

harness

Administrative Controls

1.Training for erection of scaffold

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Scaffold Supervisor

5. Provision of fall arrestor system.

PPE

Workers are equipped with safety harness and

WAH Supervisor to ensure that all personnel

involved in the activities are anchored properly to

a secured point . Eg the rebar column

Responsible Person-

1.Project Manager

2. Site Supervisor

3. Scaffold Supervisor

4.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

105

Page 106: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresSafe installation of platform for tower crane tie back

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Safe installation of

platform for tower

crane tie back

Engineering Controls

1.Provision of lifeline to anchor the safety

harness

Administrative Controls

1. Training for erection of platform.

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work

4. Inspection by Scaffold Supervisor

5. Provision of fall arrestor system.

PPE

Workers are equipped with safety harness and

WAH Supervisor to ensure that all personnel

involved in the activities are anchored properly to

a secured point . Eg the rebar column

Responsible Person-

1. Project Manager

2. Site Supervisor

3. Scaffold Supervisor

4.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

106

Page 107: Chip Eng Seng Construction Site Visit

Work Activities

for

Tower crane

107

Page 108: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresAscending /Descending of Tower Crane

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Ascending/Descen

ding of Tower

Crane

Engineering Controls

Provision of lifeline to anchor the safety harness

Administrative Controls

1.Training for Proper Use of Fall Arrestor

Permit to Work to applied to ensure all safety

measures are complied.

2.RA and SWP briefing to the workers prior to

commencement of work

3. Ensure to maintain 3 point contact and 100%

tied off

PPE

Worker to be equipped with Fall Arrest System

with rope grab and to anchored to lifeline

Responsible Person- Erection Team

CES

EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

108

Page 109: Chip Eng Seng Construction Site Visit

Activity Good Practice Photos Control Measures & Responsible Person Good EHS Means Good Business

Sense

Ascending/Desce

nding from the

mast to the cabin

Engineering Controls

Provision of ladder to access to the cabin

Administrative Controls

1.Application of Work-at-Height Permit to Work and ensure

all safety measures are complied.

2. CES and Safety Supervisor to brief RA and SWP to the

workers prior to commencement of work

3.Lifting supervisor to apply the permit for erection /

dismantling of tower crane before work commence

4.Lifting supervisor to brief the lifting plan to the workers

5.Lifting / Safety Supervisor in charge to ensure workers

who are erecting / dismantling the tower crane are wearing

safety harness and hook onto the anchorage point

PPE

Lifting / safety supervisor to ensure that workers who are

erecting / dismantling the tower crane are wearing safety

harness and hook onto the anchorage point

Responsible Person - Erection Team

CES

EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

Fall Prevention Measuresascending descending from the mast to the cabin

109

Page 110: Chip Eng Seng Construction Site Visit

Activity Good Practice Photos Control Measures & Responsible Person Good EHS Means Good Business

Sense

Safe erection /

dismantling of

tower jibs

Engineering Controls

Provision of anchorage point on the jibs and safety harness

to prevent workers from falling from height

Administrative Controls

1.Application of Work-at-Height Permit to Work and ensure

all safety measures are complied.

2.CES and Safety Supervisor to brief RA and SWP to the

workers prior to commencement of work

3.Lifting supervisor to apply the permit for erection /

dismantling of tower crane before work commence

4.Lifting supervisor to brief the lifting plan to the workers5.

5.Lifting / Safety Supervisor in charge to ensure workers

who are erecting / dismantling the tower crane are wearing

safety harness and hook onto the anchorage point

PPE

Lifting / safety supervisor to ensure that workers who are

erecting / dismantling the tower crane are wearing safety

harness and hook onto the anchorage point

Responsible Person - Erection Team

CES

EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

Fall Prevention Measuressafe erection / dismantling of tower crane jibs

110

Page 111: Chip Eng Seng Construction Site Visit

Activity Good Practice Photos Control Measures & Responsible Person Good EHS Means Good Business

Sense

Safe erection /

dismantling of

cabin / cat

Engineering Controls

Provision of anchorage point on the jib and safety harness

to prevent workers from falling from height

Administrative Controls

1.Application of Work-at-Height Permit to Work and ensure

all safety measures are complied.

