chief engineer (electrical), hydro projects, mumbai … · 2013-03-12 · 47 mode of payment in...

188
1 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11 (A. Govt. of Maharashtra Undertaking) Signature of Contractor No. of Corrections Executive Engineer For Authorised Use only B-1 Type Tender No. 8 For 2012-2013 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION, PUNE (Govt. of Maharashtra Undertaking) CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI CONSTRUCTION CIRCLE, KOLHAPUR. TENDER DOCUMENTS TENDER NO. B1 / EE / 08 / 2012-2013. Name of Work : Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach road @ Mhaisal LIS Stage -I & Stage -II Estimated Cost : 20.74 Lakhs. PRICE RS. 500 /- Office of the Executive Engineer, FOR EACH TENDER DOCUMENTS Mhaisal Elect. & Mech. Division, Sangli 416 415

Upload: others

Post on 25-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

1 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

For Authorised Use only B-1 Type Tender No. 8

For 2012-2013

MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION, PUNE (Govt. of Maharashtra Undertaking)

CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI

CONSTRUCTION CIRCLE, KOLHAPUR.

TENDER DOCUMENTS

TENDER NO. B1 / EE / 08 / 2012-2013.

Name of Work : Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach road @ Mhaisal LIS Stage -I & Stage -II

Estimated Cost : 20.74 Lakhs. PRICE RS. 500 /- Office of the Executive Engineer, FOR EACH TENDER DOCUMENTS Mhaisal Elect. & Mech. Division, Sangli 416 415

Page 2: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

2 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  

          

TENDER NO. B‐1/EE/08/2012‐13  

           Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach

road @ Mhaisal LIS Stage -I & Stage -II.  

         

 

 

  Downloaded by M/s.   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   

                   ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐   

                  ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 

             

 

              Sign & Seal of tenderer            

Page 3: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

3 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

INDEX Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach road

@ Mhaisal LIS Stage -I & Stage -II. 

 

Sr. No. 

Particulars  Page No. 

From  To 

  SECTION – I   11  36 

  Press Notice     

  Detailed Tender Notice      

  Instructions to Tenderers for e‐tendering     

  SECTION  ‐ II  37  57 

1  B –1 Tender form & Tender for works     

2  Schedule “A”     

3  Schedule “B”     

  SECTION – III  58  80 

1  Appendix     

  Appendix “A”  Details of technical personnel 

with the contractor 

   

  Appendix “B”  Details of plants and machinery 

immediately available with the 

tenderer for use on this work. 

   

Page 4: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

4 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sr. No. 

Particulars  Page No. 

From  To 

  Appendix “C”  Details of works of similar type 

and magnitude carried out by 

the contractor  

   

  Appendix “D”  Details of other works tendered 

for and in hand on the date of 

submission of tender. 

   

  Appendix “E”  Details of plants and machinery 

proposed to be used for the 

work but not immediately 

available. 

   

  Appendix “F”  Declaration of the contractor     

  Appendix “G”  Bank Guarantee Bond     

  Appendix “H”  Indenture for secured advance     

  Appendix “I”  Professional tax clearance 

certificate 

   

  Appendix “J”  Agreement     

  Appendix “K”  Form of Tender forwarding 

letter 

   

  Appendix “L”  EMD assignment form     

Page 5: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

5 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sr. No. 

Particulars  Page No. 

From  To 

  Appendix “M”  Power of attorney     

  SECTION – IV  81  128 

  Conditions of Contract. ( B‐1 Form )     

  SECTION – V   129  170 

  Special conditions of contract     

1  Contractor to inform himself fully     

2  Contract drawings and specifications     

3  Data and drawings to be furnished by the 

contractor 

   

4  Errors, Omissions, Discrepancies     

5  Use of site     

6  Contractor not to dispose off soil etc.      

7  Gold / Silver, Minerals, Oils, Relics etc. found on 

the site. 

   

8  Access to site and work and co‐operation with 

other contractors 

   

9  Cleaning up      

Page 6: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

6 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sr. No. 

Particulars  Page No. 

From  To 

10  Layout of construction roads     

11  Period and hours of work     

12  Signing field books, longitudinal section, cross 

sections and measurement books 

   

13  Programe of construction     

14  Materials     

15  Laboratory for testing work     

16  Hire of construction equipments     

17  Other contractors for the work     

18  Contract documents and matters to be treated as 

confidential 

   

19  Access to the Contractor’s books     

20  Breach on part of Govt. not to annual contract     

21  Local Laws     

22  Personnel of the contractor     

23  Death, Bankruptcy etc.     

24  Notices, How to be given     

Page 7: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

7 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sr. No. 

Particulars  Page No. 

From  To 

25  Passing of foundation etc.     

26  Reference to standard specifications     

27  Communications and Notices by contractors     

28  Non compliance of contract conditions     

29  Compensation for delay in completion of work on 

Corporation account 

   

30  Co‐ordination with other contractors     

31  Photographs of the works     

32  Fencing, lighting and ventilation     

33  Liability for accidents to persons     

34  The contractor to supply and be responsible for the 

sufficiency of the means employed 

   

35  Covering of work     

36  Quantities of work     

37  Accuracy of lines, levels and grades     

38  Excavated materials     

39  Safety measures      

Page 8: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

8 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sr. No. 

Particulars  Page No. 

From  To 

40  Sundays and holidays     

41  Handing over of works     

42  Instrumentation     

43  Inspection of works     

44  Opening out works     

45  Removal of imperfect works     

46  Jurisdiction of court for disputes     

47  Mode of payment in running bill and final bill.     

48  Bills and payments     

49  Security Deposit     

50  No interest on money due to the contractor     

51  Value Added Tax     

52  Extra Items     

53  i) LABOUR WELFARE CESS     

  ii) LABOUR AMENITY     

54  Price Variation     

Page 9: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

9 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sr. No. 

Particulars  Page No. 

From  To 

55  Insurance     

56  Approval from Electrical Inspector     

57  PTCC / RAILWAY APPROVAL     

58  MSEDCL/ MSETCL  APPROVAL     

59  Test, Inspection and rejection of detective 

materials and works: 

   

60  Plans, Drawings and other data & approval from 

Electrical Inspector 

   

61  Additional conditions regarding payment of royalty 

charges as per Bombay Minor Mineral  Extraction      

( Amendment ) Rules, 2003. 

   

62  Warrantee     

63  Defect Liability     

64  Computer & Equipment Facility     

65  Civil work in switchyard area     

66  Power Supply     

67  Storage, Watch and Ward     

Page 10: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

10 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sr. No. 

Particulars  Page No. 

From  To 

68  Evaluation of Tender     

69  Evaluation of the Bids on account of Technical 

performance data and guarantees of equipment 

offered and applying liquidated damages.  

   

  SECTION – VI  171  185 

  Technical Specification       

  SECTION – VII  186  188 

  Drawings     

Page 11: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

11 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

            

 

SECTION -I

PRESS NOTICE AND

DETAILED TENDER NOTICE           

Page 12: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

12 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

ÊxÉÊ´ÉnùÉ ºÉÖSÉxÉÉ ¨É½þÉ®úɹ]õÅ EÞò¹hÉÉ JÉÉä®äú Ê´ÉEòÉºÉ ¨É½þɨÉÆb÷³ý, {ÉÖhÉä

(¨É½þÉ®úɹ]õÅ ¶ÉɺÉxÉ +ÆMÉÒEòÞiÉ)

ÊxÉÊ´ÉnùÉ ºÉÖSÉxÉÉ Gò. ¤É-1/<Ç<Ç/ 8 / 2012 - 13

Main Portal : http://maharashtra.etenders.in MKVDC Portal : http://mkvdc.maharashtra.etenders.in

¨É½þÉ®úɹ]Åõ EÞò¹hÉÉ JÉÉä®äú Ê´ÉEòÉºÉ ¨É½þɨÉÆb÷³ýÉSªÉÉ´ÉiÉÒxÉä EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ, ¨½èþºÉɳý Ê´ÉtÖiÉ ´É ªÉÉÆÊjÉEòÒ Ê´É¦ÉÉMÉ, ºÉÉÆMɱÉÒ, nÖù®úv´ÉxÉÒ Gò. 0233-2302960, E-mail : [email protected] ½äþ ¨É½þÉ®úɹ]õÅÉiÉ xÉÉånùhÉÒEÞòiÉ +ºÉ±É䱪ÉÉ “+” ´ÉMÉÉÇiÉÒ±É {É®ú´ÉÉxÉÉvÉÉ®úEò Ê´ÉtÖiÉ EÆòjÉÉ]õnùÉ®úÉEòbÚ÷xÉ JÉɱÉÒ±É EòɨÉɺÉÉ`öÒ ¤É-1 xɨÉÖxªÉÉiÉ <Ç-ÊxÉÊ´ÉnùÉ ¨ÉÉMÉÊ´ÉiÉ +ɽäiÉþ. ÊxÉÊ´ÉnùÉ nùºiÉÉ´ÉäVÉ ´É®úÒ±É ºÉÆEäòiɺlɳýÉ´É®ú Ênù. 12/03/2013 {ÉɺÉÚxÉ 26/03/2013 {ɪÉÈiÉ ={ɱɤvÉ ½þÉä´ÉÚ ¶ÉEòiÉÒ±É. +. Gò.

EòɨÉÉSÉä xÉÉ´É +ÆnùÉVÉÒiÉ ®úCEò¨É ¯û. (±ÉIÉ)

<ºÉÉ®úÉ ®úCEò¨É ¯û.

EòɨÉÉSÉÉ +´ÉvÉÒ

EòÉä-ªÉÉ ÊxÉÊ´ÉnùÉ ºÉÆSÉÉSÉÒ ËEò¨ÉiÉ

1 2 3 4 5 6 1 ¨½èþºÉɳý ={ɺÉÉ ËºÉSÉxÉ ªÉÉäVÉxÉÉ ]õ{{ÉÉ

Gò. 1 ´É 2 SÉä Eò³ýªÉÆjÉ +É´ÉÉ®ú ´É {ÉÉä½þÉäSÉ ®úºiªÉÉEò®úÒiÉÉ |ÉEòÉ¶É ªÉÉäVÉxÉÉ Eò®úhÉä.

20.74

20,800/-

3 ¨ÉʽþxÉä

¯û. 500/- ({ÉÉSɶÉä ¨ÉÉjÉ)

Ê]õ{É VÉä ÊxÉÊ´ÉnùÉEòÉ®ú {Éʽþ±ªÉÉÆnùÉSÉ <Ç-ÊxÉÊ´ÉnùÉ |ÉÊGòªÉäiÉ ¦ÉÉMÉ PÉäiÉ +ɽäþiÉ iªÉÉÆxÉÉ ´É®úÒ±É ºÉÆEäòiÉ ºlɳýÉ´É®ú Ênù±É䱪ÉÉ ¨ÉÉMÉÇnù¶ÉÇEò iÉi´ÉÉxÉÖºÉÉ®ú |ÉlÉ¨É Êb÷ZÉÒ]õ±É ˺ÉMÉxÉäSÉ®ú ºÉ]õÔÊ¡òEäò]õ, ªÉÖVÉ®ú +ɪÉb÷Ò ´É {ÉɺɴÉbÇ÷ |ÉÉ{iÉ Eò¯ûxÉ PÉähÉä +ɴɶªÉEò +ɽäþ.

<Ç-ÊxÉÊ´ÉnùÉ |ÉÊGòªÉÉ ºÉÆnù¦ÉÉÇiÉ ºÉ´ÉÇ ¨ÉÉʽþiÉÒ ´É®úÒ±É ºÉÆEäòiÉ ºlɳýÉ´É®ú ={ɱɤvÉ +ɽäþ.

<Ç-ÊxÉÊ´ÉnùÉ (b÷É>ðxÉ ±ÉÉäb÷/+{É ±ÉÉäb÷) ºÉƤÉÆvÉÒ EòɽþÒ ºÉ½þɪªÉiÉÉ +ɴɶªÉEò +ºÉ±ªÉÉºÉ ¡òÉäxÉ xÉÆ. 020-25315555 <Ç-ÊxÉÊ´ÉnùÉ EòɪÉÇ|ÉhÉɱÉÒ ¨ÉnùiÉ EòIÉ, [email protected] ªÉÉÆSªÉɶÉÒ ºÉÆ{ÉEÇò ºÉÉvÉhªÉÉiÉ ªÉÉ´ÉÉ.

ÊxÉÊ´ÉnùÉ |ɺiÉÉ´É ºÉÉnù®ú Eò®úhªÉɺÉÉ`öÒ ÊxÉÊ´ÉnùÉEòÉ® ªÉÉÆxÉÒ Eäò±É䱪ÉÉ +ÉÌlÉEò JÉSÉÉÇºÉ VɤÉɤÉnùÉ®ú xÉ ®úɽþiÉÉ EòÉähÉiÉɽþÒ BEò ËEò´ÉÉ ºÉ´ÉÇ ÊxÉÊ´ÉnùÉ ¡äò]õɳýhªÉÉSÉä ËEò´ÉÉ ºÉÆ{ÉÚhÉÇ ÊxÉÊ´ÉnùÉ |ÉÊGòªÉÉ ®úqù Eò®úhªÉÉSÉä +ÊvÉEòÉ®ú ¨É½þɨÉÆb÷³ýÉxÉä ®úÉJÉÚxÉ `äö´É±Éä +ɽäþiÉ.

EòɪÉÇEòÉ®úÒ +ʦɪÉÆiÉÉ, ¨½èþºÉɳý Ê´ÉtÖiÉ ´É ªÉÉÆÊjÉEòÒ Ê´É¦ÉÉMÉ,

ºÉÉÆMɱÉÒ.

Page 13: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

13 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

PRESS  NOTICE MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION, PUNE 

(A Government of Maharashtra Undertaking)  Tender Notice No.B1/EE/ 8 / 2012 – 13 

Main Portal : http://maharashtra.etenders.in        MKVDC Portal: http://mkvdc.maharashtra.etenders.in 

   e‐tender  is  being  invited  from  the  licensed  electrical  contractor  of  “A”  Class 

registered  in  Maharashtra  for  and  on  behalf  of  Maharashtra  Krishna  Valley Development Corporation in B‐1 form for the following work by the Executive Engineer, Mhaisal  Electrical  &  Mechanical  Division,  Sangli.  Ph.  –  0233  ‐  2302960,  E‐mail  : [email protected] 

 The blank Tender document is available on web site from  12/03/2013 to  26/03/2013.  

Sr. No.   

Name of work  EstimatedCost Rs. (Lakh) 

  

Earnest Money Deposit Rs.  

Time limit for 

completion of work 

from date of work order. 

Cost of blank Tender 

document  (Non‐

refundable) 

1  2  3  4  5  6 

1.  Supply,  Erection,  Testing &  Commissioning  of lighting  for Switchyard & approach  road  @ Mhaisal  LIS  Stage  ‐I  & Stage ‐II 

 20.74 

 20,800/‐

 3  months 

Rs. 500/‐  (Rs. Five   hundred only) 

The tenderers participating first time in e‐Tendering process will have to procure Digital Signature Certificate, Username & Password  from competent authorities as per guideline mentioned on homepage of the website. 

All  requisite  information  required  for  the  submission  of  tender  document  is available in the above said website.  

If any assistance  is  required  regarding e‐Tendering  (upload  / download) please contact  Phone No. 020‐25315555,  e‐tendering help desk , [email protected],           The  Corporation  reserves  the  right  to  reject  any  or  all  the  bids  or  annul  the process  without  assigning  any  reason  and  without  being  responsible  for  the  cost incurred by the tenderer in preparing his Bid.  

Executive Engineer, Mhaisal Electrical & Mechanical Division, 

Sangli. 

Page 14: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

14 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

DETAILED TENDER NOTICE MAHARASHTRA KRISHNA DEVELOPMENT CORPORATION, PUNE 

(A Government of Maharashtra Undertaking) Tender Notice No.B1/EE/8 / 2012 ‐ 13 

 Main Portal : http://maharashtra.etenders.in 

       MKVDC Portal: http://mkvdc.maharashtra.etenders.in INVITATION:‐  

Online  digital  signed  e‐tender  is  being  invited  from  the  licensed  electrical contractor  of  “A”  Class  registered  in  Maharashtra  for  and  on  behalf  of Maharashtra  Krishna  Valley  Development  Corporation  in  B‐1  form  for  the following  work  by  the  Executive  Engineer,  Mhaisal  Electrical  &  Mechanical Division, Sangli. Ph. – 0233‐2302960, E‐mail : [email protected] 

 

Sr. No.     

Name of work      

Estimated 

Cost Rs. (Lakh) 

  

Earnest Money Rs.    

Time limit for 

completion of work from date of work order 

Cost of blank Tender 

document (Non‐

refundable) 

1  2  3  4  5  6 

1.  Supply,  Erection,  Testing  & Commissioning  of  lighting  for Switchyard & approach road @ Mhaisal LIS Stage ‐I & Stage ‐II 

 20.74 

 20800/‐

 

 3 months 

Rs. 500/‐ (Rs. Five   hundred only) 

  

A) PRICE BID /TENDER DOCUMENT SCHEDULE  KEY DATES 

 

Seq No  MKVDC Stage  Contractor Stage Start Date & Time Expiry Date & Time Envelopes 

1  Release Tender   ‐  11/03/2013   10.00 12/03/2013     18.00 ‐ 

2  ‐  Tender Download 12/03/2013    18.01 26/03/2013     16.00Commercial Envelope C1,Technical Envelope T1 

3  ‐  Bid Preparation   12/03/2013    18.01 30/03/2013     14.00Commercial Envelope C1,Technical Envelope T1 

Page 15: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

15 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Seq No  MKVDC Stage  Contractor Stage Start Date & Time Expiry Date & Time Envelopes 

4  Close For Technical Bid  ‐  30/03/2013    14.01 30/03/2013     18.00 Technical Envelope T1 

5  Close For Price Bid   ‐  30/03/2013    14.01 30/03/2013     18.00 Commercial Envelope C1 

6  ‐  Bid Submission   30/03/2013    18.01 01/04/2013     12.00Commercial Envelope C1,Technical Envelope T1 

7  Technical Bid Opening   ‐  01/04/2013    12.01 01/04/2013     18.00 Technical Envelope T1 

8  Price Bid Opening   ‐  01/04/2013    12.01 01/04/2013     18.00 Commercial Envelope C1 

9  Tender Award   ‐  01/04/2013    18.01 06/04/2013      18.00Commercial Envelope C1,Technical Envelope T1 

 1. REQUIREMENT OF THE CORPORATION FOR THIS WORK:‐ 

The tenderers / Contractors must have fulfilled the following criteria & upload / 

Submit the required details.  

a) The tenderer shall have “A” class registration with PWD (Electrical wing) 

Govt. of Maharashtra state.  

b) i)   The tenderer shall have minimum 5 years experience  in the field 

of  electrical  work  such  as  Supply,  Erection,  Testing  & 

Commissioning of 33 KV Switchyard / sub‐station /   33 KV  lines / 

street‐road lighting.   

ii)  Tenderer should submit / upload performance certificates of user 

for street light work (minimum two) costing not less than 15 lacks 

each certifying trouble free operation for two years.   This should 

be  certified  by  an  Officer  not  below  the  rank  of  Executive 

Engineer. 

Page 16: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

16 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

2. The  Tender  Document  is  available  on  e‐tendering web  site  of MKVDC  Portal 

http://mkvdc.maharashtra.etenders.in    From  12/03/2013  to  26/03/2013  for 

downloading.  

3. The  cost of each Tender document  is Rs. 500/‐  (Rs. Five Hundred   Only).   The 

bidders  are  required  to  deposit  this  amount  in  the  name  of  the  Executive 

Engineer, Mhaisal  Electrical & Mechanical Division,  Sangli  on  the  account No. 

48712010000514 in IDBI Bank at Sangli branch.  

4. The scanned copy of proof of deposit of such amount should be uploaded.  The 

contractors whose  amount  of  tender  cost  is  not  reflected  in  the  IDBI Bank  at 

Sangli branch,  account No.  48712010000514 will not be  opened.    The  cost of 

Tender  document  will  only  be  accepted  within  purchase  period  of  Tender 

document. 

5. The scanned copy of the Demand Draft towards EMD should be uploaded along 

with Tender document. 

6. EMD  in the form of demand draft  in Original along with hard copy of uploaded 

Documents as per Envelope No.  I &  II should be submitted  in  the office of  the 

Executive  Engineer,  Mhaisal  Electrical  &  Mechanical  Division,  Warnali, 

Vishrambag, Sangli  ‐ 416 415   Ph no. 0233‐2302960 on or before  the  last date 

and time of uploading of Tender Document Proposal.  The Tender Document will 

be rejected  if cost of Tender document and EMD  in  the  form of DD  in Original 

along with  hard  copy  as mentioned  above  are  not  received within  stipulated 

time. 

7. ( NOT APPLICABLE) 

The Pre Tender  conference open  to  all prospective  tenderers   will be held on 

00/00/2013  at  11.30  Hrs.  (if  possible)  in  the  office  of  the  Chief  Engineer, 

Electrical  Hydro  Projects,  HSBC  Bank  Building,  Fort, Mumbai  /  Chief  Engineer 

(Civil) Hydro Projects, Sinchan Bhavan, Barne Road, Mangalwar peth, Pune 411 

011.   

Page 17: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

17 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

8. Tender Document uploaded online will be opened in the office of the Executive 

Engineer, Mhaisal Electrical & Mechanical Division, Sangli  on dated 01/04/2013 

at 12.01 Hrs. if possible or next suitable date.   

B) 

1.   All  subsequent  corrigendum/amendment  shall  be  available  only  on web  site. 

Hence bidders are advised to visit web site until the Tender Document  is finally 

opened. 

2.   In  case  of  any  dispute  between  uploaded  document  and  copy  submitted  by 

bidder, then Price Bid Document uploaded by bidder on web site will be treated  

as final. 

3.   Bidders are not allowed to make any changes in the uploaded document after last   

date and time of uploading. If found so, his tender will be rejected outright & he 

will be liable for other legal action. 

4.  The MKVDC  Pune  reserves  the  right  to  reject  any  or  all  the  bids  or  annul  the 

process without   assigning any reason and without being responsible for the cost 

incurred by the bidders in preparing his Tender Document.  

 Executive Engineer 

Mhaisal Electrical & Mechanical Division, Sangli. 

 

Page 18: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

18 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Instructions to Tenderers for e‐tendering                 The  details  can  be  viewed  and  downloaded  online  directly  from  the 

Government  of Maharashtra  e‐tender  Portal  http://maharashtra.etenders.in  on  Sub 

Portal  of  Maharashtra  Krishna  Valley  Development  Corporation  http  :// 

mkvdc.maharashtra.etenders.in 

1. Detail  tender  notice  can  be  seen  on  the  notice  board  in  the  office  of  the 

Executive Engineer, Mhaisal Electrical & Mechanical Division, Sangli. Blank Price 

Bids  are  available  on  the  Government  of  Maharashtra  website 

http://maharashtra.etenders.in  through  Sub  Portal  of 

http://mkvdc.maharashtra.etenders.in.  The  competent  authority  reserves  all 

rights of rejecting any or all tender without assigning any reason. 

2. The cost of price bid  is Rs. 500 /‐ only. The bidders are required to deposit this 

amount  in  any  form  in  the  name  of  Executive  Engineer, Mhaisal  Electrical & 

Mechanical Division, Sangli on  the No. 48712010000514  in  IDBI Bank at Sangli 

branch.  EMD in the form of DD along with hard copy of uploaded Documents as 

per  Envelope  No.  I  &  II  should  be  submitted  in  the  office  of  the  Executive 

Engineer, Mhaisal Electrical & Mechanical Division, Sangli on or before  the  last 

date and time of uploading / online submission of Price Bid.  The Price Bid will be 

rejected  if  cost of price bid document and EMD  in  the  form of DD along with 

hard copy as mentioned above are not received within stipulated time. EMD  in 

the form of Bank Guarantee shall also be scanned & uploaded in Envelope No. 1 

without which Envelope No.2 will not be opened. 

3. It is necessary to give the undertaking as follows by the tenderer, that he will not 

make any changes  in tender documents downloaded from website.  If  it  is done 

the  tender of  such  tenderer will be  rejected and  the  tenderer who made  such 

changes  are  liable  for  action  as  per  Rules.  Tender  documents  published  on 

website  are  considered  as  authentic  and  legal  documents  in  case  of  any 

complaint about the tender. 

Page 19: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

19 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

4. It  is necessary to give undertaking as  follows "I have seen detailed drawings of 

works on website. It is part of tender documents. I have visited the site and I am 

well conversant to site condition. I have quoted my offer by considering all these 

things.  I  am  ready  to  sign  the  tender  &  drawings  before  depositing  security 

deposit and taking work order if my tender is accepted.” 

5. In  order  to  participate  in  the  tenders  floated  using  the  Electronic  Tender 

Management  System  (ETMS),  all  bidders  are  required  to  get  enrolled  on  the 

ETMS portal http://mahrashtra.etenders.in 

6. The  bids  submitted  online  should  be  signed  electronically  with  a  Digital 

Certificate  to establish  the  identity of  the bidder bidding online. The  tenderer 

has  to  obtain  the  Digital  Certificate.  For  information  required  for  Digital 

Certificate he may contact ETMS Help Desk. 

7. For submitting the bids online, the bidders are required to make online payment 

using the electronic payments gateway service Bid Submission Fee. The different 

modes  of  electronic  payments  accepted  on  the  ETMS  is  available  and  can  be 

viewed online on the ETMS Website httip://maharashtra.etenders.in. 

8. The  activities  of  Tender  purchase/Download,  Preparation  of  Bid  (Submit  Bid 

Hash online), Submission of  Bids, Submission of EMD and other Documents will 

be governed by the time schedules given under “Key Dates”. 

9. The Bidders has to submit (Upload, Scan, Copies/fill) his offer/credentials online 

as required in the tender in the online templates in relevant envelopes. 

10.  The  Bidders may  refer  e‐Tendering  Tool  Kit  available  online  to  perform  their 

online activities http://maharashtra.etenders.in 

11. Manner of submission of Price Bid & its accompaniments 

Page 20: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

20 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The tenderer shall submit the tender documents in two sealed envelope system 

as below. 

Envelope No.1 (Technical Envelope No.1) 

The following documents shall be duly signed uploaded in envelope No.1 

a) Scanned copy of receipt of Rs 500 /‐ as cost of blank tender form 

b) Scanned copy of earnest money deposit in the form of Demand Draft. 

c)  Scanned copy of valid certificate of registration as licensed electrical contractor 

issued by PWD of Government of Maharashtra.  

d) Scanned copy of Details of Technical Personnel with tenderer (in Appendix ‘A’ ). 

e) List of Machineries and Plants immediately available with the tenderer for use on 

this work (in Appendix B).  

f) Details of work of similar type and magnitude carried out by the tenderer during 

last five years. (in Appendix C) 

g) Details of other works  tendered  for and  in hand on  the date of submission  (in 

Appendix D). 

h) List of machinery proposed to be used for work but not immediately available (in 

Appendix E) 

i) Declaration of the Contractor (in Appendix F ) 

j) Scanned copy of the registration under clause No ‐ 8 and 9 of the Value Added 

Tax Act  ‐ 2005  is obligatory  for  registered  contractor  and  the  same  should be 

submitted in Envelope No.1. If not submitted 4% tax or as per rules in force will 

be deducted from bills if contract is awarded. 

k) Scanned copy of PAN card or attested copy of Income Tax return. 

l) The  Contractor  shall  have  to  produce  the  scan  copy  of  the    certificate  of 

Registration  under  sub‐section  (1)  of  section  5  of Maharashtra  State  Tax  on 

Page 21: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

21 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Professions, Trades, Callings and Employment Act 1975 ( see Rule 3 (2) from the 

Professional Tax Office of  the  concerned district. The Contractor  shall have  to 

submit scan copy of the information regarding proof of payment of Professional 

Tax and clearance certificate  in the  format vide Appendix –  I. The  list of all the 

employees shall also be uploaded in the same format as prescribed in Appendix 

‘A’ which shall  include office and the  field staff and those operating machinery 

and equipment. 

m) The  tenderer  shall  submit  scanned copy proof of payment of  labour provident 

fund  as  certified  from  the  competent  authority  valid  on  the  date  fixed  for 

uploading of tender. 

n) The tender shall submit scanned copy of tender forwarding letter in Appendix K.  

All the above documents shall be uploaded in the envelope No.1. If these documents 

are not found, envelope No.2 will not be opened. 

Envelope No.2 (Commercial Envelope No.2).  

The following documents shall be duly signed uploaded in the envelope No.2 

        The  second envelope  shall  contain  scan  copy of  the duly  signed on each page of 

main  tender  including  the  common  set  of  conditions/  stipulations  issued  by  the 

Corporation and scanned copy of bank guarantee for additional Earnest Money Deposit 

as required. A tender uploaded / submitted without this would be considered as invalid. 

The tenderer should quote his offer  in the form of percentage below or above of 

estimated  cost  given  in  Schedule  ‘B’  at  appropriate  place  in  B‐1  form.  The  tenderer 

should quote his offer which he  is qualified.  The  tenderer  should  quote his offer  for 

whole otherwise will be treated as non‐responsive and their offer will be rejected out 

rightly. He should not quote his offer anywhere directly or  indirectly  in Envelope No.1 

failing which the Envelope No.2 shall not be opened and his tender shall stand rejected. 

The Contractor shall quote for the work as per details given in the main tender and also 

based on the common set of conditions issued / additional stipulations made / or given 

for examination before submission of the tender by the Corporation as informed to him 

from the Superintending Engineer. This tender shall be unconditional.  

Page 22: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

22 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The envelope No 2 will also contain the following.  

i) Special features, the tenderer feels worth mentioning about his offer.  

ii) Guaranteed  performance  and  technical  particulars,  including  the  drawings, 

specifications of the equipment offered by the Tender.  

iii)  Bank Guarantee / DD for additional EMD. 

12.  SUBMISSION OF TENDER (Hard Copy) 

The two sealed envelopes No.1 and 2 shall be sealed and again put together in one 

common  cover  and  sealed. This  sealed  cover  shall be marked on  the  left  top  corner, 

with the name of the work. 

The  full  name  and  address  of  tenderer  and  the  name  of  the  authorised  agent 

delivering  the sealed cover containing  tender shall be written  in  the bottom  left hand 

corner. If submitted by post , the sealed envelope marked as above, shall be enclosed in 

another  cover  properly  addressed  and  shall  be  sent  by  Registered  Post 

Acknowledgement   Due. The date and  time  for  receipt of envelope containing  tender 

shall strictly apply in all cases. The tenderers should ensure that their tender is received 

by the Officer, before the expiry of the date and time. No delay on account of any cause 

will be entertained  for the  late receipt of the tender. Tender offered or received after 

the  stipulated  date  and  time  is  over, will  either  not  be  accepted  or  if  inadvertently 

accepted, will not be opened and shall be returned to the tenderer unopened.  

13. Opening of tenders. 

         The bids will be opened on date and  time as stipulated  in detail tender notice  in 

the Office of The Executive Engineer, Mhaisal Electrical & mechanical Division, Sangli  in 

the presence of Tenderers or their authorized representatives, if they  intend to remain 

present.   

           Following procedure will be adopted for opening of tenders. 

 

Page 23: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

23 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Envelope No.1 

          First Envelope No.1 of the bid will be opened online to verify  its contents as per 

requirement.  If  various  documents  contained  in  this  envelope  do  not  meet  the 

requirement as mentioned in 11, then Envelope No.2 will not be opened. 

Envelope No.2 

          This envelope shall be opened immediately after opening of Envelope No.1, only if 

contents of  Envelope No.1 are found to be acceptable to the Corporation. 

 14. Key Dates:   

               The tenderers are strictly advised to follow the Dates and Times as  indicated  in 

the Time Schedule in the Notice Inviting Tender. All the online activities are time tracked 

and  the  e‐Government  Procurement  System  enforces  time‐locks  that  ensure  that  no 

activity or transaction can take place outside the Start and End Dates and Time of the 

stage as defined in the Notice Inviting Tenders. 

( Note :‐ Award / Work Order will be Done Manually by The Department.)  

15.  The  tenderers  shall  study  the  guidelines  regarding  e‐tendering  to  get  clarify  e‐

tendering procedure. 

Guidelines to Contractors Regarding Government of Maharashtra – tendering  system 

15.1. Registration of the Contractors: 

The Contractors registered in Maharashtra in relevant categories and Classes are eligible 

to participate  in this open tender process. Contractors are required to get enrolled on 

the  Portal  http://maharashtra.etenders.in  &  sub  portal 

http://mkvdc.maharastra.etender.in  and  get  and  empanelled  in  relevant  sub  portal. 

After submitting their enrollment request online, the enrollment shall be required to be 

approved  by  the  Representative  of  the  Service  Provider.  After  the  approval  of 

enrollment, the Contractors shall have to apply for empanelment online which shall be 

required to be approved by the Nominated Authority of Maharashtra/Department. Only 

Page 24: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

24 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

after  the  approval  in  the  relevant  Category  /  Class,  the  Contractor  shall  be  able  to 

participate in the Open Tenders online. Open Tenders in which eligible Contractors may 

enroll on the Portal  in registered category shall be able to participate  in such Tenders. 

The  online  Enrollment  of  such  Contractors  shall  be  required  to  be  approved  by  the 

Representative  of  the  Service  Provider.  The  approval  of  enrollment  of  Contractors  is 

done  by  the  Representative  of  the  Service  Provider  upon  submission  of mandatory 

documents  by  the  Contractors.  The  Contractors may  obtain  the  list  and  formats  of 

required documents  from  the Nodal Officer of e‐Tendering System  for Government of 

Maharashtra / Service Provider. 

15.2. Obtaining a Class II – Digital Signature Certificate: 

            The Bids required to be submitted online should be signed electronically with a 

Class  II  –Digital  Signature  Certificate  to  establish  the  identity  of  the  Bidder  bidding 

online.  These  Digital  Certificates  are  issued  by  an  approved  Certifying  Authority, 

authorized  by  the Controller  of Certifying Authorities, Government  of  India. A Digital 

Signature  Certificate may  be  used  in  the  name  of  Authorized  Representative  of  the 

Organization. A Digital Certificate  is  issued upon  receipt of mandatory  identity proofs. 

