    2012-2016 Capital Improvement Plan

    COMPLETE PROJECTS

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    2/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    ACQUISITION AND PARK DEVELOPMENT

    Bartelme, Mary Sangamon St. and Adams St. - expansion Complete X . . . . . .King Lockhart Western Ave. and 106th St. Complete X X . . . . .Park #499 Expansion Complete . . . . . . .Park #510 Livingston Field - expansion Complete . . . . . . .Park #541 Pritzker Park Complete . . . . . . .Park #544 Lincoln Ave. and Addison St. Complete . . . . . . .Park #554 Bloomingdale Access Park - Whipple St. and Albany Ave. Complete X . . . . . .Park #557 Kedzie Ave. and Touhy Ave. Complete . . . . . . .Park #560 410 W. Chicago Ave. Complete . . . . . . .

    Park #563 Hegewisch Marsh - 13000 S. Torrence Ave. Complete . X . . . . .Park #564 Big Marsh - 110th St. and Stony Island Ave. Complete . X . . . . .

    North Region Ridge Ave. - facility and park development - study Complete . X . . . . .Northerly Island Framework plan Complete . X . . . . .Park #012T Park development - 18th St. and Clark St. - study Complete . . . . . . .Park #556 Artesian Ave. and Western Ave. - study Complete . . . . . . .

    Blackwelder Park development Complete X . . . . . .Central Region Campus Park - Marshall School Complete X X . . . . .Cole, Nat King Park development - including playground Complete . X . . . . .Dunbar Park development - including playground Complete X X . . . . .King Lockhart Park development - 106th St. and Western Ave. Complete X X . . . . .Lincoln Zoo - South Pond - renovation Complete . X . . . . .Moore Park development - including playground Complete X X . . . . .Park #554 Park development - Whipple St. and Albany Ave. Complete X X . . . . .Park #556 Park development - Artesian Ave. and Western Ave. Complete X . . . . . .Ping Tom Park development - phase III - shoreline and athletic field Complete X X . . . . .

    Haas Field house and park development Complete X X . . . . .Lincoln Shoreline Protection - Diversey Harbor Complete X X . . . . .Lincoln Shoreline Protection - Irving Park Dr. to Belmont Ave. Complete X X . . . . .Northerly Island Solar charging station Complete . X . . . . .

    NEW CONSTRUCTION

    PARK DEVELOPMENT

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    ACQUISITION

    PLANNING

    1 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    3/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    FACILITY REHABILITATION

    Armour Square Transition plan - access improvements Complete . X . . . . .Avalon Transition plan - access improvements Complete . X . . . . .Clark, Richard Lane Tech Stadium - interior Complete X . . . . . .Dvorak Transition plan - access improvements Complete . X . . . . .Dvorak Field house - locker room improvements Complete X X . . . . .Eckhart Transition plan - access improvements Complete . X . . . . .Field, Eugene Transition plan - access improvements Complete . X . . . . .Garfield Gold Dome - concrete and structural Complete X X . . . . .Garfield Gym floor - restore or replace Complete . X . . . . .Gill Transition plan - access improvements Complete . X . . . . .Indian Boundary Transition plan - access improvements Complete . X . . . . .Jackson, Andrew Field house - locker room improvements Complete . X . . . . .Kennicott Transition plan - access improvements Complete . X . . . . .Kosciuszko Transition plan - access improvements Complete . X . . . . .

    Lincoln CDOT - underpass - LaSalle Dr./North Ave. Complete X . . . . . .Lincoln Conservatory - steam tunnel Complete . X . . . . .Lincoln Margate Field House - locker room improvements Complete . X . . . . .Lincoln Theater on the Lake - terrace walls Complete X X . . . . .Lincoln Transition plan - access improvements - Cultural Center Complete . X . . . . .Lincoln Transition plan - access improvements - Boat Club Complete . X . . . . .Madden Field house - rehab Complete X . . . . . .Mann Transition plan - access improvements Complete . X . . . . .McGuane Transition plan - access improvements Complete . X . . . . .Mount Greenwood Transition plan - access improvements Complete . X . . . . .Palmer Transition plan - access improvements Complete . X . . . . .Piotrowski Transition plan - access improvements Complete . X . . . . .South Shore Cultural Ctr. Major rehab - exterior Complete X X . . . . .Washington, George DuSable Museum - Roundhouse Building Rehab Complete X . . . . . .Welles Transition plan - access improvements Complete . X . . . . .West Lawn Transition plan - access improvements Complete . X . . . . .Woodhull Transition plan - access improvements Complete . X . . . . .

    Ada Entrance and washrooms Complete . X . . . . .Addams, Jane Memorial Interior and drainage improvements Complete . X . . . . .Bessemer Field house - locker room improvements Complete . X . . . . .Calumet Landscape Yard - rehab Complete . X . . . . .Columbus Misc. - sump pump Complete . X . . . . .Dvorak Field house and perimeter drainage Complete . X . . . . .Euclid Transition plan - access improvements Complete . X . . . . .Fernwood Field house - interior Complete . X . . . . .Field, Eugene Misc. - sump pump Complete . X . . . . .Fuller Fitness center - roof Complete X . . . . . .Garfield Conservatory - flooring Complete . X . . . . .Garfield Conservatory - waterfall reconstruction Complete . X . . . . .Garfield Misc. - generator Complete . X . . . . .Garfield Misc. - sump pump Complete . X . . . . .Gill Misc. - sump pump Complete . X . . . . .Grant Landscape Yard - rehab Complete . X . . . . .Hamilton Gym floor - restore or replace Complete . X . . . . .Horner Misc. - gym bleachers Complete X X . . . . .Indian Boundary Misc. - sump pump Complete . X . . . . .Jackson, Andrew Landscape Yard - rehab Complete . X . . . . .King, Jr., Martin Luther Bowling alley - restoration Complete . X . . . . .La Follette Field house - painting, plastering, drainage Complete . X . . . . .Lake Meadows Field house - rehab Complete . X . . . . .Lincoln Montrose Comfort Station - entrance and washrooms Complete . X . . . . .

    MAJOR REHABILITATION

    MINOR REHABILITATION

    2 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    4/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    Lincoln Landscape Yard - rehab Complete . X . . . . .Marquette Landscape Yard - rehab Complete . X . . . . .Ogden Access improvements Complete . X . . . . .Palmer Gym floor - restore or replace Complete . X . . . . .Riis Ice Skating Rink - rehab Complete . X . . . . .South Shore Cultural Ctr. Misc. - sewer pumps and controls Complete . X . . . . .

    Taylor, Robert Gym floor - restore or replace Complete . X . . . . .Washington, George Misc. - bleachers Complete . X . . . . .Welles Field house - lobby improvements Complete . X . . . . .West Pullman Misc. - insulation Complete . X . . . . .

    Ada HVAC energy management Complete . X . . . . .Adams HVAC energy management Complete . X . . . . .Altgeld HVAC energy management Complete . X . . . . .Athletic Field Field house - new boiler Complete . X . . . . .Austin Town Hall HVAC energy management Complete . X . . . . .Avalon HVAC energy management Complete . X . . . . .Berger HVAC energy management Complete . X . . . . .Berger HVAC energy management Complete . X . . . . .

    Bessemer HVAC energy management Complete . X . . . . .Brooks, Oscar HVAC energy management Complete . X . . . . .Chase Boiler and insulation Complete . X . . . . .Chicago Women's HVAC energy management Complete . X . . . . .Columbus HVAC energy management Complete . X . . . . .Cornell Square HVAC energy management Complete . X . . . . .Davis Square HVAC energy management Complete . X . . . . .Douglas HVAC energy management Complete . X . . . . .Fernwood Field house - dehumidifier Complete . X . . . . .Foster Boiler and insulation Complete . X . . . . .Foster HVAC energy management Complete . X . . . . .Franklin HVAC energy management Complete . X . . . . .Gage HVAC energy management Complete . X . . . . .Garfield Gold Dome - boiler - upgrade Complete . X . . . . .Grand Crossing HVAC energy management Complete . X . . . . .Hamlin HVAC energy management Complete . X . . . . .Hamlin HVAC energy management Complete . X . . . . .Harris, Harriet HVAC energy management Complete X X . . . . .Horner HVAC energy management Complete . X . . . . .Humboldt HVAC energy management Complete . X . . . . .Independence HVAC energy management Complete . X . . . . .Kennedy HVAC energy management Complete . X . . . . .Kennicott HVAC energy management Complete . X . . . . .Kilbourn HVAC energy management Complete . X . . . . .Kosciuszko HVAC energy management Complete X X . . . . .Lake Shore HVAC energy management Complete . X . . . . .Lindblom HVAC energy management Complete . X . . . . .McGuane HVAC energy management Complete . X . . . . .Mozart HVAC energy management Complete . X . . . . .Olympia HVAC energy management Complete . X . . . . .Oriole HVAC energy management Complete . X . . . . .

