Key Topics
Electronic Baggage Screening Program (EBSP) Funding Priorities
Strategic Capability Roadmap Update
FY17-19 Funding Activities
EDS Capability Procurement 2
Reimbursement
ICS Systems and Tote Certification
2
EBSP Strategic Capability RoadmapPRE-DECISIONAL
As of 05/16/2017
FY2017 18 19 20 21 22 23 24 25 26
EDS CP2 P&I IDIQ, Airport Competition, STSS, ILS
Improved Threat Discrimination(R&D)
Improved Threat Dis.(Develop & Test)
Improved Threat Dis.(Deploy)
Next Gen Alarm Resolution(Procure & Deploy)
Next Gen Alarm Resolution(Develop & Test)
Next Gen Alarm Resolution(R&D)
NG ART(TSCAP)
Algorithm(Dev & Test)Algorithm (R&D) Algorithm
(Deploy)Algorithm
(Character)
HME Alg. & HW(Test)
HME Algorithm & Hardware(Deploy)
Algorithm(Dev & Test)Algorithm (R&D) Algorithm
(Deploy)Algorithm
(Character)
Algorithm(Dev & Test)Algorithm (R&D) Algorithm
(Deploy)Algorithm
(Character)
Development of 2027-2030 Capabilities (Need)Advanced Algorithm Development, Component Development, Architecture
Development of 2027-2030 Capabilities (Pre-Need)Advanced Algorithm Development, Component Development, Architecture
Development of 2030-2040 Capabilities (Pre-Need)
Application Program Interface(Develop & Test)
Application Program Interface(Deploy)
API (R&D)
Common Footprint (Develop)
Network Upgrades(Deploy)
Common Network (R&D)
Common Network(Develop & Test)
Common Net.(Deploy)
CF (R&D)
Network Remediation(Deploy)
Network Assessment(R&D)
STIP Connect.(Dev & Test)
Rem. Main./Mon.(R&D)
Remote Maintenance/Monitoring(Develop & Test)
Rem. Main./Mon.(Deploy)
STIP Connectivity(Deploy)
STIP Connectivity(Maintain)
Technical Obsolescence Recap(Deploy)
Algorithm(Character)
CGUI/OIC(Deploy)
Common Image Format(Develop, Test, & Deploy)
CIF(R&D)
CGUI/OIC(Develop)
Universal GUI (Deploy)
UltraFAR(Dev & Test)
UltraFAR(Deploy)
EDS CP2 Baseline:
ORD 3.4
Detection Requirements:• RTM Detection (5.8)• HME Capable (7.2)• UltraFAR (7.2R)System Requirements:• Speed (BPH)• Reliability• Size• Safety• Core Functions• Image Archive, Alarm
Clearing, GUI Timer, FDRS Bag Count
• Common GUI 2.0• STIP 5.0
Program Action
ORCA-MAD Action
S&T Action
Legend
STIP Action
Enterprise Arch. Element
System Arch. Element
Detection
Common Architecture
Connectivity
3
EDS Capability Procurement 2 (EDS-CP2)
EDS-CP2 is a collection of contract vehicles to better align EBSP procurement activities with EBSP’s Strategic Roadmap Uses an incremental development approach under refreshed AD102 documents EDS-CP2 is not a new Electronic Baggage Screening Program
4
Airport Competition1
P&I IDIQ2
ILS3
STSS4
EDS-CP2 Contracts What’s Refreshed in CP2
Refreshed AD102 documents, new DHS templates, and alignment to EBSP Strategic Capability Roadmap
Updated Qualification Process with upfront vendor collaboration before testing
Transition from speed and size designators to Type 1 (Inline) and Type 2 (Standalone and Mini-Inline) designators
Incorporation of Capability Enhancements per EBSP’s Strategic Capability Roadmap
Elimination of non-minimum shall requirements
Electronic Baggage Screening Program Funding Priorities
5
Priority Description
1. Program Operations and Management Manage the program (includes staffing, training, equipment testing, and other program support costs)
2. Equipment to Ensure 100% Screening Compliance
Procure and deploy Transportation Security Equipment (TSE) to maintain 100% screening compliance
3. Critical Operational Projects Execute unforeseen and urgent projects to quickly remedy unacceptable safety issues or security vulnerabilities
4. Fulfillment of Existing Obligations Fulfill projects with executed Letters of Intent (LOIs) or Other Transactional Agreements
(OTAs) Purchase and install equipment required for those projects
5. Threat Detection Capability Development Develop threat detection algorithms DOES NOT include the deployment of these capabilities