2.CES and Safety Supervisor to brief RA and SWP to the

workers prior to commencement of work

3.Lifting supervisor to apply the permit for erection /

dismantling of tower crane before work commence

4.Lifting supervisor to brief the lifting plan to the workers

5.Lifting / Safety Supervisor in charge to ensure workers

who are erecting / dismantling the tower crane are wearing

safety harness and hook onto the anchorage point

PPE

Lifting / safety supervisor to ensure that workers who are

erecting / dismantling the tower crane are wearing safety

harness and hook onto the anchorage point

Responsible Person- Erection Team

SANTE

1.Erection Manager

2.Erectors

3.WAH Supervisor

CES

EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

Fall Prevention Measuressafe erection / dismantling of cabin / cat

111

Page 112: Chip Eng Seng Construction Site Visit

Activity Good Practice Photos Control Measures & Responsible Person Good EHS Means Good Business

Sense

Safe erection /

dismantling of

counter jib and

counterweight

Engineering Controls

1. Provision of anchorage point and safety harness to

prevent workers from falling from height

2. Provision of railing to prevent falling from height

Administrative Controls

1. Application of Work-at-Height Permit to Work and ensure

all safety measures are complied.

2. CES and Safety Supervisor to brief RA and SWP to the

workers prior to commencement of work

3. Lifting supervisor to apply the permit for erection /

dismantling of tower crane before work commence

4. Lifting supervisor to brief the lifting plan to the workers

5. Lifting / Safety Supervisor in charge to ensure workers

who are erecting / dismantling the tower crane are wearing

safety harness and hook onto the anchorage point

PPE

Lifting / safety supervisor to ensure that workers who are

erecting / dismantling the tower crane are wearing safety

harness and hook onto the anchorage point

Responsible Person- Erection Team

CES

EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

Fall Prevention Measuressafe erection / dismantling of counter jibs and counterweight

112

Page 113: Chip Eng Seng Construction Site Visit

Activity Good Practice Photos Control Measures & Responsible Person Good EHS Means Good Business

Sense

Safe installation

and dismantling of

tower crane tie

back

Engineering Controls

Platform were installed onto the precast wall at the ground

level before hoisting to eliminate the risk of scaffold

erectors exposed to falling from the edge of the building or

any open sides this is to provide safe access for tower

crane erector for safe access during tie back installation

Administrative Controls

1. Application of Work-at-Height Permit to Work and ensure

all safety measures are complied.

2. CES and Safety Supervisor to brief RA and SWP to the

workers prior to commencement of work

3. Lifting supervisor to apply the permit for erection /

dismantling of tower crane before work commence

4. Lifting supervisor to brief the lifting plan to the workers

5. Lifting / Safety Supervisor in charge to ensure workers

who are erecting / dismantling the tower crane are wearing

safety harness and hook onto the anchorage point

PPE

Lifting / safety supervisor to ensure that workers who are

erecting / dismantling the tower crane are wearing safety

harness and hook onto the anchorage point

Responsible Person- Erection Team

CES

EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

Fall Prevention MeasuresSafe installation and dismantling of tower crane tie back

113

Page 114: Chip Eng Seng Construction Site Visit

Work Activities

for

M&E

114

Page 115: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresInstallation of Electrical Conduit Pipe At Height 4.3 m

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

Electrical Conduit

Pipe At Height

Engineering Controls

Provision of proper working platform or mobile

scaffolding

Administrative Controls

1. Use of mobile scaffold to access to the column

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work

4. Provision of Mobile Scaffold erected by

qualified erector and inspect by Scaffold

Supervisor

5. Workers to stand and work within the platform

and anchored their safety harness to the

guardrail

6. Scaffold erected by ASC

PPE

Worker to be equipped with fall arrest system .

Responsible Person-

1. Project Manager Daniel Tee

2. WSHS Thiruselven

3. EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

115

Page 116: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresInstallation of water pipe & AC isolator at air con ledge area

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

water pipe at air

con ledge area

Engineering Controls

Provision of hard barricade & trolley ladder

Administrative Controls

1. Training on work at edge of the building (air

con)

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work

4. Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto the water pipe opening

Responsible Person-

1.Project Manager Nyeok Khoon Siow

2.Site Sup Ganesan

3.WSHS Mostak

4.Project Manager Daniel Tee

5. WSHS Thiruselven

6.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

116

Page 117: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresInstallation of water pipe at laundry yard area

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

water pipe at

laundry yard area

Engineering Controls

Provision of hard barricade

Administrative Controls

1. Training on work at edge of the building with A-

frame ladder (Laundry yard)

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work

4. Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto the water pipe opening

Responsible Person-

1.Project Manager Nyeok Khoon Siow

2.Site Sup Ganesan

3.WSHS Mostak

4.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

117

Page 118: Chip Eng Seng Construction Site Visit

Work Activities

for

Architectural

Work

118

Page 119: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresInstallation of railing at air con ledge area

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

railing at air con

ledge area

Engineering Controls

Provision of trolley ladder

Administrative Controls

1. Training on work at edge of the building (air

con ledge area)

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work

4. Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto the water pipe opening

Responsible Person-

1.Project Manager Xue Shui Mu

2.Site Supervisor Chan Yew Wah

3.Site Supervisor Raju

4.WSHS Kamal

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

119

Page 120: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresInstallation of railing at corridor area

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Installation of

railing at corridor

area

Engineering Controls

Provision of travel restrain system

Administrative Controls

1.Training on work at edge of the building (air

con)

2.Permit to Work to applied to ensure all safety

measures are complied.

