Page 1: ChaRM Process Example

Change Request Management

Expert Guided Implementation SAP Solution Manager 7.0 EhP1 SP24

Florian Georg Liebl [email protected]

Page 2: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 2

Date Name Alteration Reason Version

08.12.2010

15.12.2010

Florian Georg Liebl

Florian Georg Liebl

Creation

Extension

1.0

2.0

Page 3: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 3

INDEX

1 Example Urgent Correction 4

2 Example Normal Correction 22

Page 4: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 4

1 Example Urgent Correction

SAP Solution Manager / Transaction CRMD_ORDER:

� Choose Extra � Settings � Specific … and choose transaction type SDCR (Change Request).

� Now press the Button CHANGE REQUEST to create a new Change Request.

� First the status of the Change Request is “To Be Approved”.

Page 5: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 5

� Fill in all the blanks and choose Urgent Correction (SDHF) as Subject.

� If the following pop-up appears press “Yes” to continue.

Page 6: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 6

�The Change Manager has now to approve the Change Request � Choose Action “Authorize Change

Request”.

� The Change Manager has to assign the Change Request to a Maintenance Cycle if you have more than

one open for your landscape.

Page 7: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 7

� The status of the Change Request is now “Authorized” … use the Document Flow button to jump into

the Change Document (Urgent Correction) or use the transaction monitor CRM_DNO_MONITOR to

review all urgent corrections.

� First thing to do in the following document (Status: “Created”) is to “Set the Correction into

Development”, after that the developer can start working on it.

Page 8: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 8

� After pressing save you are asked to create one or several transport request(s), depending on the

changes you will be making (client independent or not):

� In our example we will be adding some entries which are client dependent so we only need a

transport request of type Customizing.

� Next thing to do is to logon to the system and check whether the transport request has been made.

For example, if your authorizations are not OK a transport request will not be created, so first check!

Alternatively you can check the Text Log by using the tab “Transaction Data”.

Page 9: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 9

� Press “ABAP” if the following pop-up appears in your system.

� The developer can log on to the development system and make some changes (for example in table

t009t). After that press save and choose button “Own Requests”.

Page 10: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 10

Select the corresponding Transport Request which has been created previously.

� Go to transaction SE09 (DEV-System) and release directly your transport task.

Page 11: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 11

� After the developer assigned some test instructions he can choose the action “Pass Correction to

Test” (back in the SAP Solution Manager).

Page 12: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 12

� Select the transport request that needs to be released and imported into the QAS-System.

� Press continue and the testers can start testing; since the import of the changes will be performed

automatically by the system (ChaRM) into the next system in the system track.

Page 13: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 13

� If you now take a look into the import queue (transaction: STMS_IMPORT) for this client/system you

will see that the transport request is imported; now people can start their testing. For an urgent

correction the import stays in the import buffer for later import with its related Maintenance Cycle.

� Open your urgent correction and Logon to the test system(s). Run your test and log your results in the

test report of your urgent correction:

Page 14: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 14

� Check the changes, and if OK, perform action “Confirm Successful Test” or reset the Status to “In

Development” if the test was not successful.

� The new status is called “Successfully tested”.

Page 15: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 15

� After that the Change Manager can release (reprove) the changes for Production. Press save and the

status will changed to “Authorized for Import”. The import in this case will NOT be performed

automatically. Imports into production always must be done at a chosen point in time!

� At this point the IT-Operator can perform the actions “Start Retrofit” or “Import Correction to

Production System”.

Page 16: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 16

,

� The transport requests remains in the import buffers for a re-import. After the phase "Go-Live" of the

Maintenance Cycle all imports belonging to the urgent correction will be re-imported together with

all normal corrections (by keeping the right sequence) and deleted afterwards from the import

buffer.

� After the Import into the Productive System check the correction and if everything is OK, perform the

action “Confirm Correction”.

Page 17: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 17

� After that you can perform the action “Complete Correction”.

� Press “Yes” to complete the correction.

Page 18: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 18

� If a retrofit system is maintained for the maintenance landscape a check will be performed whether a

retrofit has been performed or not. The Information occurs if the action “Start Retrofit” for the

urgent correction has not been performed.

Page 19: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 19

� The Urgent correction is completed now.

� Use the “Document Flow” button to jump into the preceding change request or use the transaction

monitor CRM_DNO_MONITOR to review all change requests.

Page 20: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 20

� Also the Change Request should be confirmed …

� The final Status is “Confirmed”.

Page 21: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 21

� Please note that there exists a separate task list for the urgent correction which is totally independent

from the task list of the project (maintenance cycle).

� The task list of an urgent correction always represents the shortest transport track to the target

system. This will be determined automatically for each urgent correction. You can use the report

/TMWFLOW/SCMA_BTCH_SYNC_UC to import urgent corrections that have been completed into

parallel production systems, or into parallel test systems by using the report

/TMWFLOW/SCMA_BTCH_SYNC_TEST.

Page 22: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 22

2 Example Normal Correction

Solution Manager / Transaction CRMD_ORDER:

� Choose Extra � Settings � Tab Specific … and choose transaction type SDMJ (Normal Correction).

� Now press the Button NORMAL CORRECTION to create a new Normal Correction.

� First the status of the Normal Correction is “Created” if you create the Normal Correction without a

Change Request. If you want to create a Normal Correction out of a change request choose

Normal Correction (Maintenance) as Subject (Recommended Procedure / see Example Urgent

Correction).