Only upon the receipt of the required documents, a Digital Signature Certificate can be 

issued. Bid  for  a particular Tender may be  submitted only using  the Digital  Signature 

Certificate, which  is used to encrypt the data and sign the hash during the stage of Bid 

Preparation and Hash Submission. In case, during the process of a particular Tender, the 

Authorized User  looses his  / her Digital  Signature Certificate  (i.e. due  to  virus  attack, 

hardware problem, operating system problem); he / she may not be able to submit the 

Bid online. Hence, the Authorized User  is advised to back up his / her Digital Signature 

Certificate and keep the copies at safe place under proper security to be used in case of 

emergencies. In case of online tendering, if the Digital Signature Certificate issued to the 

Authorized User of a Firm is used for signing and submitting a Bid, it will be considered 

equivalent  to  a no objection  certificate  / power of  attorney  to  that User.  The Digital 

Signature Certificate should be obtained by the Authorized User enrolling on the behalf 

Page 25: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

25 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

of  the  Firm  on  the  e‐Tendering  System  for  Government  of Maharashtra.  Unless  the 

Digital  Signature  Certificate  is  revoked,  it  will  be  assumed  to  represent  adequate 

authority of the Authority User to bid on behalf of the Firm for the Tenders processed 

by  the Maharashtra as per  Information Technology Act 2000. The Digital Signature of 

this Authorized User will be binding on the Firm. It shall be the responsibility of Partners 

of  the  Firm  to  inform  the  Certifying  Authority  or  Sub  Certifying  Authority,  if  the 

Authorized  User  changes,  and  apply  for  a  fresh  Digital  Signature  Certificate.  The 

procedure for application of a Digital Signature Certificate will remain the same for the 

new Authorized User.  

The same procedure holds true for the Authorized Users in a Private / Public Limited 

Company.  In  this  case,  the Authorization Certificate will have  to be  signed by  the 

Directors  of  the  Company.  (process  of  procuring  Digital  Certificate  will  take 

minimum 4/5 days) 

15.3. Set up of Computer System: 

       In order to operate on the e‐Tendering System for Government of Maharashtra. The 

User’s  Computer  System  is  required  to  be  set  up.  A  Help  File  on  setting  up  of  the 

Computer System can be obtained  from the Service Provider or downloaded  from the 

Home  Page  of  the  Portal  http://maharashtra.etenders.in.  The  Bidders  may  refer 

e_Tendering  Tool  Kit  available  online  to  perform  their  online  activities  as mentioned 

below. In case of any query he may contact Help Desk for the same. 

15.4. Online Viewing of Detailed Notice Inviting Tenders: 

        The Contractors can view the detailed Notice Inviting Tenders and the detailed Time 

Schedule  (Key  Dates)  for  all  the  Tenders  processed  by  Maharashtra  using  the  e‐

tendering System for Government of Maharashtra on http://maharashtra.etenders.in. 

 

 

 

Page 26: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

26 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

15.5. Online Purchase / Download of Tender Documents: 

        The Tender documents can be purchased / downloaded by registered and eligible 

Contractors from the e‐Tendering System for Government of Maharashtra available on 

http://maharashtra.etenders.in. 

15.6. Submission of Bid Seal (Hash) of Online Bids: 

        Submission of Bids will be preceded by submission of the digitally signed Bid Seals 

(Hashes) as stated in the Tender Time Schedule (Key Dates) in the detailed Tender. 

15.7. Generation of Super Hash: 

        After the expiry of the time of submission of digitally signed Bid Seals (Hashes) by 

the Contractors has  lapsed,  the Bid  round will be  closed  and  a digitally  signed  Super 

Hash will be generated by the Authorized Officers of the Department. This is equivalent 

to sealing of the Tender Box. 

15.8. Decryption and Re‐encryption Online Bids: 

         Contractors have to decrypt their Bids and immediately re‐encrypt their Bids online 

and  upload  the  relevant Documents  for which  they  generated  the  respective Hashes 

during  the Bid  Preparation  and Hash  Submission  stage  after  the  generation  of  Super 

Hash within the date and time as stated in the Notice Inviting Tenders (Key Dates). The 

Bids  of  only  the Contractors who  have  submitted  their Bid  Seals  (Hashes) within  the 

stipulated time, as per the Tender Time Schedule (Key Dates), will be accepted by the e‐

Tendering System  for Government of   Maharashtra. A Contractor who has not submit 

his Bid Seals (Hashes) within the stipulated time will not be allowed to submit his Bid.  

           For  submitting  the  Bids  online,  the  contractors/bidders  are  required  to make 

online payment using the electronic payments gateway service Bid Submission Fee. The 

different modes of electronic payments available on the e‐tendering portal. 

 

 

Page 27: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

27 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

15.9 Submission of Earnest Money Deposit: 

          Contractors  have  to  submit  the  Earnest  Money  Deposit  in  a  Sealed  Physical 

Envelope and the same should reach the Office of the concerned Official before the last 

Date and Time as Stated  in Tender Documents. Contractors are required to keep their 

Earnest Money Deposit  ready as  the details of  the Earnest Money Deposit  instrument 

are required to be entered during the Bid Preparation and Hash Submission stage. The 

details of the Earnest Money Deposit shall be verified during the Tender Opening event 

and only those Contractors whose online Earnest Money Deposit details shall be found 

matching with the physical Earnest Money Deposit  instrument shall be short  listed  for 

opening of other envelopes. 

16.  Definitions and interpretations: 

In  this  tender  document  the  following  terms  shall  have  the meanings  hereby 

assigned to them except where the context otherwise requires. 

a)  “Corporation”  shall  mean  the  Maharashtra  Krishna  Valley  Development 

Corporation,  Pune  acting  through  its  Executive  Director,  as  defined  in 

Maharashtra Act XV  of 1996. 

Maharashtra Krishna valley Development Corporation, Pune is a body corporate 

constituted under the Maharashtra Act XV  of 1996 and has been established by 

the  notification  published  in  the  Gazette  Irrigation  Department  dated 

04/04/1996. The head quarters of the Maharashtra Krishna Valley Development 

Corporation  , Pune (MKVDC,Pune or MKVDC for short, and hereinafter referred 

to only as Corporation) is Pune. The official postal address for correspondence is  

   The Office Of The Executive Director  

  Maharashtra Krishna Valley Development Corporation, 

Sinchan Bhavan, Barne Road,  

Mangalwar peth,  

Pune‐411 011 

Page 28: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

28 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

General Information: 

The  functions  and  powers  of  the  Corporation  have  been  listed  in  the 

Maharashtra Act XV of 1996 .In general,  it has been entrusted with the work of 

investigation,  Planning,  Designing  of  projects,  maintenance  of  completed 

projects,  construction  of  projects  and  irrigation  management  of  the  Major, 

Medium and Minor projects ( command area more than 250 Ha.) in the Krishna 

River  Basin.  The  Projects  comprise  irrigation,  along  with  command  area 

development and multipurpose schemes. The projects are to be completed so as 

to utilize water  in Krishna basin (about 599 TMC) allotted to Maharashtra state 

by Krishna Water Dispute Tribunal.  It  is expected  to  complete  further ongoing 

and new works, so as to utilize the 599 TMC of water from Krishna basin. 

b)   Chief Engineer shall mean Chief Engineer (Elect.), Hydro Projects  Mumbai.    

c)  “Engineer / Engineer‐in‐charge” shall mean the Executive Engineer  in Charge of 

the    works  and  shall  also  include  the  Superior  Officers  of  the  Engineering 

Department  i.e.  the  Superintending  Engineer  of  respective  Circle  /  chief 

Engineer.  

d)  “Engineer’s  representative”  shall  mean  the  Deputy  Engineer  who  is  direct 

incharge  of  the  works  and  shall  include  any  Electrical  Engineer  of  the 

Corporation.  

 e)  “Contractor” shall mean the person, firm or company who enters  into contract, 

with  the  Corporation  and  shall  include  their  executors,  administrators, 

successors and submitted assignees. 

f)  “Contract”  shall  mean  and  include  agreement  having  completely  tender 

document with specification & drawings. 

g)  “Work” shall mean the work to be executed in accordance with contract.  

h)  “Specifications” shall mean the specifications for material and works as specified 

in section  XI of the contract. 

Page 29: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

29 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

i) “Drawing”  shall mean prints of  the maps, drawings, plans  in  section XII of  the 

contract  and  shall  include  any modifications  of  such  drawing  and  any  further 

drawings as may be issued by the Engineer‐in‐Charge from time to time. 

j)  “Site” shall mean the land and the other places on under, in which the works are 

carried out and any other lands or places provided by the Corporation. 

k)  “Defect(s) liability period” shall mean period of 12 months from the date of issue 

of completion certificate by the Engineer‐in‐charge. 

16.2   Singular & plural :  

Works  importing  the singular number shall also  include  the plural & vice versa 

Where the context requires. 

16.3   Heading and Marginal Headings :  

The headings & the marginal headings in the contract are solely for the purpose 

of  facilitating  references and  shall not be deemed  to be part  thereof or  taken 

into consideration in the interpretation construction thereof or of the contract. 

17  PRE‐TENDER CONFERENCE: (NOT APPLICABLE) 

1)  Pre‐tender  conference open  to  all prospective  tenderers which will be held  in 

the office  as  stated  in detailed notice. Wherein  the prospective  tenderers will 

have an opportunity  to obtain clarifications regarding  the work and  the  tender 

conditions. 

2)  The prospective tenderers are free to ask for any additional clarification either in 

writing or orally and the reply to the same will be given by the Superintending 

Engineer, in writing / E‐mail and these clarifications referred to as common set of 

conditions, shall form part of tender documents and which will also be common 

and applicable to all tenderers. 

3)  The  tender  submitted  by  the  tenderer  shall  be  based  on  the  clarification 

additional  facility  issued  (if  any)  by  the  Corporation  and  this  tender  shall  be 

Page 30: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

30 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

unconditional.  Conditional  tenders  will  be  summarily  rejected  as  non‐ 

responsive.  

4)  All tenderers are cautioned that the tenders containing any deviation  from the 

contractual  terms  and  conditions,  specifications  or  other  requirements  and 

conditional tenders will be rejected as non responsive. 

18  INSTRUCTIONS FOR SUBMISSION OF ENVELOPE NO ‐ 1     

Scanned Documents  to  be  submitted  in  Envelope No.  1  online &  in  hardcopy 

shall conform to the instructions given below.  

i) a)    EARNEST MONEY 

The Tenderer shall pay the earnest money deposit  in the form Demand Draft & 

Bank Guarantee from any Nationalised/ Scheduled Bank on the branch situated 

in the State of Maharashtra for a period of 120 days from the date of submission 

of  tender  for  an  amount  as  stated  in  the Annexure A.  –  (1.3)  in  the name  of 

Executive Engineer, Mhaisal Elect. & Mech. Dn., Sangli as stated in Annexure A.  

b) ADDITIONAL EARNEST MONEY 

In  case  Contractor’s  offer  is  less  than  90%  of  the  estimated  cost,  additional 

earnest money in the form of DD or  irrevocable Bank Guarantee for a period of 

120 days from the date of submission of tender and for an amount equal to the 

10% of the difference of the Contractor’s offer and 90% of the estimated cost as 

stated  above  shall  be  uploaded  in  Envelope  No.2.  Non  Submission  of  Bank 

Guarantee will result into outright rejection of the tender. 

The earnest money amount shall not carry any interest whatsoever. The earnest 

money will be  refunded  ( and Bank Guarantee,  if any, will be  released)    in  the 

case of tenderers whose tenders are not accepted, only after completion of all 

formalities  in  respect of  the accepted  tender or  in case of expiry of validity of 

offer,  when  specially  withdrawn  by  the  tenderer.  In  the  case  of  successful 

tenderer,  the  earnest  money  will  be  refunded  after  completion  of  contract 

Page 31: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

31 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

documents and payment of security deposit or converted into Security Deposit if 

required. 

ii)a)  SECURITY CUM PERFORMANCE DEPOSIT 

The security deposit will have  to be deposited  in  the  form of D.D. / BG by  the 

Contractor  at  the  time  of  completing  the  contract  documents,  if  his  tender  is 

accepted by the Corporation. 

The earnest money deposited by the Contractor with his tender will be retained 

by  the  Corporation  as  part  of  security  deposit.  The  balance  to make  up  this 

security  deposit may  unless  otherwise  specified  in  the  special  conditions  be 

deposited  by  the  Contractor  in  the  form  of  D.D.  The  security  deposit will  be 

retained by the Corporation for the due and faithful fulfillment of the contract by 

the Contractor  . In addition to the  sum above sums as Security Deposit will be 

deducted  from running account bills at the rate shown at Memorandum  in B‐1 

tender from to total up to a sum mentioned at Memorandum.  

The securities deposit shall be valid up to expiration of warranty period. 

b)  ADDITIONAL SECURITY DEPOSIT  

In  case  Contractors  offer  is  less  than  90%  of  the  estimated  cost,  Additional 

Security Deposit  in the form of DD or  irrevocable   Bank Guarantee for a period 

equal to period of contract and for an amount equal to the 10% of the difference 

of  the Contractors  offer  and  90%    of  estimated  cost  as  stated  above  shall  be 

submitted.    Security Deposit will be  refunded  after  the expiry of  the defect(s) 

liability (maintenance) period as stipulated in the contract.  

19   INSTRUCTIONS FOR SUBMISSION OF ENVELOPE NO. 2 

Documents  to be  submitted  in Envelope No.2  shall  conform  to  the  instruction 

given below.  

 

Page 32: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

32 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

i)  CONTRACTOR TO INFORM HIMSELF FULLY : 

The  tenderer  shall be deemed  to have  fully acquainted himself with  the work 

and  site  conditions  and  carefully  examined  the  special  conditions  ,  the 

specifications  ,  schedules  and  drawings  and  shall  be  deemed  to  have  fully 

informed himself regarding the  locations conditions. The tenderer shall also   be 

deemed to have fully acquainted with the various activities and positions of the 

manufacturer, supply of raw , semi‐ finished , finished , bought out material and 

equipment etc.  

ii)  CONDITIONAL TENDER  

Conditional Tenders will be summarily rejected . The tenders which do not fulfill 

any  of  the  conditions  of  the  notified  requirements  laid  down  in  this  detailed 

tender notice, the general rules and directions for the guidance of the tenderer 

as mentioned in the B‐1  form  or are incomplete in any respect , are likely to be 

rejected without assigning any reasons thereof.  

iii)  TENDER RATE  

The  tenderer  should  quote  his  offer  for  the  items  estimated  cost,  entered  in 

Schedule  ‘B’  ,  at  appropriate  place  in  B‐1  form,  both    in  figures  as well  as  in 

words  in  English  .  In  case  there  is  difference  between  the  rates  quoted  as 

expressed in words and in figures, the rates as expressed in words will be taken 

as  correct  irrespective of whether  it  is  lower or higher  than  that expressed  in 

figure .  

iv)  If the quoted offer by the tenderer is above or below 10% of the estimated cost 

then the tenderer shall furnish his rate analysis for all items costing Rs. 50,000/‐ 

(Fifty Thousand Only) and above put to tender in Envelope No.2 in justification of 

the workability of the rates . Tenderer shall also submit additional information in 

the analysis of the rates wherever called for by the Corporation, without which 

the offer will not be considered.  

Page 33: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

33 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

20.       TENDER UNITS: 

The  tender  has  been  invited  under  the Metric  System  of measurements.  The 

tenderer should particularly note the units mentioned  in Schedule  ‘B’ on which 

rates are to be based. 

21.  VALIDITY FOR 120 DAYS. 

The offer shall remain valid for a period of 120 (One hundred twenty days) from 

the date of the opening of tender, and thereafter until it is withdrawn by notice 

in writing by the tenderer, duly addressed to the authority and sent by R.P.A.D. If 

the acceptance of tender  is not communicated within 120 days or before and  if 

the offer  is withdrawn by the Contractor as aforesaid earnest money paid shall 

be refunded in full. 

Page 34: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

34 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

ANNEXURE – A 

DETAILED TENDER NOTICE, INFORMATION AND INSTRUCTION. 

A)   DESCRIPTION OF THE PROJECT :‐ 

The Krishna Koyna Lift  Irrigation Project envisages  lifting of water from Krishna river  in 

different  stages. Mhaisal  Stage  I &  II    are  located  at  distance  of  about  25  Kms  from 

Sangli. 

The power required for the pump house at Mhaisal Stage I & II is being supplied by the 

M.S.E.B.  through  220  KV  switchyard  located  at Narwad  Tal. Miraj Dist.  Sangli will  be 

stepped down  to 33 KV  through 220/33 KV power  transformer  in Narwad  switchyard 

and  then 33 KV double  circuit Transmission  line will  transmit power  to  switchyard at 

Stage  I  &  II  pump  house.  The  voltage will  be  then  stepped  down  to  6.6  KV  power 

transformer at respective stages and 6.35 / 11 KV (E) XLPE Power cable will be laid up to 

6.6 KV H.T. Panel in the pump house.  

B)  SCOPE OF THE WORK. 

Supply , Erection, Testing and Commissioning of lighting for switchyard & approach road 

@ Mhaisal LIS Stage I & II Tal. Miraj Dist. Sangli as per the drawing attached.    

C)  INFORMATION ABOUT WORK SITE : 

1.  Location of work                        :  Near  village  Mhaisal  TAl.  Miraj,  Dist. 

Sangli 25 Km from Sangli.  

2.  Nearest Railway Station              :  Miraj Railway station 

3.  Roads  :  Approachable Road in all weather 

4.  Telephone & Telegram Facility  :  Mhaisal / Miraj. 

5.  Petrol & Diesel Pumps                :  Mhaisal / Miraj           

D)        SERVICE CONDITIONS:  

The  equipment  to  be  supplied  against  this  specification  shall  be  suitable  for satisfactory continuous operation under the following tropical conditions.    

(i)  Maximum ambient temperature in oC  40 

(ii)  Minimum ambient temperature in oC  10 

(iii)  Relative humidity in rainy season  65% 

(iv)  Averagae annual rainfall (in mm)  150‐200 mm 

(v)  Altitude above mean sea level  600 Mtr.  

(vi)  Maximum Wind Pressure  120 Kg. / Sqmm. 

Page 35: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

35 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

1.0  Details of Work 

1.1  Name of Work                       : Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach road @ Mhaisal LIS Stage -I & Stage -II 

1.2  Estimate Cost  : Rs. 20.74 Lakhs. 

1.3  Earnest  Money  (EMD) 

(1%)  (  Branch  of  Bank 

should  be  situated  in 

state of Maharashtra.) 

:  

  a) In the form of DD.  : Rs. 20,800/‐ 

  b)  In  the  form  of 

irrevocable  Bank 

Guarantee   

: Rs.  NIL 

 

  c) Total  : Rs. 20,800/‐ 

1.4  Additional  EMD  (if 

required)  To  assessed 

and paid as per para 18 i 

(b) of Section II.  

: Rs.  

1.5  Security Deposit (5%)  : Rs. 1,03,800 /‐ 

  i) Initial (2.5%)  :  

  a) In the form of D.D.  : Rs. 51,900 /‐ 

  b)  In  the  form  of  

irrevocable  Bank 

Guarantee  (  Branch  of 

Bank  should  be  situated 

in state of Maharashtra.) 

: Rs. ‐‐ 

 

  ii) From R.A. Bills (2.5%)  : Rs. 51,900 /‐ 

  a)  Additional  (if 

required)  To  assessed 

and paid as per para 18 ii 

(b) of Section II. 

: Rs. ‐‐ 

 

1.6  Class of Contractor  : “A” Class Electrical Contractor registered to 

P.W.D. Maharashtra 

Page 36: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

36 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

1.7  Date  ,  time and place of 

Pre‐tender conference.  

  Not Applicable 

1.8  Period  of  Completion  of 

Work 

: 3 Months. 

1.9  Updated  estimate  cost 

of  the work based upon 

Schedule of Rates for the 

year when  tenders were 

invited  (  Clause  38  of 

Section  IV  (1)  conditions 

of contract) 

: ‐‐ 

1.10  Name  and  Address  of 

the Executive Engineer in 

charge of work  in whose 

name  earnest  money 

and security deposit is to 

be pledged. 

: Executive  Engineer,  Mhaisal  Electrical  & 

Mechanical  Division, Warnali,  Vishrambag, 

Sangli 416 415. 

1.11  Name and address of the 

officer  receiving  Hard 

copy and online opening 

the bidding document 

: Executive  Engineer,  Mhaisal  Electrical  & 

Mechanical  Division, Warnali,  Vishrambag, 

Sangli 416 415. 

   

Page 37: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

37 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SECTION – II

B – 1 TENDER FORM AND TENDER FOR WORKS

SCHEDULE ‘A’

SCHEDULE ‘B’

Page 38: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

38 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SECTION  ‐ II 

B‐ 1 TENDER FORM ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 

 

PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 

MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION CIRCLE: ‐  Construction Circle, Kolhapur. DIVISION: ‐  Mhaisal Electrical & Mechanical Division Sangli.  

General Rules and Directions for the Guidance of Contractors 

1.  All works proposed to be executed by contract shall be notified in a form of invitation to 

tender notice pasted on a board hung up  in  the office of  the Executive Engineer and 

signed by the Executive Engineer.  

This  form will state  the work  to be carried out as well as  the date  for submitting and 

opening tenders and the time allowed for carrying out the work, also the amount of the 

earnest money  and  additional  earnest money  if  required  to  be  deposited  with  the 

tender and the amount of the security deposit and addition security deposit if required 

to be deposited by  the  successful  tenderer and  the percentage  if any  to be deducted 

from bills. Copies of the specification, designs and drawings, estimated rates scheduled 

rates and any other documents required in connection with the works shall be signed by 

the  Executive  Engineer  for  the  purpose  of  identification  and  shall  also  be  open  for 

inspection by contractors at the office of the Executive Engineers during office hours. 

Where  the  works  are  proposed  to  be  executed  according  to  the  specifications 

recommended  by a contractor and approved by a competent authority on behalf of the 

corporation such specifications with designs and drawing shall form part of the accepted 

tender.  

1. In the event of the tender being submitted by a firm, It must be signed by each partner 

thereof, and in the event of the absence of any partner, It shall be signed on his behalf 

by a person holding a power of attorney authorising him to do so.  

2A  The contractors  shall pay along with  the  tender  the  sum as  stipulated  in Annex  'A'  to 

section I as and by way of earnest money. The contractor may pay the and amount by 

forwarding along with  the  tender   demand draft drawn on bank and  in  favour of  the 

Executive Engineer as indicated in Annex A of Detailed Tender Notice.  

Page 39: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

39 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

ii) The  contractor  shall  also  enclose  irrevocable  bank  guarantee  of  sum  as  stipulated  in 

Annex A Sr. No. 1.4 if his offer is less than 90% of the updated estimated cost as stated 

at Sr. No. 1.9 Annex. A .  The said amount of earnest money shall not carry any interest 

whatsoever. 

iii) If after submitting the under the contractor withdraws his offer, or modifies the same or 

if  after  the  acceptance  of  his  tender  the  contractor  fails  or  neglects  to  furnish  the 

balance  of  security  deposit without  prejudice  to  any  other  rights  and  powers  of  the 

Corporation hereunder of in law.  Corporation shall be entitled to forfeit the full amount  

the earnest money and the additional Ernest money deposited by him  

iv) In the event of this tender not being accepted the amount of earnest money deposited 

by the contractor shall unless  it  is prior   there to forfeited under the provision of sub‐

clause (iii) above be refunded to him on his passing receipt therefore.  

2. Receipts for payments made on account of any work, when executed by a firm should 

also be signed by all  the partners except where  the contractors are described  in  their 

tender as firm which case the receipt shall be signed in the name of the firm by one of 

the partners or by some other person having authority to give effectual receipts of the 

firm.  

3. Any  person  who  submits  a  tender  shall  fill  up  usual  printed  form  stating  at  what 

percentage above or below  the  rates specified  in Schedule‐B  ( memorandum  showing 

items of work to be carried out) he  is willing to undertake the work.   The person who 

submits  the  tender  shall  also  fill  up  printed  form  of  schedule‐B  part‐II  Anticipated 

additional  items  as  foreseen  by  the  tenderer  wherein  the  tenderer  shall  mention 

itemwise quantity, rate and amount as assessed by him.  However the percentage above 

or below the rates specified in Schedule‐B ( Memorandum showing items of works to be 

carried out ) he  is willing to undertake the work, shall be applicable only for the  items, 

rates and quantities  stipulated  in Schedule‐B part –I.   Only one percentage on all  the 

estimated  rates  shall  be  named.    Tenderers who  propose  any  alternation  except  in 

connection with  Schedule –B part –II Anticipated  additional  items  as  foreseen by  the 

tenderer in the works specified in the said form of invitation to the tender or in the time 

allowed or carrying out the work or which contain any other conditions of any sort other 

Page 40: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

40 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

than  those  specified  in  this  tender documents will be  liable  to  rejection.   No printed 

form of  tender  shall  include  a  tender  for more  than one work but  if  contractor who 

wishes  to  tender  two  or more works  they  shall  submit  a  separate  tender  for  each.  

Tenders  shall  have  the  name  and  number  of  the work  to which  they  refer, written 

outside the envelope.  

4. The officer indicated in Annex 'A' to Section I ‐ detailed Tender Notice shall open tender 

in  the  presence  of  contractors  who  have  submitted  /  uploaded  tenders  or  their 

representatives who may be present at  the  time and he will enter  the amount of  the 

several tenders  in the comparative statement  in a suitable form  in the event of tender 

being accepted the contractor shall for the purpose of  identification sign copies of the 

specifications  and  other  documents  mentioned  in  Rule  1  in  event  of  tender  being 

rejected the competent officer shall refund the amount of the earnest money deposited 

by the contractor on his giving a receipt for the return of money.  

5. The officer competent  to dispose of the tenders shall have the right of rejecting all or 

any of the tenders.  

6. No receipt for any payment alleged to have been made by a contractor in regard to any 

matter relating to this tender or the contract shall be valid and binding on corporation 

unless it is signed by the Executive Engineer.  

7. No materials of any type required for the work shall be supplied by the Corporation. All 

the  work  shall  be  executed  by  the  tenderer  with  his  own  material(s)  .    The 

memorandum of work to be tendered for shall be filled in and completed by the office 

of  the  Executive  Engineer  before  the  tender  own  is  issued.    If  a  form  issued  to  an 

intending  tenderer has not been  so  filled  in  and  completed he  shall  request  the  said 

office to have this done before he completes and delivers his tender.  

8. All work  shall be measured net by  standard measure  and  according  to  the  rules  and 

customs of the Corporation and without reference to any local custom.  

9. Under no circumstances shall any contractor be entitled  to claim entered  for  items  in 

this contract.  

11.  All corrections additions or pasted slips should be initialed.   

Page 41: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

41 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

12.  The measurements of work shall be taken according to the usual methods a use  in the 

Corporation  and  no  proposals  to  adopt  alternative methods  will  be  accepted.    The 

Executive Engineer's decision as to what  is the usual method  in use  in the corporation 

will be final.   

The measurements  shall be  recorded  in  the measurement Book  (MB) on  the basis of 

Field Book (FB) (for leveling purpose) in black ink.  The all(s) FB(s) shall be the property 

of corporation.   The rules of measurements as stipulated  in the MPW Manual shall be 

applicable "Mutatis  ‐ Mutandis" On completion of  the work /  termination of contract, 

the MS(s) & FB(s) shall be property of the Corporation.  

The  contractor  shall  submit  certified  (certified  by  the  concerned  SDO/SDE/EE‐1/AEE) 

copies of the measurement sheet(s) related to the R.A. bill/Final bill along with the R.A. 

Bill / Final Bill, without which his R.A. Bill / Final bill shall not be considered for payment.   

13.  In  view  of  the  difficult  position  regarding  the  availability  of  foreign  exchange  foreign 

exchange would be released by the Corporation for the purchase of plant & machinery 

required for the execution of the work contracted for.  

14.  The contractor will have to construct shed for storing controlled and valuable materials 

at work site having double  locking arrangement.   The materials will be taken for use  in 

the presence of  the Corporation person.   No materials will be allowed  to be  removed 

from the site of works without prior permission of Engineer‐in‐charge.  

15.  Successful tenderer will have to produce to the satisfaction of the accepting authority a 

valid  and  current  license  issued  in his  favour under  the provision of Contract  Labour 

(Regulation and Abolition Act, 1970  ) before starting work  failing which acceptance of 

the  tender  will  be  liable  for  withdrawal  and  earnest  money  will  be  forfeited  to 

Corporation.  

16.  The  contractor  shall comply with  the provisions of  the apprentice act 1961 &  rules & 

orders  issued here under  from  time  to  time.    If he  fails  to do  so his  failure will be a 

breach of  the contract and  the Chief Engineer  / S. E. may  in his discretion cancel  the 

contract the contractor shall also be liable for any pecuniary liability arising on account 

of any violation by him of the act.  

Page 42: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

42 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

B‐1 TENDER FORM  

 

PERCENTAGE RATE TENDER & CONTRACT FOR WORKS.  

   

Tender for works    

  1. I/We hereby  tender  for the execution  for the 

Maharashtra  Krishna  Valley  Development 

Corporation ( here‐in‐before and here‐in‐after 

referred  to  as  Corporation  )  of  the  work 

specified  in memorandum as enclosed within 

the time specified in such memorandum at ‐‐‐‐

‐‐‐‐‐%‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

percent  below  /  above  the  estimated  rates 

entered  in  Schedule  'B'  and  in  accordance  in 

all  respects  with  the  specifications  designs. 

drawings  and  instructions  in writing  referred 

to in Rule 1 hereof. 

   

   In figure as well as in 

    words 

  2. I/We  agree  that  the  offer  shall  remain  open 

for acceptance  for a minimum period of 120 

days from the date fixed for opening the same 

& thereafter until it is withdrawn by me/us by 

notice  in  writing  duly  addressed  to  the 

authority  opening  the  tenders  and  sent  by 

registered post AD or other wise delivered at 

the office of such authority.  Demand Draft on 

IDBI  Bank    Sangli  or  any  Scheduled  Bank 

payable at Sangli respect to the sum of Rs. ‐‐‐‐

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ in words Rupees ‐‐‐‐‐‐‐‐‐‐‐‐‐‐

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

‐‐‐‐‐‐‐  representing  the  earnest  money  is 

herewith  forwarded.    Additional  earnest 

  Amount  to  be  specified 

in  words & in figures 

Page 43: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

43 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

money  in  the  form  of  Bank  Guarantee  as 

required  in  view  of  offer  being  lower  than 

10%  below  the  updated  estimated  cost  as 

stated  at  Sr.  No.1.9  of  Annex  'A'  is  also 

enclosed.  The amount of earnest money shall 

not  bear  interest  and  shall  be  liable  to  be 

forfeited  to  the  corporation  should  I/We  fail 

to (i) abide by the stipulation to keep the offer 

open  for  the  period mentioned  above  or  (2) 

sign & complete the contractor documents as 

required  by  the  Engineer  &  furnish  the 

security deposit & additional security deposit 

if  any  as  specified  in  Sr. No.  1.5  (I) &  (II)  at 

Annexure‐A  of  the  memorandum  enclosed 

within the time limit laid down in clause (a) of 

conditions of contract.  The amount of earnest 

money may be adjusted  towards  the security 

deposit or refunded to me/us  if so desired by 

me/us  in, writing,  unless  the  same  any  part 

thereof has been forfeited as aforesaid.  

 

  3. Should  this  tender  be  accepted  I/we  hereby 

agree  to abide by and  fulfill and  the  terms & 

provisions  of  the  conditions  of  Contract 

Special conditions of contract  included  in this 

booklet  to  Corporation  the  sum  of  money 

mentioned in the said conditions.    

   

 

Page 44: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

44 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  

  

MEMORANDUM  

 

a)  General Description   :  Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach road @ Mhaisal LIS Stage -I & Stage -II 

b)  Estimated Cost.  :  Rs. 20.74 Lakhs 

c)  Earnest money ( EMD )  :  Rs. 20,800/‐ Lakh In the form of D.D.  

d)  Additional  Earnest money  in  the form  of  Bank  Guarantee  if required. 

:   

e)  Security Deposit (SD) i) Initial ( In cash) ii) To be deducted from R.A. 

bills 

:  :  

Rs. 1,03,800/‐ Rs. 51,900 ( in the form of DD) Rs. 51,900/‐  

f)  Additional SD in the form of Bank Guarantee if required. 

:  ‐‐ 

g)  Percentage,  if  any,  to  be deducted from bills so as to make up  the  total  amount  required  as Security Deposit by the time, half the work as measured by the cost is due.  

:  5%  ( Five percent ) 

h)  Time  allowed  for  the work  from date  of  written  order  to commence.  

:  3 (Three)  calendar Months 

 

Signature of Contractor          Signature of Witness  

 

  Address               Address  

 

Date           Day of       Occupation  

 

The above tender is hereby accepted by me for and on behalf of the Corporation.  

 

Date           Day of            Signature of the officer  

( To be filled by tenderer )               by whom accepted   

Page 45: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

45 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE – A  

APPLICABLE FOR WORKS COSTING LESS THAN 100 LAKHS  Schedule showing ( Approx.) the material to be supplied from the departmental stores for work 

contracted to be executed preliminary and Auxiliary work and the rate at which they are to be 

charged for  

  

Sr. 

No. 

particulars  Quantity  Rates at which the material will be 

charged to the Contractor 

Place of 

Delivery 

  

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ Nil ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐       

 

Executive Engineer, Mhaisal Elect. & Mech. Dn., 

Sangli. 

Page 46: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

46 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

CONDITIONS FOR SCHEDULE 'A' 

Note:‐  

1) The person or  firm  submitting  the  tender  should  see  that  the  rates  in  the above 

schedule are filled up by the Engineer‐in‐charge. on the issue of the form prior to 

the submission of tender. 

2) The cost of cement shown above  is  inclusive of cost of empty cement bags. The 

empty cement bags need not be returned to the Corporation by the contractor. 

3) The charges for conveyance of the materials from the place of delivery to site of 

work will be borne by the contractor. All the materials shall be made available for 

delivery on working days during the office hours. 

4) The quantities    in Schedule  'A' are   approximate and may vary according  to  the 

actual and confide use in this work. 

5) All the materials mentioned  in Schedule  'A' required  for the work shall be taken 

from  the  Corporation  only.  The materials  from  the  outside  sources  in  lieu  of 

materials from. the outside sources in schedule 'A' shall not be allowed to be used 

except under writing permission from the Executive Engineer. The sample of such 

material shall be tested all contractors cost. The materials not conforming to the 

required standard shall be removed by the contractor at once from the site of the 

work at his cost. 

6) The materials  viz.  cement,  steel  etc.  lying  unused  with  the  contractor  after 

completion of the work and if they are not returned, the contractor shall pay for 

such materials  at]  double  the  rate  at which  the materials were  issued  to  him. 

