General Procedure Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any ) 2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat 1.Surface Preparation 1.1 ๋ชฉ์  - ํ”ผ๋„์ฒด ํ‘œ๋ฉด์— ์ž”์กดํ•˜๋Š” oil,grease,dust,dirt,mill sclae,rust,old coating๋“ฑ์„ ์ œ๊ฑฐํ•˜์—ฌ CHARTEK 7๊ณผ ํ”ผ๋„์ฒด์™€์˜ ๋ถ€์ฐฉ๋ ฅ ์ฆ์ง„์— ์˜ํ–ฅ์„ ์ค€๋‹ค. - Surface Roughness๋ฅผ ์ฆ๊ฐ€ ์‹œ์ผœ์„œ ํ”ผ๋„์ฒด์™€ Primer ๋˜๋Š” ํ”ผ๋„์ฒด์™€ CHARTEK 7 ๊ณผ์˜ ๋ถ€์ฐฉ๋ ฅ์„ ๊ทน๋Œ€ํ™” ์‹œํ‚ค๋Š”๋ฐ ์˜๋ฏธ๊ฐ€ ์žˆ๋‹ค. 1.2 ๋ฐฉ๋ฒ• A. Degreasing - ๋ชจ๋“  ๋ˆˆ์— ๋ณด์ด๋Š” oil,grease,soluble contaminants๋“ฑ์„ ์ œ๊ฑฐํ•œ๋‹ค.( SSPC - SP1 ) - ๋ฐฉ๋ฒ• a. Steam cleaning using detergent ,alkaline cleaner followed by steam or fresh water b. Wiping or scrubbing the surface with wetted rags or brushes with solvent c. Vapor degreasing using stabilized chlorinated hydrocarbon solvent B. Power tool cleaning - ๋ชจ๋“  loose millscale , loose rust , loose paint ๋˜๋Š” ์˜ค์—ผ์›์„ ์ œ๊ฑฐํ•œ๋‹ค.(SSPC-SP3) C. Blast cleaning Near white blast cleaning - ๋ชจ๋“  ๋ˆˆ์— ๋ณด์ด๋Š” oil,grease,dust,dirt,millscale,rust,coating ๋“ฑ์ด ์ œ๊ฑฐ๋˜์–ด์ ธ์•ผ ํ•œ๋‹ค. ๋‹จ, ํ‘œ๋ฉด์—๋Š” 5%์ดํ•˜์˜ stain ์˜ ์  ๋˜๋Š” ํ”์ ๋งŒ ๋ณด์—ฌ์ ธ์•ผ ํ•œ๋‹ค. ( Sa 2.5 ,SSPPC-SP10,NACE 2 ) - ํ‘œ๋ฉด ์กฐ๋„๋Š” 50~75 micron ์ด ๋˜์–ด์•ผ ํ•œ๋‹ค. ๋‹จ,ALUMINUM์— ๋Œ€ํ•ด์„œ๋Š” 75~100micron์ด ์š”๊ตฌ๋˜์–ด์ง„๋‹ค. Sweep blast cleaning - ์žฅ๊ธฐ๊ฐ„ ๋ฐฉ์น˜๋œ ๋„์žฅ๋ฉด์ด๋‚˜ ์•ฝ๊ฐ„์˜ ์˜ค์—ผ์›์„ ์ œ๊ฑฐํ•˜๋Š”๋ฐ ์‚ฌ์šฉ. Wet abrasive blasting Hydro blasting 1ใŽก ์ดํ•˜์˜ ์šฉ์ ‘๋ถ€์œ„๋‚˜ ๊ตญ์†Œ์ ์ธ ๋ฐ๋ฏธ์ง€ ๋ถ€์œ„์˜ Repair์‹œ Power tool์ „์ฒ˜๋ฆฌ ํ•œ๋‹ค. CHARTEK 7 Application Method

Upload: others

Post on 29-May-2022

25 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat

1.Surface Preparation 1.1 ๋ชฉ์ 

- ํ”ผ๋„์ฒด ํ‘œ๋ฉด์— ์ž”์กดํ•˜๋Š” oil,grease,dust,dirt,mill sclae,rust,old coating๋“ฑ์„ ์ œ๊ฑฐํ•˜์—ฌ

CHARTEK 7๊ณผ ํ”ผ๋„์ฒด์™€์˜ ๋ถ€์ฐฉ๋ ฅ ์ฆ์ง„์— ์˜ํ–ฅ์„ ์ค€๋‹ค.

- Surface Roughness๋ฅผ ์ฆ๊ฐ€ ์‹œ์ผœ์„œ ํ”ผ๋„์ฒด์™€ Primer ๋˜๋Š” ํ”ผ๋„์ฒด์™€ CHARTEK 7

๊ณผ์˜ ๋ถ€์ฐฉ๋ ฅ์„ ๊ทน๋Œ€ํ™” ์‹œํ‚ค๋Š”๋ฐ ์˜๋ฏธ๊ฐ€ ์žˆ๋‹ค.

1.2 ๋ฐฉ๋ฒ•

A. Degreasing

- ๋ชจ๋“  ๋ˆˆ์— ๋ณด์ด๋Š” oil,grease,soluble contaminants๋“ฑ์„ ์ œ๊ฑฐํ•œ๋‹ค.( SSPC - SP1 )

- ๋ฐฉ๋ฒ•

a. Steam cleaning using detergent ,alkaline cleaner followed by steam or fresh water

b. Wiping or scrubbing the surface with wetted rags or brushes with solvent

c. Vapor degreasing using stabilized chlorinated hydrocarbon solvent

B. Power tool cleaning

- ๋ชจ๋“  loose millscale , loose rust , loose paint ๋˜๋Š” ์˜ค์—ผ์›์„ ์ œ๊ฑฐํ•œ๋‹ค.(SSPC-SP3)

C. Blast cleaning

Near white blast cleaning

- ๋ชจ๋“  ๋ˆˆ์— ๋ณด์ด๋Š” oil,grease,dust,dirt,millscale,rust,coating ๋“ฑ์ด ์ œ๊ฑฐ๋˜์–ด์ ธ์•ผ ํ•œ๋‹ค.

