ceyhun atuf kansu cad. bayraktar center g blok no: 114 ... · ceyhun atuf kansu cad. bayraktar...

23

Upload: others

Post on 04-Oct-2020

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and
Page 2: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

Ehlibeyt Mah.Ceyhun Atuf Kansu Cad.

Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA

w w w . n f b . c o m . t r

w w w . n f b . c o m . t r1

Page 3: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

engineering and consultancy inc.

about us

Founded by FAYİK TURAN in 2009, NFB is committed to providing high quality services to public and private sector organizations and institutions in the field of engineering and consulting. NFB Engineering and Consulting offers comprehensive solutions on Energy, Irrigation and Drainage, Flood Control and Protection, and Drinking - Potable Water Supplyand Urban Infrastructure consultancy, feasibility and final design services with its trained personnel.

DAMS & IRRIGATION WATER SUPPLY SYSTEMS Feasibility

Master PlanFinal and Detailed Design

FLOOD CONTROL & CHANNEL IMPROVEMENT Feasibility

Final and Detailed Design

RISK MANAGEMENT & INUNDATION MAPPING 1D/2D Hydraulic Modelling

Flood MappingRisk Analysis

DRINKING – USAGE WATER & STORM – SEWER SYSTEMSFeasibility

Master PlanFinal and Detailed Design

ENERGYFeasibility

Final and Detailed DesignTechnical, Economical,

Environmental Evaluation And Financial AnalysisSite Supervision And Project Control

Privatization ProcessFinancial Analysis

•••

•••

•••

•••

••

•••

w w w . n f b . c o m . t r3

w w w . n f b . c o m . t r

2

Page 4: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

Uşak-Eşme Ulubey Kışla Dam

Uşak-Eşme Bozlar Dam

• Purpose of the study was to prepare feasibility and final design projects for five dams to provide irrigation water to agricultural lands in City of Uşak, Turkey.

• In addition channel improvement projects were completed for 8-km long Dokuzsele Creek in the center of city of Uşak.

• All the necessary hydrological, water resources management, hydraulic and design studies were completed for all the structures and pipeline in the scope of the study.

Uşak-Eşme Bozlar

Dam and Irrigation

Uşak-Eşme Ulubey Kışla

Dam and Irrigation

Uşak-Merkez-Sorkun Flood Control Dam

Uşak-Eskisaray

Dam and Irrigation

Project Name:2nd Region Gölsu Uşak Region Projects Feasibility and Project Design Engineering Services

Client: DSİ 2nd Regional Directorate, İzmir

Year :2011- 2013

P R O J E C T SDAM & IRRIGATION WATER SUPPLY SYSTEM DESIGN

w w w . n f b . c o m . t r

4

Page 5: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

• Beydağ Dam is constructedto provide irrigation waterto 17 829 ha of land along Küçük Menderes River in Ödemiş Valley. After taken into operation, insufficient amount of water was flowing towards the reservoir from dam’s basin. Therefore, this project has been tendered by DSI to prepare preliminary and final design projects for 9 weirs and pipeline system that will divert water from other basins to supply irrigation water to Beydağ Dam.

• All the necessary hydrological,water resources management,hydraulic and structural designstudies were completed for allthe weir structures and pipelinesystem in the scope of the study.

P R O J E C T SDAM & IRRIGATION WATER SUPPLY SYSTEM DESIGN

Project Name:Additional Water Supply to İzmir Beydağ Dam Feasibility and Final Design Project

Client: DSİ 2nd Regional Directorate, İzmir

Year :2014

Kanlı Weir

Transmission Line

Mutaflar Weir

w w w . n f b . c o m . t r

6

Page 6: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

Ermenek Yukarı Çağlar Dam

Çorum Orataköy Daniş Dam

Manisa Kula Eroğlu Dam

• Karaman Ermenek Yukarıçağlar Dam and Irrigation System Design - DSİ 4th Regional Directorate, Konya

• 4th Region Application Based (Karaman Sarıveliler Göktepe Esentepe Dam and Irrigation) Final Design - DSİ 4th Regional Directorate, Konya

• 5th Region Application Based Final Design (Corum-Ortaköy Daniş Pond) - DSİ 5th Regional Directorate, Ankara, 2013

• Izmir Districts Lowland Irrigation Planning Engineering Services Work - Eser Proje ve Mühendislik A.Ş., 2012

