SD 8.1. PURPOSE
(a) To specify the responsibilities of the Market Operator, Transmission Network Provider, the System Operator, and other Users in Scheduling and Dispatch;
(b) To define the operational criteria for the preparation of the DispatchSchedule and issuance of Dispatch Instructions;
(c) To specify the process and requirements for the preparation of the Generation Schedule; and
(d) To specify the Central Dispatch process.
CHAPTER 8 SCHEDULING AND DISPATCHING
3
CHAPTER 8 SCHEDULING AND DISPATCHING
CHAPTER 8 SCHEDULING AND DISPATCHING
4
CHAPTER 8 SCHEDULING AND DISPATCHING
5
6
CHAPTER 8 SCHEDULING AND DISPATCHING
7
CHAPTER 8 SCHEDULING AND DISPATCHING
8
CHAPTER 8 SCHEDULING AND DISPATCHING
9
CHAPTER 8 SCHEDULING AND DISPATCHING
10
CHAPTER 8 SCHEDULING AND DISPATCHING
Thank you
CHAPTER 8 SCHEDULING AND DISPATCHING
• From SD 8.3.3.4
– Real-time snapshots
– Planned and unplanned outages
– VRE aggregated generation forecasts
– Reserve requirements
– Security constraints
– Contingency list
CHAPTER 8 SCHEDULING AND DISPATCHING
• From SD 8.4.2.2
– Nominations of available generating capacities for Dispatch of Energy and reserve
– Unplanned Outage and Scheduled Maintenance
– Other information which will pose additional constraints in the operation of their Generating Units