๋‹จ, ํ‘œ๋ฉด์—๋Š” 5%์ดํ•˜์˜ stain ์˜ ์  ๋˜๋Š” ํ”์ ๋งŒ ๋ณด์—ฌ์ ธ์•ผ ํ•œ๋‹ค.

( Sa 2.5 ,SSPPC-SP10,NACE 2 )

- ํ‘œ๋ฉด ์กฐ๋„๋Š” 50~75 micron ์ด ๋˜์–ด์•ผ ํ•œ๋‹ค.

๋‹จ,ALUMINUM์— ๋Œ€ํ•ด์„œ๋Š” 75~100micron์ด ์š”๊ตฌ๋˜์–ด์ง„๋‹ค.

Sweep blast cleaning

- ์žฅ๊ธฐ๊ฐ„ ๋ฐฉ์น˜๋œ ๋„์žฅ๋ฉด์ด๋‚˜ ์•ฝ๊ฐ„์˜ ์˜ค์—ผ์›์„ ์ œ๊ฑฐํ•˜๋Š”๋ฐ ์‚ฌ์šฉ.

Wet abrasive blasting

Hydro blasting

1ใŽก ์ดํ•˜์˜ ์šฉ์ ‘๋ถ€์œ„๋‚˜ ๊ตญ์†Œ์ ์ธ ๋ฐ๋ฏธ์ง€ ๋ถ€์œ„์˜ Repair์‹œ Power tool์ „์ฒ˜๋ฆฌ ํ•œ๋‹ค.

CHARTEK 7 Application Method

Page 2: CHARTEK 7 Application Method - pds25.egloos.com

1.3 CHARTEK Surface Preparation Requirement table

Steel Galvanized steel Aluminum Stainless steel

Degreasing v v v v

Power tool v v v v

Blast cleaning v v v

Sweep blast v

Blow down v v v v

Primer v Epoxy only v v

Blast Profile 50~75mic 50~75mic 75~100mic 35~50mic

Blast cleaned surface (Sa 2.5)

SubstrateOperationRequired

< Reference Photograph >

Power Tool cleaned surface ( SP 3 )

Page 3: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection ->Top coat

2. Priming 1.1 ๊ฐœ์š”

- CHARTEK7์ด STEEL ํ‘œ๋ฉด์— ๋ฐ”๋กœ ์‹œ๊ณต์ด ๋ ์ˆ˜ ์žˆ์œผ๋‚˜,์‹œ๊ณต์ค‘ ์‹œ๊ฐ„๊ฒฝ๊ณผ๋˜๋Š” ์—ฌ๋Ÿฌ๊ฐ€์ง€

์ด์œ ๋กœ ์ธํ•˜์—ฌ ์ง€์—ฐ๋ ์‹œ STEEL ํ‘œ๋ฉด์— flash rusting์ด ๋ฐœ์ƒ๋  ์ˆ˜ ์žˆ์œผ๋ฏ€๋กœ ์ด๋ฅผ

๋ฐฉ์ง€ ํ•˜๊ธฐ ์œ„ํ•˜์—ฌ ์ ์ ˆํ•œ primer ๋ฅผ ๋„์žฅํ•œ๋‹ค.

- Primer๋Š” STEEL๊ณผ CHARTEK7๊ณผ์˜ ๋ถ€์ฐฉ๋ ฅ์ด ์ข‹์•„์•ผ ํ•˜๋ฏ€๋กœ MAKER์—์„œ ์ถ”์ฒœํ•˜๋Š”

Primer๋ฅผ ์‚ฌ์šฉ ํ•ด์•ผํ•˜๊ณ  , DFT ๋˜ํ•œ ์ œํ•œ๋˜์–ด์ง„๋‹ค.

1.2 Maximum Dry Film Thicknesses

1.3 Reduction of over primer thickness

- ๋งŒ์•ฝ ,Primer DFT๊ฐ€ ๊ทœ์ • ๋„๋ง‰ ์ด์ƒ์ผ ๊ฒฝ์šฐ์—๋Š” CHARTEK 7 ์‹œ๊ณตํ›„ stress ๋‚˜ ์ถฉ๊ฒฉ์œผ๋กœ

- ์ „์ฒด์ ์œผ๋กœ Primer๊ฐ€ ๊ทœ์ •๋„๋ง‰ ์ด์ƒ์ผ ๊ฒฝ์šฐ์—๋Š” Sweep blasting์œผ๋กœ์จ ๊ทœ์ • ๋„๋ง‰์œผ๋กœ ๋งž์ถ”๋Š”

๊ฒƒ์ด ์ถ”์ฒœ ๋œ๋‹ค.๊ทธ๋Ÿฌ๋‚˜, partiallyํ•œ ๊ฒฝ์šฐ์—๋Š” Sand paper ( P 80 , P100 ) ๋กœ์จ ๊ณผ๋„๋ง‰์„

์ œ๊ฑฐํ•ด์•ผ ํ•œ๋‹ค.

1.4 Overcoating intervals

ํ•œ๋‹ค.ํ†ต์ƒ์ ์œผ๋กœ Primer ์‹œ๊ณตํ›„ 3์ผ์ด ์ง€๋‚˜์•ผ CHARTEK 7 ์‹œ๊ณต์ด ์ถ”์ฒœ๋˜์–ด์ง„๋‹ค.

