Fax: 0522-2465754 e-male: [email protected] No. EL/3.1.35/2 Elect. Dated: 02.02.2016
Chief Electrical Engineer,
1. Central Railway, Mumbai, CST-400 001. 2. East Central Railway, Hazipur-844101. 3. Eastern Railway, Fairlie Place, Kolkata-700001. 4. Northern Railway, Baroda House, New Delhi-110001. 5. South Central Railway, Rail Nilyam, Secunderabad-500 071. 6. South East Central Railway, Bilaspur-495004. 7. South Eastern Railway, Garden Reach, Kolkata -700 043. 8. Southern Railway, Park Town, Chennai-600 003. 9. West Central Railway, Jabalpur-482001. 10. Western Railway, Churchgate, Mumbai-400 020 11. Chittaranjan Locomotive Works, Chittaranjan – 713 331
TECHNICAL CIRCULAR No. RDSO/2016/EL/TC/0133, Rev. ‘0’, DATED:01.02.2016
Sub: Instructions to form Multiple Unit of Three Phase Electric locomotives.
1.0 Introduction
1.1 In multiple operation a maximum of two locomotives can be operated. Both must
be directly coupled to one another. They must not be separated by a carriage.
1.2 While in motion, the front driver's cab is usually activated.
1.3 When linking up or in unusual situations, it is also possible to control the locomotives from another driver's cab.
1.4 The train bus configuration for multiple operation is only possible from the
driver's cab at the uncoupled end. A configuration from a rear driver's cab is referred to as single-unit traction.
1.5 The train bus automatically checks the configuration.
1.6 The leading manned locomotive is called the master locomotive and the other
one is called the slave locomotive.
1.7 The two locomotives are correctly linked together once the mechanical and pneumatic systems and the UIC cable have been connected.
1.8 Commands are transmitted down the UIC cable.
2.0 Steps to be followed during the coupling of locomotives 2.1 Both locomotives must be deactivated.
Page 2 of 8
2.2 The key switch must be in position "0".
2.3 Couple both locomotives mechanically, pneumatically and connect the UIC cable.
2.4 Close the isolating cock on the brake supply line (on pneumatic manifold) of the
locomotives as below.
2.4.1 Setting- up Control stand
a. E-70 brake system
Fig 1- Brake controller of E-70 Remove A-9 handle from Slave Loco on Neutral position and fix A-9 handle only on Master Loco leading cab.
b. Computer Controlled Brake System (CCB)
Fig 2 - Brake Controller of CCB (i) Setting lead/trail switches for multiple loco operation in Master loco
Non-working cab
Auto Brake Handle – Full Service (FS) & Lock Direct Brake Handle – release (REL) Selector Switch – TRAIL
Selector Switch
Auto Brake Handle
Direct Brake Handle
Page 3 of 8
Working cab
Auto Brake Handle – RUN Direct Brake Handle – FULL when stopped & REL for moving the Locomotive Selector Switch – LEAD
(ii) Setting lead/trail switches for multiple loco operation in Slave loco
On both cab (Both are Non-Working) Auto Brake Handle – Full Service (FS) & Lock Direct Brake Handle – Release (REL) Selector Switch – TRAIL
2.4.2 Setting up of Control panel
a. E-70 Brake Panel
MODE
ISOLATING COCK POSITION
47 DEAD ENGINE
74 (EMERGENCY/
VIG)
136 (BRAKE FEED
PIPE)
70 (E70 BRAKE
PIPE)
MULTIPLE UNIT
LEAD (LIVE)
CLOSED (OUT)
OPEN (VERTICAL)
OPEN (HORIZONTAL)
OPEN (VERTICAL)
TRAIL (LIVE)
CLOSED (OUT)
OPEN (VERTICAL)
CLOSED (VERTICAL)
OPEN (VERTICAL)
TRAIL (DEAD)
CLOSED (OUT)
CLOSED (HORIZONTAL)
CLOSED (VERTICAL)
CLOSED (HORIZONTAL)
Fig 3 - E-70 brake panel
COCK 47
COCK 136
COCK 70
COCK 74
Page 4 of 8
b. CCB Brake Panel
MODE
ISOLATING COCK POSITION
47 DEAD ENGINE
74 (EMERGENCY/
VIG)
136 (BRAKE FEED
PIPE) PER COS
MULTIPLE UNIT
LEAD (LIVE)
CLOSED (OUT)
OPEN (VERTICAL)
OPEN (HORIZONTAL)
CLOSED (HORIZONTAL)
TRAIL (LIVE)
CLOSED (OUT)
CLOSED (HORIZONTAL)
CLOSED (VERTICAL)
CLOSED (HORIZONTAL)
TRAIL (DEAD)
CLOSED (OUT)
CLOSED (HORIZONTAL)
CLOSED (VERTICAL)
CLOSED (HORIZONTAL)
Fig 4 - CCB brake panel
COCK-74
COCK-136
COCK- PER COS
COCK-47
Page 5 of 8
2.5 Move the key switch on the slave locomotive into position "D and, as soon as the light test starts (display Node-504), turn back to position"0". The MCE on the slave locomotive is now in self-hold mode (for 10 minute).