    Palmer HVAC energy management Complete . X . . . . .Pottawattomie HVAC energy management Complete . X . . . . .Seward HVAC energy management Complete . X . . . . .Shedd HVAC energy management Complete . X . . . . .Sheridan HVAC energy management Complete . X . . . . .Sherman Boiler and insulation Complete . X . . . . .South Shore Cultural Ctr. Field house - new boiler Complete . X . . . . .Stanton HVAC energy management Complete . X . . . . .Trumbull HVAC energy management Complete . X . . . . .

    HVAC and ENERGY EFFICIENCY

    3 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    5/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    Columbus Field house - doors Complete . X . . . . .Edison Field house - windows and doors Complete . X . . . . .

    Foster Natatorium - sliding doors Complete X X . . . . .Mann Natatorium - sliding doors Complete . X . . . . .Russell Square Field house - windows and doors Complete . X . . . . .

    Burnham 39th St. Trade Yard - roof Complete . X . . . . .Cornell Square Roof Complete . X . . . . .Davis Square Roof Complete . X . . . . .Dawes Roof Complete . X . . . . .Douglas Landscape yard - roof Complete . X . . . . .Gage Power house - roof Complete . X . . . . .Humboldt Stables - roof Complete . X . . . . .

    Jefferson, Thomas Memorial Pool building - roof Complete . X . . . . .Kosciuszko Natatorium - roof Complete . X . . . . .

    Le Claire-Hearst Roof Complete . X . . . . .Lincoln Comfort station at Diversey Ave. - roof Complete . X . . . . .Nash Roof Complete X X . . . . .Norwood Landscape yard - roof Complete . X . . . . .Park #512 Landscape yard - roof Complete . X . . . . .Portage Landscape yard - roof Complete . X . . . . .South Shore Cultural Ctr. Stables - roof Complete . X . . . . .Union Gym - roof Complete . X . . . . .Wicker Roof Complete . X . . . . .Wilson, Frank Roof Complete . X . . . . .

    Grand Crossing Power house - chimney Complete . X . . . . .Hermosa Field house - basement Complete . X . . . . .

    Pulaski Pool deck - rehab Complete . X . . . . .Rutherford Sayre Field house - masonry Complete . X . . . . .Sherman Gym - walls Complete . X . . . . .Tuley Concrete and structural - stairs Complete . X . . . . .Wilson Community Center Field house - concrete and structural Complete . X . . . . .

    Chicago Women's "Helping Hands" - installation Complete . X . . . . .Davis Square Mural - restoration Complete . X . . . . .Garfield "Lincoln the Railsplitter" - restoration Complete . X . . . . .Lincoln "Bates Fountain" - restoration Complete . X . . . . .Wicker "Wicker" - restoration Complete . X . . . . .

    WINDOWS and DOORS

    ROOF

    CONCRETE, MASONRY, and STRUCTURAL

    SCULPTURE and MONUMENT

    4 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    6/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    Amundsen Fitness center - upgrade Complete . X . . . . .Archer Fitness center - upgrade Complete . X . . . . .

    Armour Square Fitness center - upgrade Complete . X . . . . .Austin Town Hall Fitness center - upgrade Complete . X . . . . .Columbus Fitness center - upgrade Complete . X . . . . .Davis Fitness center - accessibility equipment Complete . X . . . . .Dunham Fitness center - new Complete X . . . . . .Gill Fitness center - upgrade Complete . X . . . . .Haas Fitness center - new Complete . X . . . . .Harrison Fitness center - upgrade Complete . X . . . . .Hayes Fitness center - upgrade Complete . X . . . . .Hiawatha Fitness center - new equipment Complete . X . . . . .Independence Fitness center - accessibility equipment Complete . X . . . . .Jackson, Andrew Fitness center - upgrade Complete . X . . . . .Kennicott Fitness center - upgrade Complete . X . . . . .Lake Shore Fitness center - upgrade Complete . X . . . . .Nash Fitness center - upgrade Complete . X . . . . .Ogden Fitness center - upgrade Complete . X . . . . .

    Palmer Fitness center - equipment Complete . X . . . . .Palmer Fitness center - upgrade Complete . X . . . . .Piotrowski Fitness center - upgrade Complete . X . . . . .Pottawattomie Fitness center - new equipment Complete . X . . . . .Russell Square Fitness center - new equipment Complete . X . . . . .Union Fitness center - accessibility equipment Complete . X . . . . .Union Fitness center - upgrade Complete . X . . . . .Washington, George Fitness center - upgrade Complete . X . . . . .Welles Fitness center - upgrade Complete . X . . . . .West Lawn Fitness center - accessibility equipment Complete . X . . . . .West Lawn Fitness center - upgrade Complete . X . . . . .

    FITNESS CENTER

    5 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    7/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    SITE IMPROVEMENT

    Cornell Square Artificial turf athletic field - new Complete X X . . . . .Dunbar Athletic field - rehab Complete X . . . . . .Gage Artificial turf athletic field - new Complete X X . . . . .Garfield Artificial turf athletic field - new Complete X X . . . . .Gompers Athletic field - rehab Complete . X . . . . .Humboldt Artificial turf athletic field - new Complete X X . . . . .Jackson, Andrew Artificial turf athletic field - new Complete X X . . . . .Jackson, Andrew Athletic field - rehab Complete X X . . . . .La Follette Artificial turf athletic field - new Complete X X . . . . .Pasteur Artificial turf athletic field - new Complete X X . . . . .Sheridan Artificial turf baseball and multipurpose field - new Complete X X . . . . .

    Augusta Playground - Fully Funded Complete X X . . . . .Blackwelder Playground - Fully Funded Complete X X . . . . .Burnham Soldier Field - Playground Expansion - Study Complete X X . . . . .Cole, Nat King Playground - Fully Funded Complete X X . . . . .Dunbar Playground - Fully Funded Complete X X . . . . .Moore Playground - Fully Funded Complete X X . . . . .Park #544 Misc. - shade structure Complete X . . . . . .Park #554 Playground - Fully Funded Complete X X . . . . .Parsons, Lucy Misc. - shade structure Complete X . . . . . .Portage Playground - Fully Funded Complete X X . . . . .Russell Square Playground - resurfacing Complete . X . . . . .Schreiber Playground - new w/ water feature Complete X X . . . . .Weisman Playground - new w/ water feature Complete X X . . . . .Wilson, Frank Playground - Fully Funded Complete X X . . . . .Woodhull Playground - resurfacing Complete . X . . . . .

    Adams Water feature - surfacing Complete . X . . . . .Austin Town Hall Pool Retrofit -compliance Complete . X . . . . .Avondale Pool Retrofit -compliance Complete . X . . . . .Blackhawk Pool Retrofit -compliance Complete . X . . . . .Carver Pool - filter system Complete . X . . . . .Carver Pool Retrofit -compliance Complete . X . . . . .DistrictWide Pool Accessibility - Annual Program Complete . X . . . . .Eckhart Pool Retrofit -compliance Complete . X . . . . .Fernwood Pool Retrofit -compliance Complete . X . . . . .Fosco Pool Retrofit -compliance Complete . X . . . . .Foster Pool Retrofit -compliance Complete . X . . . . .Fuller Water feature - rehab Complete X . . . . . .

    Fuller Pool - valves Complete . X . . . . .Gill Pool Retrofit -compliance Complete . X . . . . .Harris, Harriet Pool Retrofit -compliance Complete . X . . . . .Harrison Pool Retrofit -compliance Complete . X . . . . .Harsh Park development Complete . X . . . . .Hayes Pool Retrofit -compliance Complete . X . . . . .Homan Square Pool Retrofit -compliance Complete . X . . . . .Kosciuszko Pool Retrofit -compliance Complete . X . . . . .La Follette Pool Retrofit -compliance Complete . X . . . . .Mann Pool Retrofit -compliance Complete . X . . . . .Moore Water feature with playground Complete X X . . . . .Nash Pool Retrofit -compliance Complete . X . . . . .Portage Pool Retrofit -compliance Complete . X . . . . .Ridge Pool Retrofit -compliance Complete . X . . . . .