- Primer ์ข…๋ฅ˜์— ๋”ฐ๋ผ maximum,minimum interval์ด ๋‹ค๋ฅด๋ฏ€๋กœ Maker recommendation์—

๋”ฐ๋ผ ์‹œ๊ณต์„ ํ•ด์•ผํ•œ๋‹ค.

100 microns

Carbon steel 50 ~ 75 microns 100 microns

Stainless steel

75 ~ 100 microns 150 microns

Dry Film ThicknessPrimer system

Epoxy PrimerNormal Areas Overlap Areas

Epoxy zinc primer 50 ~ 75 microns

35 ~ 50 microns 75 microns

- CHATEK 7์€ 100% SOLID VOLUME ์ œํ’ˆ์œผ๋กœ์จ ์‹œ๊ณต์ „ Primer๋Š” ์™„์ „ํ•˜๊ฒŒ curing์ด ๋˜์–ด์•ผ

์ธํ•˜์—ฌ weaker primer cohesive fail์ด ๋ฐœ์ƒํ•  ์ˆ˜ ์žˆ์œผ๋ฏ€๋กœ Primer์‹œ๊ณต์‹œ ์ฃผ์˜๋ฅผ ๊ธฐ์šธ์—ฌ์•ผ ํ•œ๋‹ค.

Epoxy zinc primerplus tie coat

75 ~ 110 microns 125 microns

Aluminum

Page 4: CHARTEK 7 Application Method - pds25.egloos.com

Reference Photo

Applied epoxy primer ( Intergard 269 ) Applied epoxy zinc primer ( Interzinc 52 )

Build down DFT by sand papering ( P 80 , P 100 ) Build down DFT by sweep blasting

Page 5: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat

3. Masking - PFP area์™€ ์ผ๋ฐ˜ ์ฝ”ํŒ… area์˜ ๊ตฌ๋ถ„์„ ์ง€์–ด์ค€๋‹ค.

- PFP ์ž‘์—…ํ›„ ํ›„ํ–‰ ์šฉ์ ‘์ž‘์—…์„ ์šฉ์ดํ•˜๊ฒŒ ํ•˜๊ธฐ์œ„ํ•ด ๋ณด๋ฅ˜๋ถ€์œ„๋ฅผ ์ ์ ˆํžˆ ๋งˆ์Šคํ‚นํ•œ๋‹ค.

- PFP ์ž‘์—…๋„์ค‘ ๋ฐœ์ƒ๋˜๋Š” overspray๋กœ ์ธํ•˜์—ฌ ๊ฐ์ข… ๊ธฐ๊ณ„๋ฅ˜,ํŒŒ์ดํ”„,์˜์žฅํ’ˆ,๋„์žฅ๋œ ํ‘œ๋ฉด๋“ฑ์ด

์˜ค์—ผ์ด ๋˜๋ฏ€๋กœ ์ด๋ฅผ ๋ฐฉ์ง€ํ•˜๊ธฐ ์œ„ํ•˜์—ฌ ๋งˆ์Šคํ‚นํ•œ๋‹ค.

< Reference Photograph >

Note.๋งˆ์Šคํ‚น์„ ํ•œํ›„ PFP๊ฒฝ๊ณ„ ๋ถ€์œ„์—๋Š” DOUBLE MASKING์„ ํ•˜๋Š”๊ฒƒ์ด ์ถ”์ฒœ๋œ๋‹ค.(๊ทธ๋ฆผ์ฐธ์กฐ)

1st coatํ›„ tape์„ ์ œ๊ฑฐํ•˜์—ฌ ๋๋‹จ์— ๊นจ๋—ํ•œ ๋ผ์ธ์„ ์žก์•„์ฃผ์–ด ๋๋‹จ์ฒ˜๋ฆฌ๋ฅผ ๋ง๋”ํ•˜๊ณ  ์šฉ์ดํ•˜๊ฒŒ

ํ•˜๊ธฐ ์œ„ํ•จ์ด๋‹ค.

Page 6: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat

4. Application ( Plural Pump ) - Procedure -

Material preheating,Machine preparation --> Ratio check --> Application ( Spray,Rolling,Trowling,

Stipple coat )

Before Application checklists ( ์ž‘์—…์ „ ์ค€๋น„์‚ฌํ•ญ )

a. Ambient condition ( ์ž‘์—…๊ฐ€๋Šฅ ์กฐ๊ฑด ์ฒดํฌ )

* Air Temperature : minimum 10โ„ƒ

* Relative humidity : maximum 85%

* Surface temperature : 3โ„ƒ above dew point temperature

์œ„ ์กฐ๊ฑด์€ ๊ฐ€์žฅ ์ด์ƒ์ ์ธ ์ž‘์—…๊ฐ€๋Šฅ ์กฐ๊ฑด์ด์ง€๋งŒ, Plural Pump ์‚ฌ์šฉ์‹œ์—๋Š” Air Temperatue ๊ฐ€ 5โ„ƒ

์ผ๋•Œ์—๋„ ์ž‘์—…์ด ๊ฐ€๋Šฅํ•˜๋‹ค.๋‹จ,PFP ์ž‘์—…ํ›„ ์˜จ๋„๊ฐ€ ๋–จ์–ด์งˆ ๊ฒฝ์šฐ amine bloomingํ˜„์ƒ์ด ์ƒ๊ธธ ์šฐ๋ ค๊ฐ€

์žˆ์œผ๋ฏ€๋กœ ์ž‘์—…ํ›„ 5โ„ƒ ์ด์ƒ์˜ ์˜จ๋„๊ฐ€ 2์‹œ๊ฐ„์ด์ƒ ์œ ์ง€๋˜์–ด์•ผ ํ•œ๋‹ค.

b. Material Preheating ( ์ž์žฌ ์˜ˆ์—ด )

* CHARTEK7 ์€ 100% VOLUME SOLID ์ œํ’ˆ์œผ๋กœ์„œ SOLVENT๊ฐ€ ์ „ํ˜€ ๋“ค์–ด์žˆ์ง€ ์•Š์œผ๋ฏ€๋กœ

SPRAY PATTERN์„ ํ–ฅ์ƒ์‹œํ‚ค๊ธฐ ์œ„ํ•˜์—ฌ ์˜ˆ์—ด์ด ๊ผญ ํ•„์š”ํ•˜๋‹ค.