Recovery of S.T. and G.T on the cost of surplus materials which are not returned 

by the contractor will be levied) as applicable and as per rules. 

7) The contractor will have to construct a shed with double locking arrangement at his 

own cost. 

 

 

 

Page 47: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

47 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

8) The contractor shall submit an account of all materials issued to him from time to 

time and whenever demanded and   before   final bill   is   produced.   Materials 

that cannot be accounted  for shall be recovered  from him at penal rates as may 

be decided by the Executive Engineer. 

9) Claim  for  extra  payment  on  delay  in  supply  of  these  materials  will  not  be 

entertained. 

10) Proper account of day to day consumption of materials  issued as per Schedule 

'A'  be  maintained by the contractor or his authorised  representative on site and 

it shall be checked  by the Corporation  Officer  even,' day in  token  of  its 

correctness. 

Page 48: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

48 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE‐B 

Name of the Work:  

Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach road

@ Mhaisal LIS Stage -I & Stage -II 

Qty.  Description of Item   Rate (Rs.)       

Per  Amount  (Rs.)           

   Part I :‐  

Supply,  Erection,  Testing  &  Commissioing  of Switchyard  &  approach  road  lighting  @ Mhaisal LIS Stage ‐ I. 

        

   ITEM NO:1          

28.00   Supplying  and  erecting  steel  tubular  swaged pole  139.7  x  114.3  x  88.9 mm  dia. with  4.5  x 3.65 x 3.25 mm thickness  (5 + 1.75 + 1.75 Mtr) length respectively and total 8.5 Mtr. long, with pole  cap,  base  plate  in  provided  foundation.  (Weight 109 Kg).  

12157.75 Each  340417.00

   ITEM NO:2        

28.00  Providing  cement  concrete  foundation including excavation for the poles 60 cm x 60 cm x 1.5 Mtr. deep  in 1:3:6 cement concrete  (20 x 25 stone metal) and 45 x 45 x 45 cm/45 cm dia x 45  cm  height  plinth  duly  plastered  and  with necessary  curing  and  finishing  in  an  approved manner.  

2134.96 Each  59778.88

   ITEM NO:3        

28.00  Supplying & erecting energy efficient T5  street light  suitable  for 4  x 24 watt T 5  lamp with pf >0.98 &.THD <10 The fitting canopy  is made   of deep  drown  Alluminium  body  ,  provided  with serrated acrylic diffuser and gasket. 

5641.58 Each  157964.24

   ITEM NO:4        

112.00  Supplying & erecting T5, 24 W energy efficient Fluoroscent tube.  

 

 

 

191.01 Each  21393.12

   ITEM NO:5        

Page 49: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

49 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Qty.  Description of Item   Rate (Rs.)       

Per  Amount  (Rs.)           

28.00  Supplying  and  erecting  street  light  bracket  for erection of single fitting on tubular welded pole with  40  mm.  Dia.,  1.0  Meter  long  'B'  grade G.I.pipe,  along  with    pole  cap  of  125mm  dia, 600mm long duly welded . 

829.86 Each  23236.08

   ITEM NO:6        

30.00  Supplying and Erecting FRP box of size 250 mm x 200 mm x 100 mm  2.7 mm thick complete, on pole.   

551.75 Each  16552.50

   ITEM NO:7        

224.00  Supplying &erecting mains with 2 x 2.5  sq mm FRLSstranded  copper pvc  insulated wire  laid  in provided inside pole. 

57.86 Mtr.  12960.64

   ITEM NO:8        

30.00  Supplying  and  erecting  and  marking  DPMCB single pole 6 Amp. to 32 Amp. 'B' Series (lighting ) in provided distribution board.  

520.77 Each  15623.10

   ITEM NO:9        

42.00  Supplying and erecting   G.I. Pipe  ‘A” Grade 40 mm  dia.  erected  for  enclosing  PVC  armoured cable on pole.  

196.73 Mtr.  8262.66

   ITEM NO:10        

1307.30  Supplying erecting PVC armoured cable  with ISI mark  4  Core  6  Sq.  mm.  aluminium conductor.complete  erected  with  Glands  and lugs on wall/pole/or laid in provided trench. 

181.30 Mtr.  237013.49

   ITEM NO:11        

1057.50  Making  trench  in  hard  murum/  Tar  road  of suitable width and depth for laying provided L.T. cable upto 10 Sq. mm. complete.  

86.97 Mtr.  91970.78

   ITEM NO:12        

130.00  Supplying erecting PVC armoured cable  with ISI mark  3.5  Core  25  Sq.  mm.  aluminium conductor.complete  erected  with  Glands  and lugs on wall/pole/or laid in provided trench. 

270.38 Mtr.  35149.40

   ITEM NO:13        

Page 50: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

50 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Qty.  Description of Item   Rate (Rs.)       

Per  Amount  (Rs.)           

1.00  Supplying and erecting Tripple pole and neutral distribution board  (TPNDB) with door surface / flush  mounted,  suitable  for  3  pole  MCCB  as incommer &  outgoing  TP MCB    of  4 ways  (12 POles) on iron frame  (Vertical Busbar type).  

6736.62 Each  6736.62

   ITEM NO:14        

1.00  Providing &  erecting 3 pole MCCB 63 Amp   of 25kA.  SC  rating  thermal  and magnatic  setting with provided leads on laminated board. 

5653.79 Each  5653.79

   ITEM NO:15        

4.00  Providing & erecting & marking TPMCB 40 Amp in provided distribution board   

1284.51 Each  5138.04

   ITEM NO:16        

2.00  G.I.  Sheet  1.6  mm.(16  gauge)  to  be  used  for fabrication of boxes panel board etc.  including, cutting,  bending,  drilling, welding,  riveting  etc. and  painting  with  one  coat  of  real  lead  paint and two coat of enamel paint. 

2028.42 Sq mtr. 

4056.84

   ITEM NO:17        

2.00  Supplying  and  erecting  self  locking arrangement with duplicate keys made of brass duly erected flush with surface of panel. 

188.30 Each  376.60

   ITEM NO:18        

2.00  Supplying and erecting Tripple pole iron clad H C rewirable fuse & switch 415/500V, 63Amp, with neutral link with on angle iron frame. 

3647.42 Each  7294.84

   ITEM NO:19        

2.00  Supplying  &  erecting    Gate    light  Fitting with 300  mm  dia  Opal  acrylic  bowl/  round  shape without bollard  suitable  for one 26W CFL  lamp on provided pipe. 

847.35 Each  1694.70

   ITEM NO:20        

2.00  Supplying & erecting  compact flou lamp 26 w 230 vintegral typecomplete with ceramic adopter & having p.f. more rhan 0.9  

248.28 Each  496.56

   Item No :21        

Page 51: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

51 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Qty.  Description of Item   Rate (Rs.)       

Per  Amount  (Rs.)           

20.00   Providing  and  erecting  ISI mark    G.I.  pipe  75 mm dia "C" class position with accessories. 

710.25 Mtr.  14205.00

   Item No :22        

102.60   Supplying and erecting Iron work for support to panel  box  complete  with  bending,  cutting, drilling  and  welding  complete  erected  at  the position  with  necessary  material  duly  painted with  one  coat  of  real  oxide  and  two  coats  of enamel  paint  to match  the  switch  gears  or  as direction of authority. ( size of  MS Angle 50 x 50 x 6 mm.).  

128.68 kg  13202.57

   Total Part I Rs.         1079177.45

   Part II :‐  

Supply,  Erection,  Testing &  Commissioning  of Switchyard  &  approach  road  lighting  @ Mhaisal LIS Stage ‐ II.  

       

   ITEM NO:23          

25.00   Supplying  and  erecting  steel  tubular  swaged pole  139.7  x  114.3  x  88.9 mm  dia. with  4.5  x 3.65 x 3.25 mm thickness  (5 + 1.75 + 1.75 Mtr) length respectively and total 8.5 Mtr. long, with pole  cap,  base  plate  in  provided  foundation.  (Weight 109 Kg).  

12157.75 Each  303943.75

   ITEM NO:24        

25.00  Providing  cement  concrete  foundation including excavation for the poles 60 cm x 60 cm x 1.5 Mtr. deep  in 1:3:6 cement concrete  (20 x 25 stone metal) and 45 x 45 x 45 cm/45 cm dia x 45  cm  height  plinth  duly  plastered  and  with necessary  curing  and  finishing  in  an  approved manner.  

2134.96 Each  53374.00

   ITEM NO:25        

35.00  Supplying & erecting energy efficient T5  street light  suitable  for 4  x 24 watt T 5  lamp with pf >0.98 &.THD <10 The fitting canopy  is made   of deep  drown  Alluminium  body  ,  provided  with serrated acrylic diffuser and gasket. 

5641.58 Each  197455.30

   ITEM NO:26        

Page 52: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

52 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Qty.  Description of Item   Rate (Rs.)       

Per  Amount  (Rs.)           

140.00  Supplying & erecting T5, 24 W energy efficient Fluoroscent tube. 

191.01 Each  26741.40

   ITEM NO:27        

15.00  Supplying  and  erecting  street  light  bracket  for erection of single fitting on tubular welded pole with  40  mm.  Dia.,  1.0  Meter  long  'B'  grade G.I.pipe,  along  with    pole  cap  of  125mm  dia, 600mm long duly welded .  

829.86 Each  12447.90

   ITEM NO:28        

27.00  Supplying and Erecting FRP box of size 250 mm x 200 mm x 100 mm  2.7 mm thick complete, on pole.   

551.75 Each  14897.25

   ITEM NO:29        

210.00  Supplying &erecting mains with 2 x 2.5  sq mm FRLSstranded  copper pvc  insulated wire  laid  in provided inside pole. 

57.86 Mtr.  12150.60

   ITEM NO:30        

27.00  Supplying  and  erecting  and  marking  DPMCB single pole 6 Amp. to 32 Amp. 'B' Series (lighting ) in provided distribution board.  

520.77 Each  14060.79

   ITEM NO:31        

37.50  Supplying and erecting   G.I. Pipe  ‘A” Grade 40 mm  dia.  erected  for  enclosing  PVC  armoured cable on pole.  

196.73 Mtr.  7377.38

   ITEM NO:32        

1023.55  Supplying erecting PVC armoured cable  with ISI mark  4  Core  6  Sq.  mm.  aluminium conductor.complete  erected  with  Glands  and lugs on wall/pole/or laid in provided trench. 

181.30 Mtr.  185569.62

   ITEM NO:33        

871.95  Making  trench  in  hard  murum/  Tar  road  of suitable width and depth for laying provided L.T. cable upto 10 Sq. mm. complete.  

 

 

86.97 Mtr.  75833.49

   ITEM NO:34        

Page 53: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

53 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Qty.  Description of Item   Rate (Rs.)       

Per  Amount  (Rs.)           

116.50  Supplying erecting PVC armoured cable  with ISI mark  3.5  Core  25  Sq.  mm.  aluminium conductor.complete  erected  with  Glands  and lugs on wall/pole/or laid in provided trench. 

270.38 Mtr.  31499.27

   ITEM NO:35        

1.00  Supplying and erecting Tripple pole and neutral distribution board  (TPNDB) with door surface / flush  mounted,  suitable  for  3  pole  MCCB  as incommer &  outgoing  TP MCB    of  4 ways  (12 POles) on iron frame  (Vertical Busbar type).  

6736.62 Each  6736.62

   ITEM NO:36        

1.00  Providing &  erecting 3 pole MCCB 63 Amp   of 25kA.  SC  rating  thermal  and magnatic  setting with provided leads on laminated board  

5653.79 Each  5653.79

   ITEM NO:37        

4.00  Providing & erecting & marking TPMCB 40 Amp in provided distribution board. 

1284.51 Each  5138.04

   ITEM NO:38        

2.00  G.I.  Sheet  1.6  mm.(16  gauge)  to  be  used  for fabrication of boxes panel board etc.  including, cutting,  bending,  drilling, welding,  riveting  etc. and  painting  with  one  coat  of  real  lead  paint and two coat of enamel paint. 

2028.42 Sq mtr. 

4056.84

   ITEM NO:39        

2.00  Supplying  and  erecting  self  locking arrangement with duplicate keys made of brass duly erected flush with surface of panel. 

188.30 Each  376.60

   ITEM NO:40        

2.00  Supplying and erecting Tripple pole iron clad H C rewirable fuse & switch 415/500V, 63Amp, with neutral link with on angle iron frame. 

3647.42 Each  7294.84

   ITEM NO:41        

2.00  Supplying  &  erecting    Gate    light  Fitting with 300  mm  dia  Opal  acrylic  bowl/  round  shape without bollard  suitable  for one 26W CFL  lamp on provided pipe. 

847.35 Each  1694.70

   ITEM NO:42        

Page 54: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

54 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Qty.  Description of Item   Rate (Rs.)       

Per  Amount  (Rs.)           

2.00  Supplying & erecting  compact flou lamp 26 w 230 vintegral typecomplete with ceramic adopter & having p.f. more rhan 0.9 

248.28 Each  496.56

   Item No :43        

5.00   Providing  and  erecting  ISI mark    G.I.  pipe  75 mm dia "C" class position with accessories. 

710.25 Mtr.  3551.25

   ITEM NO:44        

10.00  Supplying  and  erecting  street  light  bracket  for erection  of  double  fitting  on  tubular  welded pole with 40 mm. Dia., 1.0 Meter long  'B' grade G.I.pipe,  along  with    pole  cap  of  125mm  dia, 600mm long duly welded .  

1152.25 Each  11522.50

   ITEM NO:45        

102.60  Supplying and erecting Iron work for support to panel  box  complete  with  bending,  cutting, drilling  and  welding  complete  erected  at  the position  with  necessary  material  duly  painted with  one  coat  of  real  oxide  and  two  coats  of enamel  paint  to match  the  switch  gears  or  as direction of authority. ( size of  MS Angle 50 x 50 x 6 mm.).  

128.68 Each  13202.57

   Total Part II Rs.         995075.06

   Grand Total ( Part I + Part II) Rs.         2074252.51

   Say Rs.        2074253.00

 

In Words Rs. Twenty  Lacks Seventy Four Thousand Two Hundred Fifty Three only. 

 

Executive Engineer, Mhaisal Elect. & Mech. Dn., 

Sangli.  

Page 55: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

55 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SCHEDULE B  ‐ PART – II  

Schedule of quantities & bid rates for anticipated additional items as foreseen by the Contractor.  

  

Qty  Description of Item  Unit  Rate  In Fig.  In words (Rs.) 

Amount (Rs.) 

1  2  3  4  5 

     

     

     

     

     

     

     

     

     

     

  Total of part II   

Page 56: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

56 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Note 1 :‐    All  work  shall  be  carried  out  with  contractor’s  own materials  and  as  per  the 

specifications Part A & B.   

Note 2 :‐  All the columns  in the Schedule ‘B’ Part‐ II should be filled  in  ink and the total of 

the  entries  in  the  last  columns  should  be  struck  by  the  contractor  under  his 

signature.  

Note 3 :‐  Rates quoted include clearance of site ( prior to commencement of work and at its 

close) in all respects and hold good for work under all conditions of site, moisture, 

weather etc.  

Note 4 :‐  The  tender  %  as  quoted  by  the  tenderer  in  the  space  provided  for  in  the 

Memorandum of work shall be applicable only for the items, rates and quantities 

stipulated in schedule ‘B’ Part A & B, as put to tender by Corporation.  

Note 5 :‐   All the additional  item(s) as many as foreseen by the tenderer with quantity(es), 

rates(s),  amount(s)  and  the  detailed  description  shall  be  entered  in  to  by  the 

tender  in the space provided below Schedule  ‘B’ Part –  II. Anticipated additional 

items  as  foreseen  by  the  tenderer,    The  tenderer  is  free  to  attach  additional 

sheets,  if required by him and sign the sheets, which will form part form part of 

the tender.  

  The specifications for the additional  item(s) as foreseen by the tender shall be  in 

conformity  with  the  nearest  comparable  item  stipulated  in  the  Hand  book  of 

standard  Specifications  (PWD)  and  the  applicability  shall be decided before  the 

acceptance the tender.  

Note 6 :‐  The amounts of all the  items of Part – A & B  of schedule ‘B’ with % ( + or ‐) and 

the amount of Part – II of Schedule ‘B’ will be totaled and this will be considered 

as the offer of the tenderer.  

Note 7:‐  The work  in additional  items  in Schedule  ‘B’ Part –  II shall be paid for only when 

executed.  

Note 8:‐  The  provisions  of  Price  variation  para  No.  54  of  Special  condition  shall  be 

applicable for the work executed under Additional item of Schedule ‘B’ of Part – II.  

Page 57: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

57 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The provision of Clause 38 conditions of contract – Quantity Variation clause will 

not be applicable to the Additional items in Schedule ‘B’ of Part – II.  

Note 9 :‐  Quantities  indicated  in Schedule  ‘B’ Part –  II by  the contractor are  fixed shall be 

paid  only  on  execution.    No  payment  in  excess  of  these  quantities  will  be 

admissible.  

Note 10 :‐  As per format of price break up enclosed. 

Page 58: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

58 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SECTION – III

APPENDIX

Page 59: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

59 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX ‐ A  

DETAILS OF TECHNICAL PERSONNEL WITH THE CONTRACTOR  

 

Sr. No. 

Description  Name  Length of service in the firm 

Qualifications  Professional experience and details of works carried out 

Remark 

1  Project Manager   

 

       

2  Works Manager        (Electrical Senior Engineer) 

         

3  Engineers (Electrical ) 

 

 

       

4  Supervisors           

 

( Note :  If there is no technical personnel with your firm please give details how can your firm manage the same in remark column. ) 

 

 

 

Page 60: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

60 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

 

APPENDIX ‐ B 

 DETAILS OF PLANTS & MACHINERY IMMEDIATELY AVAILABLE WITH THE TENDERER FOR USE 

ON THIS WORK   

Sr. No. 

Name of Equipment 

No. of Units 

Kind of Make 

Capacity  Age and Condition 

Present Location 

Remarks

1  2  3  4  5  6  7  8 

          

              

                       

 Note :  If No machinery available with the firm please give details   how your firm will manage the same. 

Page 61: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

61 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

 

APPENDIX ‐ C 

DETAILS OF WORKS OF SIMILAR TYPE AND MAGNITUDE CARRIED OUT BY THE TENDERER 

 

Sr. No. 

Name of Work 

Place   Tendered Cost Rs. in Lakhs 

Time in months which 

completed 

Date of completion 

Principal features 

1  2  3  4  5  6  7 

                

           

Page 62: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

62 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

 

APPENDIX ‐ D 

DETAILS OF OTHER WORKS TENDERED FOR AND  IN HAND ON THE DATE OF SUBMISSION OF TENDER 

 

Sr. No. 

Name of 

Work 

Place  Work in Hand Works Tendered for  Rem‐arks Tendered 

Cost  Rs. Lakh 

Cost of remaining work Rs. Lakh 

Anticipated date of completion Rs. Lakh  

Estimated Cost Rs. Lakh 

Date by which decision is expected 

Stipulated date of period of completion

1  2  3  4  5 6 7 8 9  10

            

                 

Page 63: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

63 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX ‐ E 

 DETAILS OF PLANTS & MACHINERY PROPOSED TO BE USED FOR WORKS BUT NOT 

IMMEDIATELY AVAILABLE    

Sr. No. 

Name of Equipment 

No. of Units 

Kind of 

Make 

Capacity If already owned If to be purchased ( When ? Month and 

year ) 

Rem‐arks Age and 

Condition Location Probable 

date of availability 

1  2  3  4  5 6 7 8 9  10

          

             

               

Page 64: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

64 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

 APPENDIX ‐ F 

 DECLARATION OF THE CONTRACTOR 

 

1.0 I  / We  ____________________________ Contractor(s),  hereby  undertake  that 

I/We shall pay the labourers engaged on the work as indicated in Annexure ‐ A to 

Section 1 ‐ Detailed Tender Notice, wages as per Minimum Wages Act, 1948 and 

amendments  thereto  applicable  to  the  zone  in  which  work  lies  and  act 

accordingly.    I/We  also  undertake  to  abide  by  the  various  laws  in  force  and 

extend necessary facilities and amenities to the staff and workers employed by 

me/us. 

2.0  I  / We  hereby  declared  that  I/We  have made myself  /  ourselves  thoroughly 

conversant with the local conditions regarding all materials and labour on which 

I/We have bidded my/our  rates  for  this work.   The  specifications of  this work 

have been carefully studied and understood by me / us before submitting  this 

tender. 

 

              Signature of the Contractor 

Page 65: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

65 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX ‐ G 

MODEL FORM OF BANK GUARANTEE BOND 

GUARANTEE BOND 

1.0  This deed of Guarantee is made on the _________________ by ______________  

_____________________________________  having  his  head  office  at 

______________ 

(hereinafter called the ‘said Contractor(s) from the demand under the terms and 

conditions  of  Agreement  dated  ___________ made  between  _____________  

and  ______________for  ____________________________  (hereinafter  called 

‘the Agreement) of additional security deposit for the due fulfilment by the said 

Contractors  of  the  terms  and  conditions  contained  in  the  said  Agreement  on 

production  of  a  Bank  Guarantee  for  Rs.  ____________  (Rs. 

________________________ only).   We, _____________________  (hereinafter 

referred  to  as  ‘the  Bank’)  at  the  request  of  _________________________ 

(Contractor)  do  hereby  undertake  to  pay  to  the Maharashtra  Krishna  Valley 

Development  Corporation,  hereinafter  referred  to  as  Corporation,  an  amount 

not exceeding Rs. ___________ against any loss or damage caused to or suffered 

by the Corporation by reasons of any breach by the said Contractor of any of the 

terms or conditions contained in the said Agreement. 

2.0  We, ____________________________________ (indicate the name of bank) do 

hereby  undertake  to  pay  the  amount  due  and  payable  under  this  guarantee 

without any demur, merely on a demand from the Corporation stating that the 

amount claimed is due by way of loss or damage caused to or would be caused 

to or suffered by the Corporation by reason of breach by the said Contractor(s) 

of any of the terms of conditions contained in the said Agreement or any reason 

of the contractor(s)    failure to perform the said agreement.   Any such demand 

made on  the bank  shall be conclusive as  regards  the amount due and payable 

Page 66: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

66 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

under  this  guarantee  shall  be  restricted  to  an  amount  not  execeeding 

Rs.________. 

3.  We  undertake  to  pay  to  the  Corporation  any  money  so  demanded  not 

withstanding any dispute or dispute raised by the Contractor(s) Supplier(s) in any 

suit  or  proceeding  pending  before  any  court  or  tribunal  relating  thereto,  our 

liability  under  this  present  being  absolute  and  unequivocal.    The  payment  so 

made by us under this bond shall be valid discharge of our liaibility for payment 

thereunder and  the Contractor(s) Supplier(s) shall have no claim against us  for 

making such payment. 

4.0  We,  __________________________________(indicate  the  name  of  Bank) 

further agree that the guarantee herein contained shall remain  in full force and 

effect during  the period  that would be  taken  for  the performance of  the  said 

Agreement  and  that  it  shall  continue  to  be  forcible  till  all  the  dues  of  the 

Corporation under or by virtue of the said Agreement have been fully paid and 

its  claims  satisfied  or  discharged  or  till  __________________  (Office  / 

Corporation)  of  ________________________  (indicate  the  name  of 

Administrative Officer) certifies that terms and conditions of the said Agreement 

have  been  fully  and  properly  carried  out  by  the  said  Contractor(s)  and 

accordingly  discharges  this  guarantee.    Unless  a  demand  or  claim  under  this 

guarantee is made on us in writing on or before the ______________ we shall be 

discharged from all liability under this guarantee thereafter. 

5.  We, ________________________________ (indicate the name of Bank) further 

agree with  the  Corporation  that  the  Corporation  shall  have  the  fullest  liberty 

without  our  consent  and  without  affecting  in  any  manner  our  obligations 

hereunder to vary any of the terms and conditions of the said Agreement or to 

extend  time  of  performance  by  the  said  Contractor  from  time  to  time  or 

postpone  for any  time or  from  time  to  time any of  the powers excercisable by 

the Corporation against the said Contractor(s), and to forth or enforce any of the 

Page 67: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

67 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

terms  and  conditions  relating  to  the  said  Agreement,  and we  shall  not  to  be 

relieved  from our  liability by  reason of  any  such  variation, or  extension being 

granted to the said Contractor(s) or  for any  forbearance, act or commission on 

the  part  of  the Corporation  or  any  indulgence by  the Corporation  to  the  said 

Contractor  or  by  any  such matter  or  thing whatsoever which  under  the  law 

relating to surety would, but for this provision, have effect of so relieving us. 

6.  This guarantee will not be discharged due  to  the change  in  the constitution of 

the Bank or the change in the constitution of the Contractors / Suppliers. 

7.  We,  ___________________________  (indicate  the  name  of  Bank)  lastly 

undertake  not  be  revoke  this  guarantee  during  its  currency  except  with  the 

previous consent of the Corporation in writing. 

  Date the __________  day of _____________ 20       

  for _____________________________ 

               

(Indicate the Name of Bank) 

 

Page 68: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

68 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX “H”  

INDENTURE FOR SECURED ADVANCES 

( For use in cases in which the contract is for finished work and the contractor has 

entered into an agreement for the execution of a certain specified quantity of work in a 

given time) 

THIS  INDENTURE  made  the  _________________  day  of    _________  between 

__________  expression  shall where  the  context  so  admits  or  implies  be  deemed  to 

include his executors, administrators and assigns) of the one part and the Maharashtra 

Krishna Valley Development Corporation, Pune  ( hereinafter called as  the Corporation 

which expression shall where the context so admits or implies be deemed to include his 

successors in office and assigns) of the other part. 

WHEREAS  by  an  agreement  dated  _______________  (  hereinafter  called  the  said 

Agreement) the Contractor has agreed. 

AND  WHEREAS  the  Contractor  has  applied  to  the  Corporation  that  he  be  allowed 

advances on the security of materials absolutely belonging to him and brought by him to 

the site of the works, the subject of the said Agreement for use  in the construction of 

such of the works as he has undertaken to execute at rates fixed for the finished work ( 

inclusive of the cost of material and labour and other charges) 

AND WHEREAS  the Corporation has  agreed  to  advance  to  the  contractor  the  sum of 

Rupees  _________  (  in  words,  Rupees 

_________________________________________)    on  the  aforesaid  security  and  has 

reserved to himself the option of making any further advance or advances on security of 

aforesaid nature, the quantities and other particulars of the materials on the security of 

which  the  advance  or  advances  are made  being  detailed  in  Part  ‐  II  of  the  running 

account bill for the said works, signed at the time being by the Contractor on. 

Page 69: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

69 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

NOW  THIS  INDENTURE  WITNESS  that  in  pursuance  of  the  said  Agreement  and  in 

consideration of the sum of Rs. ________________ on or before the execution of these 

presents paid to the Contractor by the Corporation ( the receipt whereof the Contractor 

both hereby acknowledge) and of such further advances ( if any) as may be made to him 

as aforesaid, the Contractor does hereby covenant and agree with the Corporation and 

declare as follows. 

1. That  the  said  sum of Rs.  ......................  so advanced by  the Corporation  to  the 

Contractors  as  aforesaid  shall  be  employed  by  the  Contractor  in  or  towards 

expediting  the  execution  of  the  said  works  and  for  none  other  purpose 

whatsoever.  

2. That  the material  detailed  in  the  said  running  account  bill  which  have  been 

offered  to  and  accepted  by  the  Corporation  as  security  are  absolutely  the 

Contractor’s  own  properly  and  free  from  encumbrances  of  any  kind  and  the 

Contractor will not make any application for or receive a further advance on the 

security of materials which are not absolutely his own properly, and  free  from 

encumbrances  of  any  kind  and  the  Contractor  indemnifies  the  Corporation 

against all claims to any materials in respect of which an advance has been made 

to him as aforesaid.  

3. That  the  materials  detailed  in  the  said  running  account  bill  and  all  other 

materials  on  the  security  of  which  any  further  advance  or  advances  may 

hereafter be made as aforesaid  (hereinafter  called  the  said materials)  shall be 

used by  the contractor solely  in  the execution of  the said works  in accordance 

with  the  directions  of  the  Divisional  officer,  Division  (hereinafter  caller  the 

Divisional officer) and in the terms of the said Agreement.  

4. That  the  Contractor  shall make  at  his  own  cost  all  necessary  and  adequate 

arrangement for the proper watch, safe custody and protection against all risks 

of  the  said materials and  that until used  in  construction as aforesaid,  the  said 

materials shall remain at  the site of  the said works  in  the Contractor’s custody 

and on his own responsibility and shall at all times be open to inspection by the 

Divisional  officer  or  any  officer  authorised  by  him.    In  the  event  of  the  said 

materials  or  any  part  thereof  being  stolen,  destroyed  or  damaged,  the 

Page 70: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

70 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Contractor will forthwith replace the same with other materials of like quality or 

repair and make good the same as required by the Divisional officer.  

5. That the said materials shall not on any account be removed from the site of the 

said works  except with  the written  permission  of  the  Divisional  officer  or  an 

officer authorised by him in that behalf.  

6. That  the  advances  shall  be  repayable  in  full  when  or  before  the  contractor 

receives payment from the Corporation of the price payable to him for the said 

works under  the  terms and provisions of  the  said agreement, provided  that  if 

any  intermediate  payments  are made  so  the  contractor  on  account  of  work 

done, then on occasion of each such payment, the corporation will be at liberty 

to make  a  recovery  from  the  contractor’s  bill  for  such  payment  by  deducting 

there from the value of the said materials then actually  used in the construction 

and in respect of which recover has not been made previously , the value for this 

purpose  being  determined  in    respect  of  each  description  of materials  at  the 

rates at which amounts of advances made under these presents were calculated.  

7. That if the Contractor shall at any time make any defaults in the performance or 

observance of any of the terms and provisions of the said agreement or of these 

presents, the total amounts of the advance or advances that may still be owing 

to  the  Corporation Maharashtra  shall  immediately  on  the  happening  of  such 

defaults  be  repayable  by  the  Contractor  to  the  Corporation  ,  together  with 

interest thereon at twelve percent per annum from the date of respective dates 

of  such  advance  of  advances  to  the  date  of  repayment  and  with  all  costs, 

charges,  damages  and  expenses  incurred  by  the  Corporation  in  or  for  the 

recovery thereof or the enforcement of this security or otherwise by reason of 

the default of the Contractor and the Contractor   hereby covenants and agrees 

with the Corporation to repay and pay the same respectively to him accordingly.  

8. That the Contractor hereby charges all the said materials with the repayment to 

the Corporation of the said sum of Rs. ................... and any further sum or sums 

advanced  as  aforesaid  and  all  costs,  charges,  damages  and  expenses  payable 

under  these presents PROVIDED ALWAYS and  it  is hereby agreed and declared 

that not with standing anything  in the said agreement and without prejudice to 

the powers contained  therein,  if and whenever  the covenant  for payment and 

Page 71: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

71 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Repayment  hereinbefore  contained  shall  become  enforceable  and  the money 

owing  shall  not be paid  in  accordance  therewith,  the Corporation may  at  any 

time thereafter adopt all or any of the following courses as he may deem best.  

a) Seize and utilise the said materials or any part thereof  in the completion of 

the said works on behalf of the Contractor in accordance with the provisions 

in that behalf contained in the said agreement, debiting the Contractor with 

the actual cost of effecting such completion and the amount due  in respect 

of advances under these presents and crediting the contractor with the value 

of  work  done  as  if  he  had  carried  it  out  in  accordance  with  the  said 

agreement and at  the  rates  thereby provided.  If  the balance  is against  the 

Contractor, he is to pay the same to the corporation on demand.  

b) Remove and sell by public auction  the seized materials or any part  thereof 

and out of  the moneys arising  from  the  sale,  retain all  the  sums aforesaid 

repayable to the Corporation under these presents and pay over the surplus ( 

if any) to the Contractor.  

c) Deduct all or any part of the money owing out of the security deposits  or any 

sum due to the contractor under the said Agreement.  

9. That  except  in  the  event  of  such  default  on  the  part  of  the  contractor  as 

aforesaid interest on the said advance shall not be payable.  

10. That  in the event of any conflict between the provisions of these presents and 

the  said  Agreement,  the  provisions  of  these  presents  shall  prevail  and  in  the 

event of any dispute or difference arising over the construction or effect of these 

presents, the settlement of which has not been hereinbefore expressly provided 

for  the  same  shall  be  referred  to  the  Superintending  Engineer, 

...................................................... Circle, whose decision shall be final.  

IN  WITESS  WHEREOF  the  said  .......................................  and 

....................................  ............................................. by  the order  and under  the 

direction of  the Corporation have hereunto  set  their  respective hands  the day 

and year first above written. Signed, sealed and delivered by the said Contractor 

in the presence.  

Witness 

Page 72: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

72 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Signature 

Name:‐ 

Address  

Signed by   ...............................  

by  the  order  and  direction  of  the  Maharashtra  Krishna  Valley  Development 

Corporation in presence of  

Witness :  

Signature :  

Name :  

Address : 

Page 73: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

73 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX ‐ I 

PROFESSIONAL TAX CLEARANCE CERTIFICATE 

This  is to certify that M/s. _______________________________________ of (address), is a registered dealer under the Maharashtra State Tax on Professions, Traders Callings and  Employment’s  Act  No.  XVI  of  1975,  holding  Registration  Certificate  No. ___________ w.e.f. ______________________.  The  said  dealer  has  paid  all  tax  dues  up  to  31st March  ___________  (previous  year) under  the  act.    The  dealer  has  paid  the  Professional  Tax  dues  for  the  employees mentioned below.   

Sr. No.  Name of the Employee  Designation 

 

 

 

 

 

 

   

 

There is no Profession Tax dues outstanding against the dealer under the act. This certificate is valid for ONE year from the date of issue.          

              Signature ______________ 

              Professional Tax Officer 

Place  :___________ 

Date   : ___________ 

Page 74: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

74 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX ‘J’ 

AGREEMENT 

Articles of agreement executed on this the _____________ of _________________ Two 

Thousand  Ten  and  _______________________  between  the  Executive  Engineer, 

MKVDC  (  hereinafter  referred  to  as  MKVDC  of  the  one  part  and  Shri 

__________________________________________________________  (  Name  and 

address of the tender) ( hereinafter referred to as “ the bounden”) of the other part. 

Whereas  in  response  to  the notification No. ____________ dated ________________ 

the  bounden  has  submitted  to  the  MKVDC  a  tender  for  the  work 

_________________________  _________________________  specified  therein  subject 

to the terms and conditions contained in the said tender.  

