charm update

13
(1/12) 22/05/14 – RadWG meeting J. Mekki CHARM Update J. Mekki

Upload: gusty

Post on 09-Jan-2016

41 views

Category:

Documents


3 download

DESCRIPTION

CHARM Update. J. Mekki. CHARM Update. Goal of the facility : Complex mixed particle field present within the accelerators Simultaneous effect (TID, DD, SEE ) - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: CHARM Update

(1/12)22/05/14 – RadWG meetingJ. Mekki

CHARM Update

J. Mekki

Page 2: CHARM Update

(2/12)22/05/14 – RadWG meetingJ. Mekki

CHARM Update

Page 3: CHARM Update

(3/12)22/05/14 – RadWG meetingJ. Mekki

East Area Facilities

24 GeV/c proton beam

Page 4: CHARM Update

(4/12)22/05/14 – RadWG meetingJ. Mekki

East Area Facilities

24 GeV/c proton beam

IRRAD proton facility

PH/DT

24 GeV/c proton beam

LHC experiments

Page 5: CHARM Update

(5/12)22/05/14 – RadWG meetingJ. Mekki

East Area Facilities

24 GeV/c proton beam

CHARMR2E Project

Page 6: CHARM Update

(6/12)22/05/14 – RadWG meetingJ. Mekki

East Area Facilities

24 GeV/c proton beam

Technica

l loca

l

Connection to

the ra

diation are

a

Page 7: CHARM Update

(7/12)22/05/14 – RadWG meetingJ. Mekki

East Area Facilities

24 GeV/c proton beam

Control roomDry run test

Page 8: CHARM Update

(8/12)22/05/14 – RadWG meetingJ. Mekki

East Area Facilities

24 GeV/c proton beam

Platform for the Dry Run test of

heavy equipment e. g. UPS,

Power converters

Page 9: CHARM Update

(9/12)22/05/14 – RadWG meetingJ. Mekki

CHARM

24 GeV/c proton beam

Page 10: CHARM Update

(10/12)22/05/14 – RadWG meetingJ. Mekki

Montrac conveyer

Page 11: CHARM Update

(11/12)22/05/14 – RadWG meetingJ. Mekki

News

Page 12: CHARM Update

(12/12)22/05/14 – RadWG meetingJ. Mekki

Thank you for your attention

Page 13: CHARM Update

(13/12)22/05/14 – RadWG meetingJ. Mekki

Varying Radiation FieldVarying Radiation Field

Lateral Positions

Lo

ng

itud

ina

l

Be

am

Po

s.

Full racks, crates, set of cards, componentsHEH: 107cm-2h-1 – 1010cm-2h-1, TID: 10mGyh-1 – 10Gyh-1

HEH: 108cm-2h-1 – 1011cm-2h-1

TID: 0.1Gyh-1 – 100Gyh-1

(gradients to be considered)

Beam Position

target in:HEH: >1011cm-2h-1 TID: >100 Gyh-1

target out:HEH: >1013cm-2h-1 TID: >10 kGyh-1