challenges in managing alberta transportation’s pavement ... · challenges in managing alberta...
TRANSCRIPT
Challenges in Managing Alberta Transportation’s Pavement Assets
2016 C-TEP Workshop
Moh Lali, Executive Director
TSB, Alberta Transportation
2016 C-TEP Workshop
Moh Lali, Executive Director
TSB, Alberta Transportation
2
Presentation Outline
• Why highways are important to Albertans and our economy
• Challenges we are facing overall in all budgets
• Challenges we are facing with our pavement network
3
“To provide a safe, integrated, innovative and sustainable transportation system that supports Alberta’s economy & quality of life”
Alberta Transportation’s2015-18 Business Plan
Our Mission / Desired Outcomes
Desired Outcomes:- Well-integrated, multi-modal transportation
system- Sustainability & affordability of system - Safe & secure transportation system- Support environmental stewardship &
quality of life
Highways support Alberta’s Priority on Economy
4
• $20 billion of commodities are imported & exported using trucks
• Support the efficient movement of people and goods within the province
Challenges Overall
5
• Major capital investments are needed to provide key infrastructures for economic growth
• Bridge and Road rehabilitation are both underfunded
• Cross-asset investment optimization of limited funding is a challenge
Bridge Pavement
Design Life
Aging of System:
Note – older bridges designed for shorter service lives, smaller loads
Challenges for our Provincial Highway Network
7
• More provincial highways than any other province
Deteriorating condition
• Network continues to deteriorate
– Poor: 14.6% in 2011 to 16.5% predicted in 2017
8
Vancouver Charlottetown4,400 km
9
50% of our highway network carries 80% of the traffic
Decreasing Function and Priority
10
Overweight loads causes damage
Aged Network Under Funded for Rehabilitation Treatments
Pavement Rehabilitation Deficits
12
2,662
3,846
5,128
5,873
6,877
8,339
10,485
11,340
12,454
13,401
14,425
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
0
500
1,000
1,500
2,000
2,500
3,000
2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024
Netw
ork
Defi
cit
(km
)
Year
Pavement Management System Output
Need Year and Consequence of Delaying Treatments
13
Age
Pa
vem
ent
Qu
alit
y I
nd
ex
Loss of Structural IntegrityAlternative 2(Recon-$1.5M/km)
Existing Performance
Need Year
Trigger Level
Alternative 1(OL-$300k/km)
Options to Extend Life of Pavements
18
Consequences of Delayed Rehabilitation Funding
• Convert paved highway back to gravel
Other Challenges
19
Other Challenges
20
Other Challenges
21
• Movement of large vessels
Other Challenges
22
• Congestion and safety
Other Challenges
23
• Changing Demographics of Drivers
• Knowledge Management of dept. and industry
• Integration of environmental considerations
Thank You
Questions?