Whereas  the  bounden  has  also  deposited  with  MKVDC  a  sum  of  Rs. 

___________________  as  earnest money  for execution of  an  agreement undertaking 

the due fulfilment of the contract in case his tender is accepted by the MKVDC. 

Now these presents witness and it is mutually agreed as follows: 

1. In case the tender submitted by the bounden is accepted by the MKVDC and the 

contract  for  _________________________  is  awarded  to  the  bounden,  the 

bounden  shall within  _________  days  of  acceptance  of  his  tender  execute  an 

agreement with  the MKVDC  incorporating  all  the  terms  and  conditions  under 

which the MKVDC accepts his tender. 

2. In case  the bounden  fails  to execute  the agreement as aforesaid  incorporating 

terms and conditions. governing the contract, the MKVDC shall have power and 

authority  to  recover  from  the bounden any  loss or any damage  caused  to  the 

MKVDC by such breach, as may be determined by the MKVDC by appropriating 

the earnest money deposited by the bounden and if the earnest money is found 

to be  inadequate  the deficit amount may be  recovered  from  the bounden and 

his properties, movable and immovable in the manner hereafter contained.  

Page 75: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

75 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

3. All sums found due to the MKVDC under or by the virtue of this agreement shall 

be recoverable  from the bounden and his properties. movable and  immovable, 

under the provisions of the Maharashtra Land Revenue Code for the time being 

in  force  as  though  such  sums  are  arrears  of  land  revenue  and  in  such  other 

manner as the MKVDC may deem fit. 

4. I/We  ________________________________________________________  agree 

that  the  lead and  lift charges of construction materials are  incorporated  in  the 

agreement  and  is  accepted  and  no  additional  claims  will  be  made  on  this 

account. 

In witness whereof Shri. _________________________________________ ( Name and 

designation)  for  and  of  behalf  of  the  MKVDC  and  Shri. 

______________________________  ____________________  the  bounden  have 

hereunto set their hands the days and year shown against their respective signature. 

Signed  by  Shri.  __________________________________  date  ___________________   

in the presence of Witness. 

 

1. ____________________________________ 

2. ___________________________________ 

3.  

Signed by Shri ___________________________________ in the presence of witness. 

1. ____________________________________ 

2. ___________________________________ 

Page 76: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

76 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX ‐ K 

FORM OF TENDER FORWARDING LETTER 

(To be submitted in Envelope No. –1 ) 

 

To, 

Superintending Engineer,  Construction Circle,  Kolhapur. 

 

Subject ‐  Supply, Erection, Testing & Commissioning of lighting for

Switchyard & approach road @ Mhaisal LIS Stage -I & Stage -II 

Ref ‐  Tender No. B1/EE/ 08   / 2012‐2013. 

 

Dear Sir, 

1.  Having  examined  the  Tender  Document,  amendments  date  _________  the 

receipt of which  is hereby duly acknowledged   we  the undersigned undertake 

Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach 

road @ Mhaisal LIS Stage ‐I & Stage ‐II. 

2.  We,  the  undersigned  hereby  bid  in  accordance  with  the  said  instruction, 

conditions of contract, specifications, schedule and drawings. 

3.  We undertake, if our tender is accepted to commence work and to complete the 

work  for  the  items  specified  in  the  contract  reckoned  from  the  date  of 

‘Acceptance  of  Tender’  as  communicated  by  you.    Further, we  undertake  to 

provide a ‘Performance Security’ for an amount of 5 % (five percent) of the total 

contract price. 

4.  We agree  to abide by our  tender  for period of 120 days  fixed  for deadline  for 

submission of tender and in default, agree to forfeit to Corporation the amount 

of ‘Earnest Money’ furnished with the tender. 

Page 77: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

77 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

5.  Until a formal contract is prepared and executed, this tender together with your 

written acceptance  thereof and your notification of award constitute a binding 

contract between us. 

Earnest Money  for  an  amount  Rs.  ___________  in  favour  of  the  Executive  Engineer 

Mhaisal E & M Division, Warnali, Sangli is enclosed herewith. 

 

Yours faithfully, 

Signature ___________________ 

Designation _________________ 

for and on behalf of (Name of Company) 

Address  __________________________ 

Tel. No.   __________________________ 

Telex No.  __________________________ 

Fax No.  __________________________ 

Page 78: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

78 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

 APPENDIX – L 

EMD ASSIGNMENT FORM  

  Article of agreement executed of this the ___________________ of _____ 

_____________________________________and between the Executive Engineer 

MKVDC ( herein after referred to as MKVDC ) of the one part of Shri. ____________ 

_______________________________________ (Name and address of the tenderer ( 

hereinafter referred to as the bounden of the other part ).  

  Whereas the response to the notification No.___________ dated ______ the 

____________________bounded has submitted to the MKVDCS tender for the work 

__________________________specified therein subject to the terms and conditions 

contained in the said tender.  

  Whereas the bounden has also deposited with MKVDC a sum of Rs._______ 

____________________________ as earnest money for execution of an agreement 

undertaking the due fulment of the contract in case his accepted by MKVDC.  

 

Now these presents witness and it is mutually agreed as follows.  

1) In  case  the  tender  submitted  by  the  bounded  is  accepted  by  the  MKVDC  and 

contract  for  ________________________________________    is  awarded  to  the 

bounden  the  bounden  shall within  days  of  acceptance  of  this  tender  execute  an 

agreement with the MKVDC incorporating all the terms and conditions under which 

the MKVDC accepts his tender.  

2) In case the bounden fails to execute the agreement as aforesaid incorporating terms 

and conditions governing the contracts, the MKVDC shall be power and authority to 

recover  from  the bounden any  loss of any damage  caused  to  the MKVDC  in each 

bresch as may be determined by  the MKVDC by appropristing  the earnest money 

deposited by the bounden and  if the earnest money  is found to be  inadequate the 

deficit amount may be recovered from the bounden and his properties movable and 

immovable in the manner hereinafter contained.  

Page 79: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

79 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

3) All sums found due to the MKVDC under or by the virtue of this agreement shall be 

recoverable  from  the bounden  and his properties movable  and  immovable under 

the provisions of the Maharashtra  land revenue code for the time being  in force as 

though such sum are arrears of  land revenue an such other manner as the MKVDC 

may deem fit.  

4) In witness where of Shri.  _______________________  (Name  and  Designation)  for 

and  on  behalf  of  the  MKVDC  and  Shri.  ______________________________  in 

bounden  have  hereunto  set  their  hands  the  days  and  year  shown  against  their 

respective signature.  

 

Signed by Shri. ___________________________________ date ___________  in the 

present of witness.  

1) 

2) 

 

Signed  by  Shri.  _______________________________________  in  the  presence  of 

witness. 

1) 

2) 

 

Note :‐ The tenderer shall mention the work he intends to quote. 

Page 80: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

80 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

APPENDIX ‐ M 

POWER OF ATTORNEY 

(To be submitted in Envelope No.1) 

I,  _____________________________________________________  certify  that  I  am 

___________________________________________________________________ 

Secretary of the Corporation, Organized under the laws of _____________________and 

that  ___________________  the  Tender  No.  __________________  dated 

_____________ is authorised to bind the Corporation by authority of its governing body. 

 

 

              ________________________ 

                    ( SEAL) 

                SECRETARY 

 

Page 81: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

81 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SECTION – IV

CONDITIONS OF CONTRACT

Page 82: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

82 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

B – 1 TENDER FORM 

CONDITIONS OF CONTRACT 

A)  Security 

Deposit 

  Clause 1  :     The person  / persons whose  tender may be 

accepted  (  hereinafter  called  the  contractor,  which 

expression  shall  unless  excluded  by  a  repugnant  to  the 

context  include  his  heirs,  executors,  administrators,  and 

assigns ) shall (A) within 10 days (which may be extended 

by the Superintending Engineer concerned up to 15 days if 

Superintending  Engineer  concerned  up  to  15  days  if 

Superintending Engineer thinks fit to do so ) of the receipt 

by him of the notification of the acceptance of his tender 

deposit with the Executive Engineer in cash or corporation 

securities  endorsed  to  the  Executive  Engineer  a  sum 

sufficient which will make  up  the  initial  security  deposit 

specified  in  the  tender  form  at  para  (d)  (i)  of 

memorandum  provided  always  that  in  the  even  of  the 

contractor  depositing  a  lump  sum  by  way  of  security 

deposit  as  contemplated  at  (A)  above  then  and  in  such 

case  as  the  sum  so  deposited  shall  not  amount  as 

specified  in  memorandum  it  shall  be  lawful  for 

Corporation  at  the  time  of making  any  payment  to  the 

contractor  for work done under contract  to make up  the 

full  amount  of  security  deposit  as  specified  in 

memorandum at para (c) by deducting a sufficient sum at 

the rate specified at (g) of memorandum from every such 

payment  as  last  aforesaid  until  the  full  amount  of  the 

security  deposit  is made  up.   All  compensation  or  other 

Page 83: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

83 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

sums of money payable by the contractor to Corporation 

under the terms of his contract may be deducted from or 

paid by the sale of sufficient part of his security deposit or 

from  the  interest  arising  therefrom  or  from  any  sums 

which may become due by Corporation to the contractor 

under any other contract or transaction of any nature on 

any account whatsoever and  in the event  for his security 

deposit being reduced by reason of any such deduction or 

sale as aforesaid the contractor shall within ten days there 

after  make  good  in  cash  or  corporation  securities 

endorsed as aforesaid any sum of sums which  may  have  

been  deducted  from  or  raised  by sale  of  his  security  

deposit    of    any    part    thereof.    The  security  deposit 

referred  to  when  paid  in  cash  may  at  the  cost  of  the 

depositor be converted  into  interest bearing Corporation 

securities  provided  that  the  depositor  has  expressly 

desired this in writing. 

B)  Additional 

security Deposit 

  In case contractor’s offer  is  less than 90% of the updated 

(B)  Additional  Security  estimated  cost  as  stared  at  Sr. 

No.1.4a  of  Annexure  ‘A’  additional  Deposit.  Security 

Deposit  in  the  form of  irrevocable Bank Guarantee  for a 

period  equal  to  period  of  contract  and  for  an  amount 

equal to the difference to the contractor’s offer and 90 % 

of  the  updated  estimated  cost  as  stated  above  shall  be 

submitted  to  the  Engineer  in  charge  at  the  time  of 

completing tender documents. 

    Non submission of  the above Additional Security Deposit 

Page 84: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

84 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

will  result  into  forfeiture  of  the  E.M.D.  and  additional 

E.M.D. If the amount of the security deposit to be paid in a 

lump  sum  and    Additional    Security  Deposit  in  form  of 

irrevocable Bank Guarantee  is not paid within the period 

specified  at  (A)  above  the  tender/contract  already 

accepted shall be considered as   canceled and  legal steps 

taken against the contractor for recovery of the amounts.  

The  amount  of  the  Security  Deposit  lodged  by  the 

contractor  shall  be  refunded  along with  the  payment  of 

the  final  bill  if  the  date  up  to which  the  contractor  has 

agreed to maintain the work in good order is over.  If such 

date  is  not  over  only  50 %  amount  of  security    deposit 

shall be refunded along with the payment of the final bill.  

The    amount  of  Security  Deposit  retained  by  the 

Corporation shall be released after expiry of period up to 

which the contractor has agreed   to maintain the work  in 

good order is over.   In the event of the contractor failing 

of  neglecting  the  complete  rectification work within  the 

period up to which the contractor has agreed to maintain 

the  work  in  good  order  then  subject  to  provisions  of 

clauses 17 and 20 hereof  the amount of security Deposit 

retained  by  Corporation  shall  be  adjusted  towards  the 

excess  cost  incurred  by  the  Corporation  on  rectification 

work. 

    The Additional  Security Deposit  shall be  refunded  to  the 

contractor on  issuing of the completion certificate by the 

Engineer‐in‐charge as stipulated in the clause No. 7 of the 

contract  provided  that  the  Engineer‐in‐charge  if 

Page 85: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

85 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

demanded  in writing by the contractor shall from time to 

time release the Additional security Deposit in part which 

are in proportion to the amount of the completed work.  

Compensation of 

delay 

  Clause 2  : The  time allowed  for carrying out  the work as 

entered  in  the  tender  shall  be  strictly  observed  by  the 

contractor’s and shall be reckoned from the date on which 

the order to commence work id given to the contractor’s.  

The  work  shall  through  the  stipulated  period  of  the 

contract  proceeding  with  all  due  diligence  (  time  being 

deemed to be the essence of the contract on the part of 

the  contractor’s  )  and  the  contractor’s  shall  pay  as 

compensation  an  amount  equal  to  one  percent  or  such 

smaller  amount  as  the  Superintending  Engineer  ( whose 

decision  in  writing  shall  be  final  )  may  decide  of  the 

amount of the estimated cost of the whole work as shown 

in  the  tender  for  every  day  that  the  work  remains 

uncommenced or unifinished after the proper dates. And 

further  to ensure good progress   during execution of  the 

work,    the  contractor’s  shall  be  bound.  in  all  cases  in 

which  the time allowed for any work exceeds one month 

to complete  the part works  in specified  time slice as per 

the  programme  given  in  Annexure  A  to  Section  I  – 

Detailed Tender Notice / enclosed at the end of Schedule 

“B”. 

    If  the  contracotr’s  has  not  achieved  the  target  as  per 

physical programme of  all  items with  respect  to  time  as 

given  in  Annexure  “A”  to  Section  I  –  Detailed  Tender 

Page 86: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

86 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Notice / enclosed at the end of the Schedule “B” then the 

compensation will be  recovered with prior notice  to  the 

contracotr’s  till  the  achievement  of  particular  target  as 

decided by the Engineer‐in‐charge. 

    In the event of the contracotr’s failing to comply with this 

condition  he  shall  be  liable  to  pay  as  compensation  an 

amount equal  to one percent or such smaller amount as 

the Superintending Engineer     ( Whose decision in writing 

shall be  final  ) may decide of  the  said estimated  cost of 

the whole work  for  every  day  that  the  due  quantity  of 

work remains  incomplete : Provided always that the total 

amount of compensation to be paid under the provisions 

of this clause shall not exceed 10 percent of the estimated 

cost of  the work  as  shown  in  the  tender  Superintending 

Engineer, should be the final authority in this respect.  

Action when 

whole of security 

deposit is 

forfeited 

  Clause  3:  In  any  case  in which  under  any  clause  of  this 

contract  the  contractor’s  shall  have  rendered  himself 

liable to pay compensation amounting to the whole of his 

security  deposit  as  specified  at  para  (e)  of  the 

memorandum or in the case of  abandonment of the work 

owing to serious illness or death of the contractor’s or any 

other  cause.    The  Executive  Engineer  on  behalf  of  the 

Corporation shall have power to adapt following course.  

    To  rescind  the  contract  (  for  which  rescission  notice  in 

writing  to  the  contractor’s  under  the  hand  of  Executive 

Engineer  shall  be  conclusive  evidence  )  and  in  that  case 

the  security deposit and addition  security deposit of  the 

Page 87: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

87 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

contractor’s shall stand forfeited and be absolutely at the 

disposal of corporation.  

    In case the contract shall be rescinded under clause above 

the contractor’s shall not be entitled to recover or be paid 

any sum for any work therefore actually performed by him 

under  this  contract  unless  and  until  the  Executive 

Engineer shall have certified in writing the performance of 

the such work and the amount payable to him  in respect 

thereof and he shall only be entitle to be paid the amount 

so certified.  

    The contractor’s shall have no claim to compensation  for 

any  loss  sustained  by  him  by  reasons  of  his  having 

purchased or procured any materials or entered  into any 

engagements or made any advance on account of or with 

a view to the execution of the work or the performance of 

the contract.  The contractors; shall also be not eligible to 

tender  for  the  work  remaining  unexecuted  under  this 

contract.  

Action when the 

progress of any 

particular portion 

of the work is 

unsatisfactory 

  Clause 4  :  If progress of any particular portion of work  is 

unsatisfactory,  the  Executive  Engineer  shall 

notwithstanding  that  the general progress of  the work  is 

in accordance with the condition mentioned in clause 2 be 

entitled  to  take  action  as  under  after  giving  the 

contractors 10 days notice in writing.  

    The Corporation will have  to order  that  the work of  the 

contractor be measured up and to take such part there of 

Page 88: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

88 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

as  shall be un execute out of his hands and  to give  it  to 

another contractor to complete in which case all expenses 

incurred  to  advertisements  for  fixing  a  new  contracting 

agency  additional  supervisory  staff  including  the  cost  of 

work  charged  establishment  and  the  cost  of  the  work 

executed by  the new  contract  agency will be debited  to 

the  contractor  and  the  value  of  the  work  done  or 

executed  through  the  new  contractor  (  including 

escalation due  )  shall be credited  to  the contractor  in all 

respects and in the same manner and at the same rates as 

if  it  had  been  carried  out  by  the  contractor  under  the 

terms  of  this  contract.    The  certificate  of  the  Executive 

Engineer as to all the cost of the work and other expenses 

incurred  as  aforesaid  for  or  in  getting  the  unexecuted 

work done by  the new contractor and as  to  the value of 

the work so done shall be final and conclusive against the 

contractor.  

    In  case  the  cost  of  the  work  executed  through  a  new 

contractor and other allied expenses exceeding the value 

of  such work  credited  to  the  contractors  the  amount  of 

excess  shall  be  deducted  from  any  money  due  to  the 

contractor  by  Government  of  Corporation  under  the 

contractor  otherwise  howsoever  or  from  his  security 

deposit  and  additional  security  deposit  or  the  sale 

proceeds  thereof provided, however,  that  the contractor 

shall  have  no  claim  against  corporation  even  if  the 

certified value of the work done through a new contractor 

exceeds  the  certified  cost  of  such  work  and  allied 

expenses.    The  contractor  shall  have  no  claims  to 

Page 89: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

89 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

compensation  for any  loss sustained by him by reason of 

his having purchased or procured any materials or entered 

into any engagements or made any advances on account 

of  or with  a  view  to  the  execution  of  the work  or  the 

performance of the contract.  

    The contractor of the whole work shall not be considered 

eligible to tender for the execution of work so withdrawn 

from this contract.   The contractor will have no claim  for 

compensation for any loss sustained by him owing to such 

action.  

Contractor 

remains liable to 

pay compensation 

if action not taken 

under clause 3 & 4 

 

 

 

 

 

 

 

 

 

  Clause  5  :  In  any  case  in  which  any  of  the  powers 

conferred upon the Executive Engineer by clause 3 and 4 

here of shall exercised the non‐exercise thereof shall not 

constitute a waiving of any of  the  conditions hereof and 

such powers  shall notwithstanding be   exercisable  in  the 

event of any  future case of default by  the contractor  for 

which  under  any  clauses  hereof  he  is  have  become 

exercisable  and  the  same  shall  not  have  been  declared 

liable  to pay compensation amounting to the whole of his 

security  deposit  and  additional  security  deposit  and  the 

liability  of  the  contractor  for  past  and  future 

compensation shall remain unaffected in the event of the 

Executive Engineer taking action under clause 3 be may iif 

he  so  desires  take  possession  of  all  of  any  tools,  plant, 

materials  and  stores  in  or  upon  the  work  or  the  site 

thereof or belonging to the contractor of procure by him 

and intended to be used for the execution of the work or 

Page 90: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

90 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

 

 

 

 

 

 

 

 

 

 

Power to take 

possession of or 

require removal of 

or sale contractors 

plant 

any  part  thereof  paying  or  allowing  for  the  same  in 

account at  the  contract  rates or  in  the  case of    contract 

rates not being  applicable  at  current market  rates  to be 

certified  by  the  Executive  Engineer  whose  certificate 

thereof  shall  be  final.    In  the  alternative  the  Executive 

Engineer  may  after  giving  notice  in  writing  to  the 

contractor  or  his  clear  of  the  work  foreman  or  other 

authorised  agent  require  him  to  remove  such  tools  & 

plant materials or stores from the premises within a time 

to  be  specified  in  such  notice  and  in  the  event  of  the 

contractor failing to comply with any such requisition the 

Executive Engineer may  remove  them at  the  contractors 

expense or sell them by auction or private sale on account 

of  the  contractor  and  at  his  risk  in  all  respects  and  the 

certificate of the Executive Engineer as to the expense of 

any  such  removal  and  the  amount  of  the  proceeds  and 

expense  of  any  such  sale  shall  be  final  and  conclusive 

against the contractor. 

Extension of time    Clause  6:  If  contractor  shall  desire  an  extension  of  the 

time  for completion of work on  the ground of his having 

been  unavoidable  hindered  in  its  execution  or  on  any 

other ground he shall apply in  

    writing to the Executive Engineer before the expiration of 

the period stipulated in tender on or before the expiration 

of  30  days  from  the  date  on which  he was  hindered  as 

aforesaid or on which  the cause  for asking  for extension 

occured, whichever  is earlier and  the Executive Engineer  

Page 91: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

91 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

or  in  the  opinion  of  Superintending  Engineer  or  Chief 

Engineer as  the case may be  if  in his opinion  there were 

reasonable grounds  for granting an extension grant  such 

extension as he thinks necessary or proper be decision of 

the Executive Engineer / Superintending Engineer / Chief 

Engineer in this matter shall be final.  

Final certificate    Clause 7 :   On the completion of the work the contractor 

shall  be  furnished  with  a  certificate  by  the  Executive 

Engineer  (  hereinafter  called  the  Engineer‐in‐charge  )  of 

such completion but  so  such certificate  shall be given or 

shall  the work  be  considered  to  be  completed  until  the 

contractor  shall  have  removed  from  the  premises  on 

which  the work  shall have been executed all  scaffolding, 

surplus materials and  rubbish and  shall have  cleaned off 

the dirt from all wood work, door, windows , walls floor or 

their parts of any building  in or upon which the work has 

been executed or of which he may have had possession 

for  the purpose of executing  the work or until  the work 

have been measured by the Engineer‐in charge or where 

the measurements  have  been  taken  by  his  subordinates 

until  they have  received  approval of  the Engineer –  in – 

charge  the  said  measurements  being  binding  and 

conclusive against  the contractor.    If  the contractor  shall 

fail  to comply with  the  requirements of  this clause as  to 

the  removal of  scaffolding  surplus materials  and  rubbish 

and  cleaning  of  dirt  on  or  before  the  date  fixed  for  the 

completion of the work the Engineer‐in‐charge may at the 

expenses of the contractor, remove such  

Page 92: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

92 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

    scaffolding surplus materials and  rubbish and dispose off 

the  same  as  he  thinks  fit  and  clean  off  such  dirt  as 

aforesaid so incurred but shall have no claim in respect of 

any  such  scaffolding  or  surplus  materials  as  aforesaid 

except for any sum actually realised by the sale thereof. 

Payment on 

intermediate 

certificate to be 

regarded as 

advances 

  Clause  8  :  No  payment  shall  be  made  for  any  work 

estimated to cost  less than rupees one thousand till after 

the  whole  of  work  shall  have  been  completed  and  a 

certificate of  completion given. But  in  the  case of works 

estimated  to  cost more  than  rupees  one  thousand  the 

contractor shall on submitting a monthly part of the work 

then approved and passed by  the Engineer –  in – charge 

whose certificate of such approval and passing of the sum 

to  payable  shall  be  final  and  conclusive  against  the 

contractor  All  such  intermediate  payments  shall  be 

regarded as payments by way of advance against the final 

payments only and not a payments for work actually done 

and  completed  and  shall  not  preciude  the  Engineer‐in‐

charge  from  requiring  any  bad  unsound  imperfect  or 

unskillful  work  to  be  removed  or  taken  away  and 

reconstructed  or  re‐created  nor  shall  any  such  payment 

be considered as an admission of  the due perforation of 

the  contract  or  any  part  thereof  in  any  respect  or  the 

occurring of any claim nor shall  it conclude determine or 

effect  in  any  other way  the  powers  of  the  Engineer‐in‐

charge  as  to  the  final  settlement  of  the  accounts  or 

otherwise or in any other way very or affect the contract. 

The  final bill  shall be  submitted by  the contractor within 

Page 93: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

93 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

one month  of  the  date  fixed  for  the  completion  of  the 

work, otherwise the Engineer‐in‐charges certificate of the 

measurements and of the total amount payable for work 

shall be final and binding on all parties.  

Payment at 

reduced rates on 

account of items 

of work accepted 

as completed to 

be at the 

discretion of the 

Engineer‐in‐

charge 

  Clause 9 : The rates for several items of work estimated to 

the more than Rs. 1,000/‐ agreed to within, shall be valid 

only when the item concerned is accepted as having been 

completed  fully  in  accordance  with  the  sanctioned 

specifications.    In cases where  the  items of work are not 

accepted  as  so  completed  by  the  Engineer‐  in  –  charge 

may  make  payment  on  account  of  such  items  at  such 

reduced  rates  as  he  may  consider  reasonable  in  the 

preparation of final or on account bills.  

Bill in 

quadruplicate to 

be  submitted 

monthly – 

Measurement 

Recording by 

Engineer 

  Clause 10: A bill  shall be  submitted by  the Contractor  in 

each month on or before the date fixed by the Engineer‐

in‐charge for all work executed in the previous month  on 

the  basis  of measurements  recorded  by  the  authorised 

Engineer of the corporation.  

The measurements  for payments of running account bills 

shall  be  taken  by  the  authorised  Engineer  of  the 

corporation  in  the  presence  of  contractor  or  his 

authorised representative and shall be recorded in M.B. of 

corporation.  Based  on  the  above  measurements  the 

contractor  shall  have  to  submit  his  R.A.  bills  in  the  bill 

format.    

    Initial  levels before starting of work /  foundation  levels / 

final measurements shall be taken by authorised Engineer 

Page 94: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

94 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

of Engineer‐in‐charge  in the presence of contractor or his 

authorised representative and same shall be signed by the 

contractor in taken of his acceptance. 

    Contractor  shall  employ  a  qualified  Engineer  as  his 

authorised  representative  to  be  present  while  taking 

measurements by authorised Engineer of Corporation.  

    A bill shall be submitted by the contractor  in each month 

or before date fixed by the Engineer‐in‐charge for all work 

executed.   As far as possible the payment of the bills will 

be made monthly to the extent of availability of funds for 

the work under this contract.  

    However, the payment of final bill will be made after : 

    i)  Detailed  scrutiny  of  the  measurements  and  the 

acceptance of the bill there after. 

    ii) The contractor produces the challan of having made the 

payment  into  District  Treasury  in  respect  of  all  dues  of 

VAT  under  the  Maharashtra  VAT  on  transfer  of  goods 

involved in the execution of works contract Act. 2005. 

Bills to be on 

printed forms 

  Clause  11:  The  contractor  shall  submit  all  bills  on  the 

printed  forms  in  the  format approved by  the Engineer  in 

charge.   The charges  to be made  in  the bills shall always 

be entered at the rates specified in the tender.  In the case 

of  any  extra  work  ordered  in  pursuance  of  these 

conditions,  and  not  mentioned  or  provided  for  in  the 

tender at the rates hereinafter provided for such work.  

Page 95: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

95 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Stores supplied by 

Corporation.  

  Clause  12:  If  the  specification  or  estimate  of  the  work 

provides for the use of any special description of material 

to be supplied form the store of the corporation or if it is 

required that the contractor shall use certain stores to be 

provided by the Engineer  in charge       ( Such material and 

stores  and  the  prices  to  be  charged  therefor  an 

hereinafter mentioned being so  far as practicable  for the 

convenience of the contractor but not so as in any way to 

control the meaning or effect of this contract specified ion 

the  schedule  or memorandum  here  to  annexed.  )    The 

contractor  shall  be  supplied  with  such  materials  and 

stores as may be required from time to time to be sued by 

him for the purpose of the contract only and value of the 

full quantity of the materials and stores so supplied shall 

be  set  off  or  deducted  from  any  sums  then  due  or 

thereafter  to  become  due  to  the  contractor  under  the 

contract or otherwise or  from  the  security deposit or he 

proceeds  of  sale  thereof  it  the  security  deposit  or  the 

proceeds of sale  thereof  it  the security deposit  is held  in 

corporation  securities  the  same  or  sufficient  portion 

thereof  shall  in  that  case    be  sold  for  the  purpose.    All 

materials  supplied  to  the  contractor  shall  remain  the 

absolute property of corporation and shall on no account 

be  removed  from  the  sites  of  the work  and  shall  at  all 

times  be  open  for  inspection  by  the  Engineer‐in‐charge. 

Any such materials unused and in perfectly good condition 

at  the  time of completion or  termination of  the contract 

shall be returned to the corporation store  if the Engineer 

Page 96: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

96 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

in charge so requires by a notice in writing given under his 

hand but the contractor shall not be entitled to return any 

such  

    materials  except with  consent of  the  engineer  in  charge 

and he shall have no claim  for compensation on account 

of  any  such  material  supplied  to  him  as  aforesaid  but 

remaining unused by him or for any wastage in or damage 

to any such material. 

    Clasue 12(A)  :  If all stores of controlled materials such as 

cement,  steel  etc.  supplied  to  the  contractor  by 

corporation should be kept by the contractor under lock & 

key  and  will  be  accessible  for  inspection  by  Executive 

Engineer, or his authorised agent at all the times.  

Works to be 

executed in 

accordance with 

specifications 

drawings orders 

etc. 

  Clause  13:  The  contractor  shall  execute  the  whole  and 

every  part  of  the  work  in  the  most  substantial  and 

workman  like manner and both as  regards materials and 

every  other  respect  in  strict  accordance  with 

specifications.   The contractor shall also conform exactly.  

fully and faithfully to the designs, drawing and instructions 

in writings relating to the work signed by the Engineer  in 

charge  and  lodged  in  his  office  and  to  which  the 

contractor shall be entitle to have access for the purpose 

of  inspection  at  such  office  or  on  the  site  of  the work 

during  office  hours  the  contractor  will  be  entitled  to 

receive  three  sets  of  contract  drawing  and  tender  along 

with  the  work  order  free  of  cost  further  copies  of  the 

contract drawings and working drawing if required by him 

Page 97: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

97 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

shall  be  supplied  at  the  rate  of  Rs.  100/‐  per  working 

drawing except where otherwise specified.  

Alterations in 

specifications and 

designs not to 

invalidate 

contracts. 

  Clause  14  :  The  Engineer  in  charge  shall  have  power  to 

make  any  alterations  in  or  additions  to  the  original 

specifications. drawings  designs and instructions that may 

appear  to  him  to  be  necessary  or  advisable  during  the 

progress of the work and the contractor shall be found to 

carry out the work  in accordance with any  instructions  in 

this  connection  which  may  be  given  to  him  in  writing 

signed by the Engineer in charge and such alteration shall 

not invalidate the contract and any additional work which 

the contractor may be directed to do in he manner above 

specified as part of  the work  shall be  carried out by  the 

contractor on the same conditions in all respects on which 

he agreed to do the main work and at the same rates as 

are specified  in the tender for the main work.   And  if the 

additional and altered work included any class of  

 

 

Rates for works 

not entered in 

estimate or 

schedule of rates 

of the districts 

  work  for which no  rate  is  specified  in  this  contract  then 

such class of work shall be carried out at the rates entered 

in  the  schedule  of  rates  of  the  division  or  at  the  rates 

mutually  agreed  upon  between  the  Engineer‐in‐charge 

and the contractor which ever are lower.  If the additional 

or  already  work  for  which  no  rate  is  entered  in  the 

Schedule of  rates of  the division  is ordered  to be carried 

out before the rates are agreed upon then the contractor 

shall within seven days of the date of receipt by him of the 

order to carry out the work, inform the engineer in charge 

Page 98: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

98 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

of the rate which it is his intention to charge for such class 

of work. And  if the engineer  in charge dose not   agree to 

this rate he shall by notice in writing be at liberty to cancel 

his  order  to  carry  out  such  call  of work  and  arrange  to 

carryout  in  such manner  as  he may  consider  advisable 

provided  always  that  if  the  contractor  shall  commence 

work  or  incur  any  expenditure  in  regard  thereof  before 

the  rates  shall  have  been  determined  as  lastly  herein 

before  mentioned  then  in  such  case  he  shall  only  be 

entitled  to be paid  in  respect of  the work  carried out or 

expenditure  incurred  by  him  prior  to  the  date  of  the 

determination of  the  rate as aforesaid according  to  such 

rate of rates as shall be fixed by the engineer in charge in 

the event of a dispute, the decision of the Superintending 

Engineer of the circle will be final. 

    Where however, the work  is to be executed according to 

the  designs,  drawings  and  specifications,  recommended 

by  the  contractor  and  accepted  by  the  competent 

authority the alteration above referred to shall be within 

the  scope  of  such  designs  drawings  and  specification 

appended to the tender. 

Extensions of time 

in consequence of 

additions or 

alterations. 

  The  time  limit  for  the  completion  of  the work  shall  be 

extended  in  the  proportion  that  increase  in  its  cost 

occasioned by alternations or additions bears  to  the cost 

of  the  original  contract  work  and  the  certificate  of  the 

Engineer  in  charge  as  to  such  proportion  shall  be 

conclusive.   However such an extension will be governed 

Page 99: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

99 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

by provisions of clause 6. 

No claim to any 

payment or 

compensation for 

alteration in or 

restriction of 

work. 

  Clause 15: I) If any time after the execution of the contract 

documents  the  Engineers  shall  for  any  reason  what  so 

ever other  than default on  the part of  the contractor  for 

which  the  corporation  is entitled  to  rescind  the  contract 

desires that the whole or any part of the work specified in 

the tender should be suspended for any period or that the 

whole or part of the work should not be carried out at all 

he  shall  give  to  the  contractor  a  notice. writing  of  such 

desire and upon the receipt of such notice contractor shall 

forthwith  suspend or  stop  the work wholly or  in part  as 

required after having due regard to the appropriate stage 

at which the work should be stopped or suspended so to 

cause  any damage or  injury  to  the work  already done o 

endanger  the safety stopped or suspended shall have no 

claim  to  any  payment  or  compensation  whatsoever  by 

reason  of  or  in  presence  of  an  notice  as  aforesaid,  on 

account  of  any  suspension,  stoppage  or  curtailment 

except to the extent specified hereinafter. 