3.RA and SWP briefing to the workers prior to

commencement of work

4.Inspection by Engineer, WSHS and WAH

Supervisor

PPE

Safety Harness anchored on the travel restrain

system

Responsible Person-

1.Project Manager Xue Shui Mu

2.Site Supervisor Chan Yew Wah

3.Site Supervisor Raju

4.WSHS Kamal

5.EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

120

Page 121: Chip Eng Seng Construction Site Visit

Work Activities

for

Architectural

121

Page 122: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresPLASTERING WORKS ON SCAFFOLDING AT VOIDS

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Plastering Works

on Scaffolding at

Voids

Engineering Controls

Provision of barricade.

Administrative Controls

1. Training for safe work on scaffolding.

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work.

4. Inspection by WAH Assessor, WSHS and

WAH Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto the water pipe opening

Responsible Person-

1. Site Manager Shao Gou Lin

2. Project Manager Tan Swee Chong

3. Project Manager Yap Kim Lay

4. Project Manager Zhang Min

5. WSHS Manival

6. WSHS Palanivel

7. WSHS Habibur

8. WSHS Prabu

9. WSHS Kabilan

10. EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

122

Page 123: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresPLASTRING WORKS ON TYPICAL FLOOR

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Plastering Works

on Typical Floor

(E.g. Corridor,

building edge &

yard)

Engineering Controls

Provision of hard barricade.

Administrative Controls

1. Training for safe work at edge of building.

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work.

4. Inspection by WAH Assessor, WSHS and

WAH Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto the water pipe opening

Responsible Person-

1. Site Manager Shao Gou Lin

2. Project Manager Tan Swee Chong (Peng

Xing)

3. Project Manager Yap Kim Lay

4. Project Manager Zhang Min

5. WSHS Manival

6. WSHS Palanivel

7. WSHS Habibur

8. WSHS Prabu

9. WSHS Kabilan

10. EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

123

Page 124: Chip Eng Seng Construction Site Visit

Fall Prevention MeasuresPLASTERING WORKS AT STAIRCASE

Activity Good Practice Photos Control Measures & Responsible

Person

Good EHS Means Good Business

Sense

Plastering Works

at Staircase

Engineering Controls

1. Provision of altered workbench.

2. Permanent railing.

Administrative Controls

1. Training for safe plastering work at staircase.

2. Permit to Work to applied to ensure all safety

measures are complied.

3. RA and SWP briefing to the workers prior to

commencement of work.

4. Inspection by WAH Assessor, WSHS and

WAH Supervisor

PPE

Safety Harness anchored on the lifeline with the

looping onto the water pipe opening

Responsible Person-

1. Site Manager Shao Gou Lin

2. Project Manager Tan Swee Chong

3. Project Manager Yap Kim Lay

4. Project Manager Zhang Min

5. WSHS Manival

6. WSHS Palanivel

7. WSHS Habibur

8. WSHS Prabu

9. WSHS Kabilan

10. EHS Department

Tangible Benefits

1.Increased Profit Margin

2.Resource Cost Savings

3.Productivity Gain

4.Process Improvements

5.Safer Work Environment

Intangible Benefits

1.Uphold of good company image

2.Business Recognition

3.Increased Customer Satisfaction

4.Increased Compliance

5.Worker’s Satisfactions

124

Page 125: Chip Eng Seng Construction Site Visit

Inspection and Maintenance

Equipment and Machinery Schedule of

Inspection

Schedule Of

Maintenance

Person In Charge Monitored By

Personal Protective

Equipment

Monthly N.A Individual Company WSHS WSHC Palani/ Kevin Lam

Ladder Weekly N.A Individual Company WSHS Zone In Charge

Man Cage Once every 3

months

NA WSHS Ramesh WSHC Palani/ Kevin Lam

Schedule for Inspection and Maintenance of

Equipment and Machinery

125

Page 126: Chip Eng Seng Construction Site Visit

Incident/Accident Investigation and Analysis

All Incidents/Accidents that resulted in injuries to workers, as well as near misses, regardless of the nature, shall be

reported to immediate supervisor who shall inform the WSHO and Management immediately.