์ž์ฒด์ ์œผ๋กœ ์ž์žฌ ์˜จ๋„์ฒดํฌ๋ฅผ ํ™•์‹คํžˆ ํ•ด์ฃผ์–ด์•ผ ํ•œ๋‹ค.

* 30 ~ 34 โ„ƒ for 24 hours ( maximum 48 hours ) prior to use

์œ„ ์‚ฌํ•ญ์„ ์ค€์ˆ˜ํ•˜์—ฌ์•ผ ํ•˜๋ฉฐ ํŠนํžˆ,๊ณผ๋„ํ•œ ์˜จ๋„์ƒ์Šน์œผ๋กœ ์ธํ•˜์—ฌ ์บ” ๋‚ด๋ถ€์˜ ์ˆ˜์ง€๊ฐ€ ๋ฌผ์„ฑ์ด

๋ณ€ํ•˜์—ฌ ์บ” ๋‚ด๋ถ€์—์„œ ๊ณ ์ฐฉ์ด ๋˜๊ฑฐ๋‚˜ ์ž‘์—…์‹œ POT LIFE๊ฐ€ ์งง์•„์ ธ ์ž‘์—…์„ฑ์ด ๋–จ์–ด ์งˆ์ˆ˜๊ฐ€ ์žˆ์œผ๋ฏ€๋กœ

Page 7: CHARTEK 7 Application Method - pds25.egloos.com

c. Mesh cutting

- Mesh๋ฅผ ์ž‘์—…๊ตฌ์—ญ์˜ ๊ทœ๊ฒฉ์— ๋งž๊ฒŒ ๋ฏธ๋ฆฌ ์ ˆ๋‹จํ•˜์—ฌ ์ค€๋‹ค.

- ๋ฏธ๋ฆฌ ์ ˆ๋‹จํ•˜์—ฌ ์คŒ์œผ๋กœ์จ ๋ถˆํ•„์š”ํ•œ Mesh ์†Œ๋ชจ๋ฅผ ์ค„์ผ์ˆ˜ ์žˆ๋‹ค.

Page 8: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( Stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat

- Procedure -

Material preheating,Machine preparation --> Ratio check --> Application ( Spray ,Rolling,Trowling,

Stipple coat )

Ratio Check ( ๋น„์œจ ์ฒดํฌ )

- ๋ชจ๋“  ์ž‘์—…์ค€๋น„๊ฐ€ ์™„๋ฃŒ๋˜๋ฉด ์ž‘์—…์ „ ๋น„์œจ์ฒดํฌ๋ฅผ ์‹ค์‹œํ•ด์•ผ ํ•œ๋‹ค.

- ๋น„์œจ์ฒดํฌ๋Š” ๊ฐ€๋Šฅํ•œํ•œ ์ •๊ธฐ์ ์œผ๋กœ ์‹ค์‹œํ•ด์•ผ ํ•˜๋ฉฐ,์ตœ์†Œํ•œ ์ž‘์—… ์‹œ์ž‘์ „์—๋Š” ๋ฌด์กฐ๊ฑด ํ•ด์•ผํ•œ๋‹ค.

๊ทธ๋ฆฌ๊ณ ,์ž‘์—…์ค‘ ์žฅ๋น„๊ฐ€ ๊ณ ์žฅ๋‚˜๊ฑฐ๋‚˜ ์–ด๋– ํ•œ ์ด์œ ๋กœ ์ž‘์—…์„ ๋‹ค์‹œ ์‹œ์ž‘ํ• ์‹œ ๋น„์œจ์ฒดํฌ๋ฅผ ํ–‰ํ•œ๋‹ค.

- ๋น„์œจ์ฒดํฌ๋ฅผ ๋งˆ์น˜๊ณ  spray ๋„์ค‘ ์ƒ‰์ƒ์ด ๋ณ€ํ•˜๊ฑฐ๋‚˜ ์ž์žฌ ๋ฌผ์„ฑ์— ์ด์ƒ ๋ฐœ๊ฒฌ์‹œ ์ฆ‰์‹œ spray๋ฅผ ์ค‘๋‹จํ•˜๊ณ 

์žฅ๋น„๋‚˜ ์ž์žฌ์˜ ์ด์ƒ์œ ๋ฌด๋ฅผ ํŒŒ์•…ํ•˜์—ฌ ์กฐ์น˜ํ•œ๋‹ค.

Procedure ( ์ ˆ์ฐจ )

1. ์ฃผ์žฌ,๊ฒฝํ™”์žฌ ์บ”์„ ๊นจ๋—์ด ๋น„์šฐ๊ณ  ์บ” ์ž์ฒด์˜ ๋ฌด๊ฒŒ๋ฅผ ์žฌ์–ด ๊ธฐ๋กํ•œ๋‹ค.