• Mus Alparslan II Project, Muş Lowland Gravity Irrigation Alternative Evaluation Report, DSİ General Directorate, Ankara, 2012

• Edirne-Keşan-Seydiköy Dam and Irrigation Feasibility Report and Engineering Services - DSİ 11th Regional Directorate, Edirne, 2011

• 2nd Region Gölsu Usak Region Projects Feasibility and Design Engineering Services - DSİ 2nd Regional Directorate, Izmir, 2013

• Balıkesir Region Dams Feasibility Report Design Engineering Services DSİ 25th Regional Directorate, Balıkesir, 2013

• Kavaktepe Project Feasibility Report Design Engineering Services - DSİ 20th Regional Directorate, Kahramanmaraş, 2014

• Eskisehir Gündüzler Dam Water Supply Feasibility Report , DSİ 3rd Regional Directorate, Eskisehir, 2013

• Bartın Province Dams Feasibility and Final Design Engineering Services - DSİ 23rd Regional Directorate, Kastamonu, 2014

• 6th Region 6th Group Dams Feasibility Consultancy Services -DSİ 6th Regional Directorate, Adana, 2013

• 2nd Region Gölsu Manisa Province Projects Feasibility and Design Engineering Services - DSİ 2nd Regional Directorate, Izmir

• Sakarya Project Seyfiler - Karasu Pumping Irrigation Feasibility Revision Report , NFB Engineering & Hidrodizayn Engineering Partnership, DSİ 3rd Regional Directorate, Eskisehir, 2012

• Çanakkale Bayramic-Çan-Yenice Dams Feasibility Engineering Services - DSİ 25th Regional Directorate, Balıkesir, 2014

• Bayburt Province Dam and Irrigation Feasibility Report and Project 2nd Section Consulting Services - DSİ 22nd Regional Directorate, Trabzon, 2014

• Göksun Irrigation Project Rehabilitation and Salyan Dam Feasibility Report Engineering Services - DSİ 20th Regional Directorate, Kahramanmaraş, 2014

• Additional Water Supply to Izmir Beydağ Dam Feasibility and Final Design Engineering Services -DSİ 2nd Regional Directorate, Izmir, 2015

• Izmir Kemalpaşa Armutlu Dam Feasibility Services - DSİ 2nd Regional Directorate, Izmir, 2013

• 2nd Region Gölsu Project Feasibility and Design 3rd Section Consulting Services - DSİ 2nd Regional Directorate, Izmir, 2015

• North Aegean Basin Master Plan Report - DSİ General Directorate, Ankara, 2017

• Sakarya Basin Master Plan Preparation Consultancy Services - DSİ 3rd Regional Directorate, Eskisehir, 2016

• Sarayönü Beşgözler Project Feasibility Revision - DSI 4th Regional Directorate, Konya, 2018

• Ciy of Kütahya Altıntaş - Yeşilyurt Dam Feasibility Report - DSİ 3rd Regional Directorate, Eskisehir, 2018

• 6th Region 9th Group Dams Feasibility and Design - DSİ 6th Regional Directorate, Adana, 2018

• Adıyaman-Tut Öğütlü and Gerger Kesertaş, Gaziantep-İslahiye Çubuk1 Dams and Irrigation Feasibility Report Project - DSI 20th Regional Directorate, Kahramanmaraş, 2017

• Sivas Merkez Başsöğüt Dam Final Design, 2018

• Assessment of Water Leakage from Manisa Gördes Dam - DSI 2nd Regional Directorate, Izmir, 2015

C O M P L E T E D K E Y P R O J E C T SDAM & IRRIGATION WATER SUPPLY

SYSTEM DESIGN

w w w . n f b . c o m . t r

8

Page 7: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

O N G O I N G K E Y P R O J E C T SDAM & IRRIGATION WATER SUPPLY

SYSTEM DESIGN

• Büyük Menderes and WesternMediterranean Basins DamFeasibility Services - DSİ 21stRegional Directorate, Aydın

• Eskisehir Mihalıççık Dereçatı, Bilecik-Gölpazarı Turkmen Dams FeasibilityReport - DSİ 3rd Regional DirectorateEskisehir

• DSI 20th Regional Directorate 1st Group Dam Irrigation Projects(Hidro Dizayn Engineering & Nfb Engineering Business Partnership) - DSİ 20th Regional Directorate, Kahramanmaraş