    SWIMMING POOL and SPRAY POOL

    PLAYGROUND

    ATHLETIC FIELD

    6 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    8/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    River Water feature - rehab Complete . X . . . . .Schreiber Water feature with playground - Fully Funded Complete X X . . . . .Shabbona Pool Retrofit -compliance Complete . X . . . . .Sheridan Pool - rehab Complete . X . . . . .Sheridan Pool Retrofit -compliance Complete . X . . . . .Throop Water feature - rehab Complete . X . . . . .

    Washington, Harold Water feature - rehab Complete . X . . . . .Weisman Water feature with playground Complete X X . . . . .West Pullman Pool - filter system Complete . X . . . . .West Pullman Pool Retrofit -compliance Complete . X . . . . .

    Archer Misc. - gates Complete . X . . . . .Bessemer Misc. - gates Complete . X . . . . .Burnham Fencing - nature area Complete . X . . . . .Durkin Fencing - ballfield Complete . X . . . . .Garfield Conservatory - fencing Complete . X . . . . .Heritage Green Fencing - planting bed Complete . X . . . . .Humboldt Misc. - gates Complete . X . . . . .Kelvyn Misc. - gates Complete . X . . . . .

    Kilbourn Misc. - gates Complete . X . . . . .Kosciuszko Misc. - gates Complete . X . . . . .Washington, George Fencing - Bynum Island Complete . X . . . . .Washington, George Fencing - Green Youth Farm Complete X . . . . . .West Chatham Fencing - ballfield Complete . X . . . . .

    Hamlin Tennis court - rehab Complete . X . . . . .Humboldt Court - conversion to artificial turf junior soccer field Complete X . . . . . .Humboldt Court - conversion to artificial turf junior soccer field Complete X . . . . . .Indian Boundary Tennis court - rehab Complete . X . . . . .Mann Court - conversion to inline skating Complete X . . . . . .Metcalfe Tennis court - rehab Complete X X . . . . .Murray Basketball court - new Complete X X . . . . .

    Peterson Tennis court - rehab Complete . X . . . . .Warren Tennis court - rehab Complete . X . . . . .

    Bessemer Paving - driveway Complete . X . . . . .Burnham Landscape yard - paving Complete . X . . . . .Dvorak Paving - paths Complete . X . . . . .Kilbourn Landscape yard - paving Complete . X . . . . .La Follette Paving - paths Complete . X . . . . .Lake Meadows Parking lot - rehab Complete . X . . . . .Lincoln Parking lot - rehab Complete . X . . . . .Lincoln Landscape yard - paving Complete . X . . . . .Lincoln Paving - paths - south Complete X X . . . . .Marquette Landscape yard - paving Complete . X . . . . .

    Mount Greenwood Paving - paths Complete . X . . . . .Palmer Track - asphalt and lane lines Complete X X . . . . .Riis Paving - paths and parking lot Complete . X . . . . .Warren Parking lot - drainage improvements Complete . X . . . . .

    FENCING

    COURTS

    PAVING

    7 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    9/25

    COMPLETE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    2016

    OUTSIDE

    FUNDS

    Park District Budget

    Expected Year

    Foster Lighting - gym Complete X X . . . . .Garfield Lighting - lagoon Complete . X . . . . .

    Grant Lighting - parking lot Complete . X . . . . .Horner Lighting - exterior Complete . X . . . . .Jackson, Andrew Lighting - exterior Complete . X . . . . .Lincoln Diversey Ave. to Fullerton Dr. - lighting Complete . X . . . . .Oriole Lighting - ballfield Complete X . . . . . .Park #422 Lighting - exterior Complete . X . . . . .Sacramento Lighting - playground - upgrade Complete . X . . . . .Union Lighting - interior - upgrade Complete . X . . . . .

    Addams, Jane Memorial Ohio St. Underpass - artwork Complete . X . . . . .Clarendon Dog friendly area - new Complete X X . . . . .DistrictWide Harbor Waste Management Complete . X . . . . .Dixon Landscape and site improvement Complete . X . . . . .

    Dvorak Drinking fountain - rehab Complete . X . . . . .Grant Misc. - landscape protection Complete . X . . . . .Grant Museum Campus - paving and drainage Complete . X . . . . .Hale Benches and warm-up cage Complete X X . . . . .Hale Drinking fountain - rehab Complete . X . . . . .Jackson, Andrew Misc. - new waterlines Complete . X . . . . .Jackson, Andrew Multi-Use Trail - Marquette Drive Complete X X . . . . .Lincoln North Pond - signage Complete . X . . . . .Lincoln Pathways and drainage Complete X . . . . . .Park #548 Signage Complete . X . . . . .Park #557 Pathways and benches Complete . X . . . . .Piotrowski Misc. - lighting and drinking fountain Complete X . . . . . .Portage Dog friendly area - new Complete X . . . . . .Portage Misc. - scoreboard Complete X . . . . . .Pottawattomie Dog friendly area - new Complete X X . . . . .Riis Water service Complete . X . . . . .

    Schreiber Landscape and site improvement Complete X X . . . . .

    DistrictWide Irrigation systems Complete . X . . . . .DistrictWide Landscape - perennial plantings Complete . X . . . . .DistrictWide Natural Areas - rehab Complete . X . . . . .Jackson, Andrew 63rd St. Beach - dune restoration Complete X X . . . . .Jackson, Andrew Osaka Garden - restoration Complete . X . . . . .

    LANDSCAPE

    LIGHTING

    SITE IMPROVEMENT

    8 of 8 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    10/25

    2012-2016 Capital Improvement Plan

    ACTIVE PROJECTS

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    11/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Barberry Expansion Acquisition . . . . . .Beehive Expansion Acquisition . . . . . .

    Bloomingdale Line Bloomingdale Park and Trail - various sites Acquisition . . . . . .Broadway Armory Expansion Acquisition X . . . . .Buckthorn Expansion Acquisition . . . . . .DistrictWide Acquisitions - Annual Program Ongoing . . . X X XEdmonds Expansion Acquisition . . . . . .

    Emerald Expansion Acquisition . . . . . .Fosco Expansion Acquisition . . . . . .

    Gladys Expansion Acquisition . . . . . .Greenebaum Expansion Acquisition . . . . . .Hansberry, Lorraine Expansion Acquisition . . . . . .Harding, Fred Expansion Acquisition . . . . . .Honeysuckle Expansion Acquisition . . . . . .Kiwanis Expansion Acquisition . . . . . .Mandrake Expansion Acquisition . . . . . .North Region Hartland Park HOLD . . . . . .Park #001T Washington Blvd. and Wolcott Ave. Acquisition . . . . . .

    Park #002T Jackson Blvd. and Maplewood Ave. Acquisition X . . . . .Park #004T Mark Twain - Indiana Ave. and 15th St. Acquisition X . . . . .Park #006T Read-Dunning - Oak Park Ave. and Irving Park Rd. Acquisition . . . . . .Park #007T 114th St. and Champlain Ave. Acquisition . . . . . .Park #008T Mittal Woods - 128th St. and Stewart Ave. Acquisition . . . . . .

    Park #009T University Village - Halsted St. and 15th St. Acquisition . . . . . .Park #011T Wacker Clover - Congress Pkwy. and Wells St. Acquisition X . . . . .Park #503 South Chicago Park Acquisition . X . . . .Park #539 Palmer Blvd. Acquisition . . . . . .Park #540 Federal St. and 24th St. Acquisition . . . . . .Park #543 Printers Row Park Acquisition . . . . . .Park #545 Triple A Boatyard HOLD X . . . . .Park #552 4901-09 W. Belmont Ave. Acquisition . . . . . .Park #553 Celotex - 2800-3024 S. Sacramento Ave. Acquisition X . . . . .Park #556 Artesian Ave. and Western Ave. Acquisition . . . . . .Park #561 16th St. and Wabash Ave. Acquisition X . . . . .

    Park #562 Van Vlissingen - 1735-37 E. 96th St. Acquisition . . . . . .Park #563 Hegewisch Marsh - 13000 S. Torrence Ave. Acquisition . . . . . .

    Park #563 Hegewisch Marsh - expansion Acquisition . . . . . .

    Park #564 Big Marsh - 110th St. and Stony Island Ave. Acquisition . . . . . .

    Park #564 Big Marsh - expansion Acquisition . . . . . .Park #565 Indian Ridge - 116th St. and Torrence Ave. Acquisition . . . . . .