6. Recapitalization or Upgrade of Equipment Due for Useful Life Replacement
Replace or upgrade aging machines that have reached the end of useful life Deploy new threat detection algorithms and Risk Based Security (RBS) capabilities Upgrade network equipment in support of capability enhancements
7. System-Level Capability and Operational Efficiencies (SLCOE)
Develop and deploy EDS system improvements to increase EDS lifespan, create efficiencies, and decrease alarm rates
8. Airport-Level Capability and Operational Efficiencies (ALCOE)
Install new in-line systems Implement Checked Baggage Inspection Systems (CBIS) improvements to facilitate Planning
Guidelines and Design Standards (PGDS) compliance Implement CBIS infrastructure enhancements to enable RBS capabilities
9. Reimbursement of Systems Completed without a TSA Funding Agreement
Reimburse airport operators who had a reasonable expectation of reimbursement for costs incurred while developing and/or deploying in-line systems in the absence of an LOI or OTA funding agreement with the Transportation Security Administration (TSA)
Funding is limited for Priorities 8 - 9
EBSP Funding Outlook FY17-22
$-
$100,000,000
$200,000,000
$300,000,000
$400,000,000
$500,000,000
$600,000,000
$700,000,000
FY17 FY18 FY19 FY20 FY21 FY22
EBSP Five Year Funding Outlook
10. Money Given to Other Division's for EBSPRequirements
9. Reimbursement of Systems Completedwithout a TSA Funding Agreement
8. Airport-Level Capability and OperationalEfficiencies (ALCOE) Efficiencies
8. Airport-Level Capability and OperationalEfficiencies (ALCOE) New In-Line
7. System-Level Capability and OperationalEfficiencies (SLCOE)
6. Recapitalization or Upgrade of EquipmentDue to Useful Life Replacement
5. Threat Detection Capability Development
4. Fulfillment of Existing Obligations
3. Critical Operational Projects
2. Equipment to Ensure 100% ScreeningCompliance
1. Program Operations and Management
EBSP LCCE Subtotal
FY17 Planned Funding Activities
• Planned Purchases: 134 EDS• Recap of Itemizer DX ETDs (1899)• Recap of CTX-5500s • Recap of CTX-9000/9400s
Purchase and Installation
• Travel, Training and Supplies• System Integration
• Project Management Support Services
• Engineering Support
PO&M
• Develop/deploy EDS upgrade kits• Develop and deploy enhanced threat detection algorithms• Enhance alarm resolution capabilities• Deploy CT-80 DR+ Upgrade Kits
Technical and Engineering Initiatives
• New In-line and Recap of 9000/9400s Projects• Planned Designs: 9• Planned Facility Modifications: 6
Facility Modifications (OTAs)
FY17 Planned Activities
70%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
PO&M
Purchase andInstallation
OTA's
Techical andEngineeringInitiatives
FY18 Planned Funding Activities
• Planned Purchases: 106 EDS• Recap of CTX-9000/9400s
Purchase and Installation
• Travel, Training and Supplies• System Integration
• Project Management Support Services
• Engineering Support
PO&M
• Upgrade In-line EDS networks• Deploy information technology security enhancements
Technical and Engineering Initiatives
• Planned Designs: 17• Planned Facility Modifications: 15• Recap of CTX-9000/9400s
Facility Modifications (OTAs)
FY18 Planned Activities
80%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
PO&M
Purchase andInstallation
OTA's
Techical andEngineeringInitiatives
FY19 Planned Funding Activities
• Planned Purchases: 104 EDS Recap of CTX-9000/9400s
Purchase and Installation
• Travel, Training and Supplies• System Integration
• Project Management Support Services
• Engineering Support
PO&M
• Develop and deploy enhanced threat detection algorithms• Deploy EDS upgrade kits and network upgrades• Enhance alarm resolution capabilities
Technical and Engineering Initiatives
• Planned Designs: 19• Planned Facility Modifications: 17• Recap of CTX-9000/9400s
Facility Modifications (OTAs)
FY19 Planned Activities
90%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