    2)  Where  the  total  suspension  of  work  ordered  as 

aforesaid  continued  for a  continuos period exceeding 90 

days  the  contractor  shall be  at  liberty  to withdraw  from 

the contractual obligations under the contract so far as  it 

pertains to the unexecuted part of the work by giving a 10 

days prior notice in writing to the engineer within 30 days 

of  the  expiry  of  the  said  period  of  90  days  of  such 

intention  and  requiring  the  engineer  to  record  the  final 

Page 100: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

100 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

measurement of  the work already done and  to pay  final 

bill.  Upon  giving  such  notice  the  contractor  shall  be 

deeded  to  have  been  discharged  from  his  obligation  to 

complete  the  remaining  unexecuted  work  under  his 

contract.    On  receipt  of  such  notice  the  engineer  shall 

proceed  to  complete  the measurements  and make  such 

payment as may be finally due to the contractor within a 

period  of  90  days  from  the  receipt  of  such  notice  in 

respect of the work already done by the contractor.  Such 

payment shall not in any manner prejudice the right of the 

contractor  to  any  further,  compensation  under  the 

remaining provisions of this clauses. 

    3) Where the Engineer required the contractor to suspend 

the work for a period  in excess of 30 days at any time or 

60 days in the aggregate the contractor shall be entitled to 

apply to the Engineer within 30 days of the resumption of 

work after. Such suspension for payment of compensation 

to the extent of pecuniary  loss suffered by him  in respect 

of working machinery remained  idle on the site or on the 

account of his having and to pay the salary or the wages of 

labor engaged by him during the said period of suspension 

provision always that the contractor shall not be entitled 

to  any  claim  in  respect  of  any  such working machinery, 

salary or wages for the first 30 days whether consecutive 

or  in aggregate of  such  suspension or  in or  in  respect of 

any  suspension whatsoever occasioned by unsatisfactory 

work or any other default on his part. The decision of the 

Engineer  in this regard shall be  final & conclusive against 

Page 101: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

101 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

the contractor. 

    4) In the event of – 

i) Any  total  stoppage  of  work  on  notice  form  the 

Engineer under sub clause (1) in that behalf. 

ii) Withdrawal  by  the  contractor  form  the 

contractual obligation  to  complete  the  remaining 

unexecuted work under sub clause (2) on account 

of  continued  suspension  of  work  for  a  period 

exceeding 90 days. 

                       OR 

iii)                  Curtailment  in  the  quantity  of  item  or  items 

originally tendered on account of any alteration, omission 

or  substitution  in  the  specification  drawing,  designs  or 

instruction  under  clause  (14  (1) where  such  curtailment 

excised  25 %  in  the  quantity  and  the  value  of  quantity 

curtailed beyond 25% at the rates for the item specified in 

the tender is more than Rs. 5000/‐ 

      It shall be open to the contractor within 90 days form the 

service  of  (i)  The  notice  of  stoppage  of work  or  (ii)  The 

notice  of  withdrawal  form  the  contractual  obligation 

under  the  contract  on  account  of  the  continued 

suspension of the work or (iii) Notice under clause 14 (1) 

resulting  in  such  curtailment  to  produce  the  Engineer 

satisfactory documentary evidence that he had purchased 

or agreed  to purchase material  for use  in  the contracted 

work  before  receipt  by  him  of  the  notice  of  stoppage. 

Page 102: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

102 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

suspension or curtailment and required the corporation to 

take  over  on  payment  such  material  at  the  rates 

determined by the Engineer, provided however such rates 

shall  in no case exceed  the  rates at which  the same was 

acquired  by  the  contractor.    The  corporation  shall 

thereafter  take over  the materials,  so offered are not  in 

excess  of  the  requirements  of  the  unexecuted  work  as 

specified  in  the  accepted  tender  and  are  of  quality  & 

specification approved by the Engineer. 

No claim to 

compensation on 

account of loss 

due to delay in 

supply of material 

by corporation 

  Clause 15 A : The contractor shall not be entitled to claim 

any compensation  form corporation  for  the  loss suffered 

by him on account of delay by corporation in the supply of 

materials where such delay is caused by‐ 

i) Difficulties  relating  to  the  supply  of  railway 

wagons. 

ii) Force‐ majeure 

iii) Act of God 

iv) Act  of  enemies  of  the  state  or  any  other 

reasonable  cause  beyond  the  control  of 

corporation. 

    In  the  case  of  such  delay  in  the  supply  of  materials. 

Corporation  shall  grant  such  extension  of  time  for  the 

completion of  the work  as  shall  appear  to  the Executive 

Engineer  to  be  reasonable  in  accordance  with  the 

circumstances of the case.   The decision of the Executive 

Engineer as to the extension of the time shall be accepted 

Page 103: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

103 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

as  final  by  the  contractor  &  will  be  governed  by  the 

provision of clause 6. 

Time limit for 

unforeseen claims 

  Clause  16  :  Under  no  circumstances  whatever  shall  be 

contractor  be  entitled  to  any  compensation  from 

Corporation  on  any  account  unless  the  contractor  shall 

have  submitted  a  claim  in  writing  to  the  Engineer‐in‐

Charge  within  one  month  of  the  case  of  such  claim 

occurring. 

Action & 

Compensation 

payable in case of 

bad work. 

  Clause 17 :  If any time before the security deposit or any 

part  thereof  is refunded  to  the contractor  it shall appear 

to the Engineer – in‐charge of his subordinate in charge of 

the work that  any work has been executed with unsound, 

imperfect of unskillful workmanship or with materials of 

inferior  quality,  of  that materials  or  articles  provided  by 

him  for  the  execution of  the work  are  unsound.  or  of  a 

quantity  inferior  to  that contracted  for, or are otherwise 

not  in accordance with the contract,  it shall be  lawful for 

the Engines‐in‐charge to intimate this fact in writing to the 

contractor  and  then  notwithstanding  the  fact  that  the 

work, materials or  articles  complained of may had been 

inadvertently passed, certified and paid for the contractor 

shall be bound for with to recite, or remove or reconstruct 

the work so specified in whole or in part, as the case may 

or  if so required shall remove the materials or articles so 

specified  and  provided  other  proper  and  suitable 

materials or articles at his own charge and cost and in the 

event of his filing to do so within period to be specified by 

Page 104: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

104 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

the Engineer‐in‐charge in the written intimation aforesaid, 

the  contractor shall  be liable to pay compensation at the 

rates of one percent on the amount of estimate foe every 

day  not  exceeding  10  days,  during  which  failure  so 

continues and in the case of any such failure the Engineer‐

in‐charge may rectify of remove and re‐execute the work 

or remove and rejoice the materials or articles complained 

of as the case may be at the risk and expense in all respect 

of the contractor. Should the Engineer‐in‐ charge consider 

that  any  such  inferior  work  or  materials  as  described 

above may be accepted or made use of  it shall be within 

his direction to accept the same at such reduced rates as 

he may fix therefor. 

Work to be open 

to inspection.     

 

 

 

 

 

 

Contractor or 

responsible agent 

to be present. 

  Clause  18: All works  under  or  in  course  of  execution  or 

executed in pursuance of the contract shall at all times be 

open to the inspection and supervision of the Engineer‐in‐

charge and his subordinates and the contractor shall at all 

times during  the usual working hours and at all  times at 

which reasonable notice of the  intention of the Engineer‐

in‐charge and his subordinates to visit the work shall have 

been given to the contractor either himself or present to 

receive orders and instruction or have a responsible agent 

duly accredited in writing present for that purpose. Orders 

given  to  the  contractors  dully  authorities  agent  shall  be 

considered  to have  the  same  force  and  effect  as  if  they 

had been given to the contractor himself. 

Notice to be given    Clause  19  :  The  contractor  shall    give  not  less  than  five 

Page 105: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

105 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

before work is 

covered up. 

days  notice  in  writing  to  the  Engineer‐in‐charge  or  his 

subordination  in  charge of  the work before  coving up  to 

otherwise  placing  beyond  the  reach  of measurement  an 

work in order that the same may be measured and correct 

dimension thereof taken before the same is so covered up 

or  placed  beyond  the  reach  of measurements  and work 

shall  not  cover  up  or  place  beyond  the  reach  of 

measurement any work without  its  consent  in writing of 

the Engineer‐in‐charge or his subordinate in charge of the 

work and  if any work  shall covered up or placed beyond 

the  reach  of  measurement  without  such  notice  having 

been  given  or  consent  obtained  the  same  shall  be 

uncovered at the contractors expense & in default thereof 

no payment or allowance  shall be mad  for  such work or 

for the materials with the same was executed. 

Contractor liable 

for damage done 

and for 

imperfections for 

three months after 

certificate. 

  Clause  20  :  If  during  the  period  of  12 months  from  the 

date of completion as certified by the Engineer‐in‐charge 

pursuant  to Clause‐7 of  the  contract of 12 months  attar 

commissioning  the  work,  whichever  is  earlier    in  the 

opinion  of  the  Executing  Engineer,  the  said  work  is 

defective  in any manner whatsoever  the contractor  shall 

forthwith  on  receipt  of  notice  in  that  behalf  from  the 

Executive  Engineer,  duly  commence  execution  and 

complete  carry  out  at  his  cost  in  cherry  respect  all  the 

work  that may be necessary  for  rectifying & setting  right 

the  defects  specified  therein  including  dismounting  and 

reconstruction  of  unsafe  portions  strictly  in  accordance 

with  and  in  the  manner  prescribed  and  under  the 

Page 106: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

106 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

supervision of the Execution Engineer. In the event of the 

contractor failing or reflecting to commence execution of 

the  said  reification  work  with  in  the  period  presented 

therefor in the said notice and/or to complete the same as 

aforesaid  as  required  by  the  said  notice,  the  Executive 

Engineer  get  the  same  executed  and  carried  out 

departmentally  or  by  any  other  agency  at  the  risk  on 

account and all the cost of the contractor. The contractor 

shall  forthwith  on  demand  pay  to  the  Corporation  the 

amount of such costs, charges, and  expenses sustained or 

incurred  by  the  corporation  of  which  the  certificate  of 

Executive  Engineer  shall  be  final  and  binding  on  the 

contract    ,  such  costs,  charges  and  expenses    shall  be 

deemed to be arrears of and revenue and on the event of 

the  contractor  failing  or  neglecting  to  pay  the  same  on 

demand as aforesaid without prejudice to any other night 

and  remedies  of  the  corporation,  the  same  may  be 

recovered  from  the  contractor  as  arrears  of  land 

revenues. 

    The corporation shall also be entitled to deduct the same 

form  any  account which may  be  payable  or which may 

thereafter  become  payable  by  the  Corporation  to  the 

contractor either  in respect of the said work or any other 

work whatsoever or form the amount of security  deposit 

retained by Corporation. 

Contractor to 

supply plant, 

  Clause 21 : The contractor shall supply at his own cost all 

materials  (expect such special materials.  if any as may  in 

Page 107: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

107 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

ladders, 

scaffolding etc           

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

.And is liable for 

damages arising 

from non 

provisions of   life 

fencing etc. 

accordance  with  the  contract  be  supplied  from  the 

corporation  stores)  point,  tools,  appliance,  implements, 

ladders  carriage,  tackle,  scaffolding  and  temporary work 

requisite for the proper execution of the work, whether in 

the  original,  attired  or  subsisted  from  and  whether 

including  in the specification of other documents forming 

part of the contract or referred to in the side conditions or 

not  and  which  may  be  necessary  for  the  purpose  of 

satisfying    or  complying  with  the  requirement  of  the 

Engineer‐in‐charge  as  to  any matter  as  to  which  under 

conditions  he  is  entitled  to  be  satisfied  or  which  he  is 

entitled  to  require  together with  the  raring  therefor  to 

and  from  the  work.  The  contractor  shall  also  supply 

without charge the requisite number of persons with the 

means and materials necessary for the purpose of setting 

out works and  counting, weighting     and assisting  in  the 

measurement or examination at any time & from  item to 

time of the work or the materials, failing which the same 

may be provided by the Engineer‐in‐charge at the expense 

of the contractor and the expenses may be deducted from 

any money due to the contractor under the contractor or 

from his security deposit or the proceed of sale thereof a 

sufficient  portion  thereof.  The  contractor  shall  provided 

all necessary  fencing  and  lights  required  tap protect  the 

public from accident and  shall also the bound to bear the 

expenses of defensive of every suit, action or other  legal 

proceeding that may be brought beanie person for injures 

stained owing too neglect of the above precautions and to 

Page 108: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

108 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

pay any damages and costs which may be awarded in any 

such  suit,  action  or  proceedings  to  any  such  person  or 

which may with the consent of the contractor be paid for 

compromising any claim by any such person. 

    Clause 21 (A) : The contractor shall provided scaffolds and 

working  platforms  gangways  and  stairways  and  shall 

comply  with  the  following  regulations  in  connection 

therewith. 

    a) Suitable scaffolds shall be provided for workmen for all 

work that cannot be safety done from a ladder or by other 

means. 

    b)  A  scaffolds  shall  not  be  constructed  taken  down  or 

substantially altered expect. 

i) under  the  supervision  of  a  competent  and 

responsible person and 

ii) as far as possible by competent workers possessing 

adequate experience in this kind of work. 

    c) All  scaffolds and appliances  connected  there with and 

all ladders shall 

i) be of sound material 

ii) be of adequate strength having regard to the loads 

and strains to which they will be subjected and 

iii) the maintained in proper condition. 

    d)  Scaffolds  shall be  so  constructed  that no part  thereof 

Page 109: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

109 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

can be displaced in consequence of normal use. 

    e)  Scaffolds  shall  not  be  over‐loaded  and  so  far  as 

practicable the load shall be evenly distributed. 

    f)  Before  installing  lifting  gear  on  scaffolds  special 

precaution  shall  be  taken  to  ensure  the  strength  and 

stability of the scaffold. 

    g)  Scaffolds  shall  be  periodically  by  the  competent 

persons. 

    h) Before allowing a scaffold  to be used by his workmen 

the contractor shall whether the scaffold has been erected 

by  his  workmen  or  not  take  steps  to  ensure  that  if 

complies fully with the regulation here‐in‐specified. 

i) Working platform, gangways, stairways shall‐ 

i) be so constructed that no part thereof can sag 

unduly or unequally. 

ii) be  so  constructed  and  maintained  having 

regard  to  the  prevailing  conditions  as  to 

reduce  as  far  as  practicable  risks  of  persons 

and stripping or slipping, and 

iii) be  kept  from  form  any  unnecessary 

obstruction. 

ii) In  the  case  of  working  platforms,  gangways, 

working place and stairways at a height exceeding 

3 meters. 

i) every working  platform    and  every  gangways 

Page 110: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

110 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

shall  be  close  boarded  unless  other  adequate 

measure are taken to ensure safety. 

ii) ever working platform and gangways shall have 

adequate width and  

iii) every  working  platform,  gangways,  working 

place and stairway shall be suitable fenced. 

    k) Every opening  in the floor of a building or  in a working 

platform shall expect for the time and to extent required 

to allow the excess of persons or the transport or shifting 

of material  be  provided with  suitable means  to  prevent 

the fall of persons or material. 

    l) When persons are employed on  roof where  three  is a 

danger  of  falling  from  a  height  exceeding  3  meters 

suitable  precautions  shall  be  taken  to  prevent  the  fall 

persons of materials. 

    m) Suitable precautions shall be taken  to prevent persons 

beings struck by articles which might fall from scaffolds or 

other working places. 

    n) Safe means of access  shall be provided  to all working 

platforms & other working places. 

    o) The contractor(s) will to make payments to the laborers 

as per Minimum Wages Act. 

    Clause  21  (B)  The  contractor  shall  company  with  the 

following regulations as regards the Hoisting Appliances to 

be used by him. 

Page 111: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

111 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

    a) Hoisting  machines  and  tackle,  including  their 

attachments, anchorage and support shall. 

i) Be of good mechanical construction, sound material and 

adequate strength and free from patent defect. 

ii) be kept in good repair and good working order. 

    b) Every rope used in hoisting or lowering materials or as 

a means of suspension shall be of suitable quality and 

adequate strength and free from patent defect. 

    c) Hoisting machines  and  tackle  shall  be  examined  and 

adequately  tested  after  erection  on  the  site  and 

before  use  and  be  re‐examined  and  in  position  at 

intervals to be prescribed by the Corporation. 

    d) Every  chain.  ring  .  hook,  shackle,  swivel  and  pulley 

block  used  in  hoisting  or  lowering  materials  or  as 

means of suspension shall be periodically examined. 

    e) Every crane driver or hoisting appliance operator shall 

be properly qualified. 

    f) No person who is below the age of 18 years shall be in 

control of any hoisting machine, including any  scaffold 

which or give signals to the operator.. 

    g) In case of every hoisting machine and of every chain, 

ring,  shackles,  swivel, pulley bock used  in hoisting or 

lowering  or  as    a  means  of  suspension  the  safe 

working load shall be ascertained by adequate means. 

Page 112: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

112 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

    h) Every  hoisting  machine  and  all  gear  referred  to  in 

proceeding  regulation  shall  be  plainly marked    with 

the safe working load. 

    i) In  case of  a hoisting machine having  a  veritable  safe 

working  load,  each  safe  working  load  and  the 

conditions under which  it  is applicable shall be clearly 

indicated. 

    j) No  part  of  any  hoisting  machine  or  of  any  gear 

referred  to  in  regulation  (g)  above  shall  be  loaded 

beyond  the safe working  load expect  for  the purpose 

of  testing. 

    k) Moters,  gearing,  transmission,  electric,  wring  and 

other dangerous parts of hoisting appliances  shall be 

provided with efficient safeguards. 

    l) Hoisting appliances shall be provided with such means 

as  will  reduce  to  minimum  risk  of  the  accidental 

descent of the load. 

    m) Adequate  precaution  shall  be  taken  to  reduce  to  a 

minimum  the  risk  at  any  part  of  suspended  load 

becoming accidentally displaces. 

measures for 

prevention of fire 

  Clause  22  :  The  contractor  shall  not  set  fire  to  any 

standing  jungle,  tress,  brush  wood  or  grass  without 

attention point  from  the Executive Engineer. When  such 

permit  is given and also  in all cases when destroying out 

or  dug  up  tees.  brushwood,  grass  etc.  by  fire,  the 

Page 113: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

113 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

contractor  shall  take necessary measure  to prevent  such 

fire  spreading  to  or  otherwise  damaging  surrounding 

property.  The  contractor  shall  make  his  own 

arrangements  for dunking water  for the  labors employed 

by him. 

Liability of 

contract for any 

damage done in or 

outside work area 

  Clause  23  :  Compensation  for  all  damage  done 

internationally  or  unintentionally  by  contractors  labor 

whether  in or beyond  the  limits of Corporation property 

including  any  damage  caused  by  the  spreading  of  fire 

mentioned  in  clause  22  shall  be  estimated  by  the 

Engineer‐in‐charge  or  such  other  officer  as  he  may 

appoint  and  the  estimates  of  the  Engineer‐in‐charge 

subject to the decisions of the Superintending Engineer on 

apparel shall be final and the contractor shall be bound to 

pay  amount  of  the  assessed  compensation  on  demand, 

falling  which  the  same  will  be  recovered  from  the 

contractor as damages in the manner prescribed in clause 

1 or deducted by  the  Engineer‐in‐charge  from  any  sums 

that  may  be  due  or  become  from  Corporation  to 

contractor under this contract or otherwise. 

    The  contractor  shall bear  the expenses of defending any 

action or other  legal proceeding  that may be brought by 

any persons  for  injury sustained by him owing  to neglect 

of precautions to present the spread of fire and shall pay 

any damages and cost that may be awarded by the count 

in  consequence. 

Page 114: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

114 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Employment of 

female labour 

  Clause 24 : DELETED 

Work on weekly 

holidays 

  Clause 25 : No work shall be done on weekly local holidays 

without the sanction  in writing of the Engineer‐in‐charge. 

Work not to 

sublet.                        

 

 

 

 

 

 

 

contract may be 

rescinded and 

security for 

subletting it 

without approval 

of far bribing a 

corporation officer 

or if contractor 

becomes 

insolvent.                   

  Clause  26  :  Contract  shall  not  be  assigned  or  subject 

without  the written  approval  of  the  Engineer‐in‐charge. 

And if the contractor shall assign or subject his contract or 

attempt so  to do or become  insolvent or commence any 

proceedings  to  get  himself  adjudicated  and  insolvent  or 

make any compositions with his creditors or attempt so to 

do  or  it  bribe  ,  gratingly    loan,  perquisite  reward  of 

advantage, pecuniary or otherwise shall either directly on 

indirectly  be  given  or  promised  or  offered  by  the 

contractor  or  any  of  his  servants  or  agents  to  any 

Corporation  officer  or  person  in  the  employment  of 

corporation  in  any  way  relating  to  his  officer  or 

employment or if any such officer or person shall become 

in any way directly or indirectly interested in the contract 

the Engineer‐in‐charge may thereupon by notice in writing 

resin the contract any the security, deposit and additional 

security deposit of  the contractor shall  there upon stand 

forfeited and be absolutely at the disposal of corporation 

and same consequences shall ensure as if the contract had 

been  rescinded under  clause  3 here of  and  addition  the 

contractor  shall  not  be  entitle  to  recover  or  be  paid  for 

any  work  therefore  actually  performed  under  the 

contract. 

Page 115: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

115 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Sum payable by 

way of 

compensation to 

be considered as 

reasonable 

compensation 

without reference 

to actual loss. 

  Clause  27  :  All  sum  payable  by  a  contractor  by way  of 

compensation  under  any  of  these  condition  shall  be 

considered as a reasonable compensation to be applied to 

the  use  of  Corporation without  reference  to  the  actual 

loss  or  damage  sustained  and whether  reference  to  the 

actual loss or damage sustained and whether any damage 

has or not been sustained. 

Changes in the 

constituation of 

firm to be notified 

  Clause  28  :  In  the  case  of  tender  by  the  partners  any 

change  in  the  constitution  of  a  firm  shall  be  forthwith 

notified by the contractor to the Engineer‐in‐charge for his 

information. 

Direction and 

control of the 

superintending 

Engineer 

  Clause  29  : All work  to  be  executed  under  the  contract 

shall be executed under  the direction and  subject  to  the 

approval  in all respects of the Superintending Engineer of 

the  circle    for  the  time  being  who  shall  be  entitled  to 

direct at what point or point and in what manner they are 

to be commenced and from time to time carried out. 

    Clause 30.1 : Except where otherwise specified in contract 

and  subject  to  the  powers  delegated  to  him  by 

corporation  under  the  code,  rules  than  the  force  the 

decision of  Superintending  Engineer of  the  circle  for  the 

time  being  shall  be  final,  conclusive  and  binding  or  all 

parties  of  the  contract  upon  all  question  relating  to  the 

meaning  of  the  specification,  design,  drawing  and 

instructions herein before mentioned and as to the quality 

or workmanship or materials used on  the work or  as  to 

any  other  question  claim,  right  matter  or  thing 

Page 116: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

116 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

whatsoever  if any arising out or  relating  to  the contract, 

designs,  drawings  specification  estimate  instruction, 

orders  or  these  condition  or  otherwise  concerning  the 

works,  or  the  execution  or  failure  to  execute  same, 

whether arising during  the progress of work or after  the 

completion or abandonment thereof.  

    Clause 30.2   The contractor any within 30 days of receipt 

by  him  of  any  order  passed  by  the  Superintending 

Engineer of the circle as aforesaid appeal against it to the 

Chief  Engineer  concerned  with  the  contract  work  or 

project provided that ‐ 

    a)    The  accepted  value  of  the  contract  exceeds  Rs.  10 

Lakhs ( Rs. Ten Lakhs ) 

    b) Amount  of  claim  is  not  less  than  Rs.  1.00  Lakh  (  Rs. 

One Lakh) 

 

    Clause  30.3      If  the  contractor  is  not  satisfied with  the 

order  passed  by  the  chief  Engineer  as  aforesaid  the 

contractor may within  30  days  of  receipt  by  him  of  any 

such  order  appeal  against  it  to  the  Execute  Director 

Maharashtra  Krishna  Valley  Development  Corporation 

Pune, who  if  convinced  that  primafacle  the  contractor’s 

claim  rejected  by  Superintending  Engineer  /  Chief 

Engineer  is frivolous   and that there  is some substance  in 

the  claim  of  contractor  as  would  merit  detailed 

examination  &  decision  by  Executive  Committee  / 

Page 117: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

117 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

standing Committee shall put up the Executive Committee 

/  standing  committee  at  /  corporation  level  for  suitable 

decision.  

Stores of 

European or 

American 

manufacturer to 

be obtained from 

corporation 

  Clause  31  :    The  contractor  shall  obtain  from  the 

corporation  stores  all  stores  and  articles  of  European  of 

American  manufacture  which  may  be  required  for  the 

work  of  any  part  thereof  or  in  making  up  any  articles 

required there for / or  in connection therewith unless he 

has  obtained  permission  in  writing  from  Engineer  –in‐

charge to obtain such stores and articles elsewhere.   The 

value of  such  stores and articles may be  supplied  to  the 

contractor  by  the  Engineer‐in‐charge  will  be  debited  to 

the  contractor  in  his  account  at  the  rates  shown  in  the 

schedule,  in form A attached to the contract &  if any are 

not entered  in the said schedule, they shall be debited to 

him  at  cost price which  for  the purpose of  this  contract 

shall  include  the  cost  of  carriage  &  other  expenses 

whatsoever which  shall  have  been  incurred  in  obtaining 

delivery of the same at the stores aforesaid.  

Lump sums in 

Estimates 

  Clause 32  : When the estimate on which a tender is made 

includes  lump  sum  in  respect  of  part  of  works  the 

contractor  shall be entitled  to payment  in  respect of  the 

item of work  involved or  the part of work  in question at 

the same rates as are payable  

    under this contract for each item or if the part of work in 

question  is  not  in  the  opinion  of  the  Engineer‐in‐charge 

capable measurement  of  Engineer‐in‐charge may  at  his 

Page 118: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

118 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

described  any  the  lump  sum  amount  entered  in  the 

estimate and the certificate  in writing of the Engineer‐in‐

charge  shall be  final &  conclusive  against  the  contractor 

with regard to any sum or sums payable to him under the 

provisions of this clause. 

Action where no 

specification  

  Clause 33 : In case of any class of work for which there is 

no such specification as is mentioned in Rule 1 such work 

shall  be  carried  out  in  accordance  with  the  divisional 

specifications and in the event of there being no divisional 

specification  than  in  such  case  the work  shall be  carried 

out  in  all  respects  in  accordance with  all  instructions & 

requirements of the Engineer‐in‐charge.  

Definition of work     Clause 34  :  The expression ‘work’ or ‘works’ where used 

in these conditions shall unless there be something in the 

subject  of  context  repugnant  to  such  construction  be 

construed  to mean  the work  or works  contracted  to  be 

executed  under  or  in  virtue  of  the  contract  whether 

original, altered, substituted or additional.  

Contractor’s 

percentage 

whether applied 

to net or gross 

amount of bill 

  Clause 35 :  The  percentage referred to in the tender shall 

be deducted from / added to the gross amount of the bill 

before deducting the value of any stock issued.  

Payment of quarry 

fees and royalties 

  Clause 36 :  All quarry fees, royalties, octroi dues & ground 

rent  for  stacking  materials  if  any  ,  should  be  paid  by 

contractor.   Amount of royalties charges will be withheld 

Page 119: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

119 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

from  the  respective R.A.  bills  and  payment will  released 

on production of  receipts of paid  royalty  charges by  the 

contractor. 

Compensation 

under workmen’s 

compensation act. 

  Clause 37 :  The contractor shall be responsible for & shall 

pay any compensation to his workmen payable under the 

workmen’s compensation Act 1923 ( VIII of 1923 ) ( there 

in  after  called  the  said  Act  )  for  injuries  caused  to  the 

workmen  if such compensation  is payable and or paid by 

corporation as principal under sub‐section(i) of section 12 

of  the  said  Act  on  behalf  of  the  contractor  it  shall  be 

recoverable  by  corporation  from  the  contractor  under 

sub‐section(2) of the said section such compensation shall 

be recovered in the manner laid down in clause 1 above.  

    Clause 37(A)  :  The contractor shall be responsible for and 

shall  pay  the  expenses  to  providing medical  aid  to  any 

workmen who may suffer a bodily  injury as a result of an 

accident.  If such expenses are incurred by corporation the 

same shall be  recoverable  from contractor  forthwith and 

be  deducted without  prejudice  to  any  other  remedy  of 

corporation  from  any  amount  due  or  that may  become 

due to the contractor.  

    Clause 37 (B)   : The contractor shall provide all necessary 

personal  safety  equipment  and  list  and  apparatus 

available for the use of the persons employed on the site 

&  shall  maintain  the  same  in  condition  suitable  for 

immediate  use  at  any  time  &  shall  comply  with  the 

following regulation in connection therewith.  

Page 120: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

120 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

    a)   The worker’s shall be required to use the equipments 

so  provided  by  the  contractor  &  contractor  shall  take 

adequate  steps  to  ensure  proper  use  of  equipment  by 

those concerned.  

    b)  When  work  is  carried  on  in  proximity  to  any  place 

where  there  is a  risk of drawing all necessary equipment 

shall  be  provided &  kept  ready  for  use &  all  necessary 

steps  shall be  taken  for prompt  rescue of  any person  in 

danger.  

    C) Adequate provision shall be made  for prompt  first aid 

treatment of all  injuries  likely  to be sustained during  the 

course of the work.  

    Clause 37  (C)  : The contractor shall duly comply with the 

provision of apprentices Act 1961  (  III of 1961  ) the rules 

made thereunder & orders that may be  issued from time 

to time under the said Act & the said Rules & on his failure 

or neglect to do so he shall be subject to all the  liabilities 

& penalties provided by the said Act & said Rules.  

Claim for 

quantities entered 

in the tender or 

estimates. 

  Clause  38  :  1)    Quantities  shown  in  the  tender  are 

approximate  and  no  claim  shall  be  entertained  for 

quantities of work executed being either more or less than 

those entered in the tender or estimates. 

 

    2)  Quantities in respect of the several items shown in the 

Schedule “B” , Part I of the tender are approximate and no 

Page 121: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

121 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

revision  in  the  tendered  rates  shall  be  permitted  in 

respect of any of  items  so  long as  subject  to any  special 

provision  constrained  in  the  specification  prescribing 

different percentage of permissible variation the quantity 

of the item does not exceeds the tender quantity by more 

than  25  percent  and  so  long  as  the  value  of  the  excess 

quantity beyond this limit at the rate of the item specified 

in the tender is not more than Rs. 5,000/‐ 

    3)    The  contractor  shall  if  ordered  in  writing  by  the 

Engineer so to do, also carry out any quantities  in excess 

of  the  limit mentioned  in  sub  clause  (2)  here  of  on  the 

same  condition  as  and  in  accordance  with  the 

specification  in  the  tender  and  at  the  rates  (i)  derived 

from  the  rates  entered  in  the  current  schedule  of  rates 

and in the absence of such rate (ii) at the rate prevailing in 

the market.    The  rate  shall be  revised with  reference  to 

current DSR prevalent at that time on year to year basis or 

revised  in  accordance with mutual  agreement  there  on 

whichever is less. 

    4)  In case the quantity of any  item reduces by more than 

25%  the  rates  of  such  item  shall  be  revised  as  per 

provisions of sub clause 3 of clause 38.  However the total 

payment  of  such  item  shall  be  limited  to  seventy  five 

percent of estimated cost of that item put to tender.  

    5) The provisions of  this  clause will not be  applicable  to 

the additional anticipated items in Schedule‐‘B’, Part – II. 

Page 122: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

122 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Employment of 

famine labour etc. 

  Clause  39    :    The  contractor  shall  employ  any  famine, 

convict  of  other  labour  of  a  particular  kind  or  class  if 

ordered in waiting labour etc. to do so by the Engineer‐in‐

charge 

Claim for 

compensation for 

delay starting the 

work 

  Clause  40  :  No  compensation  shall  be  allowed  for  any 

delay  caused  in  the  starting  of  the work  on  account  of 

acquisition  of  land  or  in  the  case  of  clearance work  on 

account of delay in according to sanction of estimates.  

Claim for 

compensation for 

delay in execution 

of work 

  Clause  41  :  No  compensation  shall  be  allowed  for  any 

delay  in  the  execution of  the work  on  account  of water 

standing on borrow. pits or compartments.  The rates are 

inclusive  for hard or cracked soil, excavation  in mud sub‐

soil water or water  standing  in barrow pits and no claim 

for  an  extra  rates  shall  be  entertained  unless  otherwise 

expressly specified.  

Entering upon or 

commencing any 

portion of work  

  Clause  42  :  The  contractor  shall  be  enter  upon  or 

commence any portion of work expected with the written 

authority  and  instruction of  the Engineer‐in‐charge or of 

his  subordinate  in  charge  of  the  work  failing  such 

authority the contractors shall have no claim to  

    ask for measurement of or payment of work. 

Minimum age of 

person employed, 

the employment 

of donkeys and or 

  Clause 43 : i) No contractors shall employ any person who 

is under the age of 14 years.  

ii)   No contractors shall employ donkeys or other animals 

with breaching of string or then rope.  The breaching must 

Page 123: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

123 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

other animals.  be  at  least  there  inches wide  3  and  should be of  tape  ( 

Nawar ) 

    iii)   The Engineer –in‐charge or his Agent  is authorised to 

remove  from  the  work  any  persons  of  animal  found 

working which  does  not  satisfy  these  conditions  and  no 

responsibility  shall  be  accepted  by  corporation  for  any 

delay caused in completion of the work by such removal.  

    iv)  The contractors shall pay fair and reasonable wages to 

the  workmen  employed  by  him,  in  the  contract 

undertaken  by  him  in  the  event  of  any  dispute  arising 

between the contractor and his workmen on the grounds 

that  the  wages  paid  are  not  fair  and  reasonable  the 

dispute  shall  be  referred without  delay  to  the  Executive  

Engineer  shall  be  conclusive  and  binding  on  the 

contractors but  such decision  shall not  in  any effect  the 

conditions in the sanctioned tender rates.  

    v)  Contractors shall provide drinking water facilities to the 

workers similar amenities shall e provided to the workers 

engaged on large work in urban areas.  

    vi)    The  contractor  should  take  precaution  against 

accidents  which  take  place  on  account  of  labour  using 

loose garments while working near machinery.  

Method of 

payment  

  Clause  44:  Payment  to  contractors  shall  be  made  by 

cheque provided  the amount exceeds Rs. 500/‐ Amounts 

not exceeding Rs. 500/‐ will be paid in cash.  

Page 124: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

124 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Acceptance of 

condition 

compulsory before 

tendering the 

work  

  Clause 45  :   Any  contractors who does not accept  these 

conditions shall not be allowed to tender for works.  

