QUESTION
The Government needs to build more housing. One
way is for housing associations to cut their
costs, thus enabling more houses to be built from the
existing cash. The Government has therefore
legislated to require housing associations to reduce
their total cost of ownership by 18% in 5 years,
without compromising quality, safety and energy
efficiency. TOTO includes construction and any other
costs that housing associations have to pay. How
will Procurement ensure that this reduction is
achieved?©C M Cram FCIPS
1. What actions would be needed to achieve the 18% reduction?
2. What procurement techniques would be required to deliver those actions?
3. What expertise would be needed?
4. What resources would be needed?
5. What is the gap between what exists now and what would be needed?
6. How might one bridge that gap?
7. Would collaboration help bridge that gap? If so, what should be the model?
Please also bear in mind the relationships, internal and
external, required to deliver the reduction.©C M Cram FCIPS
QUESTIONS TO CONSIDER
WHAT ACTIONS WOULD BE NEEDED TO HELP ACHIEVE THE 18% REDUCTION?
MANY ORGANISATIONS CREATE UNNECESSARY COSTS - For themselves and Suppliers?
• Indiscipline
• Different Procedures/Contract Ts and Cs
• Complexity – e.g. Tender Procedures
• Inappropriate Allocation of Risk
• Multiplicity of Tenders
• Multiplicity of ‘Duplicate’ Contracts and Contract Managers
• Framework Agreements: Paying Suppliers to Sell to Oneself
• Varied Specifications/Reinventing the Wheel
• Very Varied Capability
• Inconsistency of Expertise, Processes and Procedures
©C M Cram FCIPS
Different Specifications for the Same Product:• Tarmac• IT • Finance Systems• Outsourcings• Street Lighting• Construction• Waste Collection and Disposal• Commodities Goods and Services
Over-Elaborate Specifications
Who has the Best Specifications?
ORGANISATIONS CREATE UNNECESSARY COSTS – for Themselves and Suppliers
©C M Cram FCIPS
BE AWARE OF COSTS TO SUPPLIERSe.g. What is the Cost to Suppliers of Tendering?
• What is the Cost?
• What is the Cost of Duplicate Tenders?
• What is the Cost of Pre-Qualification Questionnaires (PQQs)?
• What is the Cost of Tendering when one has little choice of Winning?
• What is the Cost of a Good Tendering Team?
PROCESSES CAN CREATE COST FOR EVERYONE
TENDERING COSTS DISCRIMINATE AGAINST SMEs
©C M Cram FCIPS
HOW SUPPLIERS SEE THE PUBLIC SECTOR. IS THIS HOW THEY SEE HOUSING ASSOCIATIONS? (0-5)
Indiscipline 5
Different Procedures/Contract Ts and Cs 3
Different Processes 3
Complexity – e.g. Tender Procedures 2
Inappropriate Allocation of Risk 2
Multiplicity of Tenders 2
Multiplicity of ‘Duplicate’ Contracts and Contract Managers
5
Varied Specifications/Reinventing the Wheel 3
Very Varied Capability: Inconsistency of Expertise 2
Inability to Use Best Practice Techniques 2
Framework Agreements: Paying Suppliers to Sell to PS©C M Cram FCIPS
5
HOW ELSE TO TAKE OUT COST? TACKLE THE SUPPLY CHAIN
METAL FURNITURE
• Steel is 60% of Cost of Manufacture – 60 units of cost• Assume 20% Profit• Selling Price Equals 120 units of cost• Then Cost of Steel equals 50% of Selling Price• Reduce Cost of Steel by 20% (to 48 units of cost)• Then Cost of Manufacture Drops by 12% to 88% of Former
Cost• Add 20% Profit Margin (17.6% of former manufacturing
cost)• New Price: 105.6 Units
PRICE SAVING: 12%
©C M Cram FCIPS
HOW CAN ONE SAVE MONEY THROUGH PROCUREMENT?
Eliminate those Factors that Create Cost• Increase Leverage – Get Suppliers’ Attention• Better Quality/Appropriate/Consistent Contracts• Make Tendering Easier/Simpler• Expertise Available to All• Commodity Market Knowledge Available to All• Better/More Consistent Policy Implementation• Consistent Specifications
Use More Advanced Purchasing Techniques- Relationship Management- Supply Chain Management- Value Analysis- Market Management- Sophisticated Negotiation- Innovation
©C M Cram FCIPS
WHAT PROCUREMENT TECHNIQUES WOULD BE REQUIRED TO DELIVER THOSE ACTIONS?