    Park #565 Indian Ridge - expansion Acquisition . . . . . .

    Park #566 USX - 79th St. and Lake Michigan Acquisition . . . . . .Park #567 Milwaukee Ave. and Leavitt St. Acquisition . . . . . .Park #568 Rosehill Cemetery - Western Ave. and Peterson Ave. Acquisition X . . . . .

    Park #570 1230 W. School St. Acquisition X . . . . .Park #571 Eleanor Street Park Acquisition . . . . . .

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    ACQUISITION AND PARK DEVELOPMENT

    ACQUISITION

    1 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    12/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Ronan Expansion Acquisition X . . . . .Skinner CPS - Laflin St. and Monroe St. Acquisition . . . . . .Skinner Skinner DFA - Loomis St. and Monroe St. Acquisition . . . . . .South Region Expansion - south lakefront Acquisition . . . . . .Sumac Expansion Acquisition . . . . . .Thuis Expansion Acquisition . . . . . .Till-Mobley Expansion Acquisition . . . . . .

    Wolcott Expansion Acquisition . . . . . .Woodlawn Park replacement Acquisition . . . . . .

    Addams, Jane Memorial Framework plan Design . . . . . .Chicago Women's Field house - major rehab - study Design . . . . . .DistrictWide Planning Studies - Annual Program Ongoing . X . . . .DistrictWide Ardmore to Sheridan - expansion study Pre-design X X . . . .DistrictWide Skate Park - Master Plan Pre-design . . . . . .

    Golden Gate Framework plan Pre-design . . . . . .Humboldt Lagoon Water Management - Study Pre-design . . . . . .

    Lincoln Archery Building - study Pre-design . . . . . .

    Starr Framework plan Design . . . . . .

    Bloomingdale Line Park and Trail - design Design X X . . . .Buckthorn Park development - including playground HOLD X . . . . .DistrictWide CHA - Coordination Program Ongoing . . . . . .DistrictWide Abatement services Ongoing . . X X X XDistrictWide Environmental engineering Ongoing . . X X X XDistrictWide Park Development - Annual Program Ongoing . . X X X X

    DistrictWide Surveys and Appraisals - Annual Program Ongoing . X X X X XDuSable Park development - clean and green Bid/Award X . . . . .DuSable Landscape improvements Pre-design . . X . . .Field, Eugene Aquatic restoration Construction X X . . . .Fosco Ballfields and park expansion Design . X . . . .Grant Park development - North Grant Park Design ** X . X X .Greenebaum Park development including playground, artificial turf field Construction X X . . . .Lincoln Lincoln Park Zoo - Annual Contribution Ongoing X X . . . .Northerly Island Park development - shoreline and natural area Pre-design ** . X . . .Park #001T Park development - Washington Blvd. and Wolcott Ave. HOLD . . . . . .

    Park #002T Park development - "Rockwell Gardens" Design X . . . . .Park #004T Park development - Indiana Ave. and 15th St. HOLD X . . . . .Park #006T Park development - Oak Park Ave. and Irving Park Rd. Pre-design . . . . . .Park #007T Park development - 114th St. and Champlain Ave. Design . X . . . .Park #008T Park development - 128th St. and Stewart Ave. Pre-design . . . . . .Park #011T Park development - Wacker Interchange Design X . . . . .Park #503 South Chicago - Clean and Green Construction X X . . . .Park #503 South Chicago - Park development Design . X X X . .Park #510 Livingston Field - Park development including artificial turf field Design X . . . . .Park #512 Bloomingdale Trail - Access Park development Design . . . . X XPark #523 USX site - Phase II - Lake Peoria Sediment Muds to Parks Pre-design X . . . . .Park #545 Park development - Triple A Boatyard HOLD X . . . . .Park #553 Park development - Celotex Pre-design X . . X X XPark #561 Park development - 16th St. and Wabash Ave. Design X . . . . .

    Park #562 Park Development - Van Vlissingen Pre-design . . X X . .

    Park #563 Park Development - Hegewisch Marsh Pre-design . . X X . .

    PARK DEVELOPMENT

    PLANNING

    2 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    13/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Park #564 Park Development - Big Marsh Pre-design . . X X . .

    Park #565 Park Development - Indian Ridge Pre-design . . X X . .Park #566 Park development - Avenue O and Farragut Ave. HOLD . . . . . XPark #568 Park development - Rosehill Cemetery Pre-design X . . . . .Rosenblum Park development - including artificial turf field Bid/Award X . . . . .Skinner Dog friendly area - Monroe St. and Loomis St. Design X . . . . .Stanton Park development including playground Pre-design X . . . . .

    Addams, Jane Memorial CDOT - Flyover Bike Connection Design X . . . . .Addams, Jane Memorial Ohio Street Beach house - Design Only Design . X . . . .Burnham CDOT - Bridge - 35th St. Bid/Award X . . . . .Burnham New Harbor Development - 31st St. Construction . X . . . .Burnham Shoreline Protection - 43rdSt. - 45th St. Construction X X . . . .Burnham Park development - Morgan Shoal Design X X . . . .

    Burnham Shoreline Protection - Promontory Point HOLD X X . . . .Clark, Richard New Chicago River Boat House Design X X . . . .Clark, Richard Little League Stadium - including artificial turf athletic field Pre-design X . . . . .DistrictWide New Construction - Annual Program Ongoing . . . . X XDistrictWide Water quality - pilot beach barrier Pre-design X . . . . .DuSable New Harbor Development - Gateway Design . X . . . .Jackson, Andrew Water quality - pilot beach barrier Pre-design X . . . . .Lincoln Shoreline Protection - Fullerton Design X X . . . .Lincoln Shoreline Protection - Montrose Dr. to Irving Park Dr. Design X X . . . .Northerly Island New Concert and Event Venue Design X X . . . .Park #560 New Community Center Design ** . . . . .

    Park #571 New Chicago River Boat House Design ** X . . . .Ping Tom New Chicago River Boat House Design ** X . . . .Ping Tom New Field house Design X . . . . .River New Chicago River Boat House Design ** X . . . .

    DistrictWide Technology - Annual Program Ongoing . . X X X XDistrictWide Professional Services - Annual Program* Ongoing . . X X X XDistrictWide Security Cameras Ongoing . X . . . .DistrictWide Vehicles and Equipment - Annual Program Ongoing . . X X X X

    NEW CONSTRUCTION

    TECHNOLOGY, VEHICLES and EQUIPMENT, SERVICES

    3 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    14/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Athletic Field Ceramic Building - major rehab STATE HOLD ** X . . . .Austin Town Hall Field house - major rehab Design X X . . . .Austin Town Hall Transition plan - access improvements HOLD . X . . . .Broadway Armory Field house - rehab - phase II Construction X X . . . .Broadway Armory Field house - rehab - phase III (indoor track) HOLD . X . . . .Burnham CDOT - Bridge - Oakwood St. Design X . . . . .Burnham CDOT - Bridge - 41st St. Design X . . . . .Burnham CDOT - Bridge - 43rd St. Design X . . . . .

    California McFetridge - major rehab including HVAC energy management Construction . X . . . .

    Clarendon Field house - major rehab Design X . . . . .DistrictWide Elevator - rehab Ongoing . X . . . .DistrictWide Facility Rehab - Annual Program Ongoing . . X X X XDistrictWide Tunnel System - Annual Program Pre-design . . X X X XDouglas Field house - locker room improvements Construction . X . . . .Fosco Roof Pre-design . . . X . .Foster Transition plan - access improvements Construction . X . . . .Garfield Conservatory - Major rehab from storm damage Construction X X . X X .Garfield Gold Dome - major rehab - front steps and building apron Pre-design . X . . . .Grant 9th St. pump station - renovation Bid/Award . X . . . .Grant "Buckingham Fountain" - phase III Construction . X . . . .Grant Van Buren Pedestrian Bridge - renovation Design . X X X . .Grant "Buckingham Fountain" - phase IV Pre-design . . . . X XHolstein Field house - major rehab Design ** X . . . .Horner Transition plan - access improvements

    Construction X X . . . .Humboldt Field house - major rehab Bid/Award X . X . . .Independence Bungalow - major rehab and green initiative Construction X X . . . .Independence Major rehab including transition plan access improvements Design X X . . . .Indian Boundary Field house - major rehab including masonry Pre-design . . X . . .Jackson, Andrew Darrow Bridge - restoration Pre-design . . . . . XLincoln CDOT - underpass renovation - Michigan Ave. and Oak St. Construction X . . . . .Lincoln CDOT - Bridge - Fullerton Lagoon Construction X . . . . .Lincoln CDOT - Bridge - Lawrence St. Design X . . . . .Lincoln CDOT - underpass renovation - Montrose Dr. Design X . . . . .Lincoln CDOT - Bridge - Wilson Dr. Design X . . . . .Moore Access improvements Design X X . . . .Ogden Elevator Construction X X . . . .Pulaski Transition plan - access improvements HOLD . X . . . .River Field house - roof and tuckpointing Design . X . . . .

