challenger energy group plc

13
cegplc.com Challenger Energy Group PLC “New Company, New Vision” Suriname Energy, Oil and Gas Summit June 1, 2021 Randolph Hiscock Business Development Director

Upload: others

Post on 16-Oct-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Challenger Energy Group PLC

cegplc.com

Challenger Energy Group PLC“New Company, New Vision”

Suriname Energy, Oil and Gas SummitJune 1, 2021

Randolph HiscockBusiness Development Director

Page 2: Challenger Energy Group PLC

2 cegplc.comChallenger Energy Group Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Disclaimer

This presentation (“Presentation”) has been prepared by Challenger Energy Group plc (“CEG”) solely for purposes of providing introductory information on the Company and its projects. This Presentation should not be considered as the giving ofinvestment advice by the Company or any persons, including to any of its shareholders, officers or advisers. If you are in any doubt about the contents of this Presentation or the action you should take, you should consult an independent adviserauthorised to render such advice.

This Presentation has not been independently verified and is subject to material updating, revision and further amendments without notice. The Presentation does not purport to contain all information that an investor in the Company or its projectsmay wish to receive for the purposes of assessment or valuation of that investment and is not intended to form the basis of any investment decision.

While the information contained herein has been prepared in good faith, neither the Company nor its shareholders, directors, officers, agents, employees, or advisors give, has given or has authority to give, any representations or warranties (expressor implied) as to the achievement or reasonableness of future projections, management targets, estimates, prospects or returns contained in this presentation, or in relation to the accuracy, reliability or completeness of the information in thisPresentation, or any revision thereof, or of any other written or oral information made or to be made available to any investor (all such information being referred to as “Information”).

So far as permitted by law, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers take any responsibility for, or will accept any liability in respect of, the accuracy, reliability or completeness of theInformation or for any loss, howsoever arising from the use of this Presentation. In furnishing this Presentation, the Company does not undertake any obligation to provide any additional information or to update this Presentation or to correct anyinaccuracies in, or omissions from, this Presentation which may become apparent.

This Presentation contains certain statements which may constitute forward-looking statements. All statements in this Presentation, other than statements of historical facts, that address future activities and events of developments that the Companyexpects, are forward-looking statements. Although the Company believes that the expectations reflected in these statements are based on reasonable assumptions, such statements are only predictions and are subject to inherent risks anduncertainties and changes in the underlying assumptions which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward-looking statements. Factors that couldcause actual results to differ materially from those in forward-looking statements include market prices, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any suchstatements are not guarantees of future performance and that actual results or developments may differ materially from those projected in forward-looking statements.

The Company will not undertake any obligation to release publicly any revisions to these forward-looking statements to reflect events, circumstances or unanticipated events occurring after the date of this Presentation, except as required by law or byany appropriate regulatory authority. Nothing in this Presentation or in documents referred to in it should be considered as a profit forecast. Past performance of the Company or its shares cannot be relied on as a guide to future performance.

This Presentation does not constitute, or form part of or contain any offer or invitation to sell or issue, or any offer to subscribe for, underwrite or otherwise acquire, or dispose of, any securities in the Company in any jurisdiction and is directed at, andis only for distribution in the United Kingdom to persons reasonably believed to fall within Article 19 (Investment professionals) or Article 49 (High net worth companies, unincorporated associations etc.) of the Financial Services and Markets Act 2000(Financial Promotion) Order 2005 (SI 2005/1529) or to whom this Presentation may otherwise lawfully be distributed.

Neither this Presentation nor any part of or copy of it may be taken or transmitted, directly or indirectly, into the United States of America or Canada or distributed or re-distributed directly or indirectly, in the United States of America, its territories orpossessions, or Canada, or to any resident thereof except in compliance with applicable securities laws. Any failure to comply with these restrictions may constitute a violation of applicable U.S. or Canadian securities laws. This Presentation and theinformation contained herein do not constitute an offer of securities for sale in the United States. By accepting this Presentation, the recipient represents and warrants that it is a person to whom this Presentation may be delivered or distributedwithout a violation of the laws of any relevant jurisdiction. This Presentation is not to be disclosed to any other person or used for any other purpose and any other person who receives this Presentation should not rely or act upon it.

