Chaplin Station Preliminary DesignOnline Consultation
Apr 25, 2012 to May 9, 2012
Preliminary Design by:
2
Chaplin Station Design Schedule
Open House #1 Apr 25, 2012
Online Consultation Apr 25 to May 9, 2012
Open House #2 Fall-Winter 2012
- Response to Open House #1 input
- Architectural treatments
- Final Station Design Open House
Open House #3 Early 2013 (TBD)
- Construction staging
- Ongoing Outreach on Construction
Tunnelling Construction Start Mid 2013 (TBD)
Chaplin Station Construction Start 2015 (TBD)
3
Aerial View
Chaplin Station Preliminary Design
4
Local Context
View East
Kay Gardner Beltline
View West Chaplin Cres. Parkette
• Eglinton Way BIA • Beltline Trail• Generally 26m ROW, but varies• 3 lanes of through traffic plus 2 HOV lanes, peak hours• On street parking, both sides - off hours• Turning lanes at Chaplin Crescent• Generous sidewalks - 4.75 to 5.0 wide• The Eglinton Way BIA– lighting, unit paving• Few street trees, in poor condition• Opportunity to improve public realm
5
Area Within 10 Minute Walk (500m) of Future Chaplin Station
proposed station
500m walking radius
existing roads
existing railway
Eglinton Ave W
Avenue R
d
Roselawn Ave
Chaplin Station Preliminary Design
6
Forest HillMemorial Arena
Multi-unit Residential
Eglinton Ave W
Avenue R
d
Roselawn Ave
C/R mixed use
Commercial
Institutional
Educational
Parks and Green Corridor
Recreational
Chaplin Station Preliminary Design
Land Use
7
Public Transportation
Forest HillMemorial Arena
Eglinton Ave W
Avenue R
d
Roselawn Ave
7 – Bathurst Routes
33 – Forest Hill Routes
Bus Shelters/Stops
Proposed Station Area
Proposed LRT Line
142-Downtown/Avenue Express Rd. Routes61-Avenue Rd North
14-Glencairn Routes
32-Eglinton West Route
Chaplin Station Preliminary Design
8
Pathway and Numbered Bikeways
Chaplin Station Preliminary Design
Numbered Bikeways
Belt Line
Eglinton Ave
9
Project Environmental ReportEA Layout - 2010
Chaplin Station Preliminary Design
10
2012 Consolidated LayoutStreet Level Plan
11
• Streetscape reconstruction – building face to building face• Length of streetscape work – Russell Hill Road to the bridge (210 metres)• Significant potential to enhance the public realm as per ESC urban design guidelines• Streetscape elements include:
• New consistent line of street trees• New sidewalks pavements with articulated furnishing zones• New road and pedestrian lighting
2012 Preliminary Streetscape Plan
Secondary Entrance West Secondary Entrance EastMain Entrance
12
New Preliminary Design ConceptLooking East
13
New Preliminary Design ConceptLooking West
14
Key Advantages of Consolidated Design• Improves look and feel for community
• Enhances access for communities to the west
• Enhances connectivity to Belt Line Trail
• Eliminates private property impact to Shoppers Drug Mart
• Preserves potential for future investment and development
• Shorter Station box reduces construction footprint, impact & costs
• Re-purposes Toronto Fire building for public use & preserves heritage(Toronto Fire is re-locating to a new facility)
Chaplin Station Preliminary Design
15
Main Entrance – North EastLooking East
Existing Future
Chaplin Station Preliminary Design
16
Main Entrance – North East
Existing
Future
17Secondary Entrance – South EastBefore & After
Chaplin Station Preliminary Design
Existing
Future
18
Secondary Entrance – South EastRe-purpose Toronto Fire Station & Maintain Heritage
Door Treatment Under Review
Chaplin Station Preliminary Design
19
Secondary Entrance – South WestLooking South
Today Future
Chaplin Station Preliminary Design
20
Secondary Entrance – South WestLooking West
Existing Future
Chaplin Station Preliminary Design
21
Station Box Massing South East Entrance
South West Entrance
MainEntrance
22
Longitudinal Section
Fire Ventilation ShaftPublic
MechanicalElectrical
Staff Areas
Chaplin Station Preliminary Design
23
Chaplin Station Preliminary Design
Pedestrian Circulation
24
Streetscape Section
• Proposed street section consistent with ESC urban design guidelines and the Eglington Way BIA details
• Sidewalks - 2.5m• Furnishing zone - 1.8m• Street trees - 10m on centre, flush with pavement
25
•New park design•Retained large trees on north edge•Generous paved areas are provided•New grove of large caliper trees•New bus layby on Chaplin with
new transit shelter•Potential pick-up area/taxi stand
on Gilgorm Road •New shortcut sidewalk on the north edge
Main Entrance Landscaping
26
Secondary Entrance West Landscape Concept (Ravine)
• New staircase with bike wheel ramp to access Beltline Trail
• Enhance the existing embankments with native plantings
• Provide a privacy fence at the end unit
27
East Secondary EntranceLandscape Concept (Fire Station)
• Public space in front of entrance including seating and bike rings• Security fencing on east property line
Chaplin Station Preliminary Design
Chaplin Station Community Outreach for Construction
28
Chaplin Station Preliminary Design
• At this early design stage, construction staging is not yet developed
• Comprehensive Construction Management Plan & individual construction plans for each station will be developed with local consultation well before construction
• Please contact us any time with questions you may have about construction
29
The Crosstown TeamPlease Get in Touch with Us!
Community Office Hours — 2012
Monday, Wednesday, Friday: 9:00 a.m. – 5:00 p.m. Tuesday & ThursdayPlease make an appointmentEvening hours and presentation available
Devin Horne, Franca Di Giovanni,Denise Jayawardene
E-mail: [email protected] Online: www.thecrosstown.caTel: 416-338-6310Fax: 416-397-8193TTY: 416-481-2523
Visit our West Community Office at1848 Eglinton Avenue West (at Dufferin)
facebook.com/thecrosstowntwitter.com/crosstownTO
Thank You
Chaplin Station Preliminary Design