    Shabbona Major rehab including transition plan access improvements Design X X . . . .Sherman Field house - major rehab Design . X . . . .South Shore Cultural Ctr. Major Rehab - interior Design X . X . . .Stanton Major rehab - exterior Construction X . . . . .Stanton Major rehab - interior Construction . X . . . .West Pullman Transition plan - access improvements Construction . X . . . .

    FACILITY REHABILITATION

    MAJOR REHABILITATION

    4 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    15/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    541 N. Fairbanks Administration Building - stairway access Design . X . . . .Armour Square Gym floor - restore or replace Bid/Award . X . . . .Bessemer Misc. - washrooms Pre-design . . . X . .Columbus Gym - plastering Pre-design . X . . . .Commercial Water conservation - cistern pilot Pre-design . X . . . .DistrictWide New Construction - Annual Program Ongoing . . . . X XDistrictWide Green Initiative - Annual Program Ongoing . . . X X XDistrictWide Electrical equipment recycling Ongoing . . X . . .DistrictWide Remediation Ongoing . . X . . .DistrictWide Spent waste recycling Ongoing . . X . . .DistrictWide Sump Pump - replacement Ongoing . X X X X XDistrictWide Smart home units Pre-design . . . X . .Douglas Misc. - bleachers Design . . . . X .

    Dvorak Misc. - rehab Bid/award . . . . X .Edison Misc. - plaster and siding Pre-design . . . X . .Fosco Field house - security system Pre-design . X . . . .Gage Field house - basement Bid/Award X X . . . .Garfield Conservatory - shadecloth system Construction . X . . . .Garfield Field house - lockers and bathrooms Bid/Award . X . . . .Garfield Landscape building - rehab Pre-design . . X . . .Garfield Pool - pergola rehab Pre-design . . X . . .Gompers Field house - locker room improvements Bid/Award . X . . . .Gompers Misc. - electric service Pre-design . . X . . .Graver Field house - dome restoration Design . X . . . .Graver Field house - locker room improvements Design . . . . X .Hayes Misc. - benches Pre-design . . X . . .Humboldt Gym floor - restore or replace Construction . . . X . .Humboldt Field house - music room Design X X . . . .Humboldt Pool - pergola rehab Bid/Award . X . . . .Jackson, Andrew Misc. - washrooms Pre-design . . . X . .Jackson, Andrew Misc. - partitions Pre-design . . . X . .Jackson, Andrew 63rd St. Beach House - electric upgrade Pre-design . . X . . .Jefferson, Thomas Memorial Field house - lobby improvements Pre-design . . . . . XJefferson, Thomas Memorial Field house - locker room improvements Pre-design . . X . . .Kilbourn Greenhouse - restoration Pre-design . . . X . .Kosciuszko Misc. - floor restoration Pre-design . . . . . XLincoln Margate Field House - masonry Pre-design . . X . . .Mann Field house - wall repair Pre-design . . . X . .Marquette Green House - misc. rehab Pre-design . . . X . .Merrimac Gym floor - restore or replace Design . . X . . .Oakdale Misc. - hot water tank Bid/Award . X . . . .Oakdale Misc. - changing stalls Pre-design . . . . X .

    Oakdale Misc. - washrooms Pre-design . . X . . .Portage Field house - locker room improvements Design ** X . . . .Portage Misc. - power lines Pre-design . . . X . .Ridge Field house - lobby improvements Design . . . . . XRowan Field house - locker room improvements Design . . . . X .Russell Square Gym floor - restore or replace Construction ** X . . . .Rutherford Sayre Field house - new boiler Pre-design X . . . . .Rutherford Sayre Misc. - washrooms Pre-design X . . . . .Seward Field house - lobby improvements Design . . X . . .Shedd Pergola rehab Pre-design . X . . . .Sherwood Field house - locker room improvements Design . . . . X .Smith, Joseph Misc. - interior bleachers Pre-design X . . . . .

    MINOR REHABILITATION

    5 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    16/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Smith, Joseph Pool building - entrance and washrooms Pre-design . . . X . .South Shore Cultural Ctr. Field house - interior painting Pre-design . . . X . .South Shore Cultural Ctr. Auditorium floor - rehab or replace Pre-design . X . . . .South Shore Cultural Ctr. Dining Foyer - wall rehab Pre-design . . . X . .Taylor, Robert Misc. - washrooms Design . . . X . .Washington, George Field house - locker room improvements Design . . . X . .West Pullman Misc. - bleachers Pre-design . . . . X .West Pullman Misc. - sump pump Bid/Award . X . . . .White, Edward Misc. - washrooms Design . . . X . .Wilson Community Center Entrance Pre-design . X . . . .

    Broadway Armory HVAC energy management Construction . X . . . .

    California McFetridge - major rehab including HVAC energy management Construction . X . . . .Calumet HVAC energy management Bid/Award X . X . . .

    Carver HVAC energy management Construction . X . . . .DistrictWide Boiler - upgrades Ongoing . . X X X .DistrictWide Boiler system insulation Ongoing . X . . . .Field, Eugene Boiler - automation system Design . X . . . .Fosco HVAC energy management Construction . X . . . .Fuller Boiler - automation system Design . X . . . .Gill HVAC energy management Construction . X . . . .Gompers HVAC energy management Construction . X . . . .Harris, Harriet HVAC improvements Construction . X . . . .Hiawatha Boiler - automation system Design . . X . . .Lincoln Conservatory - HVAC energy management Bid/Award X . X . . .Mann HVAC energy management Bid/Award X . X . . .Owens, Jesse Boiler - automation system Construction . X . . . .Stanton Field house - dehumidifier Design X . . . . .Taylor-Lauridsen HVAC energy management Construction . X . . . .Tuley Boiler - automation system Design . X . . . .Valley Forge HVAC energy management Construction . X . . . .Welles Boiler - automation system Design . X . . . .

    White, Willye (Gale School) HVAC energy management Construction . X . . . .

    Avondale Field house - windows and doors STATE HOLD ** . . X . .Bessemer Field house - windows Design . X . . . .Calumet Landscape yard - overhead doors Construction . X . . . .DistrictWide Windows and Doors - Annual Program Ongoing . . . . X XFosco Pool building - window security Pre-design X X . . . .Grant 9th St. landscape yard - overhead doors Pre-design . . X . . .

    Independence Pool building - windows Pre-design . . X . . .La Follette Field house and Natatorium - windows and doors Design . X . . . .Lincoln Conservatory - minor repairs Bid/Award X . . . . .McKinley Field house - doors Construction X . . . . .Oakdale Field house - doors Pre-design . . X . . .Palmer Field house - windows and doors Bid/Award . X . . . .

    HVAC and ENERGY EFFICIENCY

    WINDOWS and DOORS

    6 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    17/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Abbott Field house - roof and masonry Pre-design . . . . X .Archer Roof Design . X . . . .Burnham 39th St. Trades Yard - roof Design . X . . . .Carver Roof Bid/Award . X . . . .Chase Roof Pre-design . X . . . .DistrictWide Roof - Annual Program Ongoing . . . . . XEckhart Roof Design . X . . . .Grand Crossing Power house - roof Bid/Award . X . . . .Grant Buckingham Fountain - caf roof Bid/Award . X . . . .Hamilton Roof Design . X . . . .Hamlin Roof Pre-design . . X . . .Hayes Field house - roof Design . X . . . .King, Jr., Martin Luther Bowling alley - roof Pre-design . . X . . .

    La Follette Misc. - roof drain line Bid/Award . X . . . .Lincoln Cultural Center - roof Pre-design . . . X . .Northerly Island Adler Planetarium - roof HOLD . . . X . .Norwood Roof Bid/Award . X . . . .