2. ์บ”์„ RATIO CHECK DRAIN VALVE์— ์œ„์น˜ํ•˜์—ฌ ๋‘๊ณ  ๊ฐ๊ฐ์˜ ๋ฐธ๋ธŒ๋ฅผ ๋™์‹œ์— ์—ฐ๋‹ค.

3. Drain๋˜๋Š” ์žฌ๋ฃŒ๊ฐ€ ์บ”์˜ ์ ์–ด๋„ ์ ˆ๋ฐ˜์ด์ƒ ์ฐจ๋ฉด ๋ฐธ๋ธŒ๋ฅผ ์ž ๊ทผ๋‹ค.

4. ๊ฐ ๊ฐ์˜ ๋ฌด๊ฒŒ๋ฅผ ์žฌ์–ด ๊ธฐ๋กํ•œ ํ›„ ์ฒ˜์Œ ๋นˆ ์บ”์˜ ๋ฌด๊ฒŒ๋ฅผ ๋บ€๋‹ค.

5. ์ฃผ์žฌ์˜ ๋ฌด๊ฒŒ์—์„œ ๊ฒฝํ™”์žฌ ๋ฌด๊ฒŒ๋ฅผ ๋‚˜๋ˆ„์–ด ๊ฐ’์„ ๊ณ„์‚ฐํ•œ๋‹ค.

- Part A full container weight : 15.3 kg

- Part B full container weight : 7 kg

- Part A net weight : 15.3 kg - 1.3 kg = 14 kg

- Part B net weight : 7 kg - 1.3 kg = 5.7 kg

- PartA / Part B : 14 kg / 5.7 kg ---> 2.45

- Ratio by weight -> 2.45 : 1

Acceptable ratio range

- Standard -> 2.45 : 1 ( Part A : Part B as a ratio of total weight )

- Acceptable ratio range of Part A to Part B

2.32 : 1 ~ 2.56 : 1

Example Calculation

- Part A empty container weight : 1.3 kg

- Part B empty container weight : 1.3 kg

Page 9: CHARTEK 7 Application Method - pds25.egloos.com

Valve๋ฅผ ์ž ๊ทธ๊ณ  ๊ฐ๊ฐ์˜ ๋ฌด๊ฒŒ๋ฅผ ์žฌ์–ด ๋น„์œจ์„ ๊ณ„์‚ฐํ•œ๋‹ค.

Reference Photo

๊นจ๋—์ด ๋น„์šด ์ฃผ์žฌ,๊ฒฝํ™”์žฌ ์บ”์„ ์ค€๋น„ํ•œ๋‹ค.

๊ฐ๊ฐ์˜ ์บ”์„ Drain Valve์œ„์น˜์— ๋‘๊ณ  Drain ์‹œํ‚จ๋‹ค.(์ ˆ๋ฐ˜์ด์ƒ)

Page 10: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat

- Procedure -

Material preheating,Machine preparation --> Ratio check --> Application ( Spray ,Trowel,Mesh install,

Rolling,Stipple coat )

1st coat + Mesh installation

a. Spray

* ์ž‘์—…์ „ ์ตœ์ƒ์˜ Spray pattern์ด ์œ ์ง€ ๋˜๋„๋ก ์žฅ๋น„์™€ ์ž์žฌ๋Š” heating๊ณผ ์ ๋‹นํ•œ ์••๋ ฅ์ด ์š”๊ตฌ๋œ๋‹ค.

๋งŒ์•ฝ,Spray pattern์ด ๋ถˆ๋Ÿ‰์‹œ Fingering ํ˜„์ƒ์ด ๋ฐœ์ƒ๋˜์–ด ์ •ํ™•ํ•œ Trowel์ด ์š”๊ตฌ๋˜๋ฏ€๋กœ,๊ฐ€๋Šฅํ•œํ•œ

์ตœ์ ์˜ Spray pattern์„ ์œ ์ง€ํ•˜๋Š”๊ฒƒ์ด ์ถ”์ฒœ๋˜์–ด์ง„๋‹ค.

* Each coat ๋„๋ง‰์€ ๊ทœ์ •๋„๋ง‰์˜ ์ ˆ๋ฐ˜์ด ๋˜์•ผ ํ•˜๋ฏ€๋กœ Sprayer๋Š” ํ•ญ์ƒ Wet thickness๋ฅผ check ํ•œ๋‹ค.

* Sagging Point per coat : about 5 mm , ๊ทœ์ • ๋„๋ง‰์ด ๋งŒ์•ฝ 10mm์ด์ƒ์ผ ๊ฒฝ์šฐ์—๋Š” several coat๋กœ

๊ทœ์ •๋„๋ง‰์„ ํ˜•์„ฑ์‹œ์ผœ ์ค€๋‹ค.( three coat or four coat )

* Recommended Tip size : 0.035" ~ 0.041"

b. Trowel

* Spray ๋œ ํ‘œ๋ฉด์„ Trowel์„ ํ•ด์คŒ์œผ๋กœ์จ ํ”ผ๋„์ฒด์— wettability๋ฅผ ํ–ฅ์ƒ์‹œํ‚ค๊ณ  ๋„๋ง‰์„ ํ˜•์„ฑ ์‹œํ‚จ๋‹ค.

* Spray ๊ฐ€ ๋ถˆ๊ฐ€๋Šฅํ•œ ๊ตฌ์—ญ์€ Trowel๋กœ์„œ build up์„ ํ•  ์ˆ˜๊ฐ€ ์žˆ๊ณ  sagging,slumping๋œ ํ‘œ๋ฉด์„ ๊ท ์ผ

ํ•˜๊ฒŒ ๋งŒ๋“ค ์ˆ˜ ์žˆ๋‹ค.

* Chartek ํ‘œ๋ฉด์— ๋ถ€์ฐฉ์„ ์œ„ํ•˜์—ฌ rolling์„ ํ•œ๋‹ค.