• Trabzon Province Dams DrinkingWater Supply Consultancy Services

• 22nd Region Dam And IrrigationPlanning Report 5th SectionConsultancy Services

• Bolu Province Dams 2nd GroupFeasibility Report

• Balıkesir Dursunbey - Gönen- Sındırgı - Susurluk Kayler(Dursunbey-Göbül, Gönen -Kavakoba, Sındırgı - Düvertepe,Surniture - Kayıkçı) DamsEngıneering Services

• Eskişehir - Mihalıççık Kozlu Andİkizafer Dams Feasibility ReportConsultancy Services

• Eskişehir - Mihalıççık Seki And KavakDams Feasibility Report And DesignWork

• Sivas Altınyayla Taşlıhöyük Dam AndIrrigation Feasibility and Final DesignServices

w w w . n f b . c o m . t r

10

Page 8: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

• Purpose of the study is to prepare master plan report for one of the 25 watersheds in Turkey. The North Agean Basin area is approximately 10.000 km2.

• The basin covers highly populated cities such as İzmir, Manisa, Balıkesir, and Çanakkale.

• Within the scope of Kuzey Ege Basin water availability study, the natural and existing condition flows of gaging stations located on the main streams and facilities which are planned, under construction and under operation, have been analyzed.

• Optimal irrigation systems and methods for water saving in irrigation projects were determined to maximize the agricultural benefit obtained from water.

• Calculations and examinations of future water potential status for the years 2025 and 2050, have been carried out and results are presented in the scope of this report. Existing and future drinking and industrial water demand was calculated and all of the drinking water facilities as well as treatment plants were investigated. Population projections were carried out to determine future potable water demand. Possible Water supply amounts available were calculated to determine possible future projects.

• Groundwater balances of Kuzey Ege Basin aquifers prepared by DSİ, have been given in the interim report. In the scope of conclusive studies of master plan, after the completion of

field surveys and desk studies, the groundwater balances of sub basins were determined.

• In order to organize Source-Supply balance and basin water budget in the Kuzey Ege Basin, current and proposed facilities have been evaluated and total consumption has been calculated.

• Existing and proposed facilities within the Kuzey Ege Basin have been reviewed by taking the current meteorological and hydrological data into account.

• Analysis results of the gauging stations at which surface and groundwater quality are observed currently in the Kuzey Ege Basin, taking the “Surface Water Quality Management Regulations” into account, have been evaluated.

• In order to ensure long term sustainability of the existing and proposed projects, evaluating the analysis results according to the “Water Quality Management Regulations” and the other legislations, point and nonpoint sources of water pollution in the basin have been determined and calculated. Protected areas such as national park, special environmental protection area, natural park and wildlife protection area available in the Kuzey Ege Basin have been determined.

• Flood damages in the basin were analyzed and flood control facilities were invesitgated and new ones were proposed within the report.

P R O J E C T S MASTER PLAN REPORT

Project Name:Preparation of North Agean Basin Master Plan Report

Client: DSİ General Directorate, Ankara

Year :2017

w w w . n f b . c o m . t r13

w w w . n f b . c o m . t r

12

Page 9: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

• Preparation of Watershed Master Plan Report for the fourth largest basin (60,000 km2) in Turkey.

• Sakarya Basin Master Plan Report” has been prepared as a result of study consisting of; determining current and future water potential and usage from water sources (surface, underground and spring), determining drinking and industrial water requirements and water rights, estimating population and water need projections and users’ drinking water supply requirements, land resource of the basin, existing land usage, irrigation potential and requirement and putting forth the alternatives for irrigation methods and sources, the problems of sites having insufficient drainage and solution suggestions, investigation of existing structures such as dams, weirs, tunnels, wells, pumps, water supply networks, water treatment plants, irrigation, drainage and flood facilities, flood damages have been completed and new structures and systems

which have been found to be technically, economically and environmentally feasible have been proposed. Special attention was given to sectoral needs and resource allocation that would be made in a way to meet the requirements.

P R O J E C T S MASTER PLAN REPORT

Project Name:Preparation of Sakarya Basin Master Plan Report

Client: DSİ 3rd Regional Directorate, Eskişehir

Year :2016

w w w . n f b . c o m . t r15

w w w . n f b . c o m . t r

14

Page 10: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

P R O J E C T S• Feasibility and Preliminary

Design studies of Inönü Dam and Köylüce Weir in Havran District, Karakoç Dam in Ayvalık District, Manastır Dam, Kızılkeçili Dam, Mıhlı Dam, Zeytinli Dam, Narlı Dam and Eybek Dam which have purpose of irrigation and drinking water supply in Edremit District were completed within the scope of the project. Feasibility and Preliminary Design reports were prepared for each of the dams and submitted to the client.