    Palmer Field house - roof Pre-design . . . X . .Ping Tom Pavillion - roof Pre-design . . . . X .Portage Roof STATE HOLD ** . . . X .Rainbow Beach Roof Bid/Award ** X . . . .Robichaux Roof Pre-design . . . . X .Rosedale Roof Bid/Award . X . . . .Schrieber Roof Pre-design . . . . . XShabbona Roof Design . X . . . .Sherman Gym - roof Bid/Award . X . . . .Sherwood Field house - misc. roof Design . X . . . .Trumbull Power house - roof Bid/Award . X . . . .Tuley Roof Pre-design . . X . . .

    Ada Field house - tuckpointing Pre-design . . . . X .Altgeld Chimney Design . X . . . .Armour Square Concrete - circle walkway Pre-design . . . . . XAvalon Field house - tuckpointing Pre-design . . . . X .Berger All Buildings - concrete, structural, masonry Design . . X . . .Bessemer Chimney Design . X . . . .Bradley Field house - masonry Pre-design . . . . . XBurnham Promontory Point - Concrete and structural Design . X . . . .Calumet Field house - major rehab Bid/Award . X . . . .

    Calumet Power house - chimney Pre-design . . . . X .Carver Pool Building - deck and stairs Pre-design . . X . . .Chippewa Chimney and tuckpointing Pre-design . . . X . .Columbus Chimney Bid/Award . X . . . .

    CONCRETE, MASONRY, and STRUCTURAL

    ROOF

    7 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    18/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Davis Square Chimney Design . X . . . .

    Davis Square Field house - concrete and masonry Pre-design . . . X . .DistrictWide Concrete, Masonry, Structural - Annual Program Ongoing . . . . . XDouglas Field house and perimeter drainage Pre-design . . . X . .Douglas Field house - framing and plastering Pre-design . X . . . .Dvorak Pool building - masonry Pre-design . . X . . .Edison Field house - concrete and masonry Pre-design . . . . . XFernwood Pool building - masonry Pre-design . . X . . .Field, Eugene Concrete and structural - basement Design . X . . . .Fuller Concrete and structural - investigation Bid/Award X . . . . .Fuller Concrete and structural - interior and exterior Design X . . . . .Gage Concrete and structural - porch rehab Design . X . . . .Gage Concrete and structural - stairs and walls Pre-design . . . . X .Gill Concrete and structural - stairs Pre-design . . . X . .Grand Crossing Concrete and structural - deck Pre-design . . . . . XHorner Field house - stairs and masonry Construction . X . . . .Humboldt Concrete - lamp post rehab Design . X . . . .

    Independence Field house - west entrance rehab Design . . X . . .Kosciuszko Field house and Natatorium - concrete Design . X . . . .La Follette Field house - concrete and structural Pre-design . . X . . .Lincoln Promenade restoration - Diversey Ave. to Belmont Ave. Construction . X . . . .Lincoln "Grant" - concrete and structural Pre-design . . X . . .Lincoln Cultural Center - tuckpointing Pre-design . . . . . XLincoln Waveland Clock Tower - concrete and masonry Pre-design . . X . . .Lincoln Waveland - concrete and structural Pre-design . . . X . .Loyola Field house - masonry Construction . X . . . .Mann Field house - concrete and masonry Pre-design ** . . X . .Ogden East bath house - concrete Pre-design . . . X . .Palmer Concrete and structural - stairs Design . X . . . .Paschen Field house - tuckpointing Pre-design . . . . . XPeterson Field house - concrete and masonry Pre-design . . . . . X

    Portage Pool - chimney Design . X . . . .Portage Field house - concrete and masonry Pre-design . . . . . XPulaski Field house - concrete and structural Design . X . . . .Pulaski Field house - masonry Pre-design X . X . . .Rainbow Beach Marine Unit Building and raquetball courts - masonry Design . X . . . .Rainbow Beach Field house - masonry Pre-design . . . . X .Shedd Field house - concrete Pre-design . . . X . .Sheil Field house - masonry and lintels Pre-design . . . . X .

    Sheridan Chimney - masonry Pre-design . . X . . .Smith, Joseph Ceramic Building - major rehab Construction X . . . . .Trumbull Chimney Design . X . . . .Tuley Field house - decorative scroll rehab Pre-design . X . . . .Union Gym - tuckpointing Pre-design . . . . . XWentworth Gardens Field house - concrete Pre-design . . X . . .West Lawn Field house - parapet walls Pre-design . . X . . .Wicker Field house - entranceways Pre-design . . X . . .Wilson, Frank Field house - concrete and masonry Design . X . . . .

    Brainerd Monument - restoration Design . X . . . .DistrictWide Sculpture/Monument - Annual Program Ongoing . . . X X .Garfield Conservatory - Exhibit Restoration - Annual Program Ongoing . . X X X XGarfield Cornwall War Memorial - restoration Pre-design . . . X . .Garibaldi "Garibaldi" - restoration Pre-design . X . . . .Grant "Mestrovic" - restoration Bid/Award . X . . . .

    SCULPTURE and MONUMENT

    8 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    19/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Grant "Eagle Fountains" - restoration Design . . X . . .Grant "Logan" - restoration Pre-design . . . . X .King, Jr., Martin Luther Monument - restoration Design . X . . . .Lincoln "Fountain Girl" - restoration Construction . X . . . .Lincoln "Swedenborg" - restoration Construction . X . . . .Lincoln "Totem Pole" - restoration Pre-design . . . . X .Lincoln "Benjamin Franklin" - restoration Pre-design . . . . . XMcKinley "McKinley" - restoration Pre-design . . . . . XMcKinley "William McKinley" - restoration Pre-design . . . . . XSeneca "Ben" - restoration Bid/Award . X . . . .Washington, George "Fountain of Time" - restoration Pre-design X . . . . .

    DistrictWide Crossfit Gyms - new Pre-design . . X X X XDistrictWide Fitness - Youth Activity Centers- Annual Program Ongoing . . X X X X

    DistrictWide Fitness center - accessibility equipment Ongoing . X . . . .DistrictWide Fitness center - Annual Program Ongoing . . X X X XLincoln Fitness center - accessibility equipment Design . X . . . .

    FITNESS CENTER

    9 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    20/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Abbott Athletic field at track - rehab Design . . X . . .Altgeld Artificial turf athletic field - new Pre-design X . . . . .Brooks, Oscar Athletic field - rehab Pre-design ** . . . . .Clark, Richard Little League Stadium - including artificial turf athletic field Pre-design X . . . . .Columbus Artificial turf athletic field - new Design ** X X X . .Davis Square Artificial turf athletic field - new Design X . X . . .DistrictWide Artificial Turf Athletic Field - Annual Program Ongoing . . . . . .DistrictWide Athletic field - rehab Ongoing . . X X X XDouglas Artificial turf athletic field - new Design X . . . . .

    Douglas Artificial turf athletic field - major rehab (east) - Partially Funded Pre-design ** . . . . .Dunbar Artificial turf athletic field - Partially Funded Pre-design ** . . . . .Greenebaum Park development including artificial turf field Construction X X . . . .Harrison Artificial turf athletic field - new Design X . X . . .Lincoln Artificial turf athletic field - major rehab - Partially Funded Pre-design . . . . X .Mandrake Artificial turf athletic field - new Design X . X . . .Marquette Artificial turf athletic field - major rehab - Partially Funded Pre-design . . . . . XOriole Athletic field - rehab Pre-design ** . . . . .Park #510 Livingston Field - Park development including artificial turf field Design X . . . . .River Artificial turf athletic field - major rehab Pre-design ** . . . . .Rosenblum Park development - including artificial turf field Bid/Award X . . . . .Smith, Joseph Athletic field - rehab Design X . . . . .West Lawn Artificial turf athletic field - Partially Funded Pre-design ** . . . . .

    Blackhawk Playground with water feature - Partially Funded Design ** . . . . .Bradley Playground - Partially Funded Design . X . . . .Brown Playground - Partially Funded Design . X . . . .Burnham 31st St. Harbor - Playground - Fully Funded Construction . X . . . .Buttercup Playground - Fully Funded Construction X X . . . .Claremont Playground - Fully Funded Design X . X . . .DistrictWide Playgrounds - DistrictWide Matching Funds Ongoing . . X X X XDistrictWide Playgrounds Resurfacing - Annual Program Pre-design . . X X X XDixon Playground - Fully Funded Design ** . X . . .Eckhart Playground - Partially Funded Design X X . . . .Essex Playground - Fully Funded Design X X X . . .Filbert Playground - Fully Funded Design X . X . . .