- Jet fire scenario : 150 mm overlap

- Cellulose,hydrocarbon fire scenario : 50 mm overlap

d. Rolling

* Roller๋กœ์„œ ๊ท ์ผํ•œ ํ‘œ๋ฉด์„ ๋งŒ๋“ค์ˆ˜ ์žˆ๊ณ ,ํ”ผ๋„์ฒด์™€์˜ ๋ถ€์ฐฉ์„ ์ฆ์ง„ ์‹œํ‚ฌ ์ˆ˜ ์žˆ๋‹ค.

* ๋„“์€ ๋ถ€์œ„์—๋Š” ํฐ roller๋ฅผ ์‚ฌ์šฉํ•˜์—ฌ ํ‘œ๋ฉด์„ ๊ท ์ผํ•˜๊ฒŒ ๋งŒ๋“ค๊ณ  edge,corner์™€ ๊ฐ™์€ ์ข์€ ๋ถ€์œ„๋Š”

์ž‘์€ roller๋ฅผ ์‚ฌ์šฉํ•˜์—ฌ ๋งˆ๊ฐ์„ ํ•ด์ค€๋‹ค.

* Rolling์‹œ ๊ด€๋„ํ•œ solvent๋Š” curing time์„ ๋Š˜๋ฆด ์ˆ˜ ์žˆ๊ณ ,sagging์ด๋‚˜ slumping ๊ฐ™์€ ํ‘œ๋ฉด์„ ๋ฐœ์ƒ

์‹œํ‚ฌ ์ˆ˜ ์žˆ์œผ๋ฏ€๋กœ ํ•ญ์ƒ ์ ์ •์–‘์œผ๋กœ ์‹œ๊ณต์„ ํ•ด์•ผํ•œ๋‹ค.

c. Mesh installation ( HK-1 Mesh )

* Mesh๋Š” ํ•ญ์ƒ ๊ทœ์ •๋œ ๋„๋ง‰์˜ ์ค‘๊ฐ„์— ์œ„์น˜ํ•˜๋„๋ก ์‹œ๊ณตํ•ด์•ผ ํ•œ๋‹ค.

* Mesh๊ฐ€ ๋๋‚˜๋Š” ๋ถ€์œ„์™€ ๋‹ค์Œ Mesh๊ฐ€ ์‹œ๊ณต๋˜๋Š” ๋ถ€์œ„๋Š” ํ•ญ์ƒ ๊ทœ์ •์— ๋งž์ถฐ overlap์ด ๋˜์–ด์•ผ ํ•œ๋‹ค.

Page 11: CHARTEK 7 Application Method - pds25.egloos.com

Technical Note

- Subsequent coat ( Overcoating ๊ด€๋ จ ) -

๋ถ€์ฐฉ๋ ฅ์„ ๋‚˜ํƒ€๋‚ธ๋‹ค. ( " wet on wet " ). ๊ทธ๋Ÿฌ๋ฏ€๋กœ, 1st coat๊ฐ€ ๋๋‚œ ํ›„ ์ตœ๋Œ€ํ•œ 24์‹œ๊ฐ„ ์ด๋‚ด์—

ํ›„์†๊ณต์ •์ด ์ด๋ฃจ์–ด ์ง€๋„๋ก ๊ด€๋ฆฌํ•ด์•ผ ํ•œ๋‹ค.

* ๊ทธ๋Ÿฌ๋‚˜, ํ˜„์žฅ ์‚ฌ์ •์ด๋‚˜ ๋‹ค๋ฅธ ์ด์œ ๋กœ ์ธํ•˜์—ฌ 24์‹œ๊ฐ„ ์ด๋‚ด์— ํ›„์†๊ณต์ •์ด ๋ถˆ๊ฐ€ํ•œ ๊ฒฝ์šฐ๊ฐ€ ์˜ˆ์ƒ ๋ 

๊ฒฝ์šฐ์—๋Š” 1st coat๊ตฌ์—ญ์— holding coat๋ฅผ ํ•จ์œผ๋กœ์จ overcoating interval์„ ์ง€์—ฐ์‹œํ‚ฌ ์ˆ˜ ์žˆ๋‹ค.

Holding coat ( Stipple coat ) ์˜ ์ด์ 

a. ํ‘œ๋ฉด์— roughness( profile )๋ฅผ ์ฆ๊ฐ€์‹œ์ผœ ์ฃผ๋ฉด์„œ next coat์™€์˜ ๋ถ€์ฐฉ๋ ฅ ์ฆ์ง„์„ ํ–ฅ์ƒ ์‹œํ‚จ๋‹ค.

b.Mesh ์œ„์— Holding coat๋ฅผ ํ•จ์œผ๋กœ์จ ์ฐจํ›„ mesh์˜ ์˜ค์—ผ(overspray,dust,water)์„ ๋ฐฉ์ง€ํ•  ์ˆ˜ ์žˆ๋‹ค.

