ch 8 material handling

18
1 Important concepts in Material Handling Material Handling Unitization Palletisation Containerization Inter-modal transportation and related benefits Lead-time Cost

Post on 14-Sep-2014

3.672 views

Category:

Business


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Ch 8 material handling

1

Important concepts in Material Handling

Material Handling UnitizationPalletisationContainerization Inter-modal transportation and related benefits

• Lead-time

• Cost

Page 2: Ch 8 material handling

2

Material handling Definition: “the art & science of moving, packing &

storing substances in any form” * Receiving, moving, storing, dispatching activities* Impact on Quality, cost [capital as well as running],

Delivery & Safety Objectives of material handling1. Movement minimization2. Cost minimization3. Time minimization* Commonly used equipment- forklifts, EOT

Cranes, hoists, pulley blocks, trolleys, railroad cars, conveyers, ropes, slings, carousels, sortations, robotics

Page 3: Ch 8 material handling

3

Unitization, unit loads

Page 4: Ch 8 material handling

4

Benefits of Unitization & unit loads1. Ease of movement2. Standardization of handling equipment, 3. methods and training4. Reduction in time and cost of handling5. Inbound shipment checking is simplified6. product protection is improvedExamples: bottles in crates, steel sheets in coils,

steel ropes in coils etc. container is an example of unit load.

Page 5: Ch 8 material handling

5

Page 6: Ch 8 material handling

6

Palletization

Pallet is a Unit load platform

Page 7: Ch 8 material handling

7

Benefits of Palletization

1. Unit load is secured on a pallet, pallet provides a secure base for the unit load

2. Leads to containerization, container is a (unit load) self contained, ie., unitized and palletized, shipping unit

3. Facilitates use of standardized handling equipment like a forklift or a crane

4. Palletized unit loads bring down time of handling and cost of handling

5. Ensures safe handling

6. Product is well protected

Page 8: Ch 8 material handling

8

Types of pallets1. Wooden pallets 2. Plastic pallets3. Composite pallets4. Refrigerated pallets: self-contained shipping

units for refrigerated materialsPallet poolscentral pools to collect pallets and issue pallets to

global business

Page 9: Ch 8 material handling

9

HOIST

EOT

Page 10: Ch 8 material handling

10

pulley block

forklift

Page 11: Ch 8 material handling

11

conveyers

Page 12: Ch 8 material handling

12

Automatic Guided Vehicles

Page 13: Ch 8 material handling

13

Page 14: Ch 8 material handling

14

Principles of material handling1. Planning - high impact on cost2. Integration – material handling decision

should be part the corporate strategy-foundation, floors, layout, product

3. Standardization –handling methods, equipment, software

4. Work – minimum handling5. Ergonomics – tasks, equipment and human

beings6. Use of gravity-always use gravity to

advantage

Page 15: Ch 8 material handling

15

7. Unit load- handle only in unit loads8. Space utilization- use space and not area,

EOT rather than F/Ls 9. System – integrate handling & storage (O/H

tanks and pipe lines) and form Operational Material Handling System

10. Auomation - need based 11. Environment - explosive?

Page 16: Ch 8 material handling

16

Signs of Poor Material Handling1. Cluttered floor2. Accidents 3. Excess inventory4. High waiting time, high Through Put Time,

poor flow of material5. Excessive handling6. Poor quality of product, high scrap7. Lack of standardization8. Poor use of skilled labor

Page 17: Ch 8 material handling

17

Material handling system Types of Material Handling Systems: Manual,

mechanized, automatic, computerized Elements of the system: human, equipment,

storage, packaging Equipment selection & Purchase1. Full utilization of existing equipment2. Overall cost reduction3. Standardization 4. Integration with current system5. Alternate methods – production should not

halt

Page 18: Ch 8 material handling

18

6. Facility limitation, building, floors etc7. Future plan8. Maintenance support9. Life cycle cost