The delivery or distribution of this Presentation in or to persons in certain jurisdictions may be restricted by law and persons into whose possession this Presentation comes should inform themselves about, and observe, any such restrictions. Anyfailure to comply with these restrictions may constitute a violation of the laws of the relevant jurisdiction.

By attending a meeting where this Presentation is made or distributed, or by reading the Presentation slides, you agree to be bound by these provisions.

Page 3: Challenger Energy Group PLC

3 cegplc.com

Challenger Energy Group Overview

The Bahamas: offshore longer-term upside

Trinidad and Tobago – Saffron project & onshore producing fields: growing production & cashflow

Suriname – onshore Weg Naar Zee project:

infrastructure-led sales and cashflow

PRODUCTION ASSETS

Trinidad and Tobago: onshore SWP –‘on the doorstep’

EXPLORATION ASSETS

Uruguay: offshore low cost hi upside optionality

Challenger Energy Group Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 4: Challenger Energy Group PLC

4 cegplc.com

Challenger Energy - Caribbean and Atlantic Margin Exploration Portfolio

TRINIDAD BAHAMAS

• P1 validated a competent seal, good reservoir quality, charge & the structural model; working petroleum system points to hydrocarbon potential remaining in independent, untested play systems and structures

• Focus shifted to deeper high graded Jurassic subsalt play

• Integrate P-1 data, renew licences, reprocess 3D and farm-out process based on untested Jurassic play

• 9 Saffron ‘look-alikes’ identified; c.230 mmbbl prospect inventory

• Targeting potential new fields capable of each producing at least 2,000 bopd

• Confirm prospect validity and mature to drillable status

• ‘On the doorstep’

• Significant prospect inventory to work with

• Post Perseverance-1, reprocess 3D for Jurassic

• Licence renewal

Challenger Energy - Presentation to UK Investor Magazine – 25 May 2021

• Play analogous to offshore Guyana and Suriname. Existing wells and data

• US$800,000 commitment over 4 years initial term. No drilling obligation

• ANCAP mapped Early Cretaceous (Lenteja) prospect, estimated resource volume (EUR P50) = 1.4 bnboe

URUGUAY

• Low-cost optionality

• Farm-in potential

Challenger Energy Group Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 5: Challenger Energy Group PLC

5 cegplc.com

Suriname Onshore - Weg Naar Zee Block…near term production

Note: cash flow estimates presented are based on US$60 / bbl oil price

• Weg Naar Zee (WNZ) PSC in Suriname secured in 2019

— 70 historic wells; modest 2D seismic coverage;

up to 24 mmbbls STOIIP identified in 10 pools (c. half in a single pool)

• WNZ well and EWT scheduled for July 2021, to establish producibility

— Operations support from Trinidad

— Production leads directly to refinery sales in proximity

• A successful well will enable a broader development

WNZ core metrics (projections)

WNZ Initial Phase

• Production: 100 bopd

• Cost: appraisal well and EWT - $0.75m |4 additional production wells

• ROI 100%+ | Payback < 3 years

WNZ field-life metrics (~20-year)

• Production: 900 – 1,000 bopd (peak)

• Wells: up to 50 wells | 3.5 mmbbl 3C resource

• Gross capex: up to US$15m

• ROI ~70% | Payback <3 years

Challenger Energy Group - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 6: Challenger Energy Group PLC

6 cegplc.com

Suriname Onshore - Weg Naar Zee Block…pending drilling

Challenger Energy Group - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 7: Challenger Energy Group PLC

7 cegplc.com

Trinidad Onshore – Drilling started at Saffron-2

• Saffron-1 well (March 20) resulted in a discovery

— Located in South West Peninsula of Trinidad

• Saffron-2 appraisal well May/June 2021, to assess field producibility

— High CoS given drilling a known discovery, same location as Saffron-1

— Field activity underway

— 30-day drilling timetable; production leads directly to sales

• Successful well will enable a full field development

Saffron core metrics (projections)