No stipple coat on the mesh surface

( Water conataminated ) ( Protect mesh,make profile)

* CHARTEK 7์€ 100% Voume solid ์ œํ’ˆ์œผ๋กœ์„œ ํ›„์† ๋„์žฅ์€ ํ•˜๋„๊ฐ€ Tackyํ•œ ์ƒํƒœ์—์„œ ์ตœ์ ์˜

A stipple coated surface on the mesh surface

Page 12: CHARTEK 7 Application Method - pds25.egloos.com

Progress (1st coat + mesh installation ) - Spray on the primed surface -

A good fan makes the even surface and thickness A poor fan makes the irregular surface

( sagging,uneven surface )

- Trowel -

After trowelling,Mesh install with a proper mesh overlap ( 50 mm , 150 mm )

- Mesh installation and Rolling -

Makes the even surface and good wettability to substrate

Page 13: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat

- Procedure -

Material preheating,Machine preparation --> Ratio check --> Application ( Spray ,Trowel,Mesh install,

Rolling,Stipple coat )

2nd coat ( Stipple finish , if any )

a. Spray

* ์ž‘์—…์ „ ์ตœ์ƒ์˜ Spray pattern์ด ์œ ์ง€ ๋˜๋„๋ก ์žฅ๋น„์™€ ์ž์žฌ๋Š” heating๊ณผ ์ ๋‹นํ•œ ์••๋ ฅ์ด ์š”๊ตฌ๋˜์–ด์ง„๋‹ค.

๋งŒ์•ฝ,Spray pattern์ด ๋ถˆ๋Ÿ‰์‹œ Fingering ํ˜„์ƒ์ด ๋ฐœ์ƒ๋˜์–ด ์ •ํ™•ํ•œ Trowel์ด ์š”๊ตฌ๋˜๋ฏ€๋กœ,๊ฐ€๋Šฅํ•œํ•œ

์ตœ์ ์˜ Spray pattern์„ ์œ ์ง€ํ•˜๋Š”๊ฒƒ์ด ์ถ”์ฒœ๋˜์–ด์ง„๋‹ค.

* ๋งŒ์•ฝ spray pattern์ด ๋ถˆ๋Ÿ‰ํ•˜๋ฉด 1st stipple coat์˜ roughness๋กœ ์ธํ•˜์—ฌ rolling์‹œ bubbling์ด ๋ฐœ์ƒํ•˜๋ฏ€๋กœ

์ตœ์ ์˜ Spray pattern์„ ์œ ์ง€ํ•˜๊ณ  trowel์„ ํ™•์‹คํžˆ ํ•ด์ฃผ์–ด์•ผ ํ•œ๋‹ค.

* Each coat ๋„๋ง‰์€ ๊ทœ์ •๋„๋ง‰์˜ ์ ˆ๋ฐ˜์ด ๋˜์•ผ ํ•˜๋ฏ€๋กœ Sprayer๋Š” ํ•ญ์ƒ Wet thickness๋ฅผ check ํ•œ๋‹ค.

* Sagging Point per coat : about 5 mm , ๊ทœ์ • ๋„๋ง‰์ด ๋งŒ์•ฝ 10mm์ด์ƒ์ผ ๊ฒฝ์šฐ์—๋Š” several coat๋กœ ๊ทœ์ •

๋„๋ง‰์„ ํ˜•์„ฑ์‹œ์ผœ ์ค€๋‹ค.( three coat or four coat )

* Recommended Tip size : 0.035" ~ 0.041"

b. Trowel

* Spray ๋œ ํ‘œ๋ฉด์„ Trowel์„ ํ•ด์คŒ์œผ๋กœ์จ ํ”ผ๋„์ฒด์— wettability๋ฅผ ํ–ฅ์ƒ์‹œํ‚ค๊ณ  ๋„๋ง‰์„ ํ˜•์„ฑ ์‹œํ‚จ๋‹ค.

* Spray ๊ฐ€ ๋ถˆ๊ฐ€๋Šฅํ•œ ๊ตฌ์—ญ์€ Trowel๋กœ์„œ build up์„ ํ•  ์ˆ˜๊ฐ€ ์žˆ๊ณ  sagging,slumping๋œ ํ‘œ๋ฉด์„ ๊ท ์ผํ•˜๊ฒŒ

๋งŒ๋“ค ์ˆ˜ ์žˆ๋‹ค.

d. Rolling

* Roller๋กœ์„œ ๊ท ์ผํ•œ ํ‘œ๋ฉด์„ ๋งŒ๋“ค์ˆ˜ ์žˆ๊ณ ,ํ”ผ๋„์ฒด์™€์˜ ๋ถ€์ฐฉ์„ ์ฆ์ง„ ์‹œํ‚ฌ ์ˆ˜ ์žˆ๋‹ค.

* ๋„“์€ ๋ถ€์œ„์—๋Š” ํฐ roller๋ฅผ ์‚ฌ์šฉํ•˜์—ฌ ํ‘œ๋ฉด์„ ๊ท ์ผํ•˜๊ฒŒ ๋งŒ๋“ค๊ณ  edge,corner์™€ ๊ฐ™์€ ์ข์€ ๋ถ€์œ„๋Š”

์ž‘์€ roller๋ฅผ ์‚ฌ์šฉํ•˜์—ฌ ๋งˆ๊ฐ์„ ํ•ด์ค€๋‹ค.

* Rolling์‹œ ๊ด€๋„ํ•œ solvent๋Š” curing time์„ ๋Š˜๋ฆด ์ˆ˜ ์žˆ๊ณ ,sagging์ด๋‚˜ slumping ๊ฐ™์€ ํ‘œ๋ฉด์„ ๋ฐœ์ƒ์‹œํ‚ฌ ์ˆ˜

์žˆ์œผ๋ฏ€๋กœ ํ•ญ์ƒ ์ ์ •์–‘์œผ๋กœ ์‹œ๊ณต์„ ํ•ด์•ผํ•œ๋‹ค.

e. Stipple coat ( if any )

Page 14: CHARTEK 7 Application Method - pds25.egloos.com

Progress ( 2nd coat ,stipple finish - if any ) - DFT check -

Before 2nd coat start, A DFT checking should be done at the 1st coated area

- Spray on the 1st coated surface -

A good fan makes the even surface and thickness A poor fan makes the irregular surface

Make the even surface and good wettability to substrate

( sagging,uneven surface )

- Trowelling -

Page 15: CHARTEK 7 Application Method - pds25.egloos.com

Progress ( 2nd coat ,stipple finish - if any ) - Rolling -

- Stipple finish -

to give a wide fan and a coarse surface.