    Gill Playground - Partially Funded Bid/Award X X . . . .Gompers Playground - Fully Funded Bid/Award X X . . . .Greenebaum Park development including playground Construction X X . . . .Hermitage Playground - Fully Funded Design X X . . . .Hickory Playground - resurfacing Pre-design . X . . . .Krause Playground with water feature - Fully Funded Design . . X . . .Lawler Playground with water feature - Fully Funded Pre-design X . X . . .Lerner Playground - equipment Pre-design . . X . . .Mandrake Playground - resurfacing Bid/Award . X . X . .Mather Playground - Fully Funded Design X X . . . .Mellin Playground - Fully Funded Design ** X X . . .Merrimac Playground with water feature - Partially Funded Design ** X . . . .

    SITE IMPROVEMENT

    ATHLETIC FIELD

    PLAYGROUND

    10 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    21/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Merryman Playground - Fully Funded Design X X X . . .Meyering Playground - resurfacing Pre-design X . . . . .Micek Playground with water feature - Fully Funded Design X X . . . .Minuteman Playground - Fully Funded Design X X X . . .Riis Playground - Partially Funded Design X X . . . .Stanton Park development including playground Pre-design X . . . . .Sumac Playground - Fully Funded Design X X X . . .Tilton Playground - resurfacing Bid/Award . X . . . .Union Playground with water feature - Fully Funded Design X . . . . .Ward, A. Montgomery Playground - expansion Design X . . . . .Woodlawn Playground - study Pre-design . . . X X .

    Abbott Pool Retrofit -compliance Construction . X . . . .Ada Pool Retrofit -compliance Construction . X . . . .

    Adams Water feature - surfacing Bid/Award . X . . . .Altgeld Pool Retrofit -compliance Construction . X . . . .Archer Water feature - surfacing Bid/Award . X . . . .Armour Square Pool Retrofit -compliance Construction . X . . . .Avalon Pool Retrofit -compliance Construction . X . . . .Bessemer Pool Retrofit -compliance Construction . X . . . .Blackhawk Water feature with playground - Partially Funded Design ** . . . . .California Pool Retrofit -compliance Construction . X . . . .Chase Pool - liner Bid/Award . X . . . .Chase Pool Retrofit -compliance Construction . X . . . .Clark, John Pool Retrofit -compliance Construction . . X . . .Columbus Pool Retrofit -compliance Construction . X . . . .Cornell Square Pool Retrofit -compliance Bid/Award . X . . . .Cornell Square Pool - liner Pre-design . . . X . .Davis Square Pool Retrofit -compliance Construction . X . . . .DistrictWide Pool accessibility Pre-design . . X X X XDistrictWide Swimming Pool - Annual Program Ongoing . . . . . .Douglas Pool Retrofit -compliance Construction . X . . . .Douglas Pool - liner and valves Pre-design . . . X . .Dvorak Pool Retrofit -compliance Construction . X . . . .Eckhart Water feature with playground Design X X . . . .Franklin Pool - liner Bid/Award . X . . . .Franklin Pool Retrofit -compliance Construction . X . . . .Fuller Pool accessibility lift Bid/Award . X . . . .Fuller Pool Retrofit -compliance Construction . X . . . .Gage Pool Retrofit -compliance Construction . X . . . .Garfield Pool Retrofit -compliance Construction . X . . . .Garfield Pool - valves Pre-design . X . . . .Gill Pool - filter Pre-design . . . . X .

    Gompers Pool - liner Bid/Award . X . . . .Gompers Pool Retrofit -compliance Construction . X . . . .Grand Crossing Pool Retrofit -compliance Construction . X . . . .Hale Pool - liner and gutter Bid/Award . X . . . .Hale Pool Retrofit -compliance Construction . X . . . .Hamilton Pool Retrofit -compliance Construction . X . . . .Hamlin Pool Retrofit -compliance Construction . X . . . .Holstein Pool Retrofit -compliance Construction . X . . . .Humboldt Pool Retrofit -compliance Construction . X . . . .Independence Pool - filter system Pre-design . . . . X .

    Jefferson, Thomas Memorial Pool Retrofit -compliance Construction . . X . . .Kennedy Pool Retrofit -compliance Construction . X . . . .

    SWIMMING POOL and SPRAY POOL

    11 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    22/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Krause Water feature with playground - Fully Funded Bid/Award . X . . . .Lawler Water feature with playground - Fully Funded Pre-design X . X . . .Lindblom Pool Retrofit -compliance Construction . X . . . .McKinley Pool Retrofit -compliance Construction . X . . . .McKinley Pool - rehab Pre-design . . . X . .Merrimac Water feature with playground - Partially Funded Design ** . . . . .Micek Water feature with playground - Fully Funded Design X X . . . .Mount Greenwood Pool Retrofit -compliance Construction . X . . . .Norwood Pool Retrofit -compliance Construction . X . . . .Oakdale Pool - liner Construction . X . . . .Oakdale Pool Retrofit -compliance Construction . X . . . .Ogden Pool Retrofit -compliance Construction . X . . . .Palmer Pool Retrofit -compliance Construction . X . . . .Palmer Pool - liner, filter Pre-design . . . . X .Piotrowski Pool Retrofit -compliance Construction . X . . . .Pleasant Point Water feature - rehab Pre-design . X . . . .Portage Pool accessibility lift Bid/Award . X . . . .

    Pulaski Pool Retrofit -compliance Construction . X . . . .Riis Pool Retrofit -compliance Construction . . X . . .River Pool Retrofit -compliance Construction . X . . . .Russell Square Pool Retrofit -compliance Construction . X . . . .Russell Square Pool - liner Pre-design . . . . X .Senka Water feature - surfacing Bid/Award . X . . . .Shabbona Water feature - rehab Pre-design ** . . . . .Sherman Pool Retrofit -compliance Construction . X . . . .Sherwood Water feature - surfacing Bid/Award . X . . . .Smith, Joseph Pool Retrofit -compliance Construction . . X . . .Stanton Pool retrofit -compliance and filter Construction . X . . . .Taylor, Robert Pool Retrofit -compliance Construction . X . . . .Trumbull Pool Retrofit -compliance Construction . X . . . .Tuley Pool Retrofit -compliance Construction . X . . . .

    Union Water feature with playground Design X . . . . .Union Pool Retrofit -compliance Construction . X . . . .Washington, George Pool Retrofit -compliance Construction . . X . . .Welles Pool - filter system Pre-design . X . . . .Wentworth Gardens Pool Retrofit -compliance Construction . X . . . .Wolfe Water feature - rehab Construction . X . . . .Wrightwood Pool Retrofit -compliance Construction . . X . . .

    Avalon Misc. - traffic control gates Construction . X . . . .DistrictWide Fencing - Annual Program Ongoing . . X X X XGrant Misc. - railings Bid/Award . X . . . .Grant Museum Campus - fencing Pre-design . X . . . .

    Micek Fencing - basketball court Construction . X . . . .Portage Fencing - ornamental Pre-design ** . . . . .Rowan Fencing - ballfield Construction . X . . . .Shedd Fencing - ballfield Construction . X . . . .South Lakeview Fencing - rehab Bid/Award . X . . . .

    FENCING

    12 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    23/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Brooks, Oscar Court - improvements Pre-design ** . . . . .DistrictWide Basketball "Slam Dunk" Program - 100 courts Pre-design . X X . . .DistrictWide Courts - Annual Program Ongoing . . . . X XJackson, Mahalia Basketball and tennis court - rehab Design ** . X . . .Lincoln Tennis court - rehab Bid/Award . X . . . .Marquette Court - conversion to artificial turf junior soccer field Design . . . X . .McKinley Tennis court - rehab Construction . X . . . .Micek Court - improvements Design . . . X . .O'Hallaren Multiple courts - rehab Design X X . . . .Pottawattomie Court - conversion to artificial turf junior soccer field Design . . . X . .Russell Square Court - improvements Pre-design . X . . . .Rutherford Sayre Court - improvements Bid/Award X . . . . .Seward Court - improvements Bid/Award . X . . . .

    Smith, Joseph Tennis court - rehab and drainage Bid/Award X X . . . .South Lakeview Court - improvements Design . . . X . .Washington, George Tennis court - rehab Design . X . . . .

    Ada Paving - playground Bid/Award . X . . . .Amundsen Paving - paths Pre-design . . X . . .Armour Square Paving - paths Bid/Award X X . . . .Avalon Track - surfacing Bid/Award . X . . . .Burnham Paving - paths HOLD . . . X . .DistrictWide Lakefront Trail - improvements - Annual Program Ongoing . . X X X XDistrictWide Paving - Annual Program Ongoing . . . X X XDouglas Paving - paths Design X X . . . .