Saffron-2

• Production: 200 - 300 bopd

• Cost: $3m

• ROI 200%+ | Payback < 2 years

Initial phase post Saffron-2

• Wells: 5 - 9 additional in 2021

• Production: 1,000 - 1,500 bopd

• Gross capex: $15m - $20m

Saffron field-life metrics (15-years)

• Production: 4,000 bopd (peak)

• Wells: Up to 30 wells | 11 mmbbl field

• Gross capex: up to $60m

• ROI ~90% | Payback <3 years

Challenger Energy Group - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 8: Challenger Energy Group PLC

8 cegplc.com

Trinidad - Saffron 2 ….low risk appraisal

Lower Cruise Depth Structure Map

Saffron-2

Saffron-2

Saffron-2 Location

Challenger Energy Group - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 9: Challenger Energy Group PLC

9 cegplc.com

Trinidad Onshore Production Growth

Number(#)

Production(bopd)

Cost($k)

Well remediations Up to 10Up to 30 per well

10 - 50 each

Additional perforations 5+Up to 20 per well

25 - 50 each

Infill drilling locations 10+ 50+ per well 1,500 per well

Disciplined technical work is being applied across the Trinidad portfolio in pursuit of production growth

Sustaining and growing existing baseline production

• Remediation of existing wells

• Incremental production from existing wells

• New infill wells

• Automation - Weatherford/BPC automation trial

• Projects - CO2 injection in AT5X

New production from ‘ready to go’ projects in known, discovered fields

• Seeking to mature two new field developments within existing producing fields

• Remodel existing wells; assess pressure compartments

• New wells to access undrained resource

Challenger Energy Group, plc - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 10: Challenger Energy Group PLC

10 cegplc.com

Uruguay Exploration Area OFF-1…targeting Cretaceous turbidites

AREA OFF-1

Challenger Energy Group, plc - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

• Awarded Area OFF-1, offshore Uruguay in 2020, awaiting ratification from ANCAP.• Block size is 15,000 km2, lies on the shelf to slope margin of the Punte del Este basin in water depths from 20 to 1,000m • Minimum Period 1 work program is to licence and process 2,000 kms of 2D seismic in the 4 year exploration period.

Page 11: Challenger Energy Group PLC

11 cegplc.com

Challenger Energy - 2021 & 2022 Forward Plan

1H 2021 2022

Licences (activity)

SWP (Saffron appraisal)

SWP (Saffron development)

Goudron(Production enhancement / water injection)

Inniss-Trinity (CO2 pilot)

Trinidad Exploration (3D reprocessing)

Weg Naar Zee (Extended well test)

Weg Naar Zee (Development wells)

T&T production fields (Development / infill wells)

Bahamas (Farmout , licence renewal)

Bahamas (Exploration – drill or drop)

Uruguay(Early stage exploration / seismic reprocessing)

NOTE: 2021 / 2022 indicative schedule subject to change and further operational announcements by the Company MilestonesOnshore drilling

2H2021

Challenger Energy Group - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

Page 12: Challenger Energy Group PLC

12 cegplc.com

Challenger Energy Group

The Bahamas: offshore longer-term upside

Trinidad and Tobago – Saffron project & onshore producing fields: growing production & cashflow

Suriname – onshore Weg Naar Zee project: infrastructure-led sales and cashflow

PRODUCTION & CASHFLOW ASSETS

Trinidad and Tobago: onshore SWP – ‘on the doorstep’

EXPLORATION ASSETS

Uruguay: offshore low cost optionality

PORTFOLIO E&P BUSINESS FOCUSSED ON CARIBBEAN & ATLANTIC MARGIN

✓ 4 countries, 13 licences✓ Existing production and clear route to production

and cashflow growth✓ Long-term low cost exploration upside

Challenger Energy Group - Presentation to Suriname Energy , Oil & Gas Conference – June 1, 2021

“Corporate Reset” to place Challenger Energy in position to deliver

• Regional champion – the only full cycle E&P player in the region

• Committed & aligned management team with sector and regional expertise