PO&M
Purchase andInstallation
OTA's
Technical andEngineeringInitiatives
Map of all Active, Planned, and Needed New In-line and Recap Projects
TSA will contact remaining airports needing new in-line screening zones to determine interest in pursuing a project based on funding availability
Remaining In-line5500 Recap9000/9400 Recap 10
Active or Planned In-line
Airport Code Airport Name
IAH Houston Intercontinental
ORD Chicago-O'Hare International
BUR Burbank Bob Hope Airport
PHL Philadelphia International
PSC Tri-Cities Airport
CHS Charleston AFB/International
OAJ Albert J. Ellis
GSN Saipan International
TVC Cherry Capital Airport
EWR Newark Liberty International
PIESt. Petersburg-
Clearwater International
SAV Savannah/Hilton Head International
SIT Sitka Rocky Gutierrez Airport
Airports with Current Active and Planned In-line Projects Airport Code Airport Name
ABQ Albuquerque International
BDL Bradley International
BWIBaltimore
Washington International
CAEColumbia
Metropolitan Airport
CAK Akron-Canton Airport
COS Colorado Springs Airport
DCA Reagan National Airport
EWR Newark Liberty International
HNLHonolulu
International Airport
HOU Houston Hobby International
IAH Houston Intercontinental
ISP Long Island MacArthur Airport
LGA LaGuardia Airport
LGB Long Beach Airport
MCI Kansas City International
MEM Memphis International
OAK Oakland International
OMA Omaha Airport
ORD O'Hare International
ORF Norfolk International
PHL Philadelphia International
PSP Palm Springs International
SFB Orlando Sanford International
TUS Tuscon International
Remaining Airports Needing New In-line Screening Zones
Reimbursement
19 airports requested reimbursement during the application process TSA has requested detailed invoicing from 14 airports TSA has completed approximately half of all invoice reviews
11
Reimbursement Step Date
• Transmits Reimbursement Review and Validation Plan for In-line Baggage Screening Systems to Congress July 2016
• TSA posts application and instructions to FedBizOpps.gov July 22, 2016
• Initial applications due from airports October 20, 2016
• TSA reviews all applications and notifies airports if the project is valid or invalid December 19, 2016
• Applicants with valid projects provide invoicing and construction documentation for a detailed review January 2017
• TSA evaluates all valid projects to determine eligible reimbursement amount October 2017
• TSA develops prioritized airport reimbursement list November 2017
EDS Certification and Independent Carrier Systems (ICS) Totes
EDS units will be certified with ICS tote as a configurable item
The totes themselves do not receive a certification
EDS OEMs responsibilities during tote certification process: Coordinating the submission of their system with a specific tote configuration for certification Maintaining the certified configuration of their EDS
Tote OEMs responsibilities prior to certification process: Coordinating with EDS OEMs on data collection and testing prior to submission
Certification will be conducted under the current practices
12
Planning Guidelines and Design Standards (PGDS) v6.0 Industry Collaboration
The PGDS Industry Working Group (IWG) and TSA Technical Review Committee (TRC) have continued their collaboration over the last 2 years 50 industry participants from OEMs, designers, consultants, airlines, and airports 10+ representatives from various stakeholder groups within TSA
Over 300 comments were received from the industry since publication of v5.0 161 comments were received on v5.0 157 additional comments were received on the preliminary draft of v6.0 28 comments were received on the final draft of v6.0
Multiple collaboration sessions were held to discuss and adjudicate comments 19 TSA TRC meetings to facilitate v6.0 4 joint TRC/IWG meetings to facilitate open dialogue regarding comments
PGDS v6.0 is expected to be published by September 2017
13