Make the flat surface with a big roller at the big area Make the flat surface with a small roller at corner,edge

Stipple coat is produced by boosting chartek material temperature and raising pump pressure

Page 16: CHARTEK 7 Application Method - pds25.egloos.com

General Procedure

Surface Preparation -> Priming -> Masking -> 1st coat ,mesh installation ( stipple coat,if any )

2nd coat ( Stipple finish,if any ) -> De masking -> Final inspection -> Top coat

Before Final inspection

* 2nd coat๊ฐ€ ๋งˆ๋ฌด๋ฆฌ ๋˜๋ฉด ์ „์ฒด DFT ์ฒดํฌ ๋ฐ ๋„๋ฉด๊ณผ ์ƒ์ดํ•œ ์ ์ด ์žˆ๋Š”์ง€ ํŒŒ์•…ํ•œ๋‹ค.

* PFP์ž‘์—…์ด ๋๋‚œ ํ›„ ๋งˆ์Šคํ‚น์„ ์ œ๊ฑฐํ•˜์—ฌ ๋๋‹จ ์ฒ˜๋ฆฌ ๋ฐ ๋„์žฅ๋ถ€์œ„ ์˜ค์—ผ๋ถ€์œ„๋ฅผ ์ œ๊ฑฐํ•œ๋‹ค.

Final inspection

- Check Points -

* ์ž‘์—…๊ตฌ์—ญ์„ ์ „์ฒด์ ์œผ๋กœ ๋„๋ฉด๊ณผ ๋น„๊ตํ•˜์—ฌ ์ƒ์ดํ•œ ์ ์ด ์žˆ๋Š”์ง€ ์ฒดํฌํ•œ๋‹ค.

* ๋ชจ๋“  ๊ฒ€์‚ฌ๋Š” ์œก์•ˆ์œผ๋กœ ํ•˜๋ฉฐ ํ‘œ๋ฉด์— ๋…ธ์ถœ๋œ mesh , air pocket , hole ๋“ฑ์ด ๋ณด์—ฌ์ ธ์„œ๋Š” ์•ˆ๋˜๋ฉฐ,

๋๋‹จ ๋ถ€์œ„์˜ ์ฒ˜๋ฆฌ๊ฐ€ ๋ง๋”ํ•ด์•ผ ํ•œ๋‹ค.( detachment , all area cover )

* ํŠน๋ณ„ํ•œ ์š”๊ตฌ๊ฐ€ ์—†๋Š” ํ•œ DFT๋Š” ๊ทœ์ • ๋„๋ง‰์˜ 85% ์ด์ƒ์ด ๋˜์–ด์•ผ ํ•œ๋‹ค.๋งŒ์•ฝ , ๊ทœ์ •์— ์˜๊ฑฐํ•˜์—ฌ ํ–‰ํ•ด์ง„

DFT ์ฒดํฌ ๋ถ€์œ„๊ฐ€ ๊ทœ์ •๋„๋ง‰ ์ดํ•˜์ผ ๊ฒฝ์šฐ์—๋Š” ์ ์ • ๋„๋ง‰ ์ด์ƒ์œผ๋กœ build up ํ•˜์—ฌ์•ผ ํ•œ๋‹ค.

- DFT Check -

Location

* ๋ชจ๋“  ๋๋‹จ๋ถ€์œ„์˜ 1"์ด๋‚ด์˜ ๊ตฌ์—ญ์ด๋‚˜ web๊ณผ flange ์ ‘ํ•ฉ๋ถ€์œ„์˜ 1" ์ด๋‚ด์—๋Š” DFT ์ฒดํฌ๊ฐ€ ๋˜์–ด์ง€์ง€

์•Š๋Š” ๊ฒƒ์ด ์ถ”์ฒœ๋œ๋‹ค.

* DFT ์ฒดํฌ๋Š” ์ฝ”ํŒ…๋œ ์ „๊ตฌ์—ญ์— ๊ทœ์ •์— ๋งž๊ฒŒ random์œผ๋กœ ์ฒดํฌ๋˜์–ด์•ผ ํ•œ๋‹ค.

Frequency

* " I " sections , tee sections , channels

o Webs : 2 readings per meter length on each face

o Outer flanges : 2 readings per meter length on each face

o Inner flanges : 1 reading per meter length on each face

* Square or rectangular angles and hollow sections

o 2 readings per meter length on each face

* Circular hollow sections

o 8 readings per meter length spread evenly around the section

* Division and large flat plates

o 2 readings per 1ใŽก

Top coat

* Top coating์€ project์˜ ์š”๊ตฌ์— ์ ํ•ฉํ•œ color๋ฅผ ์‚ฌ์šฉํ•ด์•ผ ํ•˜๊ณ  , ๋‹ค์Œ๊ณผ ๊ฐ™์€ ํ™˜๊ฒฝ์— ๋Œ€๋น„ํ•˜์—ฌ

ํ•„์š”ํ•˜๋‹ค.

o Off shore environment installation

o Area of high UV exposure : chalking, color change

o Areas of high moisture exposure : splash zone

o Coarse sprayed finish : a stippled finish may collect airborne contaminants

* Top coat์ „ Chartek์€ ์™„์ „ํžˆ curing๋˜์–ด์•ผ ํ•˜๊ณ  , Overcoating interval์€ Maker ์ถ”์ฒœ์— ๋”ฐ๋ฅธ๋‹ค.

Page 17: CHARTEK 7 Application Method - pds25.egloos.com

Photo