2.6 During the self-hold mode of the slave locomotive, move key switch into Pos."D
on the master locomotive. The control electronics starts to configure the trainbus. 2.7 After the configuration procedure, screen on the display shows the serial
numbers of the master and slave locomotives.
Example:
Train Configuration
Loco 3XXXX Loco 3XXXX
3.0 Problem in formation of Multi
3.1 If configuration proves impossible (or if no slave locomotive is available)
locomotive number 00000 appears.
3.2 If more than one driver's cab is activated in both locomotives, one loco will be shut down and a corresponding message appears on the displays in both locomotives.
3.3 If the multi is formed and for any reason the train bus link is interrupted then
system protection initiates a monitored shut down of the slave locomotive. Due to interruption of train bus the pantograph of the slave locomotive is lowered and a corresponding fault message appears on the screen of the master locomotive. In case of 3.1, 3.2 and 3.3 above initiate procedure from clause 2.0. If still the multi is not forming then follow steps as per clause 4.0 below.
4.0 In case the multiple unit is not working even after adopting the above procedure following should be insured: 4.1 All sub - D connectors have 9 pin hence care should be taken that each sub D
connected at proper place on Train Bus-coupler XVB708.
Check the continuity between UIC Socket pin and connector F of connecting box trainbus (Train Bus-coupler XVB708).
Loco coupled on side UIC Socket pin no. connector F of
connecting box train bus pin no.
Cab -1 10 1 & 2
11 3 & 4
Cab - 2 10 6 & 7
11 8 & 9
Cab - 1 or 2 13 Body of connector
Page 6 of 8
Fig 5 - Train Bus-coupler
4.2 Position of Sub-D connector on connecting box trainbus (Train Bus-coupler XVB708) a. ‘H’ connected to XG of Central Electronic-1 (CEL-1). b. ‘D’ for power supply for Train Bus-coupler XVB708. c. ‘F’ connected to UIC Socket.
4.3 If labeling not available on the connecter, procedure to find right connector
S. No.
Connector on connecting box trainbus(Train Bus-coupler XVB708). Remove all the connectors from the connecting box. Type of coupler
Procedure to check correctness
1 D (Power Supply)
Check the voltage between following pin Pin no. Pin no voltage
1 4 The voltage should be
85 to 110 V
1 5 2 4 2 5
2 F (UIC Socket)
Short the UIC Socket pin no 10 & 11 of cab-1. Check the continuity at the following pin of connector F
Pin no. Pin no continuity
1 3 There
should be between
pair of pins
1 4
2 3
2 4
Short the UIC Socket pin no 10 & 11 of cab-2. Check the continuity at the following pin of connector F
From CEL
To UIC Socket
Power Supply
Pin no. Pin no continuity
1 3 There1 4 should be
continuity2 3 between
2 4 pair of pins
Remove the Sub D connector XG from cell 1. Checkthe continuity between XG pin no 1and H pin no 1.
Pin no. ofPin no. of H
XGconnector
continuityconnector
1 12 2
3 H (CEL) 3 34 4 There
5 5should bebetween
6 6pair of pins
7 78 89 9
4.4 In case of message no. F1901 P1 "TRAIN BUS ISLATED' appears on DDU (orPIXY) then follow the following:a. Switch off MCE and then Switch on MCE.b. If the message appears again then check ZVB card and its peri-card LA A424
C01.c. If ZVB card is Ok then 411 YC (adopter coding key) may be defective.
Change the same and follow the procedure as per clause 2.
4.5 In c<;lsethe multiple unit is not working even after adopting the above procedureZVB card and its Peri-Card LA A424 C01 should be checked.
5.0 The above procedures apply for WAP-5, WAP-7, WAG-9 and WAG-9H class oflocomotives.
~~lb o'V\D
(Suresh Kumar)for Director General Electrical
Secretary (Electric Traction), For kindRailway Board, informationRail Bhavan, New Delhi-11 0001. please.1. Chief Electrical Engineer, Chittaranjan Locomotive Works, For information
Chittaranjan-713331.Chief Works Manager, Electric Loco Workshop, Central Railway,Bhusawal-425 201.Chief Works Manager, Electric Loco Workshop, Eastern Railway,Kancharapara, 24 Pargana (N) - 743145 (W.B.)Chief Works Manager, Loco, Carriage & Wagon Works, WesternRailway, Dahod, P.O. Freeland Gank - 389160 (Gujrat)Sr. DEE (TRS), Electric Loco Sheds,
Central Railway, Ajni (Nagpur)-440008.South East Central Railway, BMY Complex, Bhilai,Durg-490 025.
West Central Railway, Tughlakabad, New Delhi-110 044.Northern Railway, Ghaziabad (UP)-201 001.East Central Railway, Gomoh-828 401South Central Railway, Lallaguda, Secunderabad - 500 017.Eastern Railway, Howrah-.South Eastern Railway, Tatanagar-831 002.Western Railway, Vadodara-390 002.Southern Railway, Royapuram, Chennai-600 013.Central Railway, Kalyan-421304 (Maharashtra)
and necessaryaction please.
~~~O'l.-\\bO'VI
(Suresh Kumar)for Director General Electrical