• Preliminary design of a total of 200 km long water supply pipeline network as well as pump stations, storage plant, and several potable water treatment plants were completed and proposed within the scope of the project.

• Hydraulic design calculations of water supply system were completed, the locations, hydraulic design calculations and capacities of pump stations, storage and potable water treatment plants were provided. Cost benefit estimations of the necessary components were presented.

Project Name:Küçükkuyu - Dikili Coastline Water Supply Project Feasibility and Preliminary Design Engineering Services

Client: DSİ 2nd Regional Directorate, İzmir

Year :2017

DRINKING - USAGE WATER &URBAN DEVELOPMENT

w w w . n f b . c o m . t r17

w w w . n f b . c o m . t r

16

Page 11: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

P R O J E C T SDRINKING - USAGE WATER &URBAN DEVELOPMENT

• Başlamış Dam is located in Upper Gediz Basin and it was planned for the purpose of drinking water supply for İzmir/TURKEY. 35.65 hm3 water will be supplied to İzmir by this project.

• In addition to Başlamış Dam, Germe and Sinandede Weirs were also designed within the scope of the project.

• A 46 km long pipe line was designed within the project to supply drinking water to the City of İzmir.

• Gördes Dam is located in Gediz Basin and was constructed for the purpose of irrigation and potable water supply. Supply of 59 x 106 m3 water intended for human consumption.

• Integration of water leakage to the drinking water supply pipe line was achieved.

• Feasibility and Design studies for intake structure, pipe line system, pump station and storage plant were completed.

Project Name:City of İzmir Drinking Water Supply Project - Başlamış Dam Feasibility and Preliminary Design Engineering Services

Client: DSİ 2nd Regional Directorate, İzmir

Year :2014

Project Name:Assessment of Water Leakage from Manisa Gördes Dam

Client: DSİ 2nd Regional Directorate, İzmir

Year :2017

w w w . n f b . c o m . t r19

w w w . n f b . c o m . t r

18

Page 12: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

P R O J E C T S1D/2DFLOOD MODELLING

Within the scope of Ankara Province Flood Inundation and Hazard Maps Engineering Services, calculations of flood water depths, water elevations and flow velocities were computed inside the stream and on the floodplain using 1- and 2- dimensional hydraulic modelling along 130 km long stream route in 13 risk areas within Ankara province and district centre.

Within the scope of mapping and surveying studies,

the maps with scales of

1/2000 and

1/5000 were taken at the project site.

Inundation maps and hazard maps were generated for each study area. 2D and 3D animations which show the movement of the flood wave were prepared in the Geographical Information Systems (GIS) using the model results.

Dam break study was performed and downstream inundition areas were determined in the scope of the study.

The necessary precautions that have to be taken in flooded risk areas and project suggestions and the necessary computation network for the transition to the phase of establishing early flood

warning system was prepared and presented.

