Chapter 9
Project Management
Introduction
Effective project management requires a well-structured project and diligent oversight
A well-structured project consists of a series of finite, effective, well-defined tasks
The phases of a software development methodology define the tasks to be managed to some extent
Project Management Responsibilities
Establish project schedule Establish project budget Structure the project into units of work Assemble the project team Assign units of work to individuals Determine necessary resources Carry out risk assessment Monitor progress of project Ensure resulting system meets requirements
Software Metrics
Reasons to measure software:– To facilitate estimation of development time– To assess the productivity of developers– To assess the quality of the project
Current schools of thought:– Size-oriented– Function-oriented– Object-oriented
Size-oriented Metrics
Attempt to quantify software projects by using the size of the project to normalize other quality measures
Possible data to collect:– number of lines of code– number of person-months to complete– cost of the project– number of pages of documentation– number of errors corrected before release– number of bugs found post release
Problems with using Lines of Code (LOC) as Metric
Lines of source code comprising a project are not always good gages to the size and complexity of a project:– LOC to complete a task is language dependent
– Code reuse reduces LOC but requires more effort, thus well-design system are penalized
– Using a LOC based metric encourages programmers to create more LOC, which is ultimately less efficient to maintain
Function-Oriented Metrics
Attempt to measure the functionality of a software system
Use a unit of measure called function point Some possible function points:
– Internal data structures– External data structures– User inputs– User outputs– Transformations– Transitions
Issues with Using Function-Oriented Metrics
Requires that analysis and design of a project are completed before workload estimation can occur
Validity of the workload estimation is limited to the accuracy of the analysis and design
Complexity determination of function points is subjective
Object-Oriented Metrics
Suggested measurements for object-oriented systems:– Number of scenario scripts– Number of key classes– Number of subsystems
Disadvantages:– Excludes a history-base of non-object-
oriented projects
Quality Control Metrics
Correctness – Defects per thousand LOC
Maintainability – Mean time to change
Integrity– Likelihood of thwarting an attack
Usability– Skill required of users– Time required to become proficient– Net increase in productivity– Users’ attitude toward system
Other Project Management Concepts
Mythical staff-monthConfiguration managementChange controlConfiguration AuditConfiguration status reporting
Project Planning
Project planning requires:– Defining the iterations of the project– Specifying subtasks– Determining the project schedule and allocating
time for each subtask– Associating deliverables with each subtask to verify
progress– Dividing the subtasks among the developers– Scheduling any interdependent tasks to minimize
delays - use task network or PERT chart
Monitoring Project Progress
Develop project milestones with associated deliverables to gage progress
Milestones should be created so that the project manager receives sufficient feedback at regular intervals
The feedback should take the form of a natural artifact of the development process
See figure 9.9 for a list of deliverables
Four Stages of Team Development
FormingStormingNormingPerforming
Conflict Resolution Strategies
Arbitration Rules and regulations Confrontation Negotiation Separation Neglect Coordination device
Risk Management
Risk management provides a structured evaluation of a development project to draw attention to sources of risk
The need for risk management is demonstrated by the high failure rate for large-scale software development initiatives
Successful project management relies on the additional time that is built into the development schedule to accommodate some level of delay due to risk factors
What is Risk?
A risk is any unanticipated condition or event that causes one or more tasks to be delayed, lengthened, or fail
Risks can delay or prevent the completion of a task or project as a whole
Two very general categories of risk will be identified here, technical and human risk
Sources of Technical Risk
Project complexity Project size Use of state-of-the-art technology Network vulnerability Disgruntled employees Potential for white-collar crime Data attainability Accuracy of data source Need for high-quality graphics
Sources of Human Risk
Development team
– Productivity
– Experience
– Knowledge
– Dedication End users
– Technical knowledge
– Support for project
– Agreement on system
Administration– Budgetary
constraints– Project priority– Realistic
expectations
Consequences of Risk
Delay projectCompromise the quality of the
projectCause the project to failCause the project to be too
expensive to implement or run
Reducing Risk
Early project evaluation Early implementation of risky system
aspectsEarly use of new technologyEarly resolution of class interaction
problems