Chapter 4INFORMATION SYSTEM PROJECT MANAGEMENTPREPARED BY :
DIYANA BINTI KAMARRUDINFARAH IZZATI BINTI MOHAMMADNOR RAIHAN BINTI MD JOHARI
![Page 2: Chapter 4 INFORMATION SYSTEM PROJECT MANAGEMENT PREPARED BY : DIYANA BINTI KAMARRUDIN FARAH IZZATI BINTI MOHAMMAD NOR RAIHAN BINTI MD JOHARI](https://reader036.vdocuments.site/reader036/viewer/2022082401/56649e585503460f94b50dd1/html5/thumbnails/2.jpg)
INTRODUCTION
•On going process of directing and coordinating all phases of the systems development life cycle.
•Objectives :▫Deliver system that acceptable to users ▫Developed system within time and budget
•Project management is the process of :▫Planning▫Scheduling▫Controlling
![Page 3: Chapter 4 INFORMATION SYSTEM PROJECT MANAGEMENT PREPARED BY : DIYANA BINTI KAMARRUDIN FARAH IZZATI BINTI MOHAMMAD NOR RAIHAN BINTI MD JOHARI](https://reader036.vdocuments.site/reader036/viewer/2022082401/56649e585503460f94b50dd1/html5/thumbnails/3.jpg)
PLANNING
1. Specifying the task in terms of :▫Time▫Budget▫Staff
2. Determining the duration of the system project tasks3. Determine the resources needed to complete the work
![Page 4: Chapter 4 INFORMATION SYSTEM PROJECT MANAGEMENT PREPARED BY : DIYANA BINTI KAMARRUDIN FARAH IZZATI BINTI MOHAMMAD NOR RAIHAN BINTI MD JOHARI](https://reader036.vdocuments.site/reader036/viewer/2022082401/56649e585503460f94b50dd1/html5/thumbnails/4.jpg)
SCHEDULING
•Determining the dependency of the tasks•A popular tool is the use of a Gantt Chart
▫Shows tasks done against time by using the MICROSOFT PROJECT
▫Useful tools for planning and scheduling projects
![Page 5: Chapter 4 INFORMATION SYSTEM PROJECT MANAGEMENT PREPARED BY : DIYANA BINTI KAMARRUDIN FARAH IZZATI BINTI MOHAMMAD NOR RAIHAN BINTI MD JOHARI](https://reader036.vdocuments.site/reader036/viewer/2022082401/56649e585503460f94b50dd1/html5/thumbnails/5.jpg)
TRACKING AND MONITORING
•Tracking :▫Comparing actual progress of the system project to plan
•Monitoring ▫Gantt Charts are useful for monitoring the project’s
progress▫PERT / CPM are use for a more complex project
PERT / CPM is a project management tool used to estimate, schedule and manage a network of interdependent project tasks
![Page 6: Chapter 4 INFORMATION SYSTEM PROJECT MANAGEMENT PREPARED BY : DIYANA BINTI KAMARRUDIN FARAH IZZATI BINTI MOHAMMAD NOR RAIHAN BINTI MD JOHARI](https://reader036.vdocuments.site/reader036/viewer/2022082401/56649e585503460f94b50dd1/html5/thumbnails/6.jpg)
REPORTING• 3 types of reports :
1. Variance Critical in identifying when a project is off-track Less useful in identifying what is causing the problems
2. Status Open-ended report that details the process that led to the current
project state3. Resource allocation
Identifies resources in term of person-hours, equipments that are apply use for specific project tasks
• Status and resources allocation are more helpful in determining the source and possible correction of project’s problem