WHAT EXPERTISE WOULD BE NEEDED?
Cost Reduction Priorities Importance 0-10
1. Increase Leverage
2. Consistent Contracts
3. Consistent Processes Procedures and Legal Interpretation
4. Excellent Contracts Management
5. Specialist Global Category Expertise6. Exceptional Contracting Expertise
7. Consistent Specifications8. Best Practice Techniques 1) Relationship Management 2) Supply Chain Management 3) Value Analysis 4) Market Management 5) Sophisticated Negotiation 6) Innovation 7) Better whole life costing 8) Better risk management9. Re-fresh Supplier Base
10. Committed Business Volumes
11. Greater Commercial Freedom© C M Cram
WHAT RESOURCES WOULD BE NEEDED?
WHAT IS THE GAP BETWEEN WHAT EXISTS NOW AND WHAT WOULD BE NEEDED?
Resource NeededResource
NowResource Needed
GapBenefit
£
Specialist Plumbing Procurement Expert 0 2 2 ?
Global cement procurement specialist 1 2 1 ?
Expert value analyst 1 3 2 ?
Exceptional contracting specialist 1 3 2 ?
TOTAL © C M Cram
HOW MIGHT ONE BRIDGE THAT GAP?
Implementation Risks Degree of Risk
0-10
How Far Can Risks be
Mitigated? (0-10
Staff Requirements Unaffordable 10 8
Unable to recruit specialists needed 8 7
Procurement has inadequate authority 98
Nearby housing associations lukewarm about collaborating
74
Internal indiscipline 1010
TOTAL © C M Cram
STORES AND STOCKHOLDINGS COSTS
Costs: Interest/Opportunity Cost 5%
Depreciation, Obsolescence and Redundancy
4-10%Handling
5%Storage
5%Insurance/Losses due to Fire and Flood
1.5%
WHY ARE STOCKHOLDINGS ALWAYS GREATER THAN THE STATED POLICY?
• Decide Outcome required and How its Achievement can be Measured
• Examine end to end Process. How far does it deliver the desired outcome?
• Examine and Map individual Processes
• Evaluate how essential each Process is to achieving the desired Outcome
• How much time does each Process take. What is its added Value?
• Re-design individual and End to End Process to Deliver Required Outcomes
• Introduce any Technology with Caution. No Point in Automating the Wrong Thing
WHO ARE THE BEST PEOPLE TO DO THIS? THE STAFF©C M Cram FCIPS
GETTING IT RIGHT
WOULD MORE STRUCTURED COLLABORATION/JOINT PROCUREMENT HELP BRIDGE THAT GAP? IF SO, WHAT
SHOULD BE THE MODEL?
Collaborative Model/ Objectives Note: All models incorporate some local procurement
As Now
Consortium
Geographical e.g. Greater Manchester
and Merseyside
National Integrated:
Central, Geographical,
Local
Strategic Management of Procurement. Save 18% TOTO in 5 years
Leverage
Consistent Processes Procedures and Legal Interpretation
Reduced Costs for Suppliers and Contracting Organisations
Access to Specialist Expertise (Contracting and Category)
Consistent Specifications
Best Practice Techniques
Accountability
Sustainable Procurement Org
High Levels of Service
TOTAL © C M Cram
JOINT PROCUREMENT CASE STUDY: RESEARCH COUNCILS
Where We Were in 2000 Loose procurement collaboration between 5
councils and some research institutions
Where We Are Now Shared Service Centre – Procurement, HR, IT,
Pensions, Office Services Membership of 8 Research Councils and over 60
Research Institutions Fully Joined up Service Providing Services to Other Public Bodies
©C M Cram FCIPS
ISSUES
Cost of Current Operations – Base-lining Work Volume of Current Operations Staff Concerned About Efficiencies Some Staff Not up the Job Directors of Procurement Unhappy Different Cultures Different Pay and Conditions Different Procedures, Processes, Finance
Systems
©C M Cram FCIPS
BENEFITS IN YEAR 1
Cash Savings of £10m Staff Savings of 15% Workload Increase of 15% Performance Measurement Costs Known Service Defined Full Transparency and Accountability Respect from Industry – Lower Costs
©C M Cram FCIPS
INDEPENDENCE
COLLABORATION
INTEGRATION
© C M Cram
HOUSING ASSOCIATION PROCUREMENT: THE FUTURE?
Colin M Cram
Marc1 Ltd
Tel: 01457 239894
Mob: 075251 49611
Email: [email protected]
www.marc1ltd.com
THANK YOU!