Employment of 

scarcity labour 

  Clause 46  :    If Government declares a state of scarcity or 

famine to visit  in any village situated within 16 km of the 

work the contractors shall employ upon such parts of the 

works  as  are  suitable  for  unskilled  labour  any  persons 

certified to him to him by Executive  

    Engineer may have delegated this duty  in writing to be  in 

need of relief and shall be bound to pay to such persons 

wages  not  below  the minimum which Government may 

have fixed in this behalf.  Any disputes which may arise in 

connection with the implementation of this clause shall be 

decided by  the Executive Engineer whose decisions  shall 

be final and binding on contractors. 

    Clause 47  :  The price quoted by the contractors shall not 

in  any  case  exceed  the  control  price.    if  any  fixed  by 

Government or reasonable price which it is permissible for 

him to charge a private purchaser for the same class and 

description  the  controlled  price  or  the  price  permissible 

exceed the controlled price or the price permissible under 

Hoarding  and  Profiteering  ordinance,  1948  as  amended 

from  times  to  time.  if  the  price  quoted  exceed  the 

controlled  price  or  the price  permissible  under  hoarding 

and profiteering prevention ordinance the contractors will 

specifically mention this fact in this tender along with the 

Page 125: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

125 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

reasons for quoted such higher price.  The purchaser at his 

description will  in such case exercise the right of revising 

the  price  at  any  stages  so  as  to  conform  with  the 

controlled  price  as  permissible  under  the  Hoarding  and 

prevention  ordinance  This  discretion  will  be  exercised 

without prejudice  to any other action  that may be  taken 

against the contractor.  

    Clause  48  :    The  rates  to  be  quoted  by  the  contractors 

must be  inclusive of states Tax No. extra payment on this 

account will be made to the contractor.  

Surplus material    Clause 49  :    In  the  case  if materials may  remain  surplus 

with  the  contractors  from  those  issued  for  the  work 

contracted for the  date of ascertainment of the materials 

being surplus will be taken as the date of the sale for the 

purpose of sales tax and the sales tax will be recovered on 

such sales.  

Employment of 

local labour 

  Clause  50  :    The  contractor  shall  employ  the  unskilled 

labour to be employed by him on the said work only from 

locally  available  labours  and  shall  give  performance  to 

those  persons  enrolled  under  Maharshtra  Government 

Employment and self Employment department’s scheme.  

    Provided, however,  that  if  the  required unskilled  labours 

are  not  available  locally  the  contractor  shall  in  the  first 

instance  employ  such  number  of  persons  as  is  available 

and there after may with previous permission in writing fo 

the Executive Engineer in charge of the said work of in the 

rest of  requirement of unskilled  the  labour  from outside 

Page 126: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

126 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

the  above  scheme.    charge  of  the  said work  obtain  the 

rest of  the  requirement of unskilled  labour  from outside 

the above scheme. 

Wages as per 

minimum wages 

Act 1948 

  Clause 51 :   Wages to be paid to the skilled and unskilled 

labours engaged by the contractors.  

    the contractors shall any the labours skills according to the 

wages  prescribed  by  the  Minimum  wages  Act  of  1948 

applicable  to  the  area  in  which  the  work  of  the 

contractors is located.  

Hiring of 

Machinery 

  Clause 52 : All amounts whatsoever which the contractor 

is  liable to pay to the corporation  in connection with the 

execution  of  the work  including  the  amount  payable  in 

respect of  (i) materials and  / or  stores  supplied  /  issued 

hereunder  by  the  corporation  to  the  contractor  ii  )  hire 

charges  in  respect  of  heavy  plant  machinery  and 

equipment  given  on  hire  by  the  corporation  to  the 

contractor  for execution by him of  the work and  / or on 

which advances have been given by the corporation it the 

contracotr  shall  be  deemed  to  be  arrears  of  the  Land 

Revenue  and  the  corporation  any  without  prejudice  to 

and other  right and  remedies of  the Corporation  recover 

the same from contractor as arrears of revenue.  

Maharashtra 

Contract Labour 

(Rules 1977) 

  Clause 53  : The contractor  shall duly comply with all  the 

previsions  of  the  contract  labour  (  Regulation  and 

Abolition  )  Act  197  (  37  of  1970  )  and  the Maharashtra 

contract labour ( Regulation and Abolition ) Rules 1971 as 

Page 127: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

127 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

amended  from time to time and all other relevant status 

and  statuary  provisions  conceding  payment  of  wages 

particularly to workmen employed by  the contractor and 

working on  the  site of  the work  in particular   contractor 

shall pay wages  to each worker employed by him on  the 

site  of  the  work  at  the  rates  prescribed  under  the 

Maharashtra contract  labour  ( Regulation and Abolition  ) 

Rule 1971.1 if the contractor fails or neglect to pay wages 

as  the  said  rates  or  makes  short  payment  and  the 

Corporation makes such payment of wages  in  full or part 

thereof less paid by the Corporation to such workers shall 

be  deemed  to  the  arrears  of  Lands  Revenue  and  the 

Corporation shall be entitled to recover the same as such 

from the contractors or deduct the same from the amount 

payable by the corporation to the contractor hereunder or 

from  any  other  amounts  payable  to  him  by  the 

Corporation. 

MVAT Tax    Clause 54  :   The contractor shall duly comply with all the 

provisions of the Maharashtra state tax on he professions 

and tenders callings and employment act 1975 ( See Rule 

3(2).  The contractor shall obtain certificate of registration 

clearance certificates and when demanded.  

Maharashtra 

Professional Tax 

  Clause 55  :   The contractor shall duly comply with all the 

provisions of the Maharashtra Value Added Tax  Act 2005 

rule 58 on the transfer of goods involved in the execution 

of work contracts.  

    As per  the Maharashtra value Added Tax on  the  transfer 

of  property  in  goods  involved  in  the  execution  of works 

contracts  of  the  contract  rules,  the  amount  of  tax 

Page 128: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

128 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

deducted  at  source  is  2%  in  respect  of  contractor 

registered  under  VAT  ACT  2005  and  4%  in  respect  of 

contractors not registered under VAT Act 2005 from every 

payment  made  towards  such  contracts  where  the 

aggregate  amount  payable  is  more  than  Rs.  50,000/‐ 

during one year.  

Fuel arrangement 

for labours of 

contractors 

  Clause  56:  The  contractor  shall  make  arrangement  to 

supply fuel for domestic use to all the labours engaged on 

site  and  prvent  the  labour  from  cutting  trees  fro  the 

purpose of fuel.  If the contractors labour found to cut the 

trees the contractor shall be held responsible for the same 

and  shall  be  punished  as  per  the  provision  in  forest 

conservation Act – 1980. 

Page 129: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

129 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SECTION – V

SPECIAL CONDITIONS OF CONTRACT

Page 130: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

130 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SPECIAL CONDITIONS OF CONTRACT 

1.0  Contractor to inform himself fully: 

The  contractor  shall be deemed  to have  carefully examined  the work and  site 

conditions,  the  special  conditions,  the  specifications,  schedules  and  drawings 

and hall be deemed to have visited the work site, his own quarries for rubble and 

sand and to have fully informed himself regarding the availability of construction 

materials,  local  conditions,  ancillary  works  required  to  be  done  etc.  before 

quoting the offer.  

The  contractor  has  to  ascertain  and  satisfy  himself  the  regarding  the  lead 

involved  for the material required for the work.   The offer quoted by him shall 

include the cost of this component. So that no extra lead charges will be claimed 

by him during execution of work. 

This will be applicable in the case of items and specifications of works where the 

cost of lead is involved for the materials brought by the contractor.  

If  he  shall  have  any  doubts  as  to  the meaning  of  any  portion  of  the  special 

conditions  or  the  scope  of  work  or  the  specifications  or  any  other  matter 

concerning he contract,  he shall in good time, set  forth the particulars thereof 

and  submit  them  to  the  Engineer‐in‐charge.  The  Engineer‐in‐charge  generally 

means the Executive Engineer directly in charge of the work, but also means the 

Superintending  Engineer, Chief  Engineer of Corporation,  for  exercising powers 

under this contract.  

2.0 Contract Drawings and Specifications : 

2.1 On acceptance of the tender, three sets of contract drawings and working 

drawings will  be  supplied  to  the  contractor  free  of  charge within  one 

week on request by the contractor and at the discretion of Engineer‐in‐

charge.  The  contractor  shall  be  supplied  additional  copies  of  contract 

Page 131: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

131 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

documents to be charged at the rate of Rs. 1500/‐ ( Rs. One thousand five 

hundred only ) per set.  

2.2 The drawings which form part of this contract show the works to be done 

in  such  details  as  possible  to  do  for  the  present.    They  will  be 

supplemented  or  superseded  by  such  additional  detailed  drawings  as 

may be necessary as  the work progress.   The contractor  shall carry out 

the work in accordance with these additional and . or revised drawings as 

the  case  nay  be  at  the  applicable  rates  as  per  the  contract.    The 

contractor shall be supplied a maximum number of three copies of each 

of  the  such working drawings  free of  charge.    If  the  contractor  require 

any additional copy for his use, this may be supplied at the discretion of 

Engineer‐in‐chare and the contractor will be charged Rs. 500/‐ per set of 

contract drawings and Rs. 100/‐ for each of such additional copy of each 

drawing.  

2.3 The  contractor  shall  check  all  drawings  carefully  and  intimated  the 

Engineer‐in‐charge immediately any errors or omissions discovered.  The 

contractor shall not take advantage of any kind of errors or omissions  in 

the drawings supplied.  

3.0 Data and Drawings to be furnished by the Contractor: 

A) Prior  to  the commencement of  the work  the contractor  shall  submit  to 

the  Engineer‐in‐charge  for  approval,  drawings  or  prints  on  white 

ammonia paper of size 1020 mm x 690 mm or 510 mm x 345 mm as may 

be suitable in triplicate showing, the location of major plant workshop, if 

any, roadways, temporary bridges, unloading facilities and storage yards, 

etc. which he proposes to put up at the site.  

B) Then  contractor  shall  submit  to  the  Engineer‐in‐charge  for  approval 

within one month  from  the date of his  receiving notice  to  start work a 

Page 132: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

132 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

layout plan of construction plant and equipment for the execution of the 

work which the contractor proposes to adopt at site.  

C) Any changes in the approved layout will be subject to further approval.  

D) The approval of the drawings, however, will not relieve the contractor of 

his responsibility from any errors or omissions.  

4.0 Errors, Omissions, Discrepancies :  

A) In case of errors, omissions and / or disagreement between written and 

scaled  dimensions  on  the  drawings  or  between  the  drawings  and 

specifications, the following orders of preference shall apply.  

  Between actual scaled and written dimensions or description on 

drawing  and  corresponding  one  in  the  specification,  the  latter 

shall be adopted.  

  Between  the  quantities  in  the  schedule  of  quantities  and  those 

arrived at from the drawings, the former shall apply. 

  Between  the written  description  of  he  item  in  the  schedule  of 

quantities  and  the  detailed  specifications  of  the  same  item  the 

latter shall be adopted. 

B) The  information  in  connection with  the works and work  site as well as 

specifications  are  contained  in  this  book  of  contract  in  general  and  in 

particular  in two parts, viz, special conditions and specifications for  item 

of work in case of any discrepancy or repugnancy in the clauses in these 

sections, the specifications will prevail over special conditions. 

C) The special conditions of contract and the specifications shall prevail over 

various clauses of B‐1 tender form.  

D) In  all  cases  of  omissions  and  /  or  doubts  or  discrepancies,  in  the 

dimensions or description of any  item, a reference shall be made to the 

Page 133: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

133 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Engineer‐in‐charge whose  elucidation  ,  elaboration  or  decision  shall be 

considered as authentic and final subject to he Clause 30.1 of B‐1 From.  

The contractor shall be held responsible for any errors that may occur in 

the work through lack of such reference and precaution.  

5.0 Use of site :  

A) All  land  required  shall be arranged by  the  contractor  from private  land 

owner  /  Revenue  department  at  his  own  cost  and  no  claim  on  this 

account shall be entertained.  

B) All areas of operation, including those of his staff and labour colonies, in 

case  handed  over  to  the  Contractor  shall  be  cleared  and  handed  over 

back  in good condition to he Engineer‐in‐charge, except the areas under 

works  constructed  from  the  Engineer‐in‐charge.  The  contractor  shall 

make good, to the satisfaction of the Engineer‐in‐charge any damage or 

alterations made  to areas which he has  to hand over   back or  to other 

property or land handed over to him for the purpose of this work. 

C) The  lands shall as herein before mentioned, be handed over back to the 

Engineer‐in‐Charge within three months after the completion of the work 

under  this  contract  or  the  termination  of  the  contract  whichever  is 

earlier.  Also  no  land  shall  be  held  by  the  contractor  longer  than  the 

Engineer‐in‐charge shall deem necessary and the Contractor shall on due 

notice by the Engineer‐in‐charge   vacate and return   the  land which the 

Engineer‐in‐charge may  certify  as no  longer  required by  the  contractor 

for the purpose of the works. In case the lands are not handed over back 

to  the Corporation within  the  time  limit,  specified above, penal  rent as 

may be decided by the Engineer‐in‐charge will be recoverable. 

D) The  vegetation  and  forest  is  noticeable  in  project  area.  The  contractor 

should  take  utmost  care  for  the  preservation  of  this    vegetation  and 

Page 134: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

134 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

forest.  Any  damage  in  this  variation  and  forest  will  have  to  be 

compensated by the contractor and decision from Engineer‐in‐charge will 

be final and binding on contractor. 

6.0 Contractor Not To Dispose Off Soil etc.:  

The  contractor  shall not  sell or otherwise dispose off or  remove exert  for  the 

purpose of this contract, sand stone, clay, battiest, earth rock or other substance 

of materials which may be obtained from the excavation made for the purpose 

of these contract or any produce from the site.  All such substance, materials and 

produces  shall be  the property   of Corporation  and  shall be disposed off  in  a 

manner and at a poach shown in the drawings or as and where the Engineer‐in‐

charge may direct. 

7.0 Gold/Silver, Minerals, Oils, Relics, etc found on the site. : 

All gold, silver, oil or other minerals of any description and all precious stones, 

coins treasure, relic, antiquities and other similar things which shall be found  in 

or upon the site, shall be property of Government and the Contractor shall duly 

preserve  the  same  to  the  satisfaction of  the Engineer‐in‐charge and  shall  from 

time  to  time,  delive  the  same  to  such  person  or  persons  as  the  Engineer‐in‐

charge may appoint. 

8.0 Access to site and work and Co‐operation with other contractors : 

The Engineer‐in‐charge may, if he considers fit, form time to time, enter on any 

lands which may be  in the possession of the Contractor under the contract  for 

the purpose of exciting any works not included in the contract and may execute 

such works not included in this contract by agents or by other contractors at his 

option and the contractor shall in accordance with the requirements of Engineer‐

in‐charge  afford  all  reasonable  facilities  for  execution    of  he works,  including 

occupation of lands by structures or otherwise to any other contractor employed 

by the corporation and his workmen or for he workmen of the Corporation who 

Page 135: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

135 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

may be employed in the execution on or near the site of work not included in the 

contract, or of any contract  in connection with or specially to the works and  in 

default,  the  contractor  shall  be  liable  to  the  Corporation  for  any  delay  or 

experiences  incurred  by  reason  of  such  defaults.  The  contractor  shall  not 

however, on account of any such modified, new or extra work executed by or for 

the  same of  the corporation   be entitled  to claim  relief  from  the obligation  to 

execute the works. The contractor shall also Co‐operate with other contractors 

with  all  fairness  and mutual understanding  and use  the  common  facilities  like 

access roads to quarries, whether supply arrangements, etc. 

The contract shall also not cause adversely or  inadvertently and obstruction or 

impediments in the progress of the progress of the other works beings executed 

by corporation or through other agencies, In the event of dispute regarding the 

claim, the responsibility, liabilities etc. in respect of such facilities, the decision of 

he Engineer‐in‐charge shall be final. 

9.0 Cleaning up : 

a) The  contractor  shall  at  all  times  keep  the  construction  areas  and  his 

colony  and  storage  free  from  accumulation  of  waste  or  rejected 

materials. 

b) Prior      to  the  complain  of  the  work,  the  contractor  shall  remove  all 

rubbish  from  and  around  the  premises  and  all  tools,  scaffolding 

equipment,  and materials which  are  not  part  of  permanent  structures 

except otherwise asked for or as provided under any other clauses of this 

contract,  the premises will be  left  in  a manner  fully  satisfactory  to  the 

Engineer‐in‐charge. 

10.0 Layout of construction roads : 

The  contractor  shall  have  to  submit  detailed  plan  to  the  Engineer‐in‐charge. 

Showing the layout of the work site, roads and approach roads proposed by him 

Page 136: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

136 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

before he start the actual work such a road layout plan will be scrutinized by the 

Engineer‐in‐charge and any modifications  suggested by him will be binding on 

the  contractor  if  it  is  decided  by  the  Engineer‐in‐charge  to  have  some  of  the 

roads  pressed  by  the  contractor  as  common  roads  for  common  use  for 

Corporation and other contractors or convenient and for compact, and planned 

layout of work  site,  the  contractor will be bound  to  construct  them and allow 

them to be used simultaneously by other contractors and departments.  In case 

of disputes, the decision of the Engineer‐in‐charge shall be final and binding on 

the contractor. 

11.0 Period and hours of work : 

The work shall be done usually during the day time, in the interest of progress if 

it  is  felt  necessary  to  work  during  night,  the  contractor  shall  obtain  specific 

permission of  the Engineer‐in‐charge.  If  the work  is  to be done at night, prior 

permission  of  Engineer‐in‐charge  should  be  obtained  and  adequate  lighting 

arrangement shall be made as directed by the Engineer‐in‐charge. 

12.0 Signing  Field  Books,  Longitudinal  Sections,  Cross  Sections  and Measurement 

Books: 

12.1 Before  starting  the work,  and  at  the  end  before  the work  is  covered, 

levels for plotting the  longitudinal section (along the axis   as decided by 

the  Engineer‐in‐charge  or  his  authorised  representative)  and  cross 

sections  of  the  proton  of  the  work  shall  be  taken  by  the  authorised 

Engineer of  the contractor  in  the presence of  the Engineer‐in‐charge or 

his  duly  arthorised  representative  and  the  same  shall  have  to  be  got 

attested  form  the  Engineer‐in‐charge  or  his  representative  in  the 

authorised  books  shall  be  final  and  finding  on  the  contractor.  For  this 

purpose,  suitable date or date  shall be  fixed by  the  Engineer‐in‐charge 

and  intimated  to  the  contractor  at  least  three  days  in  advance,  if  the 

contractor  or his duly authorised agent fails to attend on the appointed 

Page 137: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

137 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

date  or  dates,  the  levels  will  be  taken  on  such  alignment  and  cross 

sections as will be useful for reference permanently and described under 

specifications  for  ‘Excavation’.  The  point  of  locations  for  he  level  will 

depend  upon  the  roughness  of  the  area  and  will  also  be  at  last  in 

conformity with the requirements fo specifications for ‘Excavation’ as far 

as possible. 

13.0 Programme of Construction : 

Work and Progress Schedules : 

The contraction programme is given in Annex ‘A’ to Section 1 – Detailed Tender 

Notice  of  tender  document  based  on  which  the  physical  proegramme  is 

prepared.  If the tenderer dose not agree with this programme, he shall submit 

his own programme without snagging total   period of tender along with tender 

documents  inclusive of the physical programme as stated above, subject to the 

provision that 50% of the work shall be completed in 50% of the contract period. 

In  case  it  is  subsequently  found  necessary  to  alter  his  programme  agree  in 

contract  document  including  the  changes  in  the  sequence  of  the  items,  the 

contractor  shall  submit  in  good  time  a  revised  programme  incorporating 

necessary modification proposed and get the same approved form the Engineer‐

in‐charge. 

The submission of the works programme and approval to  it by the Engineer‐in‐

charge  shall  not  relieve  the  contractor  of  any  of  his  duties  or  responsibilities 

under the contractor,  like timely completion, the damages due to fold or other 

natural calamities etc. The contractor shall not be entitled for any claims for any 

damages caused due to particular work programme. It is the entire responsibility 

of he contractor to frame the programme after anticipating the rains, floods, etc. 

Actual work turned out shall be mainly taken into account and not just the sum 

total of the various payment s made to the contractor. 

Page 138: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

138 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The advance on  the material brought  to  the site of work will be accounted  for 

while arriving at the progress achieved by the contractor in terms of proportion 

of the total work tendered for. 

14.0 Materials : 

a) Cement 

The cement shall conform to  I.S.269‐1967 and subsequent revision for Portland 

Cement and I.S 1489‐1976 and subsequent revisions for Pozollana cement. 

All cement required for the work under this contract (If work cost  is more than         

Rs. 100 lakhes) shall be procured, well in advance by the contractor in polyphone 

bags  to  twenty  to  a metric  ton  as  received  from  the  cement  actuaries.  The 

cement  bags shall be branded by words’ GOVERNMENT OF OF MAHARASHTRA’ 

with 80 mm high and 15 mm thin letters on one side of the beg. The contractor 

shall  be  writer  application  collect  the  authorisation  letter  indicating  contract 

number. quantity of cement from the contractor intends to purpose the cement 

to brand the cement bags as stipulated above. Following cement factories have 

been approved by the corporation. 

(1) ACC Ltd.,   (2)  Manikgarh,  (3)   L&T,   

(4)   CCI(Tender),  (5)   Narmade,  (6)  Rajashree. 

The contractor shall produce proof of purpose of cement form the cement form 

the cement  factories  the purpose bill supported by Delivery Challan and Excise 

Gate Pass shall constitute adequate proof of purchase. 

Cement shall be stored in such a way as to allow the removal and use of cement 

in chronological order of receipt i.e. first received being first used. 

Cement shall be kept  in a store under double  locking arrangement (one  lock to 

be  operated  by  contractor  and  second  lock  to  be  operated  by  the  authorised 

person of Corporation) so that  it can be taken out or fresh stock admitted with 

Page 139: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

139 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

the knowledge of  supervising  staff of  the Corporation. The watch and word of 

the cement stores shall be the responsibility of the contractor. 

In  the  event  of  cement  in  branded  bags  remaining  surplus  due  to  authorised 

reduction in quantity of work certified by the Engineer‐in‐charge and as noticed 

after the issue of completion certificate, the contractor may chose either of the 

following three alternative. 

1 To  transfer  the  cement  in branded bags, with prior written permission 

from  the  Engineer‐in‐charge.  to  any  of  the  contract  work  with  the 

Corporation and account for the same therein.  

2 To  sell  the  cement  in branded bags with prior written permission  from 

the Engineer‐in‐charge to any of  the contractors carrying out  the works 

on contract with the Corporation at a price to be negotiated by both the 

contract account for the same.  

3 To sell  the cement  in branded bags with prior written   permission  from 

the Engineer‐in‐charged to the Corporation at the Ex‐factory price = Sales 

tax + Octroi,  if any + delivery at Corporation go down as directed by the 

corporation. If the purchases price paid by the contractor plus delivery at 

Corporation  go  down  is  the      above,  the  lower  of  the  two  shall  be 

considered. The corporation will accept the cement in branded bags only 

if the same is as per the specifications and of acceptable quality. 

For works  costing  less  than Rs.  100  lakhs,  cement  shall be  supplied by 

Corporation at the rtes and place of delivery as specified in schedule ‘A’ 

15.0 Laboratory for testing work : 

Whenever the testing of materials concert maxis, motor  and also of foundations 

of completed works are equipped as per the detailed specifications or otherwise 

required by the Engineer‐in‐charge at Contractor’s cost and the results given by 

this laboratory shall be considered correct and authentic by the contract. 

Page 140: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

140 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The materials, mixes and any other arrangements,  including  laboures,  shall be 

supplied  by  the  contractor  to  the  Corporation  free  of  cost.  the  samples  for 

testing shall be taken in the presence of Engineer‐in‐charge or his representative 

present on site. 

The Contractor or his authorised representative shall have a free access in these 

laboratories, to get himself satisfied about procedures of testing etc. Even if the 

contractor or his representative fails to remain present which collecting samples 

or  testing  the  result  will  be  considered  as  authentic  and  binding  on  the 

contractor. 

16.0 Hire of Construction Equipment’s :  (Not Applicable) 

  Construction equipment owned by the Corporation, if available and can given on 

hire conveniently will be made available on specific request to the contractor at 

rates  that  will  be  prescribed  by  corporation  form  time  to  time.  Supervision 

charges will also be levied as prescribed by the corporation and shall agree to the 

specific rates of hire and supervision charges in force on the day of transaction in 

writhing before machinery  in  taken out of  the Corporation’s  yard by him. The 

contractor shall pay  irrevocable bank guarantee for a value equal to 25% of the 

cost of the similar new machinery; for a period equal to period of hire plus three 

months. Some such items of equipment are indicated below. 

Rated Equipment 

i) Tankers 

ii) Diesel road rollers 

iii) Tippers  

iv) Dozers 

v) Loader 

vi) Seismopactor 

Page 141: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

141 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The machinery  shall   be entirely  in  the  custody of  the Corporation.  It  shall be 

issued to the contractor at the yard where they are stationed. The machinery will 

not be allowed to level the work area on any account. All machinery so hired will 

be entirely operated and maintained by the Corporation  in consideration of the 

hire charges to be paid by the contractor. 

If an equipment is to be used in excess of 8 (eight) hours per day, permission of 

the Engineer‐in‐charge shall be obtained in advance. 

Reckoning  of  working  hours  will  start  from  the  time  the  machinery  leaves 

Corporation yard, where it has to return to it daily, and in other cases when the 

machinery actually states working. Cosign time of working will be when it returns 

to the Corporation yard or actually ceases working for the day, respectively. 

Log books shall be maintained by the Engineer or his authorised representative 

for  each  piece  of  equipment    in  the  form  laid  down  by  the  engineer.  The 

Contractor or his duly authorised agent shall verify and sign in the log book or on 

the machinery duly slip  in  lieu   thereof, daily.  If the contractor’s representative 

fails to sign the  log book, the entries made by the Corporation's representative 

shall be binding on  the  contractor. Any  complaint or  representation  regarding 

the recorded working hours must be   submitted  in writing with 24(twenty four) 

hours of  the close of  the shift. The Engineer’s decision regarding such disputes 

pertaining  to  working  hours  shall  be  final  and  binding  on  the  Contractor. 

complaints or  representations made after  lapse of 24  (twenty  four) hours  limit 

shall  not  be  considered.  The  log  nooks  shall  form  the  basis  for  raising  debits 

against the Contractor. 

All expenses  in  respect of oil,  fuel, grease, cotton waste etc. shall be borne by 

the Corporation. Crew  for  operating  the  equipment    shall  be  provided  by  the 

Corporation. 

Page 142: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

142 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

All minor and major repairs shall be carried out by the corporation, to keep the 

equipment  in working  condition. However  in  case  of  any  breakage,  damages, 

slips  etc.  which  may  occur  due  to  the  negligence  of  contractors  labour, 

equipment  or  staff  or  by  reason,  for  which  Corporation  personnel  are  not 

responsible  the  cost of  such damages  shall be  recovered  from  the  contractor. 

The decision regarding fixing of responsibility for any damages shall rest with the 

Engineer‐in‐charge and decision given by him shall be binding on the Contractor. 

Equipment shall be given on hire only when  these can be spared. No claim on 

account of sickness or non availability of machinery shall be entertained. 

In  case  of  damage  to  the  equipment  during  haulage  to  site  of  work  from 

Corporation  stores or  serving yard,  full cost of  repairs  shall be  recovered  from 

the contractor  

when damage  is due  to  rough handling. That damage  to  trucks/tippers hue  to 

bad haulage  roads will also be  recovered  from  the  contractor. Decision of  the 

Engineer‐in‐charge regarding of repairs and cause of damage shall be  final and 

binding on the contractor. 

A truck, tipper, tanker and any other equipment may be hired for a single day at 

a time and the minimum charges to be levied will be 8 (eight) hours plus mileage 

or for 8 (eight) hours when mileage is not applicable. 

Compressor and concrete mixers shall not be hired or  less than a day time and 

minimum charges for hire will be that for four hours per day. Crusher shall not 

be hired for a period  less than a moth at a time. the minimum charges for hire 

will be those for 25 (twenty five) days and 8 (eight) hours per day. 

17.0 Other Contractor for the work :  

Corporation has the right to split‐up the project work detailed  in the work and 

site  conditions,  into  distinct  items  and  this  contract  shall  apply  only  to  those 

items which shall have been specified in this contract.  

Page 143: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

143 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Should  Corporation  enter  into  other  contractors  for  specified  items  of  the 

project work, each contractor  shall co‐operate with others to the fullest extent 

and shall allow others every facility and co‐operation for execution of their works 

simultaneously and satisfactorily, as  intended  in the designs, specifications and 

drawings.  

Should  there  be  a  dispute  or  disagreement  between  the  contractors  for  any 

cause whatsoever,  the same shall be referred  to  the Engineer‐in‐charge whose 

decision  regarding  the co‐ordination, co‐operation and  facilities  to be provided 

by any of the contractors to others shall be final and binding on all parties and 

such  a  decision  or  decisions  shall  not  vitiate  any  contract  nor  absolve  the 

contractor of his responsibilities under the contract nor form the grounds for any 

claim of compensation.  

18.0 Contract documents and matters to be treated as confidential :  

All  documents  correspondence  decisions  and  other  matters  concerning  the 

contract  shall  be  considered  as  of  confidential  and  restricted  nature  by  this 

contractor  and  be  shall  not  divulge  or  allow  access  thereto  any  unauthorised 

person.  

19.0 Access to the Contractor’s Book :  

Whenever  it  is considered necessary by the Engineer‐in‐charge to ascertain the 

actual  cost  of  execution  of  any  particulars  item  of work  or  supply  of  plant  of 

material he shall direct the contractor to produce the relevant documents such 

as pay‐rolls records of personnel, invoices of materials and any and all other data 

and documents relevant to the  item or necessary to determine  its cost etc. the 

contractor  shall  where  so  required  furnish  information  pertaining  to  the 

aforesaid items in the mode and manner that may be specified. 

 

 

Page 144: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

144 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

20.0 Breach on part of Corporation Not to Annual Contract : 

No breach or non‐observance on the part of Corporation of any of the conditions 

contained herein shall an all this contract or discharge the contractor  form the 

observance  and  performance  thereof  but  on  application  by  the  Engineer‐in‐

charge an extension of  time any be given  to  the  contractor  in  respect of  such 

breach  or  non‐observance  by  the  corporation  ,  which  shall  be  governed  by 

Clause 6 to B – 1 form.  

The Contractor shall not, however, be entitled to consideration or any extension 

of  time  for  any  item  of  the  work  unless  the  contractor  shall  have made  an 

application in waiting to the Executive‐in‐charge within one month of the cause 

needing such extension, but the Engineer‐in‐charge may at his discretion, which 

shall be conclusive, while  the condition regarding this period of one month 

21.0 Local Laws : 

All local laws in force at the time of entering into the contract and those enacted 

thereafter shall vibe binding on the Contractor and he shall abide by the same. 

All import and excise duties, sales tax, local panchayat  tax and other taxes shall 

be borne by the Contractor and they shall be deemed to have been covered by 

his quoted tender rates, except that the contractor shall not be liable to any land 

tax  for  the  land handed over  to him  for  the operation  in  connection with  this 

contract  or  for  his  colony  or  appurtenant works    constructed  by  him  for  the 

purpose of his contract. 

The contractor shall also be  liable to all relevant provision of the Indian Income 

Tax Act. which may be applicable to him from time to time 

The contractor shall also be liable to all relevant provisions of the Indian Income 

Tax Act, which may be applicable to him from time to time.  

Page 145: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

145 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The  contractor  shall  protect  and  indemnify  Corporation  against  all  claims  or 

liabilities  arising  from  or  based  on  the  violation  of  such  laws,  ordinances, 

regulations, bylaws by him or his employee.  

22.0  Personnel of the contractor:  

The Contractor shall at all times, maintain on the work a staff of duly qualified 

engineers and supervisors of sufficient experience of similar other jobs, to assure 

that  the quality of work  turned out  shall be  as  intended  in  the  specifications.  

The Contractor  shall also maintain at  the work, a Works Manager of  sufficient 

status, experience and office and duly authorise him to deal with all aspects of 

the day to day work.   All communications to and commitments works Manager 

shall be absolutely binding on the Contractor.  

The  Contractor  shall  supply  to  the  Engineer‐in‐charge  details  of  names, 

qualifications and experience in regards to all supervisory staff employed by the 

Contractor  and notify  changes when made,  and  satisfy  the  Engineer‐in‐charge 

regarding the quality and sufficiency of staff thus employed.  

The Engineer‐in‐charge will have the unquestionable right to ask for changes  in 

the quality and number of contractor’s staff.  The contractor shall on the written 

directives  of  the  Engineer‐in‐charge  remove  from  the  works  any  person 

employed  thereon,  who  may  in  the  opinion  of  the  Engineer‐in‐charge  be 

incompetent  or  has misconduct  himself.    Such  person  shall  not  be  employed 

again, on  the work, without  the written permission of  the  Engineer‐in‐charge.  

The contractor shall have to submit  information regarding proof of payment of 

Professional Tax and the clearance certificate in format vide Appendix ‘I’.  

23.0  Death, Bankruptcy etc. :  

If the contractor shall die or commit any act of bankruptcy or being a corporation 

commences  winding  up  expect  for  reconstruction  purposes  or  carry  on  its 

business under a receiver, the executors, successors or other representatives  in 

Page 146: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

146 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

law of the estate of the contractor or any such receiver, liquidator or any person 

whom  the  contract may become  vested,  shall  forthwith  give notice  thereof  in 

writing to the Corporation and shall for one month, during which he shall take all 

reasonable steps to prevent a stoppage of work, have the option of carrying out 

this contract subject to his or their providing such guarantee as may be required 

by  the  Corporation,  but  not  exceeding  value  of  the work  for  the  time  being 

remaining unexcited.  In the event of stoppage of work the period of the option 

under this clause shall be fourteen days, only.   Should the above option be not 

exercised.  The contract may be terminated by corporation, by a notice in writing 

to  contractor  or  his  successor.    The  power  and  provisions  reserved  to 

Corporation  in  this contract of  taking of  the work out of  the contractor’s hand 

shall  immediately  become  operative,  Copy  of  such  notice  shall  be  pasted  on 

work site and advertised in newspaper.  

24.0  Notices, How to be given :  

Where any legal or other notice or any other document or any other direction is 

to be given to or served upon the Contractor, it shall be deemed to be duly given 

or  served,  if  it  shall  have  been  either  delivered  to  him  personally  or  to  his 

recognised  agent  or  works  Manager  (including  in  the  case  of  company,  the 

Secretary of such Company) or delivered at or sent through the post, addressed 

to the last known place of business, or abode of the contractor, a notice or other 

documents which shall be so given to or so served on any one of the partners in 

such firms, shall be deemed to have been given or served on all of them.  