    Foster Parking lot - rehab Design . . X . . .Garfield Conservatory - parking lot - rehab Bid/Award . X . . . .Garfield Paving - paths Design X X . . . .Grant Paving - paths Design . X . . . .Grant Hutchinson Field - paving - access ramp Design . . . X . .Graver Paving - speed bumps Design . . X . . .Harrison Paving - paths and driveway Design . . . X . .Hiawatha Parking lot - paving and drainage Bid/Award ** X . . . .Humboldt Parking lot - rehab Bid/Award . X . . . .Humboldt Paving - paths Bid/Award X X . . . .Jackson, Andrew Paving - pathways Pre-design X X . . . .Jackson, Andrew Wooded Island -pathways Pre-design X X . . . .Kelly Paving - pathways Bid/Award . X . . . .Kelvyn Paving - paths Design . X . . . .

    Kennicott Paving - paths and parking lot Design . X . . . .Lincoln Paving - paths - near Berwyn Ave. Bid/Award . X . . . .Lincoln Paving - paths - Cannon Drive Design . . X . . .Lincoln Paving - paths - Montrose to Lawrence Design . . X . . .Lincoln Paving - paths - Lawrence to Foster Design . . . X . .Lincoln Paving - running paths Design . . X . . .Loyola Paving - paths Design . . . X . .Maplewood Sidewalk - restore or replace Design . . X . . .Marshfield Paving Bid/Award . . X . . .McGuane Paving - paths Design X X . . . .Merrimac Paving - paths Pre-design ** . . . . .Meyering Paving - track Bid/Award X . . . . .

    PAVING

    COURTS

    13 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    24/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Munroe Paving - paths Design ** . X . . .Palmer Sidewalk - rehab Design X X . . . .Peterson Paving - paths Bid/Award . . X . . .Portage Parking lot - rehab Pre-design ** . . . . .Rainbow Beach Paving - paths Design X X . . . .Rainbow Beach Paving - driveway Design . . . X . .Rutherford Sayre Paving Design X . . . . .

    Ada Lighting - parking lot Construction . X . . . .Clarendon Lighting - ballfield Bid/Award . X . . . .Coliseum Lighting - exterior Construction . X . . . .DistrictWide Lighting - Annual Program Ongoing . . X X X XDouglas Lighting - exterior Bid/Award . X . . . .Grant Lighting - Museum Campus Bid/Award . X . . . .

    Graver Lighting - security Construction . X . . . .Hayes Lighting - athletic field Design . X . . . .Humboldt Lighting - ballfield Bid/Award X X . . . .Jackson, Mahalia Lighting - athletic field Bid/Award . X . . . .Lincoln Lighting - ballfield Bid/Award . X . . . .Lincoln Lighting - lagoon Construction . X . . . .Lincoln Lighting - Roscoe St. and Barry St. underpass Bid/Award . X . . . .Lincoln Misc. - electric service near Zoo Construction . X . . . .Rutherford Sayre Lighting - exterior Design X . . . . .Taylor, Robert Lighting - interior gym Construction . X . . . .Washington, George Lighting - exterior Bid/Award . X . . . .Wolfe Lighting - exterior Construction . X . . . .

    Avalon Benches Bid/Award . X . . . .Avalon Drainage improvements Pre-design . X . . . .Burnham 43rd St. to 45th St. - trail rehab Construction X . . . . .Burnham 47th St. to 51st St. - new trail Design X . . . . .Burnham Drainage improvements Pre-design . X . . . .Chopin Park improvements Design . X . . . .Chopin Drainage improvements Pre-design . X . . . .Claremont Landscape and site improvement Construction X X . . . .DistrictWide Access Improvements - Annual Program Ongoing . . X X X XDistrictWide Misc. - drinking fountain Ongoing . X . . . .DistrictWide Water conservation - drinking fountain retrofit Ongoing . X . . . .DistrictWide Garbage/Recycling Cans, Solar Compactors, Big Bellies Ongoing . X X X X XDistrictWide Beach accessibility Ongoing . X . . . .

    DistrictWide Harbor Improvements - Annual Program Ongoing . X X X . .DistrictWide Landscape Yards - Annual Program Ongoing . . X X X XDistrictWide River Edge Restoration - Annual Program Ongoing . . X X X XDistrictWide Signage - Annual Program Ongoing . . X X X XDistrictWide Site Improvements - Annual Program Ongoing . . X X X XDistrictWide Sewer and drainage improvements Pre-design . . X X X XDouglas Athletic field - drainage Design . X . . . .Dubkin Misc. - garden beds Bid/award X . . . . .Franklin Drinking fountain - new Pre-design . X . . . .Harris (Ryan) Memorial Misc. - water feature and playground improvements STATE HOLD ** . . . . .Humboldt Benches and warm-up cage Construction X . . . . .Humboldt Misc. - water main Bid/Award . X . . . .

    LIGHTING

    SITE IMPROVEMENT

    14 of 15 As of April 1, 2012

  • 8/2/2019 Chicago Park District Capital Improvements 2012-2016 Table of Projects

    25/25

    ACTIVE PROJECTS

    PARK PROJECT SCOPE

    STATUS

    (April 2012) PRIOR

    2012

    2013

    2014

    2015

    Park District Budge

    Expected Year

    OUTSIDE

    FUNDS

    Jackson, Andrew Hayes Dr. to 67th St. - trail rehab Bid/Award X X . . . .Jackson, Andrew Multi-use trail - 59th St. to 63rd St. Design ** X . . . .Jackson, Andrew Multi-use trail - 59th and Stony Island Pre-design X . . X . .Kelvyn Drainage improvements Pre-design . X . . . .Kensington Site and facility improvements Bid/Award . X . . . .La Follette Track - new Pre-design X . . . . .Lincoln Running path - hydration station Bid/Award ** . . . . .Lincoln Foster Dr. to Ardmore Dr. - trail rehab Design X X . . . .Lincoln Fullerton Dr. (Theater on the Lake) - trail rehab Design X . . . . .Lowe Site Improvements - courts, fencing, lighting Construction X X . . . .Mandrake Track - surfacing Pre-design . . . X . .Merrill Landscape and site improvement Design X . . . . .Micek Drinking fountain - rehab Pre-design . X . . . .Nichols Miscellaneous - fountain plumbing Pre-design . X . . . .Norwood Dog friendly area - new Bid/Award ** . . . . .Pleasant Point Misc. - lighting and paving Construction . X . . . .Portage Dog friendly area - new Pre-design ** . . . . .

    Portage Drainage improvements Pre-design ** . . . . .Robichaux Drinking fountain - rehab Pre-design . X . . . .Sacramento Lighting - playground - upgrade STATE HOLD ** . . . . .Senka Retaining wall - rehab Design . X . . . .Senka Landscape and site improvement STATE HOLD ** . . . . .Skinner Dog friendly area - Monroe St. and Laflin St. Construction X . . . . .Smith, Joseph Walkway - new Bid/Award . X . . . .Smith, Joseph Misc. - pool benches and tables Design . X . . . .South Lakeview Misc. - new waterlines Design X . . . . .Ward, A. Montgomery Dog friendly area - rehab Design X . . . . .Washington, George Water service Pre-design . X . . . .West Chatham Site and facility improvements Pre-design . . X . . .White, Edward Drainage improvements Pre-design . X . . . .

    Burnham Natural Areas - new Pre-design . X X X X XDistrictWide Dutch Elm Disease - management Pre-design . . X X X XDistrictWide Natural Areas - habitat restoration Pre-design . . X X X XDistrictWide Lagoons - restoration - Annual Program Ongoing . . X X X XDistrictWide Tree Planting, Landscape, Restoration - Annual Program Ongoing . X X X X XDistrictWide Water quality - beach management Pre-design X X . . . .DistrictWide Water quality - communication program Pre-design X . . . . .DistrictWide Water quality - gull management Pre-design X . . . . .DistrictWide Water quality - monitoring equipment Pre-design X X . . . .DistrictWide Water quality - stormwater research Pre-design X . . . . .DistrictWide Renewable energy meters Pre-design . X . . . .Grant Trees - Dutch Elm Disease management Ongoing . X . . . .

    Kells Landscape restoration Pre-design . X . . . .Pottawattomie Community garden Pre-design X . . . . .

    * Funding for Professional Services is distributed throughout all program types.

    ** Outside funding is expected for this project, but a grant or donation agreement is not yet finalized.

    LANDSCAPE