cg-9335 c4isr project dashboard report date: 12/02/2009

10
CG-9335 C4ISR Project Dashboard Report Date: 12/02/2009  United States Coast Guard Organization Total Activities Completed Percentage of Activities Completed SV MA Management's Detailed Assessment C2CEN Lab Project 5 of 34 15%  11/25/2009 - 153AB IBR was held on November 16-17 in Moorestown. The contractor was given several contingencies as action items to be corrected before final approval. Cable production and configuration are currently being Deepwater Segment 2 (MSAM Compliance) 40 of 123 33%  11/12/2009 - NSTR Deepwater Segment 3 7 of 101 7% 10/21/2009 - Segment 3 is on track to go to the ADE1 briefing in February and has received funding to proceed with the PORD and ORD for 2010. Sentinel C4ISR 9 of 94 10%  11/13/2009 - Sentinel CDR is scheduled for 17 - 19 Nov 09 at PRO Lockport. There are no C4ISR CDRL's open for review. Current activities include preparing to attend CDR, preliminary C4ISR project resource requirements planning, and reviewing the Sentinel DT&E plan. Schedule Variance legend: High (>20%) Medium (10-20%) Low (<10%) Completed Management's Assessment legend: High severity risks - considerable schedule delays Medium severity risks - tasks slightly behind schedule On-target

Upload: shannon-skinner

Post on 18-Nov-2014

232 views

Category:

Documents


3 download

TRANSCRIPT

CG-9335 C4ISR Project Dashboard Report Date: 12/02/2009United States Coast GuardOrganization Total Activities Completed 5 of 34 40 of 123 7 of 101 Percentage of Activities Completed 15% 33% 7% SV MA Management's Detailed Assessment 11/25/2009 - 153AB IBR was held on November 16-17 in Moorestown. The contractor was given several contingencies as action items to be corrected before final approval. Cable production and configuration are currently being 11/12/2009 - NSTR 10/21/2009 - Segment 3 is on track to go to the ADE1 briefing in February and has received funding to proceed with the PORD and ORD for 2010. 11/13/2009 - Sentinel CDR is scheduled for 17 - 19 Nov 09 at PRO Lockport. There are no C4ISR CDRL's open for review. Current activities include preparing to attend CDR, preliminary C4ISR project resource requirements planning, and reviewing the Sentinel DT&E plan.Management's Assessment legend:

C2CEN Lab Project Deepwater Segment 2 (MSAM Compliance) Deepwater Segment 3

Sentinel C4ISR

9 of 94

10%

Schedule Variance legend:

High (>20%)

Medium (10Low 20%) (