Work Order Book :  

The  contractor  shall  maintain  bound  work  order  book  at  work  site  as  the 

Engineer‐in‐charge  may  direct.    This  work  order  book  shall  have  machine 

numbered pages  in triplicate.   The contractor shall make them available to the 

Engineer‐in‐charge or his representative, whenever called for.  

Page 147: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

147 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Executive Engineer or his representative may record order about works,  in this 

book  leaving  the original copy  in  the book and  removing  the  second and  third 

copy with him.   The contractor or his authorised representative, shall also sign 

this work order, in token of it’s acceptance.  

All orders  recorded  in  these work order book,  shall be deemed  to have been 

served on the contractor.   On completion of the work all the work order books 

may be handed over to the executive Engineer.  

In the event of refusal of the Contractor’s representative on the spot to sign the 

work order book.   Engineer‐in‐charge  shall  take  the necessary  further  steps  in 

respect of further communication and control, modification or stoppage of work 

as deemed fit at the entire responsibility of the contractor.  

25.0  Passing of Foundation etc. :   

After  the completion of  the work of excavation,  the same will be checked and 

passed by the Executive Engineer.   No masonry or concrete or back  filling shall 

be  laid.   Unless  the  foundation  is  so  passed.   No  concreting  shall  commence 

unless  the  centering  and  the  reinforcement  is  checked  and  passed  by  the 

Engineer‐in‐charge.  

26.0  Reference to Standard Specifications :  

The  specifications  of  the  work  as  enclosed  with  this  contract  document  are 

drawn  with  a  specific  reference  to  site  conditions  and  do  not  every  where 

include the details of the standard tests and procedures, which are already  laid 

down and available  in  the current  Indian Standard Specifications.   Where ever 

such details are not specified in this contract.  The provision under current Indian 

Standard  Specifications  and  /  or  the  Standard  Specifications  (1970)  of  the 

Government of Maharashtra shall be deemed to be applicable.  

 

 

Page 148: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

148 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

27.0  Communications and Notices by Contractors :  

All communications and / or notices pertaining to works and concerning matters, 

such  as  passing  and  approving  of  foundation,  reinforcement  and  form work, 

measurements, mark outs, etc. shall not be addressed by  the Contractor  to an 

Officer below the rank Sub‐Divisional Officer.   All such notices communications, 

should be addressed in good time so as not to hold up the work.  

28.0  Non‐compliance of Contract Conditions :  

If  the  contractor  shall  neglect  or  fail  to  proceed  with  the  works,  with  due 

diligence or he  violates any of  the provisions of  the  contract,  the Engineer‐in‐

charge  may  given  notice  to  the  contractor,  identifying  deficiencies  in 

performance  and  demanding  corrective  action.    The  Engineer‐in‐charge,  shall 

also  clearly  state  in  the  notice  the  nature  of  action,  that  shall  be  taken,  if 

contractor fails to fulfil by necessary corrective action.  

Depending on nature of default the Engineer‐in‐charge at his desecration, shall 

have two options, regarding action to be taken in case of default by contractor.  

He shall withhold nay of the payments due to the contractor or shall terminate 

the  contractor  in  whole  or  in  part.    But  Engineer‐in‐charge  shall,  clearly 

mentioned  in his notice, the action that shall be taken  if the contractor  fails to 

take the corrective action.  The period of 14 days shall be given to the contractor 

to take such corrective action after the issue of such notice.  

No claims, for compensation of any sort, from contractor will be entertained for 

withholding the bills indefinitely till specified requirements are complied with by 

the contractor.  

After the issue of the notice about default by the contractor, the contractor shall 

not remove, from the site any plant, equipment and materials.  The Corporation 

shall have a  lien on all such plants, equipments and materials  from the date of 

such notice, till deficiencies have been corrected.  

Page 149: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

149 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

29.0  Compensation for delay in completion of work on Corporation account :  

(This clause  is applicable only  if  the estimated cost put  to  tender  is more  than        

Rs. 100 lakh.)  

Compensation by way of reliefs on account of delay in completion of work due to 

(1)  Shortage,  (2)  land  acquisition  etc. will  be  decided  and  given  as  described 

below.    In  case  of  total  stoppage  of work,  compensation  for  idle  labour  and 

contractors  overhead  charges  for  the  persons  question,  for  which  detailed 

record should be maintained by project officer may, be granted to the contractor 

either  careful  scrutiny  of  the  claims  and  obligating  Corporation  approval 

Formulas  form containing  the  record of  labour  should be got approved by  the 

contractor from the Engineer‐in‐charge well in advance.   

The appropriate affected period  for considering grant of relief shall be decided 

by  the Chief Engineer(SP) Water Resources Department, Pune / Chief Engineer 

(WRD)  Water  Resources  Department,  Pune.    However,  no  relief  will  be 

admissible for the stoppage for a period less than two months.  

The  decision  regarding  grant  of  relief  in  such  cases  shall  be  taken  by  Chief 

Engineer(SP) Water Resources Department, Pune / Chief Engineer (WRD) Water 

Resources Department, Pune.  and it will be final and binding on contractor.  

30.0  Co‐ordination with other contractors :  

The  contractor  should  note  that  there  will  be  other  agencies  including 

Corporation working  in the same area for works other than the  included  in this 

contract.    The  contractor  shall  co‐operate  with  these  agencies  to  the  fullest 

extent and shall allow them reasonable facility and co ordination for execution of 

work, simultaneously and   satisfactorily as  intended  in  the contract conditions, 

specifications and drawings.  

Should  there be a dispute or disagreement between  the  contractor and other 

agencies for any cause whatsoever, the same shall be referred to the Engineer‐

Page 150: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

150 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

in‐charge whose decision regarding Co‐ordination and facilities to be provided by 

all contractor to others shall be final and binding on all parties and such decision 

shall  not  vitiate  any  contract  or  absolve  the  contractor  of  this  responsibility 

under the contract, and shall not form ground for any claim or compensation.  

31.0  Photographs of the Works:  

The contractor will not be allowed to take photographs showing field work or the 

general  location  of  the work.    The  Engineer, may  however,  at  his  discretion, 

allow  a  few  construct5ion  photographs  to  be  taken  for  the  purpose  of  the 

contractor’s record. Prior approval of the Engineer‐in‐charge should be obtained 

in  such  cases  and  also  in  case  such photographs  are  to be exhibited  in public 

literature and calendars. etc.  in all  such cases negatives of  the photos  shall be 

submitted  to  the  Engineer,  after  taking  approval  number  of  copies  and  the 

negative will become the absolute property of the Corporation.  

32.0  Fencing, lighting and Ventilation:  

a)  The contractor shall be responsible for the proper lighting, fencing, guarding and 

necessary  health  and  safety  measures  while  executing  all  works  under  this 

contract  and  for  proper  provision  of  temporary  roadways,  guards,  footways, 

fences, caution notices, etc. as  far as  the  same may be  rendered necessary by 

reasons of the work, for the accommodation of the workmen.   foot passengers 

or  other  traffic  and  of  owners  and  occupiers  of  adjacent  property  and  of  the 

public and at all remain responsible for any accidents that may occur on account 

of his failure to take proper and timely precaution.  

b)  Maintenance of Services:  

After all the work under this contract  is completed and accepted as such,  in 

case  the  Engineer‐in‐charge  so  directs,  the  contractor  shall  maintain  the 

lighting, Ventilation, communication facilities etc. upto a date determined by 

the Engineer‐in‐charge, but not  longer  than  for a period of  twelve months.  

Page 151: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

151 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

All reasonable charges for such maintenance otherwise not required by the 

Contractor for his purposes under the contract will be borne by Corporation.  

As regards the reasonableness of such charges, the decision of the Engineer‐

in‐charge shall be final and binding on the Contractor.  

33.0  Liability for accidents to Persons :  

It  shall be  contractor’s  responsibility  to protect  against  accidents on  the work 

site.   He shall  indemnify  the Corporation against any claims  for damage  to  the 

property, injury to workers or any other persons, deaths etc.  On the occurrence 

of an accident resulting in death or which is so serious as to be likely to result, in 

death the contractor shall within 24 hours report  in writing to the Engineer‐in‐

charge,  the  facts stating clearly about  the circumstances  in which accident has 

occured and the subsequent action taken.  Other minor accidents causing minor 

injuries and loss of property should be communicated in writing, promptly to the 

Engineer‐in‐charge.    In all cases  the contractor shall  indemnify  the Corporation 

against all losses or damage resulting directly or indirectly from the contractor’s 

failure to report in the manner aforesaid.  This includes penalties or fines if any, 

payable by the Government as a consequence of failure to give notice under the 

Workmen’s Compensation Act or failure to conform to the provisions of the said 

Act in regard to such accidents.  

In the event of accident in respect of which compensation may become payable 

under  the Workmen’s Compensation Act VIII, of 1923  including all  subsequent 

modifications there of, Engineer‐in‐charge may retain the sums of money as may 

in the opinion of Engineer‐in‐charge be sufficient ot meet such liability out of the 

amounts  payable  to  the  contractor.    These  sums  shall  be  recovered  from  the 

immediate payment due to the contractor in one instalment or in more than one 

instalments.   The decision of the Engineer‐in‐charge regarding this shall be final 

and  binding  on  the  contractor.    On  receipt  of  award  from  the  Labour 

Page 152: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

152 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Commissioner the balance amount shall be reimbursed to or recovered from the 

contractor.  

It  should  be  noted  that  though  the  Corporation  is  a  Principal  employer  the 

complete responsibility of compensation shall be on the contractor.  

34.0  The contractor  to supply and be  responsible  for  the sufficiency of  the means 

employed :  

The contractor shall supply and take upon himself the entire responsibility of the 

sufficiency of  the  scaffolding,  timbering,  tools,  implements and generally of all 

the  means  irrespective  of  whether  such  means  may  or may  not  have  been 

approved  of  or  recommended  by  the  Engineer‐in‐charge  and  the  Contractor 

must  accept  all  risks  of  accidents  or  damages  from whatever  cause  they may 

arise, until the completion of this contract.  

 35.0  Covering of work :  

The  contractor  shall  give  not  less  than  seven  days  notice  in  writing  to  the 

Engineer‐in‐charge of  the work which  is proposed  to be  covered up or placed 

beyond  the  reach  of measurements  so  that  the measurements may  be  taken 

before the work is covered up or placed beyond the reach of measurements.  No 

work shall be covered up or placed beyond the reach of measurements before 

ensuring  that  the measurements of work  to be covered up are  recorded.   Any 

work  covered  up  or  placed  beyond  the  reach  of measurements without  such 

notice having been given or consent obtained,  the same shall be uncovered at 

the  Contraactor’s  expenses  and  in  default  there  of  no  payment  or  allowance 

shall be made for such work or for materials with which the same was executed.  

36.0  Quantities of work :  

The  quantities  of work  under  the  various  items  in  the  Schedule  “B”  Part  –  I 

Schedule  of Quantities  and  Bid  Rates  as  estimated  by  the  corporation’s  have 

been  provided  as  could  be  reasonably  anticipated  and  should  be  taken  as 

Page 153: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

153 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

indicative only.  The amount of work will depend upon the actual conditions that 

will be encountered in the construction and the results of detailed designs which 

will continue to be refined as more field date and information comes to hand.  If 

the work  is  stated  by  the  Corporation,  the  quantities  put  to  tender  shall  be 

reduced  to  the  extent  the work  is  done  by  the  Corporation  upto  the  date  of 

starting the work by the contractor.   No claims due to reduction  in quantity on 

his account will be entertained.  

37.0  Accuracy of lines, levels and Grades :  

Setting Out : 

a)  The contractor shall be responsible for the true and proper setting put of 

the work and for the correctness of the position, levels, dimension 

alignment of all parts of the work and for the provisions of all necessary 

instruments, appliances and labour in connection with this.  

b) For  the  purpose  of  setting  out,  one  permanent  bench mark  shall  be 

established the contractor near the value of which shall be given to the 

contractor,  by  the  Engineer‐in‐charge  on  demand  by  the  contractor.  

Similarly the reference line in the form of centre line of junction wall and 

of  some  other  components,  if  found  by  the  Engineer‐in‐charge  for 

complete setting out the structure shall be given.  All the setting out shall 

be with reference to this bench mark and reference line.    

c)  If at time during the progress of works the error shall appear or arise  in 

the possible,  level, dimensional  alignment of any part of  the work,  the 

contractor shall rectify such error to ht satisfaction of Engineer‐in‐charge 

without any extra cost. the Corporation.  

d)  The periodical  checking of  these by Corporation  staff  shall not  absolve 

the  contractor  of  his  responsibility  regarding  accuracy.    In  case  of 

deviation, the contractor shall make good to the discrepancy at his own 

Page 154: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

154 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

cost  and  without  any  compensation  for  the  additional  work  involved.  

Wherever  such  discrepancies,  if  any,  are  found  to  arise  between  the 

works of different contractors at the junction of their works, the relative 

liability  to  set  right  their  respective  discrepancies  shall  be  fixed  by  the 

Engineer‐in‐charge,  whose  decision  shall  be  final  and  binding  on  the 

contractors  concerned.    The  Engineer‐in‐charge  shall  further  have  the 

unquestioned  right  to  rectify  the  discrepancies  and  recover  the  costs 

from  the  contractor or  contractors according  to proportions as he may 

consider reasonable.  

e) It  is  the responsibility of contractor  to preserve  the benchmark and  the 

reference points established for setting out.  

38.0  Excavated Material  

All  the materials available  from excavation will be  the property of Corporation 

and  shall  be  disposed  off  only  as  directed  by  the  Engineer‐in‐charge.    The 

materials  of  approved  quality  available  from  the  excavation  including  that 

carried out by  the Corporation may be used by  the  contractor  in  the  items of 

works  included  in Schedule  ‘B’ or for ancillary or preparatory work, free of cost 

Prior approval of Engineer‐in‐charge for such use shall, however, be taken.  The 

contractor shall make proper arrangements for sorting out and stacking material 

of approved quality  that he proposes  to use as aforesaid.   Corporation will be 

free to make use other materials not required or not likely to be required for use 

by the contractor as will be determined by the Engineer‐in‐charge. 

The excavated material not to be used by the contractor as above or stacked for 

his  use,  but  remaining  unused  at  site  after  completion  of  works,  shall  be 

disposed off by the contractor at his own cost in manner and at place shown in 

the drawings or as and where the Engineer‐in‐charge may direct.  

Page 155: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

155 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

The  contractor  should  utilise material  available  from  excavated  stuff  for  back 

filling. 

39.0  Safety Measures :  

The contractor shall arrange for the safety in his operations as required including 

the provisions  in  the safety manual published by  the Central Water and Power 

Commission, New Delhi (Jan. 1962 Ed.) In case the contractor fails to make such 

arrangements  the  Engineer‐in‐charge  shall  be  entitled  to  cause  them  to  be 

provided and to recover the cost there of form the contractor.  The following are 

some of the measures listed, but the same are not exhaustive and the contractor 

shall  all  to  and  suggest  these  precautions  on  his  own  where  necessary  and 

should comply with the directions issued by the Engineer‐in‐charge in this behalf 

from time to time and at all times.  

Providing protective head guard to workers in the works like deep excavation to 

protect them against fall of overburden materials.  

Getting the workers  in such  jobs periodically examined for chest trouble due to 

too much breathing in fine dust.  

Taking  such  normal  precaution  like  fencing  and  lighting  to  excavations  or 

trenches,  not  allowing,  nails  or metal  parts  or  useless  timber  spread  around, 

marking danger area for blasting whistles etc.  

Providing sufficient suitable and safe accesses to all work spots including ladders, 

gangways, platforms, etc. avoiding naked wires, etc. such would electrocute the 

workers.  

Taking necessary  steps  towards  training  the workers  concerned on  the use of 

machinery before they are allowed to handle them independently and taking all 

necessary precautions  in  and  around  areas where machines hoists  and  similar 

units are working.  

 

Page 156: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

156 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

40.0  Sundays and holidays :  

No  work  shall  be  done  on  weekly  local  holidays  or  on  other  Government 

holidays, due gazetted or on holidays observed by local usage without the prior 

sanction of the Engineer‐in‐charge.  Withholding of  such sanction shall not from 

any grounds for compensation or extension of time limit.  

If  on  the  other  hand  the  Engineer‐in‐charge  directs  that  the  work  shall  be 

proceeded with on days and during hours otherwise not permissible under this 

contract, the Contractor shall proceed with the works as directed, without in any 

way violating this contract or forming any grounds for compensation or claim.  

The Contractor shall,  in his dealing with  labour at all times during the period of 

this contract have due regard to local festivals, religious and other customs.  

41.0  Handing over of work :  

All the work and materials, before finally taken over by Corporation will be the 

entire  liability of the contractor for guarding, maintaining and making good any 

damages of any magnitude, interim payments made for such work will not after 

this  position.    The  handing  over  by  the  contractor  and  taking  over  by  the 

Executive Engineer or his authorised representative will be always  in writing of 

which copies will go to the Executive Engineer or his authorised representative 

and  the  contractor5.    It  is  however,  understood  that  before  taking  over  such 

work Corporation will not put it into regular use        

as  district  from  casual  or  incidental  one  except  as  specifically mentioned  else 

where or as mutually agreed to. 

42.0  Instrumentation :  

In case, it is proposed to have any instrumentation, in work the instruments and 

their  accessories  will  be  procured  and  installed  by  the  Corporation  as  per 

programme  framed    by  the  Engineer‐in‐charge.    Care  should  be  taken  by  the 

Contractor  to  protect  these  instruments  as  well  as  their  connections  during 

various construction operations.  The contractor shall also extend all facilities for 

Page 157: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

157 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

installation and observation of  these  instruments.   All  the operations  required 

for  facilitating  the  installation  of  the  instruments  shall  stand  included  in  the 

relevant  items of  tender.   No  claim, however  shall be entertained due  to  any 

delay or obstruction that might be created due to installation or observation.  

43.0  Inspection of Works :  

The  Engineer  or  his  duly  authorised  representative  shall  have  at  all  times  full 

power  to  inspect  the  work,  whenever  in  progress  either  on  the  site,  in  the 

contractor’s  premises  or  the work  site.    Further,  contractor  shall  not without 

written  authorisation  permit  entry  on  site  of  work  of  any  person  expect 

authorised representative of the Corporation or the Engineer or the contractor’s 

staff and labour directly engaged on and in connection with the work.  

The  contractor  shall  at  his  cost  provide  all  necessary  facilities  for  proper 

inspection  and  supervision  of  the  work  gangways,  platforms,  scaffolding  and 

ladders,  etc.  of  suitable  dimensions  and  sufficiently  strong  at  appropriate 

locations and all accesses to passages etc. shall be well lighted and maintained in 

good order.  The Engineer’s decision about the sufficiency and adequacy thereof 

shall be final.  

The  contractor  shall  during  working  hours,  maintain  supervisor  of  sufficient 

training and experience  to  supervise various  items and operations of  the work 

and the said supervisors shall remain present during inspections of the Engineer.  

All  orders  and  directions  given  to  such  supervisors  or  other  staff  of  the 

contractor shall  be deemed to have been given to the contractor, to be present 

on any specified inspection and the contractor shall comply with such directions.  

44.0  Opening out works :  

Should the Engineer consider,  if necessary,  in order to satisfy himself as to the 

quality of work  the contractor  shall at any  time during  the continuance of  the 

contract pull down or cut into any part of the work, and make such openings into 

and  to  such  an  extent  through  the  same  as  the  Engineer may  direct  and  the 

Page 158: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

158 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

contractor  shall make good  the  same at his cost and  to  the  satisfaction of  the 

Engineer.  

45.0  Removal of imperfect work :  

If it shall appear, that the work has been executed with unsound, imperfect or of 

an inferior quality or otherwise not in accordance with the contract documents, 

the contractor  shall at his own cost  rectify,  reform,  remove or  reconstruct  the 

same, wherein whole or in part as may be, directed by the Engineer, whether or 

not,  the  value  of  any  such work  of material  shall  have  been  included  in  any 

payment made to the contractor.  The decision of the Engineer may, if he thinks 

fit, allow such work to be paid at reduced rates and his decision will be final and 

binding, provided further that the rates fixed by the Engineer, be not acceptable 

to  the  contractor,  he  shall  have  the  option  to  replace  the  defective work  or 

materials with ones in accordance with the specified standards.  

46.0  Jurisdiction of court for disputes:  

Disputes, if any, arising out of this contract shall be subject to the jurisdiction of 

the High Court of Bombay.  

47.0  Mode of payment in running bill and final bill :  

The tendered rates will be treated as inclusive of all taxes, duties, excise etc.  The 

phase wise  payments will  be  released  as  under,  after  deducting  all  taxes  and 

security deposit as mentioned in the tender document. Schedule – B. 

1. 75%  of  the  cost  for  that  item  in  Schedule  ‘B’  is  payable  after  receipt  of 

material.  

2. 10% of the cost will be paid on completion of erection of the equipment.  

3. 15% of the cost will be paid after successful testing and commissioning at 

site.  

48.0  Bills and payments: 

1) One  running  payments  in  a  month  is  permitted.  First  bill  shall  be 

submitted by  the contractor by 10th day of  the month, Payment of  this 

Page 159: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

159 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

bill shall be effected as stated in clause 10 to B‐1 form. Non‐submission of 

the bills on the schedule dates will absolve the corporation of the liability 

to make payment. 

2) The  format  of  running  bill  on which  the  bills  are  be  submitted  by  the 

contractor will be supplied to the contractor by the Corporation. Printed 

copies  of  the  bill  forms  as  per  this  format  shall  be  arranged  by  the 

contract  at  his  cost.  The  bills  in  five  copies  shall  be  submitted  to  the 

concerned Deputy Engineer, in the standard proforma only. 

3) The  final bill shall be submitted within one month of  the date  issues of 

completion certificate.  

49.0  Security Deposit : 

The  security  deposit  accumulated  from  deductions  from  the  running  account 

bills may  from  time  and  at  any  time on  application by  and  at  the  cost of  the  

Contractor be covered  into  interest bearing Corporation securities approved by 

and  in  the name of  the Corporation. Should  the market value of  the securities 

fall for any reasons whatsoever below that specified, the contractor shall make 

good the same in cash or as may otherwise    acceptable wherever called upon to 

do so or to replace the security by other acceptable to the Engineer‐in‐charge. 

The contractor shall bear all charges for commission and brokerage incidents the 

purchases  ,  safe  custody  withdrawal  and  collection  of  interest  on  these 

securities. 

50.0  No interest on money due to the contractor : 

No  omission  by  the  Engineer  to  pay  the  amount  due  upon measurements  of 

otherwise  shall  vitiate  or make  void  the  contract  nor  shall  the  contractor  be 

entitled  to  interest  on  any  guarantee  bond  or  payment  in  arrears  nor  on  any 

balance which may on the final settlement of his account be found due to him.  

 

 

Page 160: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

160 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

51.0  Value Added Tax :  

“The tender rates are inclusive of all taxes, rates and cess and are also inclusive 

of the leviable tax in respect of sale by transfer of property in goods involved in 

the execution of a work contract under the provision of Rule 58 of Maharashtra 

Value Added Tax Act 2005, for the purpose of levy of Tax.”  

52.0  Extra Items:   

Extra items of work shall not vitiate the contract.  The contractor shall be bound 

to execute extra items of work as directed by the Engineer‐in‐charge.  The rates 

for  extra  items  will  be  governed  by  the  provisions  of  clause  14  and  30  of 

conditions of contract.  

53.0  i)   LABOUR WELFARE CESS 

As per Govt.in Industries & Power G.R.No. BCA‐2009/CR‐108/Labour 7‐A 

Dated  17/06/2010,  1%  cess  on  labour welfare  shall  be  deducted  from 

each R. A. bill as prescribed in the above said G. R.  

  ii)  LABOUR AMENITY :‐  

As per Govt. Circular No. DSR  ‐1090/CR‐6453/PLN‐3 dated 14/07/1993, 

1% for labour amenity is considered in DSR item while arriving rates. 

54.0  Price Variation:‐   

i)  Price variation clause shall be applicable for the Electrical equipments for 

Transformers,  circuit  breaker  only.    Amount  to  words  PVC  shall  be 

calculate on the basis formulated by “IEEMA INDIA,”  

ii)  The  price  variation  shall  not  be  payable  for  excess  quantities  payable 

under provision of clause 38 of B‐1 from.  

iii)  No  price  variation will  be  paid  on  the  items  for which  IEEMA  has  not 

formulated / developed. 

 

 

Page 161: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

161 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

55.0  Insurance :   

i)    The contractor, shall unless other wise specified by the Engineer, insure the 

plan  and  shall  keep  it  insured  against  destruction  of  damage  by  fire, 

earthquake, flood, storm under exposure to weather or through riot, Civil, 

commotion, war or rebellion, theft, etc. for the full value of the plant and 

materials until the plant is taken over.  

ii) The insurance for the equipment shall be effected by the contractor with 

Government  insurance  Fund  on  behalf  of  the  corporation  covering  the 

risks towards handing transit, storage at site, re‐transporting upto place 

of erection, testing and commissioning of the  equipment at site and also 

for  further  period  of  90  days,  for  replacement  value  of  the  plant  and 

material. The address of Government Insurance fund is as below.  

iii) Director  of  Insurance,  Maharashtra  housing  and  Area  Development 

Authority (MHADA) Building I. Kalanagar, Bandra East, Bombay.  

iv) The  tenderer  shall  note  that  insurance  effected  through  and  other 

company will not be accepted.  

v) The Contractor shall take the policy  in the name of the consignee of the 

corporation.  The Insurance policy then will be assigned to the contractor 

for further operation.  The Insurance shall be full and shall cover and loss 

or damage in accordance with what is said above.  The claims arising out 

of  composite  insurance  policy  shall  be  dealt  with  or  handled  by  the 

contractor  at  his  own  cost  after  receipt  of  preliminary  damage  /  loss 

intimation  given  by  the  corporation  or  damage  /  loss  noticed  by  the 

contractor himself.  

vi) The Insurance of plan up to a period of 90 days beyond period of 1. months 

for  completion  of work  as  per  clause  and  satisfactory  performance  and 

guarantee test shall be on the account of contractor.  

vii) Third party  Insurance:  In addition to above the contractor shall  indemnity 

the  corporation against  the  loss or damages  to  the property of  the  third 

Page 162: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

162 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

party  and  or  injuries  to  the  third  person which may  arises  out  of  or  in 

consequences  of  transport,  storage  and  erection,  testing  and 

commissioning of the goods / equipment.  

viii) The rates  in the schedule B  in case of DSR  Items are  inclusive of all taxes, 

cesses,  Insurance,  overhead  &  transportation.    So  as  per  Government 

Resolution No. ʴɨÉɺÉ1098/|ÉGò ú28/98/¶ÉɺÉxÉ ½þ¨ÉÒ / Ê´ÉkÉ Ê´É¦ÉÉMÉ ¨ÉÆjÉɱɪÉ,

¨ÉÖƤÉ<Ç ÊnùxÉÉÆEò 19 +ÉìMɺ]õ 1998,  If  insurance document  is not submitted by 

Agency the Amount worth to 1% of Tender Amount to be recovered from 

the 1st R.A. Bill. 

56.0  APPROVAL FROM ELECTRICAL INSPECTOR ( IF APPLICABLE)    

  The  tenderer  is  required  to  get  approved  the  various  drawings  for  the    

transmission line/Switchyard from the concerned Electrical  Inspector within 

15 days from the notification award. 

  Subsequently,  on  completion  of  work  the  entire  installation  shall  be  get 

approved  by  the  tenderer  from  the  concerned  Electrical  Inspector  for 

commissioning of the lines and installations. 

  Any  charges/official  fees  etc.  required  for  approval  of  installation  by 

Electrical  Inspector shall be borne by  the  tenderer. Re‐imbursement will be 

paid at actual against proof of document through bills by the corporation. 

57.0  PTCC / RAILWAY APPROVAL :  (Not Applicable) 

The tenderer is required to  get approved the various drawings , showing line 

profile,  proposal  of  PTCC  /  railway  crossing  /  Road  crossing  etc.  from 

competent  authority  at  his  own  cost.    Engineer‐in‐charge will  persue  the 

proposal  to  concerns  authorities which will  be  get  approved  by  tenderer 

before  charging  the  line. The  cost of protection work  suggested by PTCC  / 

railway  crossing  /  Road  crossing  authorities  will  be  reimbursed  to  the 

contractor at actual  through the bills against proof of document. 

 

Page 163: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

163 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

58.0  MSEDCL/ MSETCL  APPROVAL : ( IF APPLICABLE)    

The  tenderer  is  required  to    get  approved  the  various  drawings  ,  plans, 

profile, proposal of Outgoing Bay at MSEB Sub‐station etc.  from competent 

authority  at  his  own  cost.    Engineer‐in‐charge will  persue  the  proposal  to 

concerns authorities which will be get approved by tenderer before charging 

the Bay/ line. The cost of testing work of electrical equipments suggested by 

MSEB authorities will be reimbursed to the contractor at actual through the 

bills against proof of document. 

59.0  Test, Inspection and rejection of defective materials and works:  

The Engineer shall have access at all times to the places where components are 

being manufactured for use under the contract to determine that manufactures 

is proceeding  in  accordance with drawings  and  specification  and  the  Engineer 

shall also have access at all times to the places of storage.  

Further, contractor shall not without written authorisation, permit entry on site 

of work of any person except authroised  representative of  the Corporation or 

the Engineer or the contractor’s staff and directly engaged on and in connection 

with the work.  

The tests and  inspections of  items specified at contractors manufactures works 

or  sub‐works  be  witnessed  by  two  representative  of  the  Engineer.    The 

contractor will provide the cost of travel, lodging and boarding of the inspectors.  

The  travel  shall  be  arranged  generally  by  Air,  1st  class  Railway  or  Car.    The 

Corporation reserves the right to appoint and deploy the services of the outside 

agency,  in association with the corporation for said purposes, however changes 

for the services with the outside agency will be borne by the Corporation.   The 

acceptance  of  the  test  shall  be  entirely  with  the  Engineer  or  his  authorised 

representative.  

The test and inspection of the item to be carried out.  

All the equipment’s covered under specification.  

Page 164: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

164 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

A) The  test  report  of  manufactures  certifying  that  the  equipment  is 

manufactured  as  per  specifications  of  the  tender  shall  be  furnished by 

the contractor.  

B) Contractor cannot be relived from the responsibility even  if the drawing 

and quality are approved by  the Engineer‐in‐charge  for  the purposes of 

guarantee and quality of equipment.  

59.1  Inspection and Tests at Manufactures works and waive of Inspection:         

( IF APPLICABLE)    

The  contractor  shall  arrange  Inspection  of  the  electrical  equipments  like 

conductor, fabrication, G.I. wire, stay wire, pin insulator, Disc insulators and RSJ 

poles at supplies please by authority, if required.  

The waival of inspection can be considered if contractor produces, recent latest 

certificates for similar type of equipment as approved by authority.    

60.0  Plans,  Drawings  and  Other  Data  and  Statutory  Approval  from  Electrical 

Inspector.  

1) The Contractor shall submit the following information to the Engineer for 

approval within the time stipulated against each item below.  

a) Drawings or prints  in triplicate showing the  location of major plants and 

other  facilities which  he  proposes  to  put  up  at  the  site,  including  any 

changes  in  the general  laying.   Drawings  shall be  submitted at  least 15 

days prior to the work commencement.  

b) The  contractor  shall  furnish  complete  engineering  data  of  each  set  of 

equipment  such  as name of manufacture,  the  type  and model of each 

principal  item  of  equipment  proposed  to  be  furnished  and  erected  at 

started in the annexures Standard catalogues pages and other documents 

of  the  tenderer,  may  be  used  in  the  tender  to  provide  additional 

information and date as deemed necessary by the Indenter.   The review 

of these date by the Engineer will covers only general confirmation of the 

Page 165: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

165 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

data to the specifications and documents interfaces with the dimensions 

which might  affect plant  layout.    This  review by  the  Engineer may not 

indicate a through review of all dimensions quantities and details of the 

equipment, materials any devices or  items  indicated or  the accuracy of 

the  information  submitted.    This  review  and    /  or  approved  by  the 

Engineer shall not be constracted by the contractor as limiting any of his 

responsibilities and requirement specified under these specifications and 

documents.    The  above  data  shall  be  submitted within  15  days  of  the 

date of issue of work order.  

c) The  approval  to  the  plans  and  the  drawings,  designs  and  other  data 

submitted by the contractor for approval will be given within 15 days.  

d) Two sets of reproducible drawings (tracings) as required by the Engineer 

shall be furnished by the contractor.  

e) Each drawing  submitted by  the  contractor  shall be  clearly marked with 

the  name  of  the  Engineer  and  the  name  of  the  project  if  standard 

catalogue  pages  are  submitted  the  applicable  items  shall  be  indicated 

therein.   All titles nothings, markings and writings on the drawings shall 

be in English.  All dimensions should be in Metric units. 

All manufacturing and fabrication work  in connection with the equipment prior 

to the approval of the drawings shall be at the contractor’s risk.  The contractor 

may  make  any  changes  in  the  design  which  are  necessary  to  make  the 

equipment  conform  to  the  provision  and  indent  of  the  contract  and  such 

changes will again be  subjected  to  the approved by  the Engineer. Approval of 

contractors drawings or work by the Engineer shall not relieve the contractor of 

any of the responsibilities and liabilities under the contract.  

 

 

 

Page 166: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

166 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

61.0  Additional  conditions  regarding  payment  of  royalty  charges  as  per  Bombay 

Minor Mineral Extraction (Amendment) Rules, 2003. (Not applicable) 

1.  The  royalty  charges  are  to  be  paid  by  the  Contractor  to  the  Revenue 

authorities.   This  is the prime responsibility of Contractor as per Tender 

Clause No. 36 of this Tender Document. 

2.  Percentage  as  stated  in  para  7  B  of  Annex  –A  of  the  Detailed  Tender 

Notice shall be withheld by MKVDC for the purpose of payment towards 

royalty charges.  This amount shall be released to the contractor subject 

to the following conditions.  

a) Contractor  shall  submit proof of  the payment of  the  royalty  charges  to 

the concerned Revenue Authorities acceptable to the Engineer‐in‐charge.  

b) The  total  amount  that  can  be  released  shall  be  limited  to  the  actual 

payment made as mentioned in the condition (a).  

c) If  the  actual  royalty  charges  are  less  than  the  amount  withheld, 

remaining amount shall be retained by the MKVDC.  

d) If  the  actual  royalty  charges  are more  than  the  amount withheld,  the 

contractor  shall  pay  the  excess  amount  to  the  concerned  Revenue 

Authority without any burden on the MKVDC.  

e) The  contractor  shall  indemnify MKVDC  towards payment of  the  royalty 

charges. 

