Project Constraint/Challenges faced in 11 Tx site

RoW permission from Govt. Authority (City corporation, RAJUK) Regulatory permission (BTRC) Conflict with Building owner Adverse weather World Cup Cricket 2011 Fiber constraint Resource constraint Priorities of other project

Future Challenges & Solutions:

Page 3: Challenges Future Fiber Project

InternalInternalTP-OBPTP-OBP

1. Vendor provided fiber & patch shelf standardization according to GP Standard.

2. Road owner identification (RoW) during TR3. Building owner permission just 1 week after fiber TR4. End 2 End fiber loss during fiber acceptance 5. Transparent communication regarding fiber PAT6. Equal priority to fiber project7. Utilization of Go4fiber patch shelf.

Page 4: Challenges Future Fiber Project

InternalInternalTP-OBPTP-OBP

Major Stakeholders

CW_Fiber

ROMTP

SAAcceptance

Rollout

Page 5: Challenges Future Fiber Project

InternalInternalTP-OBPTP-OBP