•Investigations shall be conducted to determine any underlying deficiencies in the existing underlying Fall

Preventation Plan which may cause or contribute to the occurrence of the incident;

•In event of such as accident/incident, the fall preventation plan shall be re-evaluated to determine whether that

additional measures ( Practices, Procedures, Training) are necessary to prevent recurrence

•Identify the opportunities for preventive measures to be implemented to prevent any incident form

•The results from any such investigated (Inclusive of lesson learnt and the corrective and preventive actions to be

taken)should be promptly communicated to all relevant parties.

•A record of all accidents and incidents and their investigation findings and outcomes should be properly

documented.

126

Page 127: Chip Eng Seng Construction Site Visit

Incident/Accident Investigation and Analysis

127

Page 128: Chip Eng Seng Construction Site Visit

Review of Fall Prevention Programme

• The review of the Fall Protection Programme together with the rescue plan shall be

based on the following criteria.

• Dangerous Occurrence & Accident on site pertaining to Falling From Height Hazard

• Findings and Comments By MOM

• Any Issues raised By Corporate Safety Dept

• Any Findings raised during Weekly Committee Inspection

• Any Issues raised during Weekly Coordination Meeting

• Any Issues raised during Monthly Committee Meeting

• Other Government Authorities.

128

Page 129: Chip Eng Seng Construction Site Visit

Walk Through Exhibition Gallery&

Site Walk

Page 130: Chip Eng Seng Construction Site Visit

General Manager Mr. Low Gam Weng

Betterment Of WAH Awareness

Page 131: Chip Eng Seng Construction Site Visit

Betterment Of

WAH Awareness

Page 132: Chip Eng Seng Construction Site Visit

CONTENTS PAGECONTENTS SLIDES NUMBER

1. INCREASE

PRODUCTIVITY

3-5

2.RECOGNITION 6-7

3. GOOD TRACK

RECORDS

8

Page 133: Chip Eng Seng Construction Site Visit

1. Increase Productivity

Thru various innovative designs which

aimed to eliminate WAH risks, there is a

simultaneous process which aims at

decreasing manpower usage.

Thorough thoughts and consideration

were invested to ensure the innovations

are safe and cost saving.

Page 134: Chip Eng Seng Construction Site Visit

1. Increase Productivity

Introduction of “L” Bracket

Eliminate Scaffold Support by Erectors

Safe Installation of Precast Sunshade

Productivity

Gain/Improvements

Page 135: Chip Eng Seng Construction Site Visit

1. Increase Productivity Innovation of Double Tier Ring Ladder Column (Silver Award, SCAL

2014)

Prevent fall of person or ladder tilted while releasing the rig point

Page 136: Chip Eng Seng Construction Site Visit

2. Recognition

SHARP AWARD, HDB Safety Award, BCA Award-Construction and Productivity

2016 HDB SAFETY AWARD HDB Safety Awards for Bukit Panjang BPN4C15

2016 SHARP WSH Performance AWARD / SHARP for Yishun Mixed Developmen7

2016 SHARP WSH Performance AWARD / SHARP for Fulcrum

2015 SHARP WSH Performance AWARD / SHARP for Yishun Mixed Development

2014 MeritChip Eng Seng Contractors (1988) Pte Ltd was awarded BCA Green and

Gracious Builder Certification by BCA

2014Merit CES Engineering & Construction Pte Ltd was awarded BCA Green and

Gracious Builder Certification by BCA

2014 MeritCESCs project Hougang N9C12 was awarded Certificate of Merit Award

in HDB Construction Safety Award 2014.

2014 Commendation WSH SHARP Award (Certificate of Commendation) for Hougang N4C17

2014 CommendationWSH SHARP Award (Certificate of Commendation) for Bukit Batok

N1C13 & N2C2

2014 CommendationWSH SHARP Award (Certificate of Commendation) for My Manhattan

@Simei

2014 SilverCESCs project Bukit Batok N1C13 “Skyline I” was awarded Silver

Awards in SCAL Work and Safety Health Innovation Awards 2014

2014 BronzeCESCs project Tampines N4C27 was awarded Bronze Awards in SCAL

Work and Safety Health Innovation Awards 2014

2013 Gold BCA Awards – Construction Productivity Award Advocates

2013 Merit BCA Construction Excellence Award for Queenstown RC25

2012 HDB SAFETY AWARD HDB Safety Awards for Queenstown RC25 (Ghim Moh Valley)

2012 HDB SAFETY AWARDHDB Safety Awards for Punggol West C25

Page 137: Chip Eng Seng Construction Site Visit

2. Recognition HDB Safety Award

Page 138: Chip Eng Seng Construction Site Visit

3. Good Track Records

Increase in

Productivity

Increase in

WAH Awareness

Good WSH Track Records

with Authorities &

Agencies, increase our

eligibility & opportunity for

project tendering and good

business sense.

Decrease in

Accidents/Injuri

es

Page 139: Chip Eng Seng Construction Site Visit

Q & A