62.0  Warranty :‐  

This  warranty  shall  remain  valid  for  12  months  from  date  of  putting  in  to 

commercial use.   

63.0  Defect Liability :‐ 

Within a period of 12 Months after completion & commissioning of work  if any 

repair due to the defect  in construction & equipment the same will be rectified 

by the contractor at his own cost. The security deposit amount is only payable 

after completion of this period. 

Page 167: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

167 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Contractor have to provide the arrangement for running and maintenance of the 

work completed and commissioned  in this tender during defect  liability period.  

The  arrangement  includes  men,  machinery,  skilled  /  unskilled  labour,  parts, 

equipments required for running & maintenance of the work.  

64.  COMPUTER & EQUIPMENT FACILITY: 

  A)  EQUIPMENT FACILITY:   

The Contractor shall be required to provide following air conditioning unit  

for  office  of the  Executive  Engineer,  Mhaisal  Electrical  &  Mechanical 

Division, Sangli as ordered by Executive Engineer‐in‐charge within 1 (One) 

Month  from  the  date  of  order.    Financial  provision  of  such  air 

conditioning unit shall deemed to be included in the offer & no separate 

payment for this shall be considered.  

1  Supplying  and  erecting  split  type  room  Air  conditioning unit  2  TR  capacity  3  star  250  V,  50  cycles,  A.C.  supply having  1  No.  of  air  handling  unit  hi‐wall mounting  type complete at position. – PANASONIC MAKE 

1 No.  

   

B)  VEHICLE FACILITY:    (NOT APPLICABLE) 

The  Contractor  shall  provide                  bolero  Jeep  inspection  vehicle  as 

ordered by  Engineer‐in‐charge.    The  inspection  vehicle mainly used  for 

arranging  the  visits  of  AIBP & MKVDC  officials  for  inspection work  till 

completion of work &  finally  shall be  retained by  the MKVDC. Financial 

provision  of  such  vehicles  & machine  agreement  shall  deemed  to  be 

included  in  the  offer  and  no  separate  payment  for  this  shall  be 

considered.   The vehicle  should be  registered with RTO  in  the name of 

Executive  Engineer  Mhaisal  Electrical  &  Mechanical  Division,  Sangli  & 

other necessary taxes & insurance etc. should be paid by the contractor.  

 

 

Page 168: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

168 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  C)  FURNITURE FACILITY:  (NOT APPLICABLE) 

The contractor shall provide following types of Office furniture as ordered 

by  Executive  Engineer‐in‐charge  within  1  (One)  Month  from  date  or 

order.   Financial provision of such furniture shall deemed to be  included 

in the offer & no separate payment for this shall be considered.  

65.0  CIVIL WORKS 

The  construction work pertaining  to excavation.  leveling, construction of  cable 

trenches  (  main  &  sub  trenches),  foundations  required  for  installation  of 

electrical equipments shall be scope of tenderer.  

For  this, contractor shall submit  the complete design  in  respect of above work 

along with drawings for according approval from Electrical wing to the Executive 

Engineer‐in‐charge.    After  getting  the  approval  from  concern  authority, 

contractor shall be complete the civil work  in supervision of Engineer‐in‐charge 

of Electrical wing.  

66.0  Power supply: 

The Tenderer shall note that no power supply is available at the work site. Hence 

the tenderer shall make his own arrangements of power for welding, drilling etc. 

67.0  Storage, watch and ward : 

Sufficient  storage  of  steel  and  other materials  shall  be  arranged  by  tenderer. 

Watch and ward  of the same up to completion of the work shall be arranged by 

the tenderer at his cost. No responsibility of any material of the tenderer will be 

taken by the department. 

68.0  EVALUATION OF TENDER : 

Evaluation & comparison of the offers shall be carried out on the cost for work quoted 

in the Envelope No.2.  

No change in the price after the opening of the Envelope No. 2 will be allowed.  

Page 169: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

169 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Weightage  will  be  given  to  the  Tenderer  who  will  pay  Sales  Tax  /  Turnover  Tax  to 

Government  of  Maharashtra  according  to  the  payment  declared  vide  clause  59  of 

special condition of contract.  

69.0  EVAULATION OF  THE BIDS ON ACCOUNT OF  TECHNICAL  PERFORMANCE DATA AND 

GURANTEES OF EQUIPMENT OFFERED AND APPLYING LIQUIDATED DAMAGES: 

A)  RATES FOR EVALUATION OF LOAD AND NO LOAD LOSSES:‐  (NOT APPLICABLE)  

The bidder has to quote the guaranteed values for the losses in the data sheet as below.  

1. Guaranteed maximum  iron  loss  in KW at 750 C of average winding temperature at 

rated voltage.  

2. Guaranteed maximum load loss ( Copper loss + Stray loss ) in KW at average winding 

temperature of 750 C. 

3. Guaranteed maximum auxiliary loss in KW because of consumption by cooling fans / 

Air blowers etc. at average winding temperature 750 C (Loss at 3 are not applicable 

to ONAN rating) 

The quoted guaranteed values shall be corrected by increasing the same to take into 

account permissible tolerance  limit as per  IS  ‐2026.   These corrected values of the 

losses will then be compared with reference to the lowest corrected value of these 

losses.   For the purpose of evaluation of the bid, the total price of the bid shall be 

increased  at  the  following  rates  for  excess  losses  arrived  over  and  above  the 

reference lowest corrected value of the losses mentioned earlier.  

I) For no load losses   :  Rs. 295689/‐ Per excess KW loss.  

II) For load losses     :  Rs. 171500/‐ per excess KW loss.  

III) Auxiliary losses    :  Rs. 295689/‐ per excess KW loss. 

B)  RATES FOR LIQUIDATED DAMAGES: ( NOT APPLICABLE ) 

For the purposes of ascertaining whether the guarantees are fulfilled or otherwise each 

transformer shall be tested at factory before dispatch and the above mentioned  losses 

shall  be measured.    The measured  losses  shall  then  be  compared  with  the  quoted 

guaranteed  losses and provision  regarding  liquidated damages  / penalty  for  failure  to 

meet  the  guarantees  etc.  shall  be  double  the  rate  taken  for  evaluation  as  stipulated 

below.  

Page 170: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

170 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

I) For no load losses   :  Rs. 591378/‐ Per excess KW loss.  

II) For load losses     :  Rs. 343000/‐ per excess KW loss.  

III) Auxiliary losses    :  Rs. 591378/‐ per excess KW loss. 

I. The  penalty will  be  limited  to  10%  of  contract  price  of  trans.  If  the  penalty 

exceeds 10% of the contract price the trans. will be rejected. 

Page 171: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

171 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SECTION – VI

TECHNICAL SPECIFICATIONS

Page 172: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

172 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

 

TECHNICAL SPECIFICATION 

SCOPE OF WORK 

Supply, Erection, Testing & Commissioning of lighting for Switchyard & approach road

@ Mhaisal LIS Stage -I & Stage -II. 

1.0      Steel Tubular Poles   

  Supply of  steel  tubular swaged pole  (Swan  type or other wise) as per  IS 2713: 

Part  2  1980,  fabricated  with  earthing  stud,  pole  base  plate  with  required 

numbers  of  holes  and  erecting  the  pole,  including  painting  in  provided 

foundation as per method of construction. 

  Material: 

a. Steel tubular swaged pole (Swan type or other wise) as per Table No 8/1

b. MS Base plate of 30x30x0.6 cms.  

c. Pole cap 4 mm  thick with  inside diameter equal  to outside Dia. of  the 

pole and minimum height shall be 100 mm shall be welded or fixed with 

set screws. 

d. Earth stud 5/8”mm Dia. size bolt welded to pole with required size nut 

and double G.I./M.S. washers 

e. Bituminous paint 

f. Aluminium paint/ any other paint as per the instructions of engineer in 

charge. 

g. Red oxide paint 

  Method of construction: 

  Before  erection  of  pole  base  plate  of  size  30x30x0.6  cm  shall  be  full  length 

welded or fixed with 4 set screws at the bottom of the pole, a suitable hole of 

required diameter and at specified height shall be drilled and welded with knock 

out nipple for laying wires of street light. The pole shall be then painted by  2 

Page 173: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

173 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

coats of red oxide paint and one coat of bituminous paint before erection for 1/6 

length to be buried in   ground & after erection  remaining portion by  two coats 

of aluminium paint. The pole shall be erected  in C. C foundation and muffing  in 

perfect plumb.  

  Mode of Measurement:   

  Executed quantity will be measured on number basis. (i.e. each)  

Designation  Overall 

Length 

in mtr 

Planting 

Depth  in 

mtr 

Height 

above 

Ground 

in mtr 

Length of  Sections  in 

mtr 

Outside  Diameter  / 

Thickness of Sections 

Appro.

Weight 

of 

Pole. 

Kg 

Bottom

   h3 

Middle

  h2 

Top

 h1 

Bottom Middle  Top 

 410 SP‐28  9.00  1.50  7.50 5.00 2.00 2.00 139.7 

x 4.50 

114.3 

x 3.65 

88.9  x 

3.25 

1

1

 410 SP‐31  9.00  1.50  7.50 5.00 2.00 2.00 165.1 

x 4.50 

139.7 

x 4.50 

114.3 

x 3.65 

147

410 SP‐52  11.00 1.80  9.20 5.60 2.70 2.70 165.1 

x 4.50 

139.7 

x 4.50 

114.3 

x 3.65 

175

 410 SP‐60  12.00 2.00  0.60 5.80 3.10 3.10 165.1 

x 5.40 

139.7 

x 4.50 

114.3 

x 3.65 

208

 

2.0   Bracket welded to Pole Cap   

Fabrication of Street light bracket of specified diameter ‘B’ class G.I. Pipe, 1.0 m. 

in  length welded  to pole cap erected on  top of  the pole  for erection of either 

single / double side entry WP fluorescent/CFL/MV/MH/SV fitting(s), duly painted 

with one coat of red oxide & one coat of aluminum paint, and erecting the same 

with provided leads. 

  Material: 

GI Pipe: GI Pipe of specified diameter as per CW‐PLB/GP mentioned  

  Pole Cap: Pole cap fabricated from 4 mm thick MS Sheet, of 30 cm in length. 

Page 174: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

174 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  Corner support: 3 mm thick MS Sheet. 

  Set screws: MS bolts, nuts of 6 mm dia. 

  Clamps: MS sheet 5 mm thick 40 mm wide. 

  Paint: Red oxide & Aluminum paint. 

  Method of Construction: 

  The bracket shall be  fabricated as per  relevent  I. S. and shall be placed on  the 

 pole cap.  Inner diameter of pole cap shall be as per the outer diameter of pole 

with   sufficient clearance, so as  to  facilitate easy placing of  the cap on  top of 

pole. Two holes of   minimum 6 mm diameter shall be drilled to pole cap. The 

nuts shall be placed on the pole   cap duly aligned with the hole, and shall be 

butt welded. Bolts shall then be tightened   through  the  nut  so  as  to  hold  the 

bracket in vertical position.  

Mode of Measurement: 

Executed quantity shall be counted on number basis. (i.e each) 

3.0   Mains with 2 x 2.5 sq mm : 

  Providing specified wires and drawing them through provided conduits and / or 

as  directed;  ferruling  by  coding  tags,  harnessing  the  bunch  of  wires  with 

necessary material when used in panel boards, and duly connecting with lugs. 

Material:  

Mains / Sub‐mains / Circuit mains (comprising phase and neutral wires):  

PVC  insulated  wire  of  specified  size,  minimum  FR  grade  insulation,  copper 

conductor  of  electrolytic  grade,  having  insulation  1.1  kV  grade,  ISI marked,  of 

required colour coding. 

Earth Wire:  

PVC  insulated  wire  minimum  FR  grade  insulation  copper  conductor  of 

electrolytic grade, having insulation 1.1 kV grade, of green colour, ISI marked, of 

specified size but not less than 1.5 sq.mm. 

Lugs: copper lugs of required size & type 

Page 175: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

175 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Other material:  Rubber  grommet,  bush,  harnessing material,  flexible  conduit 

etc. 

  Method of construction:  

  Drawing of wires: General  

Wires shall be drawn with adequate care.   Correct colour coding, shall be used 

for phase, neutral and earth. Wires shall not have intermediate joint in between 

terminals of the accessories. Earth‐wire and Return wire (neutral) may be looped 

only within  circuit.    For  lighting  load or  single‐phase distribution wires of  two 

different phases shall not be drawn in single pipe.  Wires shall be terminated in 

the terminals of accessories only, with correct type of and correct size of lugs. 

Drawing of wires: through PVC conduits  

Insulated Earth wire of green or green‐yellow colour of minimum 1.5 sq mm or 

as per specified shall be drawn through pipe.  Number of wires shall not exceed 

with respect to size of pipe. 

Drawing of wires: through Rigid Steel conduits  

Bush  shall  be  used  at  pipe  opening  to  protect  wire  insulation  from  getting 

damaged  due  to  burrs  /  sharp  edges. Number  of wires  shall  not  exceed with 

respect to size of pipe.  

Open Wire  bunch: Open wires  shall  be  erected with  due  care  so  as  to  avoid 

chances  of  any  mechanical  injury.  Harnessing  shall  be  done  with  required 

material  in an approved manner  in panel boards or where ever necessary. For 

covering lead wires flexible conduit shall be used with gland as per necessity.  

Testing: 

Insulation resistance test:  

All wiring  shall be  tested with 500V Megger between phases, phase – neutral 

and to Earth. IR value shall not be less than 1M‐ohm. 

    Earth continuity: 

Earth continuity shall be ensured at termination point of Earth wire. 

Page 176: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

176 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Polarity Test:  

Test shall be carried out for ensuring the correct polarity in plug 

Mode of measurement: 

Measurement shall be carried out on the basis per running meter length of single 

wire or bunch as specified. 

4.0  Miniature Circuit Breakers 

  Supplying  of MCB  of  specified  poles,  current  rating, &  either  of  B  series  or  C 

series with   required wiring connections &  lugs etc. and erecting  in provided 

enclosure / distribution   board. 

  General Specifications for MCB’s 

MCB’s shall be of current limiting type, ISI marked confirms to IS 8828 – 1996. 

The power  loss per pole shall be  low and shall be  in accordance with  IS 8828 – 

1996. 

All cable entries shall be either from bottom or top. 

MCB’s shall be of C‐ curve characteristic & shall have quick make & break non‐

welding  self  wiping  silver  alloy  contacts  for  10  KA  short  circuit  both  on  the 

manual & automatic operation. 

All the active, live parts of MCB’s should be out of human reach, ensuring safety 

& confirms to IP20 degree of protection. 

The MCB’s must house transparent label holder to ensure circuit identification. 

The MCB’s must have fully insulated safety shutters. 

The MCB’s shall have lockable switching lever. 

The Minimum electrical endurance shall be 20,000 operations. 

The  housing  of  the  MCB  shall  be  mounted  self‐extinguishing  DMC  (Dough 

Molding Compound). 

The short circuit Current shall be brought to zero within 4 to 5 milliseconds from 

the time they are established. 

All MCB’s shall have a minimum short circuit Capacity of 10kA RMS. 

Page 177: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

177 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  Material: 

1. Single Pole / Single pole with Neutral / Double Pole / Triple pole / Four 

pole,   MCB,  ISI marked as per  IS 8828  : 1996  (IEC 60898) with hammer 

trip  and  watch  mechanism15  arc  plates,10  KA  capacity  with  nominal 

rating of 240/415V.  

2. Lugs – Copper lugs of suitable size 

  Method of Construction:  

MCB shall be erected in provided enclosure / distribution board and terminating 

the provided wires by copper lugs (crimping type) and connecting the same. 

Mode of Measurement: Executed quantity  shall be  counted on number basis. 

(i.e. each 

5.0  Galvanized Iron Pipes 

This part of specification deals with the Galvanized  Iron pipes of different Class 

(Heavy, Medium & Light) used for water supply, or any other purpose.Supplying 

and  erecting GI  Pipes  of  specified  class, with  necessary  accessories,  (such  as: 

Bends, Tees, Couplings, Unions,  sockets, bends,  tees, enlargers,  reducers, back 

nuts, plugs, unions, etc) at designated place, having relevant ISI mark, complete 

to the satisfaction of the department.           

  Material: 

  Pipe: 

The  galvanized  iron  pipes  shall  comply with  IS:  1239‐‐1973  and  1969  for  the 

specified class. The specified diameter of the pipes shall refer to inside diameter.  

  Fittings & Accessories: 

Bends, Tees, Couplings, Unions,  sockets, bends,  tees, enlargers,  reducers, back 

nuts,   plugs, unions, etc shall made of galvanized iron and shall comply IS: 1239‐

1973 and   1969. 

  Plumbing material: Hemp, Linseed oil. 

Page 178: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

178 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

MS Clamps: Clamps fabricated of required length and shape, of 3 mm thick mild 

steel having 25 mm width. 

Hardware: MS  nuts &  bolts  of  required  size  and  strength,  Sheet Metal  (SM) 

screws of required sizes, plugs/wooden gitties, etc.  

  Method of Construction: 

    The guide lines for the use of pipes are as under: 

Heavy  guage  pipes  shall  be  used  for  delivery  line  of  Submersible 

pumps/Ejecto Jet pumps/Open well submersible pumps.   

Medium  guage  shall  be  used  for  suction  pipe  of  Centrifugal  pumps, 

(Except for Centrifugal pumps meant for Fire fighting purpose.) and shall 

be used enclosure for cables while meant for laying underground at road 

crossing, or any other location as directed by engineer in‐charge, etc. 

Light  guage  shall  be  used  as  enclosure  for  cables  on wall,  pole,  or  for 

other purpose wherever specified. 

  Pipes to be used as Enclosure: 

  Erection of Pipe on wall: 

The required length of pipe shall be machine cut, without any sharp edges, burrs, 

etc. The pipe duly enclosing  the  specified material,  shall be erected on wall  in 

plum, and fixed with required size of MS clamps on wall with plugs, gitties, etc. 

When the pipe is to be fixed to walls it shall be fixed with standard bracket, clips 

or holder by keeping the pipe about 12mm clear of the wall.   The pipe shall be 

fixed  to  the wall horizontally  and  vertically  and parallel  to one  another, when 

more than one pipe is laid,unless unavoidable. The supporting clips, etc., for the 

pipe shall be spaced at about  two meters or so as necessary.   When holes are 

not left during construction they shall be cut into the walls or slabs, etc., to pass 

the pipe through or to fix clamps, etc., after fixing of the pipes, clamps etc., these 

shall be made good, as directed by the site engineer. 

 

 

Page 179: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

179 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  Erection of Pipe on pole:   

The required length of pipe shall be machine cut, without any sharp edges, burrs, 

etc. The pipe duly enclosing  the specified material, shall be erected on pole  in 

plum, and fixedwith required size of MS clamps with MS nuts & bolts of required 

size and strength. 

When the pipe is to be used as cable enclosure and is to be terminated on street 

light pole(s), the pipe at the trench  level should be placed at  least 30 cm above 

the cable for avoiding damage to the insulation of cable. 

  Laying the Pipe underground: 

  The excavation for laying the pipe underground shall be done only so much, and 

in   advance of  laying  , so as  to cause  least damage  to  the  trench and  least 

inconvenience to traffic and in other respects. The trench for laying the pipe shall 

be excavated to the lines   and levels as directed by the site engineer. The bed 

shall  be made  even.  Unless  otherwise  specified  in  the  special  provisions,  the 

excavation shall be about 30 cm. wide and not less than 45 cm. deep. The trench 

shall be excavated  through all strata met with. Where necessary, sides may be 

shored or sloped.  In case rock  is met with the section of the trench, the depth 

may  be  slightly  reduced  but  shall  be  sufficient  to  receive  the  pipe  and  the 

cushioning  with  a  safe  margin.  Dewatering  shall  be  done  where  necessary.  

During excavation, if any, pipes, water mains, cables. etc., are met, these shall be 

carefully protected and supported; any damage done shall be made good by the 

contractor at his own cost. 

  Pipe used for Plumbing purpose: 

The required  length of pipe shall be machine cut and threaded (threading shall 

be done by machine only), without any  sharp edges, burrs, etc. The pipe  shall 

then be properly aligned with  the accessory and  tightening by applying hemp, 

linseed oil, so as to make  it  leak proof. During the erection, wherever required, 

correct  accessory  shall  be    used. When  holes  are  not  left  during  construction 

they shall be cut into the walls or slabs, etc., to pass the pipe through. 

Page 180: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

180 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  Mode of Measurement:  

Executed quantity shall be measured on running meter basis, including the entire 

accessory. The  lengths  shall be measured net on  the  straight and bends along 

the center line of the pipes and fittings correct up to a cm. (i.e. per meter)   

6.0  ARMOURED CABLES (HT & LT) 

All material shall conform to relevant standard as per BIS and shall carry ISI mark. 

Work  shall  be  carried  out  as  per  the method  of  construction  as  specified  by 

BIS/Chapter 16 of P.W. Dept. Handbook/NEC. 

The following  list records those  Indian Standards  in force, which are acceptable 

as good practice, and accepted standards. 

SP 30: 1984  :  National Electrical Code 

SP 7 (Group 4): 2005  :  National Building Code 

IS 1255: 1983                  Code of practice of  Installation & Maintenance of 

armoured cables up to 33 kV. 

  IS 3961: Part 2: 1967  :  Recommended current ratings of PVC cables. 

Providing armoured cable of specified voltage  level, size & of required material 

(Aluminum  /  Copper)  for  erection  including  hardware  and  erecting  armoured 

cable on wall, ceiling, RCC slab or drawing the same through pole, pipe, etc. 

  MATERIAL: 

Cables: All cables shall be manufactured as per relevant IS. The core shall either 

be  of  circular  shape  (for  solid  conductor)  or  sector  shaped  (for  stranded 

conductor) duly covered with  flat galvanized  steel armouring  strips, Virgin PVC 

insulation  with  manufacturer’s  name,  IS  No  &  License  No  of  IS  duly 

embossed/screen  printed  while  extruding  the  insulation  at  every  metre  and 

having the total count of progressive length in meter at each mark.  

Earth wire: Galvanized Iron (G I) wire of appropriate guage as per Table No 7/1.   

MS Spacers:  Spacers made from 6 mm thick mild steel and having 25 mm width, 

duly machined  for  smooth  edges,  and  2  holes  of  8/10 mm  dia.  for  fixing  of 

Page 181: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

181 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

counter sunk head SM screws. Spacer shall be painted with black colour enamel 

paint of superior quality. 

Saddles: Saddles  fabricated  from GI/MS sheet of required gauge  (16/18 gauge) 

either  galvanized  or  painted  with  superior  quality  enamel  black  paint,  with 

necessary shearing for mechanical strength, semi circular shaped with extended 

piece having suitable holes for fixing on spacer.  

  G I Strip: 22 g x 25 mm width G I Strip. 

MS Clamps: Clamps fabricated of required length and shape, of 3 mm thick mild 

steel having 25 mm width. 

Hardware: Sheet Metal (SM) screws of required sizes, plugs/wooden gitties, etc.  

  METHOD OF CONSTRUCTION: 

  Erection of Cable on Surface: 

Erection  shall be done  as per  the  layout  finalized,  in perfect  level  and plumb. 

Before fixing the cable shall be straightened as far as possible for good aesthetics 

look, along with continuous bare GI earth wire of required guage. Cable with G I 

wire shall be fixed on MS Spacers with saddles firmly clipped on cable. Spacers 

shall be  fixed  to wall with minimum 50 x 8 mm SM screws with plugs/wooden 

gitties  (Distance  between  two  spacers  shall  be maximum  600 mm). Wooden 

gitties  shall be used wherever  required  (Especially  for  stone wall). MS Saddles 

shall be fixed to spacers with two 25 x 8 mm machine SM screws. Wherever the 

cable has to be bent, the turning radius shall be as Per I. S. The entries made in 

wall, floor slab, etc for laying the cable shall be made good by filling and finishing 

with plastering the same.  

  Erection of Cable on Trusses: 

Cable along with bare GI earth wire, while erecting on  trusses,  shall be  firmly 

clamped by wrapping GI strip of 22 g, 25 mm width of required  length fixed to 

truss with SM nuts and bolts. 

 

Page 182: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

182 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

  Erection of Cable on Pole: 

Cable  along  with  bare  GI  earth  wire,  while  erecting  on  pole,  shall  be  firmly 

clipped by 25 x 3 mm MS Clamp of  required  length and  fixed  to pole with SM 

nuts and bolts. 

  Laying of Cable in provided Trench/Pole: 

While  laying Cable along with bare GI earth wire, utmost care shall be taken to 

prevent damage to the insulation of the cable and at the open end, the bare GI 

earth wire shall be run along with cable. Cable shall be brought out from trench 

vertically straight (minimum 1.0 metre from G L). 

  Mode of Measurement: 

Executed quantity shall be measured on  the basis of  running metre per  run of 

cable. 

  DISMANTLING 

Cable  laid  underground,  or  fixed  on  any  surface  shall  be  dismantled  carefully 

without  damaging  complete  with  all  its  accessories.  The  surface  of  the 

dismantled  cable  shall  be made  proper  by  finishing with  cement mortar,  and 

refilling  back  and making  the  surface  proper,  if  dismantled  from  trench.  The 

dismantled cable & batten shall be retained by the  agency. 

  MODE OF MEASUREMENT: 

Executed quantity shall be measured on  the basis of  running metre per  run of 

cable. 

7.0  Distribution Board suitable for MCB’s             

Supplying of MCBDB suitable for 230 V / 415 V, horizontal/vertical, with/without 

door of specified ways (poles), surface / flush mounting to house  incoming and 

outgoing MCB’s, and erected on iron frame. 

  General Specifications for MCBDB’s 

DB’s shall be prewired and shall be fabricated as per IS: 8623. 

Page 183: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

183 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Suitable for flush mounting & surface mounting, with 100 A copper bus bar (For 

Horizontal type DB), neutral bar, earth bar & cable ties for cable management.  

In case of Vertical DB the bus bar shall be of 200 A rating. 

DB’s shall be of IP – 43 degree of protection. 

All  the MCB distribution boards  shall be  fabricated out of 18 SWG  thick  sheet 

steel duly rust inhibited through a process of degreasing, pickling, phosphating & 

powder  coating  to  an  approved  colour  over  primer  &  shall  be  of  the  totally 

enclosed dust proof type suitable for wall mounting. 

All  components  shall be mounted on DIN  rails &  covered  totally with  a  sheet 

steel cover  rendering  it  finger‐safe. Access  to  the  internal connections shall be 

only through removing the cover sheet. 

All DB’s  shall  be  internally  prewired  using  copper  insulated  high  temperature 

PVC wires. 

Bus bars & neutral bar shall be fully insulated with standard colour code. 

Bus bar withstanding capacity shall be 10kA. 

DB’s must have facility of reversing door without modification, pan assembly for 

ease of installation & convertible locking. 

  Material: 

1. Horizontal/Vertical type MCBDB:  ISI marked as per IS 8623, of specified 

ways (poles), surface/flush mounting, with/without door, suitable for 230 

V / 415 V. 

2. Lugs – Copper lugs of suitable size. 

3. Iron work: Suitable size of angle/flat. 

4. Hardware: SM screws, rawl plug, gitties, etc. 

  Method of Construction:  

MCBDB shall be erected at designated location and directed by site engineer and 

terminating the   provided  wires  by  copper  lugs  (crimping  type)  and 

connecting the same. 

Page 184: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

184 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Mode of Measurement: Executed quantity  shall be  counted on number basis. 

(i.e. each) 

8.0  Metal clad TP/TPN Switches with HRC fuse     

Supplying and erecting Metal clad TP/TPN switches with HRC Fuses of specified 

rating on angle iron frame of suitable size. 

  Material 

TP/TPN  Switches:  Combination  fuse  switch  unit, Metal  clad,  Triple  pole with 

Neutral link, Degree of Protection IP‐2L3 as per IS:13947 (pt.3)1993.Quick  make 

and break,  Interlockable cover, uninterrupted duty, Utilization category AC‐23A 

and  confirming  to  IS:13947  (Part.3)1993.  It  shall  be  suitable  for  three  high 

rupturing capacity equal  to 80 KA  (HRC) cartridge  fuses confirming  to  IS:13703 

(Part.1) 1993 and  IS:13703  (Part.2/Section 1& 2)1993 having rupturing capacity 

80 KA minimum, with rated voltage 415 Volts, 50 Hz. AC. 

   Enclosure: shall be made of CRC sheet of thickness  not less than 1.2mm. 

  Fuses: 80 KA High rupturing capacity fuses with ISI mark. 

  Mounting: Required size of angle iron / MS Flat. 

Paint:  Superior  quality  enamel  paint  of  specified  shade  &  colour,  Red  Oxide 

paint. 

Hardware: SM screws, MS Nuts & bolts, rawl plug, wooden gitties etc. 

Grouting material: Cement, Sand, Putty, Water, etc. 

  Method of Construction 

The switch shall be erected at designated place duly mounted on suitable size of 

angle  iron  frame  as  per  table  no.  5.1/1  with  the  help  of  required  nut  bolt, 

washer, etc on frame/wall. The angle frame to be erected on wall with the help 

of screws, or to be grouted in wall with the help of cement plaster, and finished 

as original. The Frame shall be painted prior to erection.  

Mode of Measurement: Executed quantity will be counted on number basis. (i.e. 

Each) 

Page 185: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

185 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

Table No.5.1/1 

Minimum size of angle to be used for Mounting frames of Switchgear   

S No.  Capacity  Minimum Size of angle iron

1  16A,32  A,  DP/TP/TPN/  changeover 

switch 

25x25x3 mm 

2  63A to 200 A DP/TP/TPN/ changeover 

switch 

40x40x5 mm 

3  300  A  and  above  TPN/changeover 

switch 

50x50x6 mm 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 186: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

186 MAHARASHTRA KRISHNA VALLEY DEVELOPMENT CORPORATION , PUNE,-11

(A. Govt. of Maharashtra Undertaking)

Signature of Contractor No. of Corrections Executive Engineer

SECTION - VIII

DRAWINGS

 

 

 

 

 

 

 

Page 187: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

MH

AIS

AL - K

AG

WA

D R

OA

D

MHAISAL STAGE 1

33 / 6.6 kV SWITCHYARD

GOVERNMENT OF MAHARASHTRA M.K.V.D.C PUNE

CONSTRUCTION CIRCLE KOLHAPUR

MHAISHAL ELECTRICAL AND MECHANICAL DN. SANGLI

MHAISAL LIFT IRRIGATION SCHEME STAGE II

TAL : MIRAJ, DIST : SANGLI

TITLE OF DWG :33 / 6.6 kV SWITCHYARD AREA AND APPROCH

ROAD LIGHTNING @ MHAISAL STAGE I

DRAWN BY :

CHECKED BY :

S. B. MALI (SEC ENGR.)

DEPUTY ENGINEER

MHAISAL ELECTRICAL

SUB. DN.- 2 SANGLI

DWG NO : MEMD / MH1 / 3 / 2013

EXECUTIVE ENGINEER

MHAISAL ELEC. & MECH DN. SANGLI

( N. A. SHIRSAT )

( V. P. MAHAJAN )

1.4 M

5.15 M

1.4 M

P16

P17

P18

P19

P20

P21

P22

P23

P24

P25

P26

P27

P28

P4 P2

P1

P7

P5

GL1

P3

P6

GL2

P12

P13

P11

P10

P9

P8

P14

P15

TR1

MHAISAL STAGE 1

PUMP HOUSE

CONTROL

ROOM

CA

BLE

T

RE

NT

CH

33 kV

TOWER

14 M

15.5 M15.5 M

2

0

M

5.15 M

4 M

1

5

.

5

M

29.5 M

50 M

4

5

M

225 M

75 M

LEGEND

8.5 M SWEGED STEP POLE

POLE WITH SINGLE 24 W X 4 T5 CFL

STREET LIGHT FITTING

GATE LIGHT FITTING

DISTRIBUTION BOARD

Page 188: CHIEF ENGINEER (ELECTRICAL), HYDRO PROJECTS, MUMBAI … · 2013-03-12 · 47 Mode of payment in running bill and final bill. 48 ... 61 Additional conditions regarding payment of royalty

MHAISAL STAGE - II

PUMP HOUSE

CONTROL

ROOM

WATCHMEN

SHED

CA

BE

L T

RE

NC

H

OST

SWITCHYARD

MHAISAL STAGE - II

33 / 6.6 kV SWITCHYARD

TO NARWAD

TO

M

HA

IS

AL S

TA

GE

- II

20.5 M

P9

P11

P12

P13

P14

P15

P16

P17

P18

P19

P20

P21

P22

P23

P24

P25

GL1

GL2

P10

P4

P5

P6

P8

P2

P7

P1

P3

TR1 TR2

20 M5.8 M.

1 M

9.7 M

16 M

15.5 M

5.5 M

2

0

.2

5

M

1

9

.5

M

9.4 M

1 M

16 M

13.2 M

13.2 M

12 M 84 M

GOVERNMENT OF MAHARASHTRA M.K.V.D.C PUNE

CONSTRUCTION CIRCLE KOLHAPUR

MHAISHAL ELECTRICAL AND MECHANICAL DN. SANGLI

MHAISAL LIFT IRRIGATION SCHEME STAGE- II

TAL : MIRAJ, DIST : SANGLI

TITLE OF DWG :33 / 6.6 kV SWITCHYARD AREA AND

APPROCH ROAD LIGHTNING @ MHAISAL

STAGE- II

DRAWN BY :

CHECKED BY :

S. B. MALI (SEC ENGR.)

DEPUTY ENGINEER

MHAISAL ELECTRICAL SUB.

DN.- 2 SANGLI

DWG NO : MEMD / MH2 / 2 / 2013

EXECUTIVE ENGINEER

MHAISAL ELEC. & MECH DN. SANGLI

( N. A. SHIRSAT )

( V. P. MAHAJAN )

G

A

T

E

4

1

M

40 M

45 M

NOT TO SCAE

LEGEND

8.5 M SWEGED STEP POLE

POLE WITH SINGLE 24 W X 4 T5 CFL

STREET LIGHT FITTING

GATE LIGHT FITTING

POLE WITH DOUBLE 24 W X 4 T5 CFL

STREET LIGHT FITTING

DISTRIBUTION BOARD