Page 23: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 23

� Fill in all the blank fields and enter a “Description of Change”.

Page 24: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 24

� After saving, choose one maintenance cycle if you have more than one open for your landscape.

Current Phase: Development without Release (or Development with Release)

� First action to perform is to set the normal correction to In Development. After that the developer

can start working on it. Press save ... and the normal correction get the status “In Development”.

Page 25: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 25

� Now create transport request(s) depending on the functionality you will be developing, you will

create Customizing, Workbench or both. In contrast to the urgent correction, this action will not

run automatically, but must be performed manually.

� Press “Save” and select what you want to create. The description of the correction is copied into

the Short Description of the transport request on the development system.

Page 26: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 26

� Now you can see that a transport request has been created, this is the transport number that you

will be using for all your changes belonging to this correction. You can perceive the number by

using the tabs “Transaction Data” � “Objects” inside your normal correction.

Page 27: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 27

� Now the developer can log on to the development system to perform his changes on the system.

� Make your change on the development system and assign it to the correct transport request when

saving the change. After pressing the button “Own Requests” you may see all transport requests

corresponding to your user.

Page 28: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 28

�Release your tasks (transaction SE09) and last leave the Development System (DEV). Now you can

go back to the normal correction on the SAP Solution Manager system.

� If your project phase is “Development without Release” the change manager now can switch the

project phase to “Development with Release” so that the developers can complete their

developments (Action: “Complete Development”).

� The recommended way to switch the project phase is via the cycle transaction. The project /change

manager can reach the cycle transaction (SDMN) through several ways:

� One possibility to reach the cycle transaction is via the transaction CRM_DNO_MONITOR.

Page 29: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 29

� Another possibility to reach the cycle transaction is to execute the task “Change Transaction in

Service Desk” within the task list.

� Please note that you always switch the phase for the whole project and not only for a single normal

correction.

Page 30: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 30

Current Phase: Development with Release

� The Developer can enter a “Test Instruction” for the Tester.

� Through the action “Complete Development” a test transport (transport of copies) will be created

and exported from the DEV-System. This test transport is now available in the following import

buffer (usually the import buffer of the QAS-System). A project manager / change manager can

schedule the task “Import Transport Request” for that QAS-System so that a unit test can be

performed on the QAS-System (the test transports are not present in the import buffer of the

production system).

Page 31: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 31

� The result is visible in the Import Queue of the QAS System (Client 802).

Page 32: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 32

�Another possibility to create a test transport is the corresponding action “Test Transport”. This

action does not lead to a status change. The normal correction still remains in status “In

Development”.

� Back to the standard workflow: The next status of the normal correction is “To Be Tested”.

Page 33: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 33

� The following activity should be performed either by an administrator or project / change manager.

By the help of the task list the test transport can be imported into the QAS-System.

� Go to the target system track and schedule “Import Transport Request (Background)”.

Page 34: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 34

� Choose some scheduling details and press “Schedule Job (F2)”.

� On the following pop-up window you can change some import options or just press “Continue”.

Page 35: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 35

� Now the test transport has been imported to the QAS-System (Client 802). The Developer or Tester

can log on to the QAS-System to verify his changes.

� The next step is to set the status to “Consolidated” via the action “Confirm Successful Test”.

Page 36: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 36

� Through this action the original transports will be released and put into the transport buffer of the

quality assurance system (not yet in the transport buffer of the production system). There they

will remain with all the other normal corrections (in status “Consolidated”) until the whole project

moves to the next phase.

Page 37: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 37

� After that the project / change manager can switch the phase from “Development with Release” to

“Test”.

Current Phase: Test

� Because the project (maintenance cycle) has reached the test phase you can schedule the import

of the original transport request into the quality assurance system via the task list. During the test

phase no further normal correction can be exported from the DEV-System. To fix errors during

the integration test so called test messages (SDTM) can be created.

Page 38: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 38

� After running the integration test the project / change manager can switch the phase to

“Emergency Correction”. This phase represents a finished test phase and allows the preparation

of the upcoming go-live.

Current Phase: Emergency Correction

� Now the project / change manager prepare the go-live and switch the phase to “Go-Live”.

Page 39: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 39

Current Phase: Go-Live

� During the go-live phase the IT-Operator can schedule the import of all normal corrections within

the status “Consolidated” (corresponding to the project) into the production system (including

the re-import of the urgent corrections) in the correct sequence.

Page 40: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 40

� Now go back to the normal correction and perform action “Set Production Status”. If you want to

change this status for many normal corrections you can use the report

CRM_SOCM_SERVICE_REPORT.

� This action checks if all transport requests belonging to that normal correction has been imported

successfully and set the status “Production” for that normal correction.

Page 41: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 41

� After that the project / change manager can switch the phase to “Completing”.

Current Phase: Completing

� Now the project / change manager can decide whether to complete the maintenance cycle

(recommended) or to switch the phases back to “Development without Release”.

Page 42: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 42

� Recommended option: Complete Maintenance Cycle.

� Now you can call the transaction SOLAR_PROJECT_ADMIN to create a new task list and start a new

maintenance cycle.

Page 43: ChaRM Process Example

Change Request Management - Process Example

EGI ChaRM – Process Description 43

� In case there are still open urgent or normal corrections no change processes will get lost. They will

be assigned to the next maintenance cycle.

� Now you can start with the developments for the next release.