Project Name:City of Ankara Flood Hazard Maps and Engineering Services

Client: DSİ 5th Regional Directorate, Ankara

Year :2016

Uğ Creek, Çankaya / AnkaraSöğütözü Creek, Çankaya / Ankara

Uğ Creek, Çankaya / Ankara

w w w . n f b . c o m . t r21

w w w . n f b . c o m . t r

20

Page 13: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

1D/2D FLOOD MODELLING

Project Name : City of Trabzon Flood Hazard Maps and

Engineering ServicesClient : DSİ 22nd Regional

Directorate, TrabzonYear: 2015

Project Name : City of Giresun Flood Hazard Maps and

Engineering Services Client : DSİ 22nd Regional

Directorate, TrabzonYear: 2014

Project Name : City of Rize Flood Hazard Maps and

Engineering Services Client : DSİ 22nd Regional

Directorate, TrabzonYear: 2014

Project Name : City of Bayburt Flood Hazard Maps and

Engineering Services Client : DSİ 22nd Regional

Directorate, TrabzonYear: 2014

Project Name : City of Bolu Flood Hazard Maps and

Engineering Services Client : DSİ 5th Regional

Directorate, AnkaraYear: 2018

Yatak Creek, Sürmene / Trabzon

Ekşili Creek, Yomra / Trabzon

Gelevera Creek, Espiye / Giresun

P R O J E C T S

meters

1053,06

1023,49

993,91

964,33

934,76

905,18

875,60

846,03

816,45

1082,64

1053,06

1023,49

993,91

964,33

934,76

905,18

875,60

846,03

w w w . n f b . c o m . t r

22

Page 14: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

1D/2D FLOOD MODELLING

Değirmendere, Merkez / Rize

Karadere, Araklı / Trabzon

Karadere, Araklı / Trabzon

Atasu Dam Break, Trabzon

Ekşili Creek, Yomra / Trabzon

P R O J E C T S

w w w . n f b . c o m . t r

24

Page 15: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

ONGOING PROJECTS FLOOD MANAGEMENT PLANS

Project Name : Flood Management Plan Preparation

Project for Kuzey Ege,Gediz, And Küçük Menderes Basins

Client : General Directorate of Water Management, Ministry of Agriculture and Forestry, Turkey

Year: 2017

Project Name : Flood Management Plan Preparation

Project For Kızılırmak Basin

Client : Hidro Dizayn Engineering Consultancy Construction & Trade Inc.

Year: 2016

KIZILIRMAK

KUZEY EGE BASIN

KÜÇÜK MENDERES BASIN

GEDİZ BASIN

KIZILIRMAK BASIN

w w w . n f b . c o m . t r27

w w w . n f b . c o m . t r

26

Page 16: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

FLOOD MANAGEMENT PLANS

Değirmendere, Kuşadası / Aydın

Zeytinli Creek, Edremit / Balıkesir

Kale Creek, Aksihar / Manisa

Kaynar Creek, Kula / Manisa

P R O J E C T S

w w w . n f b . c o m . t r

28

Page 17: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

FLOOD MANAGEMENT PLANS

Kocadere, Karşıyaka / İzmir

Kızılkeçili Creek, Edremit / Balıkesir

Kırşehir City Centre

Yerköy / Yozgat

P R O J E C T S

w w w . n f b . c o m . t r

30

Page 18: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

• Purpose of the study was toimprove 90 km section of theKızılırmak River which is one ofthe longest rivers in Turkey.

• Flood modeling studies wereperformed in the scope of thestudy.

• Proposed hydraulic crosssectionsand river alignment weredesigned in the study.

• Existing and Proposed conditionsflood maps were delineated.

• All necessary geological analysisalong the channel alignmentwere completed.

COMPLETED KEY PROJECTS CHANNEL IMPROVEMENT & FLOOD CONTROL

Project Name:Kızılırmak River Improvement

Client: Hidro Dizayn Engineering Consultancy Construction & Trade Inc., Ankara

Year :2012

w w w . n f b . c o m . t r33

w w w . n f b . c o m . t r

32

Page 19: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

COMPLETED KEY PROJECTS CHANNEL IMPROVEMENT & FLOOD CONTROL

Project Name : Dokuzsele Creek Channel Improvement Project,

Uşak, TurkeyClient : DSİ 2nd Regional

Directorate, İzmirYear: 2014

Project Name : 13th

Region Regional Flood and Sedimentation Control Study

ReportClient : DSİ 13th Regional

Directorate, AntalyaYear: 2015

Project Name : Preparation of Balıkesir - Gönen Ayvalık - Nikita

Creeks Channel Impovement Report

Client : DSİ 25th Regional Directorate, Balıkesir

Year: 2016

w w w . n f b . c o m . t r

34

Page 20: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

P R O J E C T S• Purpose of the Alpaslan II

Dam and HEPP, which is to be implemented within the scope of Muş Alpaslan II Project are Energy Production, Irrigation and Flood Control and Mitigation. It is proposed to produce an average of 852.96 GWh energy per year, 575.630 GWh of firm energy with an installed capacity of 200 MW in Alpaslan II HEPP, also provided that the control for the possible flooding of Murat River will be complied with, and irrigate a total of 75,000 ha agricultural area within Muş Plain. The Report is prepared in order to re-consider and re-evaluate water potential and energy production availability for Alpaslan II HEPP by considering development stages of upstream and downstream projects.

Project Name : Alpaslan II Dam and HEPP Project Hydrology

and Energy Production Update Report

Client : EnerjiSAYear: 2015

Project Name : Alpaslan II Dam and HEPP Project Operation and

Downstream Impact Assessment Report

Client : Enerjisa, EBRD Year: 2015

Project Name : Alpaslan II Dam and HEPP Project Transboundary

Impact Assessment Report Client : Enerjisa, EBRD

Year: 2015

Project Name : Gürsöğüt Dam and HEPP Feasibility Report

Client : LİMAKYear: 2018

Project Name : Pirinçli Weir and HEPP Project Feasibility Study Client : Derya Electricity and

Production Co.,Year: 2017

Project Name : Alara Energy Project Feasibility Report,

Alkumru Dam and HEPP Project Client : Borusan – EnBW Energy Investment and Production Co.,

Year: 2017

And more...

E N E R G Y

w w w . n f b . c o m . t r37

w w w . n f b . c o m . t r

36

Page 21: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

P R O J E C T S PROJECT LOCATIONS

ÇANAKKALE

KÜTAHYA

MANİSA

BALIKESİR

BOLU

BARTINEDİRNE

GİRESUN

SAMSUN

BİLECİK

ESKİŞEHİR

SAKARYA

RİZE

VAN

TRABZON

GÜMÜŞHANE

GAZİANTEP

KAYSERİ

HATAY

ADANA

NEVŞEHİR

MERSİN

KIRŞEHİR

HAKKARİ

İZMİR

AYDIN

MUĞLA

ANTALYA

KAHRAMANMARAŞ

ADIYAMAN

SİVAS

KONYA

ANKARA

KIRIKKALE

KASTAMONU

ÇORUM

YOZGAT

BAYBURT

UŞAK

w w w . n f b . c o m . t r39

w w w . n f b . c o m . t r

38

Page 22: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

• Hydropower Plant and Dam Projects• Irrigation and Drainage Projects• Watershed Planning Projects• Flood Control and Protection Projects• Stormsewer Design and Drinking Water

Supply Projects

We offer our Clients the followingSolutions ;• Technical Due Diligence Reports• Feasibility Reports• Preliminary Evaluation• Financial Institution Consulting• Privatization Projects Consultancy

Services• Site Supervision And Project Control• Technical, Economical, Environmental

Evaluation And Financial Analysis• Master Plan Studies• One and Two-Dimensional Hydraulic

Modeling• Structural Analysis• Geological Investigation

Our clients include but not limited to;• STATE HYDRAULIC WORKS of TURKEY (DSİ)• GENERAL DIRECTORATE of WATER

MANAGEMENT (SYGM)• BORUSAN ENBW• ENERJİSA-EON• HİDRO DİZAYN• LİMAK• SANKO• SURYAPI

Company Capability• In all of our projects, we collect hydro-

meteorological data from State HydraulicWorks (DSI) and State MeteorologicalServices (DMI) and etc.

• Collect water usage information forupstream and downstream projects incoordination with agencies and projectowners to determine whether thosewould impact our projects.

• Determine water supply potential andflood evaluation at the project location

• Perform analysis to calculate sedimentvolumes transported to the project site

• Perform reservoir optimization andoperation studies in order to determineoptimum project formulation and facilitydimensions.

• Evaluate the water potential at thedam site. Investigate geological andtopographical conditions at the dam sites.In addition, determine whether the damtype, size and location are applicable.

• Perform economical and financialanalyses using necessary input suchas unit prices and market prices todetermine whether the project is feasible.

• We can provide our clients help onfinding requested and required technicalreports and also help translating those byour bilingual technical staff.

• We coordinate with involved partiesas well as other involved parties todetermine any current and futureplanning to determine future restrictionsthat would impact our projects.

We are experienced on hydropower projects’ privatization process; Evaluate and investigate the currentperformance of the project that is inthe privatization processby considering;

• Water potential• Upstream and downstream projects and

their capacity• Efficiency of the project by looking

whether the water potential has beenfully utilized

• Structure durability• Installed capacity and energy generations• Economics & financial analyses of the

projects

Feasibility and Final Design Services for;

w w w . n f b . c o m . t r

serv

ice

sw w w . n f b . c o m . t r

40

Page 23: Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114 ... · Ceyhun Atuf Kansu Cad. Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA www. nfb.com.tr 1. engineering and

Ehlibeyt Mah.Ceyhun Atuf Kansu Cad.

Bayraktar Center G Blok No: 114/5 Balgat - Çankaya / ANKARA

P: +90 312 221 10 41F: +90 312 221 10 99

e-mail: [email protected]

w w w . n f b . c o m . t r